Within thiscontext proposed to the Chief Scientist of the Ministry of Environment and Ministry of
Energy; a master plan of unifying the various solar panel fields and installation in Israel into an
integrated centrally controlled distributed electrical energy system which will contain electrical
energy storage (via batteries or other means) to be extended also to residential location within a;
“CCC” system regulating the electrical grid power as an additional electrical “backbone”
supply system to the existing electrical network
adaptation of electrical network controllers for solar panels to the electrical grid
gravitational non-water energy storage adapted to Israel topography,
the “CCC” system regulating the electrical grid power as an additional electrical “back
bone” supply system to existing electrical network
adaptation of electrical network controllers for solar panels to electrical grid
gravitational non-water energy storage adapted to Israel topography,
special purpose sensor on electrical network transformer monitoring the hysteresis curve
and initiate additional power, by removing the transformer load and by this prolonging to
over 50 years, the usefulness of the main electrical network transformer
night lighting based on the human eye retina structure and required spectral vision,
LLC resonant transformers and magnetic resonance electrical power transfer to deliver a
range of power over distance to charge batteries (this is a resurrection of a project I
initiated at the time at Tadiran Electronics)
Various solution of Micro-Grids for; academic campuses, kibbutzim and moshavim etc.,
Electrical energy storage facilities based on latent heat in conjunction with combined cycle
power plants.
The use of water reservoirs for solar panels farms, to reduces the 1800 mm water
evaporations in Israel and cooling the panels, by this increasing efficiency by 20% to 25%
Some of the innovative subsystems are posted on my “LinkedIn” page
special-purpose sensor on electrical network transformer monitoring the hysteresis curve
and initiate additional power, by removing the transformer load and by this prolonging to
over 50 years, the usefulness of the main electrical network transformer
night lighting based on the human eye retina structure and required spectral vision,
LLC resonant transformers and magnetic resonance electrical power transfer to deliver a
range of power over distance to charge batteries (this is a resurrection of a project I
initiated at the time at Tadiran Electronics)
Haim R. Branisteanu
Gotlieb Street 12 Apt. 8, Tel Aviv 64392
Tel. 03-523-2744 Cellular 052-270-2523
E-mail hbranisteanu@bezeqint.net
http://www.slideshare.net/HaimBranisteanu/
An Expert on matters of Energy, Renewable Energy,
Biomass Processing, Solar Energy a variety of
Energy Storage Systems, Hydrogen and SMR’s
Initiated several proposals for renewable energy projects,
which projects were presented, to leading Israeli companies.
Presented to the Israeli Knesset Economic Committee, a
framework, whose outlines were considered by the respective
ministerial bodies.
2.
Page 2
Varioussolution of Micro-Grids for; academic campuses, kibbutzim and moshavim etc.,
Electrical energy storage facilities based on latent heat in conjunction with combined cycle
power plants.
The use of water reservoirs for solar panels farms, to reduces the 1800 mm water
evaporations in Israel and cooling the panels, by this increasing efficiency by 20% to 25%
Some of the innovative subsystems are posted on my “LinkedIn” page
Involved in establishing renewable energy projects at Russian ministerial level which will
encompass using forestry / woody waste with corporation like “ILIM/IP”, “Basic Element” of
Deripaska and cultivating energy crops in Central /Eastern Siberia as soil enhancement/fertilizer
for agricultural use in the first stage and as a follow up designing, investing and operate vertically
integrated multiple processing facilities of forestry/woody waste, anaerobic digester, algae and
water cultures as substitute of farm animal protein feeds and later high value raw material for the
petrochemical industry. The project status at the moment is waiting for the lifting of sanctions and
supply contracts and delivery for 5 to 10 years. This proposed project has the support of the
Governor of Irkutsk and generated interest within the Office of the Russian President.
Designed and proposed a Biomass Project for Eastern Europe of growing Energy grasses for use in
coal fired utilities. The proposal was presented to Ukraine Donetsk Oblast, Bulgaria and Romania
at ministerial levels received invitation for presentation before the respectable state/oblast
renewable energy/ecological committees. Due to the 2008/9 economic crisis the project stalled.
Initiated and was involved in the proposal for the 500 MWe power station in the Negev to supply
Israel and Jordanian Dead Sea Works, based on locally available shale oil by assisting a US based
company with the support of US Guaranties through OPIC, at the recommendation of Senior US
State Department officials. In Israel former MK Otniel Schneller was actively working with the
Jordanian counter parties (and also discussed the project with the blessing of (the then) Israel
G.M. Ministry of Finance Yossi Bachar). After receiving the assignment at the time, I managed to
formulate a structure that was attractive to investors, and able to secure OPIC funding, and
possible US Guaranties. I was referred by Senior Partners at Arthur Andersen NY office to Israel
several partners at Luboshitz Kasierer (by now E&Y) who were/are familiar with my work.
Past experience, mostly in the US,
Some background - during my 18 years in the US, I was involved in; financing mid-sized businesses
($10 to $350 million), assisted banks to dispose of non-performing loans and other various
turnaround and distressed situation, structured DIP sale lease back transaction and financing of
overseas projects. During that period I developed a wide network of contacts from law firms to
the "former Big Six" and smaller accounting firms who referred business and also Hedge Funds
with assets under management of $300 to over $3,000 million.
My extensive experience in financial markets and structured debt placement and derivatives
hedging can have a positive contribution to the company bottom line. If interested, I could
provide additional contacts from additional US banks.
ADDITIONAL PROFESSIONAL BACKGROUND
Extensive experience in international and domestic (US) corporate finance transaction and as a
hands-on operational turnaround and crisis management consultant, involved in manufacturing,
distribution and retail/consumer goods enterprises.
Actively involved in financial and operational restructuring of mid-size corporations.
3.
Page 3
Structuringand negotiating International Trade Finance & Project Financing, Bankruptcy
Remote
Funding including D.I.P. financing.
Assisting in identifying, analyzing, structuring and financing various client acquisitions.
Assisting commercial banks in selling off non - performing loans and real estate assets.
Identifying new markets, products and applications for corporate clients.
my knowledge to turnaround troubled companies and return them to profitability
my expertise in providing operational solutions and implement turnaround plans or
streamlining operations.
my ability to assemble and lead successfully teams of employees in accomplishing difficult
task in relative short period of time
due to my 15 years of “hands on” involvement in refinancing or restructuring of a variety of
corporations,
I am well versed in a variety of investment strategies related to the equity and debt markets
such as equity option and convertible debt. My diverse background and familiarity with the
European approach to business enabled me to develop business relationships at high
governmental levels or find companies interested in investment opportunities in Central and
Eastern Europe. Due to my present contacts with some of the "Big Five" accounting firms and a
several New York and New Jersey leading law firms I will have excellent access to wide range of
corporation in this region.
From previous experience, I am able to establish successful connection at high levels within the
corporate world. Further, I was pleased recently, to be interviewed and quoted in the Wall Street
Journal and other financial newspapers.
Retained by following organizations:
Money Marketing Inc., South Hackensack NJ Nextran Inc. South Hackensack NJ
Athra Trading / Athra NJ - New York & Rutherford NJ PANACO Inc. (AMEX) Houston TX
ROM Telecom Privatization - Bucharest, Romania BEZEQ - Israel Telecom Corp., (TASE)
Advising the Presidential Adviser of Romania Dell Computers (EU) Bracknell UK
Bezeq, International Joint Ventures - Tel Aviv, Israel ACF Industries Inc., St. Louis, MO
First Union Bancorporation, (NYSE) Newark NJ Sterling National Bank., New York, NY
H.I. Developments, Tampa, FL UMB Bank and Trust Co., New York, NY
Bank Leumi and Trust Co., (TASE) New York, NY Midlantic Bank, N.A. Clark, NJ
Bank Hapoalim B.M. (TASE), New York, NY HBR Hotel Group, San Francisco, CA
Telrad Electronic Industries, Ltd. Woodbury, NY Triex Corporation Vasilia, CA
Jupiter Industries Inc. Chicago, Ill. Transportation Div. IGI Inc. (AMEX) Vineland, NJ
over $3 billion in assets Financial Services Div. Linn Sondeck Ltd. Glasgow, Scotland
Real Estate & Retail Div 47 Street Photo Inc. New York, NY
Designatronics Inc. (AMEX ) )New Hyde Park, NY Tridex Corporation (AMEX) Westport, CT
FCP Inc./Bulova (NASDAQ) Queens, NY Bob Ciasulli Auto Mall, Little Falls, NJ
RB&W Corporation (AMEX) Mentor, Ohio Gemstar Inc., Spring Valley, NY
Toam (USA) - TAKAM New York, NY Remee Products, Florida, NY
Legacy Hotels, Atlanta, GA GTE/Sylvania S.A. Geneva, Switzerland
High Voltage Engineering Corp. (NYSE) Burlington, MA T.M. Systems, Inc./Hadax Electronics Inc.
Tadiran Ltd. (NYSE) Tel Aviv, Israel Tadiran Telecommunication Div. (now part of ECI) over $900 million in sales
Tadiran Battery Div. and also Tadiran Tactical/Military Div. Started Development of Florescent light bulbs
4.
Page 4
I wasalso directly or indirectly involved in various Sale/Leaseback’s and Structured Financing of
Airplanes, Heavy Equipment, Railroad Cars and Industrial Projects.
IMT Ltd. Founder and CEO, Tel Aviv, Israel - Started own, high-end Consumer Electronics company
whose products captured close to 60% of the Israeli market. Due to the quality and novelty of those
products, company received extensive coverage in international trade and technical publications,
which enabled expansion into European and American markets.
Prior Experience: R&D and Manufacturing consultant, high-tech companies; R&D Engineer,
telecommunication,
MOTOROLA Inc.; Special Projects Director, Signal Corps, field intelligence & telecommunication with
the Israeli Defense Forces;
Education: M.Sc. Physics, Hebrew University of Jerusalem. Personal born in Lugoj, Romania
Research subject Superconductive materials. Fluent in: English, German, Hebrew, Romanian
Physics and Mathematics, Citizenship: USA, EU
Patents: Awarded patents in electronics, telecommunications and electro - optics