TABLE OF CONTENTS
TABLE OF FIGURES ............................................................................................................................................. 5
1        INTRODUCTION ......................................................................................................................................... 7
2        STRATEGIC VISION ..................................................................................................................................... 9

     2.1     HAVE A VISION............................................................................................................................................11
     2.2     WHY FORECAST? ............................................................................................................................................12
     2.3     PROFILE OF SUCCESS.........................................................................................................................................14
     2.4     MAKING FORECASTING EFFECTIVE .......................................................................................................................17
     2.5     UNDERSTANDING CUSTOMERS ..................................................................................................................19
        2.5.1 Market Segmentation ...........................................................................................................................19
     2.6     REALISTIC ASSUMPTIONS ...........................................................................................................................21
     2.7     GETTING STARTED WITH YOUR FORECAST ..............................................................................................................23

3.       REVENUES ................................................................................................................................................28
     3.1     PRODUCT SALES ..............................................................................................................................................30
     3.2     PRICING ........................................................................................................................................................33
     3.3     GEOGRAPHICAL EXPANSION ......................................................................................................................36
     3.4     NEW PRODUCT REVENUES .............................................................................................................................38
     3.5     ALLIANCES, PARTNERSHIPS, LICENSING AND DISTRIBUTION AGREEMENTS ..............................................39
        3.5.1 Licensing ................................................................................................................................................40
        3.5.2 Strategic Alliances ..................................................................................................................................41
        3.5.3 Distribution Channels .............................................................................................................................41
     3.6     FRANCHISING .............................................................................................................................................43
        3.6.1 Being a Franchisor .................................................................................................................................43
        3.6.2 Being a Franchisee .................................................................................................................................44
     3.7     PROJECT MANAGEMENT ............................................................................................................................45
     3.8     OTHER INCOME ..............................................................................................................................................47
        3.8.1 Grants & Financial Assistance ...............................................................................................................47
        3.8.2 Intellectual Property Income .................................................................................................................47
4.       COSTS .......................................................................................................................................................49
     4.1     COST OF SALE .................................................................................................................................................51
        4.1.1 Refunds, Warranties and Guarantees ....................................................................................................52
        4.1.2 Loyalty & Awards Programmes .............................................................................................................52
     4.2     OPERATING EXPENSES / OVERHEADS ................................................................................................................54
        4.2.1 Marketing ..............................................................................................................................................55
        4.2.2 Marketing ‐ Market Research ...............................................................................................................56
        4.2.3 Marketing‐ Marketing Effectiveness ..................................................................................................... 57
        4.2.4 Competitive Intelligence .......................................................................................................................57
        4.2.5 Marketing – Customer Retention ..........................................................................................................58
        4.2.6 Marketing ‐ Branding ............................................................................................................................60
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                                      The definitive eGuide for developing company financial forecasts.
                   4.2.7 Information Technology – As A Revenue & Profit Driver .......................................................................61
                   4.2.8 Information Technology – As A Cost Of Doing Business ........................................................................62
                   4.2.9 Employee / Personnel Costs ...................................................................................................................63
                   4.2.10    Staff & Management Incentives (Commissions, Bonuses)................................................................66
                   4.2.11    Director / External Advisor Payments ...............................................................................................67
                   4.2.12    Other Operating Expenses ................................................................................................................67
                   4.2.13    Building Lease ...................................................................................................................................68
                   4.2.14    Insurance ..........................................................................................................................................69
                   4.2.15   Legal Costs .........................................................................................................................................69
                   4.2.16   Accounting Costs ...............................................................................................................................70
                   4.2.17   Taxes..................................................................................................................................................70
                   4.2.18    GST (General Sales Tax) ....................................................................................................................70
                   4.2.19    Income Tax........................................................................................................................................71
                   4.2.20    Other taxes .......................................................................................................................................72
                   4.2.21    Tax Planning .....................................................................................................................................73

          5.       BALANCE SHEET, WORKING CAPITAL & CAPITAL EXPENDITURE .................................................................74
               5.1      BUSINESS CHALLENGES – MANAGING YOUR CASH FLOW .......................................................................................77
                  5.1.1      Managing Working Capital ...............................................................................................................77
                  5.1.2 Managing Receivables ..........................................................................................................................78
                  5.1.3 Managing Payables ..............................................................................................................................79
                  5.1.4 Managing Inventory..............................................................................................................................80
               5.2      FUNDING WORKING CAPITAL AND GROWTH ....................................................................................................83
                  5.2.1 EQUIPMENT FINANCE – LOANS AND LEASING......................................................................................83
                  5.2.2 Factoring ...............................................................................................................................................85
                  5.2.3 Inventory Finance ..................................................................................................................................85
                  5.2.4 Production Finance ...............................................................................................................................86
                  5.2.5 Warehouse Finance...............................................................................................................................86
                  5.2.6 Vendor Finance .....................................................................................................................................86
               5.3      BUSINESS GROWTH – INVESTING IN THE FUTURE .......................................................................................87
                  5.3.1 Capital Expenditure ...............................................................................................................................87
                  5.3.2 Manufacturing Challenges ....................................................................................................................89
                  5.3.3 Research & Development challenges ....................................................................................................89
               5.4      LIMITS TO GROWTH – CAN YOU GROW TOO QUICKLY? .............................................................................91
          6        FINANCING ..............................................................................................................................................92
               6.1     DEBT ...........................................................................................................................................................95
               6.2     EQUITY .......................................................................................................................................................98
                  6.2.1 Dividends and Retained Profits ..............................................................................................................98
                  6.2.2 Employee Shares & Options ...................................................................................................................99
                  6.2.3 Other Reserves .....................................................................................................................................100
               6.3     HIGH GROWTH COMPANY’S – SPECIAL CONSIDERATION .......................................................................................102
          7 REPORTING & ANALYSIS ............................................................................................................................... 104


          3|Page
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                                    The definitive eGuide for developing company financial forecasts.
               7.1     CASH FLOW & CASH MANAGEMENT FORECASTING .............................................................................................105
                  7.1.1 Cash Flow & Investors ..........................................................................................................................107
               7.2     RATIO ANALYSIS............................................................................................................................................108
               7.3     VARIANCE .................................................................................................................................................109
               7.4     SCENARIO ANALYSIS .................................................................................................................................111
               7.5     SENSITIVITY ANALYSIS ....................................................................................................................................113
               7.6     RISK MANAGEMENT .................................................................................................................................114
                  7.6.1 Business Risks.......................................................................................................................................114
                  7.6.2 Financial Risks .....................................................................................................................................114
                  7.6.3 Risk Management Framework ............................................................................................................117
          8.       ACQUIRING OR SELLING – VALUATION & OTHER CHALLENGES ................................................................ 118
               8.1     INCREASING YOUR BUSINESS VALUE ........................................................................................................120
               8.2     ACQUISITIONS ..............................................................................................................................................122
                  8.2.1 Vertical Integration ..............................................................................................................................123
               8.3     DUE DILIGENCE .........................................................................................................................................124
                  8.3.1 Due Diligence – Organisational & Financial ........................................................................................124
                  8.3.2 Due Diligence – Market Opportunity ..................................................................................................125
                  8.3.3 Due Diligence – Legal, Technical & Manufacturing ............................................................................ 126
               8.4     EXITING YOUR BUSINESS ..........................................................................................................................128

          9        REVIEWING YOUR FORECAST .................................................................................................................. 129




          4|Page
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                                  The definitive eGuide for developing company financial forecasts.




          TABLE OF FIGURES
          Figure 1 Company Stakeholders ..................................................................................................................................10

          Figure 2: The Valuation Increases as the Company achieves its Milestones. .............................................................13

          Figure 3: Porter's Five Forces Model ...........................................................................................................................15

          Figure 4: Five Forces Model & Bread Producers .........................................................................................................16

          Figure 5: Segmenting Your Market into Attackable Niches ........................................................................................20

          Figure 6: Revenue Streams & Assumptions for an Airport .........................................................................................22

          Figure 7: Front Cover to Aggregate Forecast ...............................................................................................................24

          Figure 8: Linking Actuals from Accounting Software ...................................................................................................26

          Figure 9: Overall Expenses ...........................................................................................................................................27

          Figure 10: Expenses in Detail ......................................................................................................................................27

          Figure 11: Forecasted Income Statement....................................................................................................................28

          Figure 12: Revenues and Assumptions ‐ Charity ........................................................................................................32

          Figure 13: Evaluating Growth Opportunities ..............................................................................................................37

          Figure 14: Process for Assessing Alliance Opportunities ............................................................................................39

          Figure 15: Process for Valuing IP ................................................................................................................................48

          Figure 16: Fixed and Variable Costs ............................................................................................................................49

          Figure 17: Strategies for Customer Retention ............................................................................................................59

          Figure 18: Building a Financial Model to include new and existing Revenues ...........................................................60

          Figure 19: Tax Modelling ............................................................................................................................................72

          Figure 20: Forecasted Balance Sheet ..........................................................................................................................75

          Figure 21: Equipment Lease & Own Options ...............................................................................................................83

          Figure 22: Capital Expenditure Model ........................................................................................................................88

          Figure 23: Calculating Gearing ....................................................................................................................................93


          5|Page
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                                The definitive eGuide for developing company financial forecasts.
          Figure 24: Covenant Modelling...................................................................................................................................97

          Figure 25: Financing a High Growth Business ...........................................................................................................102

          Figure 26: Cash Flow Forecast Modelling .................................................................................................................105

          Figure 27: Variance Analysis in Reporting ................................................................................................................110

          Figure 28: Graphical Analysis of Scenarios ...............................................................................................................112

          Figure 29: Average Business Value by Industry. SOURCE: BizExchange Index March 2008 Quarter Results .........119

          Figure 30: Increasing Business Value ........................................................................................................................121

          Figure 31: Organisational & Financial ‐ Due Diligence ..............................................................................................125

          Figure 32: Due Diligence ‐ Market Opportunity .......................................................................................................126

          Figure 33: Organisational, Legal, Technical & Manufacturing Due Diligence ...........................................................127




          6|Page
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          1          INTRODUCTION
                                              Entrepreneurship has its glamour. However behind the world of
                                              intense negotiations, last minute deals and successful garage
                                              visionaries are the less glamorous concepts that you must get right –
                                              cash flow, working capital, pricing strategy etc.

                                    This eGuide is all about financial forecasting. It addresses the truism
                                    “failing to plan is planning to fail”. A forecast is simply a translation of
                                    the vision and strategy of your company into financial numbers. Many
                                    entrepreneurs and managers find this process tedious and
          intimidating. External support is not always there for you. This eGuide is here to assist you.

          Your company must be self‐sustaining over the short term and profitable over the long term. It
          must generate sufficient cash to pay the bills and maintain increasing levels of sales.

          I wrote this having spent many years working with fast growing dynamic Small & Medium
          Enterprises. These dynamic companies continually faced the longer term financial challenges
          which would help determine their success.

          Most businesses use adequate to good Management Accounting packages such as MYOB, and
          Quicken. These tools are perfect for audit and for a historical review of the enterprise, but do
          not address future challenges. How are key expansion questions such as the following
          answered?

               •     What is our company worth today? How can we increase its value in the future?
               •     How can we afford to fund our growth? How will our needs for ever increasing amount
                     of working capital be addressed?
               •     Should we purchase? Should we build / buy that new automation system or factory?
               •     Our new venture? Should we pursue the opportunity to develop and market a new
                     product range?
               •     Buy versus build? Should we invest in the capacity to produce key inventory ourselves
                     or outsource this?



          7|Page
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Our acquisition plans? Will the anticipated future profit streams and the savings from
                     synergies justify the cost of acquisition?



          The forecasting process is often one of iteration, where you can plan different ‘what if’ figures
          model and assess the different outcomes. If you increase the sales budget, how many
          additional sales people will you need to generate that level of extra sales? What will happen to
          your cash flow in the months that it takes for the salespeople to reach peak performance?

          Developing your forecast on a spreadsheet or custom building standalone or web‐based
          software allows you more flexibility and complexity in trying out these different scenarios.

          The different scenarios will also show the impact of relevant risk factors. How will interest
          rates affect the demand for housing? What is the relationship between the amount of rain next
          summer and my company’s ice cream sales?

          I’ll make a couple more points before getting into the detail:

          Firstly, there's no need to reinvent the wheel in regards to building your own forecasting
          spreadsheets. There are a wide range of software packages and spreadsheets commercially
          available. They vary in quality, robustness, price and applicability to your demands of your
          particular company or industry. I have not specifically mentioned any in this booklet, but my
          organisation would be delighted to understand more about your specific operating conditions
          and talk you through your options.

          Secondly, I’ve tried to cover as many different types of industry, position on the supply chain,
          and way of doing business as I can within the limited space below. I haven’t managed to cram
          in every variable for every company, but would be delighted to receive your feedback about
          what needs to be addressed. The booklet is only in PDF soft copy at present, meaning that I can
          update it whenever I need to. Hence your insights would be most welcome.

          Happy reading and most important of all, good luck with your venture!


          Mark Ostryn
          markostryn@knowledge2020.com
          September 2008




          8|Page
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          2          STRATEGIC VISION
          It is often said that there are four types of company:

               •     Those that make things happen.
               •     Those that watch things happen and respond.
               •     Those that watch things happen and don’t respond.
               •     Those that didn’t notice that anything had happened.

          We’d all like to be in the first group, but no matter how visionary we are, much of our work is in
          responding to other’s first moves. We’ve even got it wrong from time to time, and not
          responded when we needed to!

          This eGuide is all about planning to make things happen – having a strategy. We’ll also try to
          help you with responding to market shifts – mainly by forecasting that they will occur and doing
          some scenario planning (what if….?), some sensitivity analysis (if interest rates increase by x%
          what will be the effects on sales?) and some risk management.

          A business entity is simply a collaboration of resources that is must make the greatest possible
          return on a flow of financial inputs provided to it.

               •     These inputs are DEBT, primarily from financial institutions and EQUITY from
                     shareholders.
               •     The company itself is a collection of productive resources – brainpower, technology,
                     manufacturing processes and intellectual property that must turn these financial inputs
                     into productive assets.
               •     The end financial output must represent either a greater or a more secure rate of return
                     than competing investment proposition that also require those debt and equity inputs.

          Thus your company is only sustainable if, for a given level of risk:

               •     A holder of EQUITY in your company (i.e. a part‐owner) can get a greater return on that
                     investment compared with other investment opportunities
               •     A holder of DEBT in your company earns a market competitive rate of interest for
                     lending funds to your company.

          Along the way there are also other stakeholders in the company that also need to be satisfied


          9|Page
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 1 Company Stakeholders


          While many of these stakeholders may not have a direct bearing on the performance
          measurements generated by the company, their indirect impact may be substantial e.g.

                     •    Requirement for environmental measures, sustainability etc.
                     •    Requirement to look at the community impact of decisions to locate in a particular
                          city, provide employment to residents of that city
                     •    Requirement to look at “financial dispersements” made by the company which may
                          not be “financial rational” to shareholders, but which may show the company as a
                          good corporate citizen e.g. charity donations etc.




          10 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          2.1        HAVE A VISION



                             “You can analyse the past but you need to design the future. That is
                             the difference between suffering the future and enjoying it” Edward de
                             Bono



          Forecasting is more than looking at what you achieved last year and extrapolating it forward for
          the next few years. That’s called backcasting! Forecasting requires you to think about what
          you want to be in the future, consider what it going to take to get you there, and think about
          what how your industry, you customer and the world in general can change in the meantime.

          How will the following global trends affect your customers and your processes and

          Look how rapidly, new technologies and ideas are spreading. What will telecommunications
          and the internet look like in ten years time?

          How will substantially higher energy costs and green issues affect the way we all do business
          and consume?

          There are many, many of these big questions to ask: Globalisations of plagues and diseases,
          restrictions on alcohol and “junk” food, wealth disparities between rich and poor people,
          continued growth of China and India, increasing migration, evolution of cities, evolution in
          genetic research, development in nanotechnology, changes in life expectancy, exponential
          growth in innovations and inventions, changes to family life.

          The list is endless. What will impact on your business?




          11 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          2.2        WHY FORECAST?

          As forecasts are invariable inaccurate or even wrong, is it worth going through the forecasting
          process?

          You must have a set of financial projections, a numerical statement of what you want your
          company to achieve. Additionally, lenders need to see a strong likelihood of repayment; angel
          investors and venture capitalists will calculate what they think is the value of your venture.

          These figures will be used by the investor to calculate the potential future value of your
          company based on a valuation technique such as multiples of earnings or profits or discounted
          cash flow. If they are convinced that your framework has been scrupulously prepared using
          best available information, they will have more confidence to invest in your company.

          The process of generating these figures also adds reality to your expansion plans. For example,
          if you want to open up a production facility in China you will need to research and allocate the
          costs for doing so. Having performed that financial analysis, you will be in a better position to
          assess alternatives such as outsourcing manufacture instead.

          A supplier of funds will also see where you are more financially vulnerable and where you are
          most likely to require financial injections. You may find that you do not require all of the $5m
          invested upfront and by having it staged over time you have the opportunity to obtain a higher
          valuation for your company as you move through from start up to expansionary phase.

          The following real life model has a series of performance milestones that the company is
          forecasted to achieve, prior to them receiving additional funding at the pre‐negotiated price
          per share




          12 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 2: The Valuation Increases as the Company achieves its Milestones.


          In short, while no investor is expecting you to get your future projections "correct", the thought
          process discipline required to do the projections in the first place alerts you to potential
          opportunities or threats that you may not have otherwise considered.




          13 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          2.3        PROFILE OF SUCCESS

          Successful growth companies will share many of the following characteristics:

               •     Proprietary technology, owned by the company. This acts as a barrier to entry,
                     preventing other players from coming into the market. That way margins can remain
                     higher, and there is less need to discount price in the face of competition.
               •     Entrepreneurs with a great track record – i.e. previous successful ventures.
               •     Large and growing potential market for the product or service. Typically with a forecast,
                     the demand curve will start off slowly as the product or service establishes itself as
                     “needed” by its target market. Earlier versions may be slower sellers, and the company
                     has to adjust its operating cost base in order to fulfil growing demand. Here, working
                     capital pressures can be at their greatest.
               •     Good potential sales and sustainable margins. This can be through ownership of
                     Intellectual Property or proprietary know‐how.
               •     A tendency for the company to remain innovative and on the cutting edge of technology
               •     A proven market need for the product, established through researching and testing the
                     market
               •     A sustainable competitive advantage with high barriers to entry for potential
                     competitors.
               •     A greater possibility for strategic alliances to leverage the strengths of other companies



          An excellent framework for assessing where your company is in relation to its competitive
          environment is Porters Five Forces Model. Developed by Michael Porter, the model describes
          five forces that determine the competitive intensity and therefore the attractiveness of a
          market. These forces are continually changing and such continual changes also require that
          you continually reassess your marketplace.




          14 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 3: Porter's Five Forces Model


          To illustrate this, imagine the competitive forces of a bread producer:

               •     Their bargaining power with their customers – the supermarkets and catering firms.
               •     The impact of health trends on the types of bread they produced.
               •     The changing cost of raw materials such as grain and transportation charges.
               •     Bread substitutes. What else can people eat for lunch apart from sandwiches?
               •     The impact of local bakeries and local franchises on total demand.

          This and other factors can be mapped to the following diagram:




          15 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 4: Five Forces Model & Bread Producers


          Prior to forecasting the number for your own venture, you may want to review the key forces
          that will affect your industry over the next five years or so, using the Five Forces framework.




          16 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          2.4        MAKING FORECASTING EFFECTIVE

          Following in from this, consider the following:

               •     Do you know how marketplace trends will affect your company over the short and
                     longer term?
               •     Have you established your company’s goals and priorities for the next financial year, and
                     beyond to the next three to five years?
               •     Have you set financial targets for the next financial year?
               •     Do you have a method for measuring your company’s performance against your goals,
                     priorities and financial targets?
               •     Does your management team know your company’s goals and financial targets for the
                     next financial year, and what they need to do to achieve them?
               •     How frequently will these targets be reviewed?
               •     What incentives do the key managers have to achieve these targets?



                             "Planning differs between budgeting and forecasting in intent. While
                             the budget is used to control, the forecast is used to predict, the plan
                             sets out desired outcomes and expectations usually over a longer‐
                             term period. In essence plans are used to affect change." PA
                             Consulting Group



          There are several major steps to ensure that the forecasting approach is effective and that the
          results are credible:

               •     Forecasts imply a plan so your team should be familiar at least with the aims of their
                     own functional or strategic area. Issues such as confidentiality which may preclude full
                     openness should be ironed out prior to a session.
               •     Parameters and assumptions such as the size of the market, major production or
                     product changes, expected sales growth, exchange rates and so on should be set early
                     and disseminated uniformly to form the basis of the plan.
               •     The sales budget should be the first part to be tackled, as it reflects the economic and
                     competitive forecasts and shapes all of the other component parts of the budget. All



          17 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

                     other budgets should be developed consistently with the sales volumes. Manufacturing
                     production targets, stock levels and product support are all dependent.
               •     Once the forecast has shaped up, your cash flow forecast is needed to assess
                     affordability. This will ensure that the forecast when finalised is consistent with broad
                     financial parameters and does not, for example, assume unrealistic borrowing
                     requirements.
               •     Effective forecasting requires good communications throughout your organisation. The
                     budgeting component may move up and down the organisation and sanity checks
                     between senior managers of the various divisions may be required before all changes
                     are agreed.
               •     Once agreed, the final figures need to be reviewed and confirmed that at a corporate
                     level the return on assets / investment is sufficiently high. If not, consideration needs to
                     be given to cutting costs, selling more or increasing efficiency.




          18 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          2.5        UNDERSTANDING CUSTOMERS

          An important aspect of forecasting is in understanding the makeup of customers who purchase
          your products. One key issue for planning is – are they profitable? Consider the types of
          products they purchase and the services that they may require with them. Consider also the
          implications of negotiating a volume deal over time with a large company.

          Will the discounted price, plus all of the free priority support and service offering they may
          require, make Big Company overall a viable customer?

          And what if Big Company doesn’t renew or repurchase in the future. Might you have lost the
          focus or even the contact of smaller customer companies?


          2.5.1                MARKET SEGMENTATION
          Importantly, you will also need to consider what customers you effectively wish to target.
          Some target markets can be addressed more profitably than others. As a general rule, you can
          segment your market by dividing up your total market into a series of niches, and reviewing
          each niche (below) in order to rank the priority levels that you will address those markets.
          Some niches may never be cost effective, as it will cost you more to service them than the
          revenues you can expect from them.

          Take the potential market for a product such as a device to test water quality at the water
          source rather than back at the laboratory. There are several different niches that the product
          can be sold into, but the company has limited resources and cannot attach all niches
          simultaneously.




          19 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 5: Segmenting Your Market into Attackable Niches


          Management and advisors have determined that given limited personnel, promotional; budget
          and R&D funds, it would be best to concentrate on two specific niches (1.3 and 2.1) initially,
          before attempting to grab the wider market.




          20 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          2.6        REALISTIC ASSUMPTIONS

          Your forecast should document all assumptions used when you created this view of the market.
          Some of these assumptions may be controllable e.g. the per capita take up of a new medical
          device over time, and some uncontrollable, such as the future price of a barrel of oil.

          Taking the Australian car industry as an example, the total population of Australia is 21million
          and car ownership is at around 12 million. To forecast the total sales of a particular car brand,
          you would take into account:

                     •    The growth of total population of Australia in the forecasting period.
                     •    The number of people under 17, or those in the upper age bracket ineligible to drive.
                     •    The trend in car ownership per household.
                     •    The trends in type of car (sedan, convertible, 4WD) likely to occur.
                     •    The trends in public transport available.
                     •    The costs of car parking in major cities.
                     •    The reputation of the particular brand and model of the car
                     •    Relative running costs of that model compared with competing models

          And a whole host of other factors.

          It can often be informative to map out each of the key revenues and costs of your business, and
          place alongside them all of the assumptions that you have made. For example, an airport will
          have several revenue streams, each of which will depend on a range of future assumptions that
          you will have input. Some of these assumptions are general and will be made across a range of
          revenue streams (e.g. total passenger or freight traffic, which in turn will be partially based on
          general economic health), and some will be specific to a particular revenue stream e.g. the
          viability of Tax Free shops may depend on future adjustments to the consumption tax both in
          Australia and overseas in the future.

          A mapped out list of assumptions may look something like this:




          21 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 6: Revenue Streams & Assumptions for an Airport




          22 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          2.7        GETTING STARTED WITH YOUR FORECAST

          Before you calculate and type in your first numbers, you have to consider a series of issues
          pertaining to your forecast. These include:

          CUSTOM SOFTWARE OR EXCEL SPREADSHEET?

          The market for purpose built financial software is expanding, both as downloadable software or
          software‐as‐a‐service, where you log on to a provider via an internet connection. Amongst
          spreadsheets, typically Excel® based, you may choose to build your own from scratch (with its
          inherent time consuming challenges) or purchase ready made forecasting spreadsheets. The
          merits and pitfalls of each option call for another booklet worth of discussion!

          If you wish to consider alternatives to spreadsheets as a platform for your forecast, you may
          also want to review:

               •     Software based pre‐built financial models that require you to simply input your forecast
                     data.
               •     Pre‐built financial models accessible on demand via the internet (software as a service)
               •     And for large companies, a range of ERP, Business Performance and Business
                     Intelligence tools

          TIME SPAN OF FORECAST

          How long do you want to forecast forward for (in years)? This answer will depend on what you
          want from your forecast. If you want to do a discounted cash flow for a valuation, or if you
          want to track the longer term performance of return on your assets, you’ll probably want to do
          at least five years. If you are about to commercialise a gold mine, it will be more like thirty
          years! Conversely, if your concern is running out of money and you want to track your end of
          month, or even end of week bank balance, you’ll need to focus on one year or less.

          LENGTH OF EACH PERIOD

          When you’ve decided how many months or years forward you wish to forecast, consider then,
          an ideal number of columns that are useful for your business and are not time consuming or
          unnecessary for you to fill in. A 60 column spreadsheet (monthly forecast for five years) is
          unnecessarily large, unwieldy to view on your screen and the monthly figures will likely become
          meaningless as your move toward the distant future.

          COMPANY STRUCTURE

          23 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          How will you sub‐divide your forecast as to make it meaningful without overburdening yourself
          with data? Assume you have 10 product groups with a total of 700 SKU’s and sales offices in 10
          territories in Australia and another 20 worldwide. Will you try and incorporate all of this data
          on a single spreadsheet? Will you create separate spreadsheets and feed in the macro data
          into a master spreadsheet? How will you make allowance for future products or territories?

          The following company has a model for each division (see the worksheet tabs) and the front
          cover simply aggregates the data from these worksheets:




          Figure 7: Front Cover to Aggregate Forecast


          Issues such as how the various financial statements, produced by your company, its subsidiaries
          and other wholly or partially owned trading entities consolidate. This is further complicated by
          inter‐company trading and borrowings, minority interests and joint ventures.

          COLLABORATION

          Are you producing this forecast alone or will parts of it be delegated to other individuals. If it’s
          the latter, will you be dividing it up into several sections or will more than one person be
          working on a particular section. Will your forecasting platform allow for version control or
          multi‐user inputs? Would you prefer that rights to edit the data are restricted, and a certain
          sub‐group can only have access in view mode?

          USABILITY

          Aligned with collaboration, on a slightly different subject, will other people who have not been
          involved in the construction of your forecast be able to intuitively understand your forecasting
          model if you weren’t there to guide them? Along with documenting the assumptions that you
          made when producing the figures, you will need to make abide by certain rules so that the logic

          24 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          and process behind the model is transparent. This will range from including a Table of Contents
          in the forecast; to shading input cells yellow (normally) to differentiate them from calculate
          cells.

          DEALING WITH COMPLEXITY

          Producing a thorough forecasting model may be much more complex that you will have give
          allowance to. Consider some of the following challenges:

               •     The phasing in of receipt and payment of Sales Taxes such as GST and their impact on
                     cash flow.
               •     Taking account of the time span between receiving an order, completion, delivery,
                     invoicing and payment for the goods and services.
               •     The capacity to produce meaningful working capital estimates when so many variables
                     have to be factored in.
               •     Applying depreciation and amortisation estimates to tangible and intangible assets.

          Accept the fact that these financial forecasts you produce will be a simple approximation, and
          resist the urge to try and make certain parts of the forecast unnecessarily detailed (coffee
          supplies in the staff room) when others can only be a simple approximation (extrapolated 20%
          growth in revenue between 2012 and 2013).

          HISTORICAL DATA

          You’ll need to have an up to date set of financial statements with sufficiently detailed
          background information behind them to get started. The key detail may also relate to trends in
          sales across product lines and seasonal fluctuations. Details of this data may help you detect
          and programme in growth trends. You’ll also need to know the detail behind your current
          status of payables, receivables, loans and other balance sheet items, as they will form a part of
          your near term forecast.

          Also you will need to factor out (or in) the following:

               •     Historical items of income or expense that were unusual, non recurring or unlikely to
                     have any influence within the forecasting period.
               •     Revenue that was derived from assets no longer operating within the company.

          INTEGRATION WITH YOUR ACCOUNTING SOFTWARE



          25 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Will you want to integrate a feed of the ACTUAL financial performance into your forecasting
          spreadsheet / software? This would:

               •     Save manually rekeying to input your actual financials.
               •     Provide comparisons between your actual financials and what you had previously
                     forecast.

          Some forecasting packages provide a mapping function so that you can link Excel outputs from
          your accounting software into your forecasting software




          Figure 8: Linking Actuals from Accounting Software




          DESIGN AND USABILITY

          If you are opting to build your own forecasting spreadsheet, make sure that it is well designed,
          easy to manipulate, well documented and understood by other users. Design tips include:

               •     Modularise the model into different sections with summary sheets that bring together
                     the various components.
               •     Ensure that you can support a simple sensitivity analysis, looking at the effects of a
                     change in one variable on the financials.
               •     Show clearly which cells are input cells and which cells are calculated by the software.
               •     Document your assumptions separately.
               •     Do not hard code variables into a formula. P (price) and Q (quantity)

          Here’s an example of the need to modularise your model into different sections in order to not
          have one overly complex summary sheet.

          You may have a summary sheet of overall operating expenses:



          26 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 9: Overall Expenses


          But feeding in to that total Administrative Expense, there may be a sheet where these expenses
          are broken down into their individual components – salaries, leases, office equipment etc. This
          sheet in itself may also be a summary of what has be calculated at a lower level. For example,
          the staff costs would have been calculated by a lower level sub‐sheet:




          Figure 10: Expenses in Detail




          27 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          3.         REVENUES
          Forecasts begin with your analysis of the revenue potential of your company’s products and
          services.

          The first, key financial statement is the Income Statement, often known as a Profit and Loss.

          The forecasted income statement is a summary of all of the expected revenues and expenses
          incurred during the forecast period. These includes the sales of major items, their cost of sales,
          operating expenses, a portion of the capital costs of operating the company, interest and tax.




          Figure 11: Forecasted Income Statement


          This statement takes account of when revenues and costs were earned or incurred, not when
          payment and receipts were made. Making a profit here, does not necessarily mean that your
          company won’t go broke. In business, cash is king and survival is only guaranteed if either your
          inflow of cash is greater than your outflow, or that you have the means to fund a


          28 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          haemorrhaging company through external funding. We’ll discuss the all important cash flow
          statement in Section 7

          Looking through each of the components of the Income Statement.




          29 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          3.1        PRODUCT SALES

          The sales revenues for each product / service line are a major component for the forecast.
          Everything else is geared around your company’s ability to exploit its sales potential.

          This is an easier process if you have historical sales data and the industry is relatively stable,
          compare to if you are a trailblazer launching a new product into a new market.

          One approach to forecasting product and service revenues for more difficult markets to assess
          is to look at the size of the addressable market in the next period, evaluate what the relative
          shares of competitors will be and then multiple units sold by price.




          Key factors affecting the sales volumes include:

               •     Previous year’s sales – is there a trend?
               •     Sales trends in the overall market
               •     New promotions, sales initiatives or other marketing drives
               •     New product launches


          30 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Overall changes in the economy
               •     Changes in consumer tastes
               •     Seasonal trends – ice cream sales in summer compared to winter
               •     Changes in competitive strategy
               •     Varying competitor scenarios

          If you have multiple product lines, services, divisions or geographical locations, you’ll naturally
          be forecasting each as a separate line item. It is important to forecast each of the product lines.
          Consider also what the effects are on sales of one product line on another product line:

               •     One product may be complementary to another in which case there is a direct
                     relationship between one and the other. As one increases, so does the other.
               •     Increases in sales for one product may negatively affect the sales of another product
               •     The sales of two lines of product may both increase as a result of outside factors – sales
                     of gym memberships generally increase at the beginning of the year after people make
                     New Year resolutions.

          Then factor in all of the potential revenue streams that could accrue to your company in the
          coming years? These may be new revenue streams that you currently do not enjoy, including:

               •     Existing products into new market
               •     Complementary products
               •     Packaged bundles of product
               •     Upgrade revenues
               •     Support revenues
               •     Training revenues
               •     Service revenues
               •     Consulting revenues
               •     Licensing revenues

          This is equally applicable in not‐for‐profit organisations where several revenue streams may
          accrue. One interest exercise may be for you to map each of the potential sources of revenue,
          along with their assumptions. For a charity this may include:




          31 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 12: Revenues and Assumptions ‐ Charity


          When considering future revenues, it is important to keep a running total of the installed base
          of total users of your product or service. They may require service, upgrades or support at any
          time in the future. They would also be a great prospect for future company offerings, provided
          they are satisfied with their current products. So

               •     How many people are out using your product (installed base)?
               •     What is the propensity for customers (in % terms of installed base) to seek out
                     additional products, services or support?
               •     Can you increase the frequency of purchases for each customer? Or, the value of each
                     purchase made.

          Total Revenue is simply price per unit x number of units sold. This can be increased in one of
          three ways:

               •     Increasing the number of customers
               •     Increasing the value of each sale
               •     Increasing the volume of each sale.




          32 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          3.2        PRICING

          Price is a key business driver and a proper pricing policy can assist growth more than either
          increases in volume or cost reductions. Depending on your industry and your company’s
          strength within it, you may have the capability to set price. If not, you still may have the
          capacity to create your own niche (perhaps through sustainable product differentiation) in
          order to obtain economic profit. The introduction of 3,4, and now 5 bladed shavers have
          allowed producers such as Gillette to charge enormous price premiums on what was once a low
          margin industry.

          Here are some alternative pricing strategies. Consider which you would want to apply to what
          products or services you sell or intend to sell and how you’re pricing policy may change over
          time:

          PRICING                     DESCRIPTION                 ADVANTAGES                                    DISADVANTAGES
          APPROACH
          Cost Plus                   Standard margin             Easy to calculate and                         Doesn’t take market
                                      above cost                  administer                                    conditions into account.
                                                                                                                Price may be lower than
                                                                                                                what many consumers
                                                                                                                are prepared to pay.
          Market Based                Sets price to               Higher profit margins.                        Determine the value that
                                      capture the full            Flexibility to reduce as                      each customer places on
                                      value that                  competitive conditions change                 each of your products
                                      customers place                                                           across each geographical
                                      on your product                                                           territory.
          Penetration                 Setting price low           Opportunity to grab market                    Risk of competitor
          Pricing                     to gain market              share rapidly and hence deliver               retaliation, and that the
                                      share or achieve            those economies.                              product is successful at
                                      volume and                  Damage to competitors                         the low price point.
                                      economies of
                                      scale.
          Skimming                    Price high to               High initial margins from                     Locking out a market
                                      maximise margin             cashed up customers.                          unprepared to pay this
                                      from those                                                                price.
                                      customers willing                                                         Competitor me‐too’s
                                      to pay the most.



          You will also want to consider the impact of discounting your price on your Gross Margin over
          time

          33 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




           DISCOUNT PRICING IMPACT
           OVERVIEW
           (1) If your present margin is:
                             20%        30%       40%      50%
           (2) And you reduce price
           by 10,20, or even 30%:
                             (3) Then to produce the same gross
                             revenue your sales volume must
                             increase by:
           10%               100%       50%       33%      25%
           20%               ‐          200%      100%     67%
           30%               ‐          ‐         300%     150%



          If a company is operating on a 30% gross profit margin and introduces a 10% discount sale (10%
          discount on gross revenue), the company would need to generate an additional 50% in sales to
          maintain that 30% profitability level.

          This is optimistic at the best of times: 50% more sales, half as much again! Even more startling,
          at 25% discount strategy (25% discount on gross revenue at 30% margin); sales would have to
          increase by an enormous 500% to maintain that profitability. This would be unheard of and
          illustrates how ill advised such a discount would be.

          More broadly, does a particular customer’s sales volume justify the discounts, rebates, or
          promotion structure you provide to that customer?

          Conversely, if you adopt a premium pricing strategy

           PREMIUM PRICING
           IMPACT OVERVIEW
           (1) If your present margin is:
                          20%       30%                      40%            50%
           (2) Then you increase price by
           10,20% or even 30%:

                               (3) Your sales could decline by the
                               amount below before your gross profit

          34 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

                               is reduced
           10%                 33%        25%                20%            17%
           20%                 50%        40%                33%            29%
           30%                 60%        50%                43%            38%



          This shows the amount by which your sales would have to decline following a price increase
          before your gross profit would be reduced below its present level. For example, at the same
          40% margin, a 10% increase in price could sustain a 20% reduction in sales volume. Less work
          for more return!

          Finally, if competitive pressures are forcing you to evaluate your current pricing, consider some
          of the following options for offering “a better deal” to certain customers:

               •     Discounts on volume.
               •     Time dependent promotional bonuses.
               •     If selling through channels, marketing allowances and co‐operative advertising
               •     Alternate payment terms e.g. discount on early payments.
               •     Bundling multiple products.
               •     Money back guarantees

          All of these initiatives would need to be included in a forecast.




          35 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          3.3        GEOGRAPHICAL EXPANSION

          New markets may be alluring whether you are considering increasing sales, improvements in
          operational cost‐ effectiveness or new international customers, but your forecasting process
          need to rigorously assess their cost benefit. This is particularly so in the sales start up phases
          where it may be expensive to establish a brand and a suitable distribution channel in a market
          that may have little awareness of your products and services.

          In short, does my international expansion add value to the company or does it simply just grow
          my top line revenue figures?

          When considering expansion the forecast needs to evaluate the prioritisation of country’s (size
          and accessibility) and an entry plan for each including company expansion, acquisition or
          partnering with a local provider.

          When forecasting product revenues, you need to consider and evaluate the following

               •     Determining the total customer base or market size.
               •     Segmenting the market to identify what portion should be targeted by your product or
                     service.
               •     Expected penetration of the product or service into the market segment.
               •     Competitive environment.
               •     Respect for intellectual property and legal infrastructure.
               •     Expected price per unit.
               •     Expected distribution margin when selling through wholesalers, retailers or agents.
               •     Relative pricing of incumbent suppliers.
               •     Consumer affordability.
               •     Regulatory approvals for foreign product.
               •     Transportation costs.
               •     Local labour costs.
               •     Political & other risks (legal, currency, corruption, bureaucracy, IP protection).

          A local provider can be valuable when preparing an entry strategy, particularly if they have a
          privileged market position, brand recognition and access to powerbrokers, resources,
          transportation or distribution systems.

          In short there are four major ways that you can sell products in overseas markets



          36 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Branch office – Gives control of the business, but establishing the infrastructure may be
                     expensive
               •     Distributor / Local Agent – Low risk and low investment, but distributor may not give
                     your products much attention, while taking a proportion of your margin.
               •     Joint Venture – Partner has already established infrastructure and risks / costs are share,
                     however you must be prepared to give up some control of the operation
               •     Online – May be cost effective, but it’s hard to get noticed.

          One of the first steps in considering the internationalisation of a venture would be to map out
          all of the issues that need to be researched, prior to making any substantial decisions on the
          above. A large English language provider of eShopping websites would be likely to produce
          something like the following when initially considering growth opportunities in China:




          Figure 13: Evaluating Growth Opportunities




          37 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          3.4        NEW PRODUCT REVENUES

          Forecasting the revenue potential of new products is more problematic than with existing
          products as you have no past history of sales figures to project from.

          Some considerations include:

               •     Does the customer have to change behaviour?
               •     Does purchase decision maker have to define a new budget for the item?
               •     Are the technology standards of the product being universally adopted?
               •     Will the product create other costs or complications for the customer?
               •     Will there be obsolescence costs created by the customer changing their current way of
                     doing things?

          Once the new product has launched:

               •     How quickly will sales ramp up?
               •     What are the costs of bringing this product to market?
               •     How much will it cost to achieve adequate exposure in the market?

          The commercial viability for any new product needs to be established early in the new product
          development programme. Aside from the bottom line financial impact, consider the following:

               •     Will it encourage customers to buy other products as well?
               •     Can the development act as a catalyst for improvements in overall manufacturing
                     efficiency and quality?
               •     Can new intellectual property be generated or new manufacturing techniques
                     exploited?




          38 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          3.5 ALLIANCES, PARTNERSHIPS, LICENSING AND DISTRIBUTION
          AGREEMENTS



          There are a wide range of alliances that can be formed using your or others unique know how,
          location, technology and intellectual property. These alliances can help you increase your
          revenues and profitability without the risk that “going direct” would assume. Broadly speaking
          such alliances and partnerships include: joint ventures, marketing alliances, licensing
          arrangements, selling/distribution agreements, channel partnerships and software agreements.

          These alliances and partnerships may give you a competitive advantage, create barriers to entry
          and help you reach customers more efficiently.

          The MindMap diagram below looks through the process timeframe for considering a
          partnership / alliance, through the evaluation of benefits, negotiation process and exit
          provisions. The process starts at 1 and runs clockwise to 9.




          Figure 14: Process for Assessing Alliance Opportunities




          39 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          The alliances pathway may actually be a more flexible, less resource intensive and lower risk
          method of achieving your goals than a merger or acquisition.


          3.5.1 LICENSING
          Licensing is the capacity to exploit other parties IP, processor technology in return for agreed
          fees.

          Licensing can generate a revenue stream by giving permission to others to sell your products or
          integrate your technology or know how into their products or services.

          This revenue stream may potentially be lower risk as many of the costs of market entry may be
          removed. In addition, the licensee may incorporate their own know‐how into the final solution
          that may be well targeted at their customer base.

          Licensing works by transferring technology to a licensee and fees can be generated through
          royalties, management assistance etc. These royalties can be either from upfront payments,
          running royalties or a combination of both.

          It is also possible to negotiate multiple non‐exclusive licenses or minimum guaranteed license
          revenues

          From a business and forecasting perspective, the following needs to be considered:

               •     Is the license exclusive or nonexclusive?
               •     How long should the license be granted for?
               •     What is the size of the market and market penetration?
               •     Without the license, what is the investment required for manufacture?
               •     Does the market already exist or must it be created?
               •     Without the license, how much will it cost to establish sales channels?
               •     What is the prospective return on investment?
               •     What are the nature and extent of competition to be expected?
               •     What is the market life for the licensed technology?
               •     What kind of lead time will the license afford?
               •     What technical help, know‐how, or show‐how is provided?
               •     Without the license, what would it cost to “reinvent the wheel”?
               •     Will we create a new market or reduce production costs?
               •     Are profit margins in the industry sufficiently high?
               •     How do we wish to get paid?
               •     Can the licensee sub‐license?

          40 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Finally, there’s an often quoted 25% rule of thumb for licensing revenue. It’s 25% to licensor,
          75% to licensee of an expected profit margin. Probably best used as a starting point for
          negotiations!


          3.5.2 STRATEGIC ALLIANCES
          The world doesn’t come looking for a better mousetrap, and the economy is a machine that
          involves companies acting together as well as competing (co‐opetition). It’s very difficult to
          build a wholly self sufficient company, so it makes sense to assemble a group of companies
          together that form a sustainable force.

          Alliance opportunities enable:

               •     INNOVATION: Generate new product ideas and accelerate commercialisation.
               •     EXTENSION: enable your company to enter new channels and reach new custom
                     segments.
               •     GEOGRAPHIC EXPANSION: Enable your company to enter new markets or improve
                     existing international or interstate operations using the alliance partner’s local assets.
               •     PERFORMANCE IMPROVEMENT: Enable improvements in efficiency and lower
                     operating costs and capital requirements through outsourcing.


           3.5.3               DISTRIBUTION CHANNELS
          It’s easy to see why a food manufacturer would use wholesalers or supermarkets to sell their
          products, but a component of your forecast is to evaluate whether your financial interests are
          best served by using a channel strategy. If you were comparing product revenues and costs by
          using direct sales versus via indirect, here are some of the key considerations:

               •     LOWER COST: Using resellers can save on the costs of a direct salesforce while
                     extending the range of customers you are effectively speaking to. Similarly you may
                     save on warehouse management, inventory management and logistics by taking up
                     space in distributors facilities rather than building your own.
               •     INTEGRATION WITH OTHER PRODUCTS: Your products may require integration or
                     bundling with other products in order to provide a complete solution to customers’
                     requirements. In this instance you may require specialist resellers with integration skills
                     to sell complementary technology and effectively support and advise customers.



          41 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     CUSTOMER REACH: As your business grows you may require resellers to reach a diverse
                     range of customers. If your product addresses many market segments and requires
                     geographical coverage then customer convenience in accessing a reseller becomes a
                     key criteria

          If you are considering using non‐direct sales, remember to evaluate a range of options, which
          ultimately will depend on your own industry structure. These include: master distributors, local
          distributors, value added resellers, integrators and the rapidly developing channel of online
          selling via the web (auction sites, catalogues etc)




          42 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

           3.6 FRANCHISING

          With brand name backing and reliable systems in place, it’s no surprise that franchising is one
          of the fastest growing forms of business structure in Australia. In industries from fast food to
          accountancy advice, franchising removes much of the need for promotional expenditure to
          brand build and gives clients the reassurance that they can trust the products and services of
          the franchisee.

          Franchising works best for businesses that have a good past sales and profit history can be
          easily replicated in new territories are easy and inexpensive to operate and have good brand
          name recognition.


          3.6.1 BEING A FRANCHISOR
          The "franchisor" authorizes the proven methods and trademarks of their business to the
          "franchisee" for a fee and a usually a percentage of gross monthly sales. In return for this,
          support systems, advertising, training and other benefits will be made available to the
          franchisee.

          The key financial benefits of franchising your operation are:

               •     Once you have a methodology and a structure in place, it’s easier to open “cookie
                     cutter” type operations through franchisees than doing it yourself.
               •     Costas are substantially lower as the franchisees upfront fees will defray much of the
                     risk.
               •     The franchisee may have much greater experience dealing with their local market.
               •     Greater motivation on the franchisees behalf to make it successful than if you were to
                     do it through your own employees.

          The key downsides of franchising your operations are:

               •     There may be some loss of control, as it may be more difficult to manage and get things
                     done through an individual franchisee than through a staff member.
               •     Getting the price right. Price it too high relative to the franchisees income streams and
                     it’s a permanent de‐motivator to the franchisee. Price it too low, and you’ve left value
                     on the table.
               •     Potential for conflicts: An incompetent franchisee can damage the customers goodwill
                     for the brand by providing inferior goods and services

          43 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.



          The key issues and controls you need to put into place are:

               •     Length of agreement – could be from five (sufficient time to realise returns from the
                     initial outlay and the lean start up period) to twenty years.
               •     What would trigger an early termination of a contract?
               •     What is the extent of a territory?
               •     Exclusive or non exclusive?




          3.6.2 BEING A FRANCHISEE
          The key financial benefits of purchasing a franchise are:

               •     You will most likely to have a recognised brand and an exclusive territory such that you
                     can go to market and earn positive cash flows comparatively quickly.
               •     Much of the expensive legwork in establishing this brand and promoting it will be done
                     for you saving you time and money, while having customers directed to you.
               •      The systems and processes created and developed by the franchisor will already be in
                     place, saving you time and money in having to create your own.



          The key downsides of being a franchisee are:

               •     An incompetent franchisor can destroy their franchisees by not promoting the brand
                     adequately or being too aggressive for profits.
               •     You may or may not respond favourably to the lack of independence from the
                     franchisor, their methods and the controls they have in place for monitoring your
                     business.
               •     The success or otherwise of your operation may be due to factors outside of your
                     control – e.g. the decisions and behaviour of the franchisor or of other franchisees.
               •     There may be restrictions against the sale or transfer of the franchisees business.




          44 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          3.7        PROJECT MANAGEMENT

          Much of the emphasis of this book so far is on the production and sale of tangible goods and
          services. If your company’s business is based on the successful completion of specific projects
          including a whole series of different financial and forecasting considerations come into play.

          Your success is dependent on the successful management of a set of resources – people and
          expertise, materials, money in order to achieve the objectives of a project. The goal is profit;
          the classic constraints are time, quality and budget.

          Your initial analysis determines the price you will charge for the project based on an estimate of
          the costs involved. From a financial viewpoint the key risk is that the project timescales or costs
          overrun, and this can be partially mitigated by:

               •     Thorough pre‐planning and consideration of each variable.
               •     A clear understanding and alignment with the customers’ requirements.
               •     Taking account of all potential risks and having a strategy in place to address them.
               •     Having flexibility in the contract to be able to pass on unforseen challenges to the
                     customer.
               •     Effective people, process and budgetary management throughout the project phases,
                     including sub‐contractors.

          To ensure that the project remains on cost and on time, consider the following:

               •     What is the critical path and what are the interrelationships and interactions and
                     interdependencies between the resources?
               •     What key events, milestones, progress evaluations and critical activities been identified?
               •     Has time been allocated for quality, customer and stakeholder involvement?
               •     How has time contingency been incorporated into the plan?
               •     How thoroughly have target or actual project costs been clearly identified and
                     documented?
               •     Does the project cost estimation involve cost related risks and how are these managed?
               •     Is the project budget consistent with the project requirements, assumptions, risks and
                     contingencies? How will the project costs be managed to ensure that the project is
                     completed within budget?
               •     Is there a satisfactory process for accounting of project purchasing and other
                     expenditure? Has this purchasing process been documented?


          45 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Can you identify the root causes for budget variances, both favourable and
                     unfavourable? Is this reviewed?
               •     How has cost contingency been incorporated into the plan?




          46 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          3.8        OTHER INCOME

          There are a wide range of other items that can fall into the “Other Income” category of your
          Profit and loss. These can range from Grants from governments of private bodies, donations or
          even the proceeds of your intellectual property. Some examples follow, but they’ll depend on
          your own circumstances.


          3.8.1                GRANTS & FINANCIAL ASSISTANCE
          Financial assistance programmes at a federal (AusIndustry), state and export body (Austrade)
          level can assist with grants and loans and tax offsets.

          Examples include:

               •     AusIndustry’s support programs provide financial, managerial and technical support to
                     innovative early stage companies, their R&D Tax Concession programmes allows tax
                     concession of up to 125% of expenditure incurred on R&D and they offers specific
                     industry support in areas such as Tourism, Automotive, Biofuels, Climate change and
                     green based initiatives.
               •     EFIC (Export Finance & Insurance Corporation) is Australia’s export cr3edit agency offers
                     export guarantees and direct loans.
               •     State governments offer a variety of programmes for SME’s. In NSW, for example, the
                     Department of State & Regional Development (DSRD) provides assistance with
                     commercialising R&D, regional relocation incentives, export incentives and payroll tax
                     rebates.
               •     Austrade, Australia’s export authority provides an Export Market Development Grant
                     (EMDG), as a rebate on the proportion of total expenses incurred on eligible export
                     promotion activities.
               •     Regional, state and national governments worldwide may offer an incentive for
                     company’s to locate or relocate their activities there, particularly where they provide
                     employment (especially skilled employment) to local residents.


          3.8.2                INTELLECTUAL PROPERTY INCOME
          Obtaining a royalty stream from your Intellectual Property can, once the IP has been developed,
          protected and marketed, be one of the significant income streams as it goes straight to the



          47 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          bottom line. (IBM for example many billions of dollars of income annually accruing from their
          past IP).

          Here’s a MindMap checklist of the considerations when embarking on a route to market that
          involves the development and licensing of IP.




          Figure 15: Process for Valuing IP




          48 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          4.         COSTS
          This section looks at each of the key costs payable by your company, both variable (expenses
          that change in proportion to the activity of a business) and fixed (those which don’t change in
          proportion to the business).

          This simple diagram illustrates the two types of cost:




                                                                                                                   TOTAL COSTS
                        $
                       Costs

                                                                                                  Variable Costs



                                                                                                  Fixed Costs



                                                                         Units Produced


          Greater Fixed and Variable profit are achieved by greater revenues and less costs. The business
           Figure 16: margins and Costs

          challenge pre‐empted by your company forecast is to regularly eliminate unnecessary costs and
          reallocate resources to activities that will generate the greatest returns. Forecasting to reduce
          costs need to take the following into account:

               •     Likely cost savings given risks of executing and variability of outcomes
               •     Costs and investments required to achieve savings e.g. severance fees, new structures
                     and technologies
               •     Impact on revenue and earnings
               •     Timing required to implement initiative and realize benefits


          49 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Execution risks.




          50 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          4.1        COST OF SALE

          Cost of sale refers to the direct costs attributed to the production of goods sold by your
          company, including the material costs and labour costs incurred when producing the goods.

          The formula for this is:




          In a retailing or wholesaling company a large proportion of your cost of sale will be finished
          goods inventory. A full discussion on reducing the risks from an extended working capital cycle
          may be found in the section on Risk Management.

          You may be reviewing your sourcing strategy as there may be substantial cost savings from
          sourcing from outside Australia, particularly in the Asia Pacific region. However, these reduced
          costs must be weighed up against

               •     the costs and risks of a build‐up in inventory from having to purchase more,
               •     the costs involved in having a lengthier supply chain with much of your stock “on the
                     water”
               •     advanced contractual commitments to produce more in remote manufacturing plants.

          Thus you have to weigh up reduced costs with the potential of carrying greater inventory and
          less flexibility.

          Also, a lower cost of sale will also result from making adjustments to the costs involved in
          serving a customer. This could result from automated order taking processes to reducing

          51 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          delivery costs to automated purchasing set up based on minimum reorder quantities being
          reached by the customer.


          4.1.1 REFUNDS, WARRANTIES AND GUARANTEES
          Having your company back the products that you sell with a money back guarantee or a
          warranty on product failure, are almost essential components of establishing a credible brand.
          Even if you don’t offer one, the legal system would probably step in to ensure that justifiably
          dissatisfied customers could enjoy a cooling off period, or that you were guilty under the Trade
          Practices Act of “misleading and deceptive conduct”.

          From a forecasting perspective, you need to consider the following:

               •     The potential for faulty (or even non faulty) product to be returned as new. What is
                     your policy for this? If you deal through channels, do they get a replacement product or
                     money back guarantee? Will you refund customers money even if the product is perfect
                     and the customer simply decides that they don’t want it?
               •     The potential for product faults within warranty period. How much warranty will you
                     provide? What is your process for fixing faulty product – service agents, back to
                     manufacturer? What commercial arrangements will be in place for this?
               •     The potential for product faults outside warranty period. Is it worth fixing the product?
                     If so, by whom? What strategies do you have in place for replacing or upgrading the
                     customer’s product?


          4.1.2 LOYALTY & AWARDS PROGRAMMES
          They are both cost to the business, and a future revenue driver. An airline will give away free
          flights and upgrades to frequent fliers, but the act of accumulating points in the first place may
          have generated some brand loyalty – if only to get the free flights!

          The challenges are

               •     Giving away something in return for engendering loyalty for the product, rather than
                     merely getting something for nothing.
               •     Making sure that the giveaway is actually redeemable. Qantas, like most airlines, face
                     constant criticism for the non availability of free flights.
               •     Accounting for the cost of freebies that have not yet been redeemed.



          52 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          The latter is a forecasting issue, as there are liabilities created on the balance sheet. You need
          to give consideration to:

               •     The probability that they will be redeemed at all. Some customers may simply not both
                     with the free gift or service.
               •     The cost of them being redeemed. Returning to the airline example, the marginal cost
                     of giving away a seat on a plane that wasn’t full anyway is lower than the cost of turning
                     away a paying passenger because their seat had already been taken by a free flight
                     redeemer.
               •     Expiry dates on redemption. This will lower the liability, but could also engender ill will
                     when customers lose out when they simply don’t take up an offer prior to expiry.




          53 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          4.2        OPERATING EXPENSES / OVERHEADS

          Overheads refer to the ongoing expenses involved in running a company. These refer to all of
          the necessary costs in running a company – rent, telecommunications, accounting fees that do
          not directly generate revenue.

          Included within the profit and loss account (income statement) are those Operating Expenses,
          i.e. the ongoing costs for running a business, plus a proportion of the Capital Expenses, known
          as depreciation for expenditures on assets that will give benefit beyond the current twelve
          month period.

          A component of your forecasting process should involve consideration of what percentage of
          revenues should be spent on overhead. More importantly,

               •     How do they compare with other organisations in your market space?
               •     How can you reduce this percentage over time, and therefore increase your profits,
                     without affecting the efficiency of your company?


          In the long term, you may need to review your entire operating processes, ensuring that they
          can evolve to be the best in the industry and that they can see the company through both
          booms and busts in the economic cycle. Key issues include:

               •     Where can work can conducted most cost effectively? Are there parts of your operation
                     that can be relocated to other (non CBD) offices, interstate or overseas?
               •     Can you shift work to a supplier based their capabilities? Do they have a superior cost
                     structure compared to yours?
               •     Can you outsource or use shared services? In recent years, internal telemarketing
                     teams have been outsourced to call centres, while IT departments have been replaced
                     by specialist IT service companies monitoring your network performance with back up
                     facilities and timed response rates.
               •     Can you transform your entire way of doing business? How can you optimise your
                     workforce, processes and technology to provide the most productive and efficient
                     environment for your company?



          The following sections look at all of the different components of your overheads.


          54 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          4.2.1 MARKETING
          Budgets need to be developed in order to ensure that your products and services are exposed
          to your target audience. The methods of marketing used and the marketing spend / total
          revenue ratio will vary across firms and industries and across the life cycle of a particular
          product. First of all, seek out and use available data (online industry reports) to gauge an idea
          of a realistic cost of creating a brand, and creating an awareness and desire for them to
          purchase your goods.

          Managers frequently underestimate the costs of marketing, and in order to cut through the
          advertising clutter in order to obtain consumer awareness, these costs have to be maintained
          over an extended period of time.

          Within the marketing budget, has your company taken the following into account?



          Advertising                         Placements Fees, Concept Development, Channel or Industry Specific

          Bundling                            Cost of bundled product, Promotion, Packaging, Fulfilment, Support

          Channel                             Distributor & Reseller expenses including ‐ catalogues, co‐operative
                                              marketing, product management services, PR Programmes,
                                              publications, reseller presentations, technical training, trade show
                                              appearances, vendor nights, website listings

          Collaterals                         Logo, Domain Registration, Brochures, Case Studies, CD's, Demo
                                              Disks, folders, electronic presentation, Not For Resale Software,
                                              Merchandise (caps, mugs etc), Packaging

          Direct Marketing                    Direct Mail, Direct Fax, Infomercials, Telemarketing
          Electronic Marketing                Website development & maintenance, Web ad development, CD
                                              ROM distribution, Search Engine costs.

          General Administration              Training, Equipment Rental, Hardware, Meals & Entertainment,
                                              Research, Consulting, couriers, Resource Materials, Software, Travel,
                                              Web Hosting
          Public Relations                    Editorial Guides, launch events, Press Kits, PR Agency, Press Mailings

          Sales Promotions                    Bundling Costs, Design Development, Price Promotions, Seminars &
                                              Other Events




          55 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Sponsorship                         Physical facilities, Causes, Events, Celebrities


          Trade Shows & Events                Stand costs, Personnel costs, transport & accommodation, advertising




          Ultimately, your company will need to have a realistic proportion of forecast revenue set aside
          for promotional expenditure. This can be in the range of 15‐30% of total revenue and will
          depend on criteria like the number of new product releases, how competitive the market is etc.
          A good guide is to look at the financial statements of publicly listed companies to review the
          relationship between their marketing expenditure and revenue / profit. However, do not
          assume an instant correlation between promotional spend and revenue. It takes a lot of
          exposure and brand building before the effect on sales can be truly felt.

          Much of the wastage involved in marketing can be eliminated through intelligently Test
          Marketing a certain proportion of your target market by using short campaigns in certain, well
          defined geographical locations to ascertain whether the marketing message is understood,
          what media provides the best value for money (response per dollar spent) what the propensity
          is for the customer to buy and how satisfied is the customer with their purchase. Global brands
          will frequently use a test market such as Australia to determine the likelihood of success prior
          to investing in global marketing.

          In addition to the marketing spend involved in promoting current and forthcoming products,
          you will also need to allocate expenditure on the following:


          4.2.2                MARKETING ‐ MARKET RESEARCH
          Understanding the consumer’s motivations, their need for your services and their perceptions
          of your products must be an essential part of the new product development, launch and sales
          cycle for your products. Some key questions need to be addressed within your Market
          Research brief:

               •     What is the potential size of the market and the estimated level of sales?
               •     Is this market growing or declining? What factors will affect this market?
               •     Have you clearly defined the market sector for your product or service?
               •     Have you researched your market territories been researched thoroughly? What local
                     differences, customers, language and regulation are likely to affect your final product?

          56 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     What is the consequence of making product changes for these different geographical
                     territories?
               •     If you are exporting, how competitive will your products remain if exchange rates
                     change?
               •     What are the appropriate channels to market? Direct selling, online, agents,
                     distributors, retailers? What is the possibility of channel conflict if more than one route
                     is utilised?
               •     What branding and other promotional effort is required?
               •     What is the shape of the competitive market place like now and what is it likely to look
                     like in the future? What competitors and competing products have been identified?
                     What future developments are there likely to be in these products and how will your
                     competitor respond to your product launch?




          4.2.3                MARKETING‐ MARKETING EFFECTIVENESS
          You should set some budget aside for measuring the effectiveness of alternative forms of
          promotion, and use the knowledge derived to plan alternate marketing strategies. With online
          marketing and Web analytics, it has become a whole lot easier in recent years to quantify key
          interrelationships between customer exposure – customer interest – leads and customer sales.


          4.2.4                COMPETITIVE INTELLIGENCE
          It is important to invest in the capability to collect and analyse what is going on in your market.
          You can get swamped by all of accessible online information (websites, newsletters, search
          bots, share trading sites etc) about your competitors, future competitors, suppliers, customer
          trends etc. The challenge is not in finding it, it’s having the headspace to filter, analyse it and
          think about the repercussions of it for your own growth. To really understand what is going you
          will require a time and a financial commitment:

                     •    Purchasing filtered specialised news services that deliver relevant, industry specific
                          news to your desktop.
                     •    Joining trade associations, networking forums and industry groups that allow you to
                          network to find out what is going on.
                     •    Undertaking international reconnaissance. While you may not be a global firm at
                          present, overseas trends may well impact your own market as well as alter the

          57 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

                          landscape and potential for export. Jump on a plane and talk to people at
                          international trade shows, exhibitions, industry forums etc.
                     •    Consider outsourcing information filtering to Information specialists well versus in
                          reading, condensing market data and producing it for you in the form of updates,
                          newsletters, alerts.
                     •    Developing an in‐house “Knowledge Base” and train your staff to listen to
                          observations, rumours and opinions.




          4.2.5                MARKETING – CUSTOMER RETENTION


          To grow your market, you naturally have to find new customers and much of the here is
          dedicated to the goal. However it is an often stated, yet important truism that it costs
          significant less to have an existing customer purchase from you that it is to source a new one.

          The growth in technology has made suppliers lazy in this goal and the use of impersonal
          technologies such as e‐mail newsletters and other one way electronic messaging can make us
          lose contact with the customer, their requirements, and whether indeed they are shopping
          elsewhere. Repeat purchases, upgrades, subscription renewals etc are then at stake.

          There are a wide number of Customer Retention strategies, but they can be summarised in the
          following ways:




          58 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 17: Strategies for Customer Retention




          Customer retention and the capacity to provide them with new and additional services, renew
          their subscriptions, charge them retainer fees etc, provides some interesting financial modelling
          challenges.

          Here’s a sample Excel® based model for a company that sells hardware, software and services
          to both new and existing customers:




          59 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 18: Building a Financial Model to include new and existing Revenues


          The model has been set up so only the yellow cells need to have an input.

          There is a known population of pieces of hardware out in the market at the beginning of a
          period, plus a forecasted assumption that around 65% of that existing population will purchase
          a “renewal”. This 65% renewal rate on existing customers plus the new customers acquired in
          that period then become the new hardware population at the beginning of the following
          period, and the calculation is made again at that point.


          4.2.6                MARKETING ‐ BRANDING
          Creating a unique identity for your company or product is a business necessity in order to
          achieve customer recognition while fashioning an image for the offering.

          Established brands can have great intangible value in themselves, but the costs of establishing
          and sustaining a brand can easily be underestimated. These costs include:

               •     Design and production of all elements of brand – stationery, signage, advertising etc.
               •     Brand maintenance: Registering trademarks, providing permission for authorised usage
                     of trademarks and tracking, litigating and threatening to litigate against unauthorised
                     usage.

          60 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          4.2.7 INFORMATION TECHNOLOGY – AS A REVENUE & PROFIT DRIVER
          The use of technology within your company can loosely fall under two categories – as an
          investment in driving revenue, profitability and growth, or as a cost of doing business.

          Excellence in information technology can drive real improvements to your company’s bottom
          line. IT must deliver value to your company, rather than simply be a cost that should be
          contained.

          The rapid adoption rate in E‐ Commerce, Enterprise Resource Planning (ERP) systems, Customer
          Relations Management (CRM), Knowledge Management, Business Intelligence & Analytics and
          many web based technologies elevate IT considerations from being merely a cost to being a
          driver of profitability and growth.

          Effective use of technology creates competitive advantage. IT expenditure tied to your
          company's business strategy will have the most clear‐cut business value, in terms of return on
          investment. Moreover, when IT solutions and business strategy are woven together, companies
          are finding that business benefits are often broader and deeper than expected.

          Investments in the following technologies can all have long term highly positive payback in
          terms of customer relationships and business efficiency:

               •     E‐Commerce: including a web store, inventory management process, order fulfilment
                     process and accounting system.
               •     Customer Relationship Management (CRM): Systems for tracking customer data and
                     customer interactions, as well as internal project tracking.
               •     Enterprise Resource Planning (ERP): An integration suite of most of the internal
                     processes within an organisation including manufacturing (scheduling, materials,
                     workflow and quality), supply chain management (inventory, suppliers, scheduling),
                     financials and project management.
               •     Management Accounting Software. While common low cost generic software such as
                     MYOB and Quicken may service your organisation for a while, at what point do you
                     require the greater functionality of mid‐range accounting packages?

          As you grow, you will also need to cost in other applications such as purchasing management
          software, business process automation, document automation, asset management and other
          applications specific to your production, R&D and warehousing operations.



          61 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Consider with each the following costs: the “per seat” licence, the implementation costs, the
          renewal costs, the additional customisation costs through their life, and the costs involved in
          migrating the data to larger systems should your growth take hold.


          4.2.8 INFORMATION TECHNOLOGY – AS A COST OF DOING BUSINESS
          Outside of staffing costs, Information Technology costs can be one of the most significant
          operating costs of your company. As you grow your company, consider the future costs of
          some of the following necessities:

                     •    Hardware, software and networking products for your team
                     •    Connectivity solutions with customers, suppliers, distributors etc.
                     •    Disaster recovery and contingency planning requirements.
                     •    Network and data security.

          Even without the business benefits, there are commercial costs for not investing in technology.
           Consider the costs of the following lost hours due to printer problems, network problems, loss
          of unsaved work & failure to back‐up documents, equipment purchase delays, inadequate
          computer training, inefficient processing power, computer downtime (crashes/system failure)
          associated with inexpensive or inferior equipment, inefficient systems and double entry, poor
          document management and access, complicated systems or retrieval of data

          Also consider the lost revenue because your phone lines are engaged or your equipment is
          inefficient, because sales data is not immediately accessible to your sales team and because
          your sales team does not have a contact management system to remind them to call back
          potential clients.

          Key areas for considering appropriate levels of IT expense include:

          Personal Computers                   Considerations:
                                               Required power of a new computer
                                               Ability to upgrade PC’s versus purchasing new ones
                                               Rent v Lease v Buy equation
          Software                             Considerations:
                                               Are software upgrades always necessary?
                                               Are service / support agreements with software vendors being fully utilised?
                                               How many of your applications software can be utilised via SaaS (Software
                                               as a Service), whereby applications are accessible via the web rather than
                                               via the desktop*.
                                               Is there an appropriate level of documentation being purchased with the


          62 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

                                               software, particularly as most vendors no longer package documentation?
          Servers                              There is likely to continue to be a rapid increase in the number of servers
                                               that your company operates as it continues to grow.
                                               There are also technologies (e.g. virtualisation software) that can reduce the
                                               number of servers, as well as the use of distributed applications.
          Broadband                            Rapid increases in broadband take up in recent years. However the market
                                               will continue to become more competitive and technologies will ensure that
                                               “Moore’s Law” continues.
          Outsourcing                          The extent to which high fixed costs e.g. IT professionals can be outsourced.
                                               Wide range of personnel and procedures outsourced to specialised
                                               companies providing full system monitoring, application development etc.

                          *‐ Established software providers such as salesforce.com (Sales Tracking) and NetSuite (integrated
                          CRM, ERP and Ecommerce software) utilise the SaaS Model, enabling perpetual license fees rather
                          than larger one off costs, automatic roll out of upgrades and effective disaster recovery.




          4.2.9 EMPLOYEE / PERSONNEL COSTS
          Staff costs, including a reasonable “living wage” for yourself, the owner, can account for a large
          proportion of total business costs for your company.

          In addition to salaries, bonuses and commissions you will need to factor in the following other
          employee entitlements.

               •     Superannuation
               •     Annual Leave
               •     Long Service Leave
               •     Cumulative sick leave
               •     Post employment benefits
               •     Termination benefits

          Depending on how your organisation remunerates its employees there may also be share based
          benefits ‐ such as shares owned, options etc.

          According to a recent study (AMI‐ Partner Inc 2002) less than 50% of total human resources
          spending are on direct staff salaries and wages:

               •     Staffing Services 49%
               •     Legal, HR Services 16%


          63 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Recruiting/ Benefits/ Administration / Miscellaneous 16%
               •     Payroll Services 8%

          The key issues for consideration are:

               •     Labour force required to service the level of sales and support activity within the
                     company.
               •     Use of commissioned staff
               •     Use of overtime
               •     Use of contractors rather than full time employees
               •     Use of outsourcing
               •     Possibilities of promotions or other changes in role necessitating change in salary rate.

          Like IT costs, training costs can be seen as either a cost of an investment in the skill set of your
          company’s employees. Consider when forecasting, ways to best allocate spending to improve
          effectiveness of your company’s learning and development processes. The training areas to be
          considered include: leadership; management development; professional skills; technology
          skills; and new product skills.

          One key forecasting question, given that staff costs are often the most significant single cost in
          a company, is – how many staff do you need? The answer can be clearer cut in some job
          functions than in others. For production, it may be whatever keeps the assembly line in
          operation if you decide to produce in‐house rather than outsource. In customer service
          however, you may passively say whatever it takes to answer every inbound customer call, but
          this passive approach needs to be considered in the light of having an active policy to perhaps:

          Discourage low value calls by improving the quality of web based documentation and FAQ’s.

          Or

          Encourage high value customers by having an outbound call centre that checks up on their
          levels of satisfaction.

          Another example where you need to evaluate your personnel resource is in the availability of
          sales people or pre‐sales engineers to close business. Particularly, what are the costs of getting
          a new customer or getting an existing customer to buy more?

          When looking at obtaining a new customer, you need to consider a Sales Funnel for your own
          company. How many initial contacts do you need to obtain one sale? What is the cost of


          64 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          servicing those initial contacts (salesforce, presentations, proposals etc) in order to make that
          sale?




          In this example, 250 initial prospects, pipelines through to only 10 sales, but you must cost in
          the resource of making contact with all of those initial 250.

          A major cost in business is that of staff turnover. Every time one of your team members leaves,
          you lose their expertise, their experience and their knowledge of the customers, products and
          your internal systems. Whenever they leave you must incur costs of recruiting and hiring and
          the cost of time that it takes them to be fully effective. While a certain amount of staff
          turnover may be a good thing in terms of bringing in new individuals that could invigorate your
          company through fresh ideas, you must also factor in the expenditures required to keep good
          staff happy and motivated, thus reducing the turnover rate in the first place. Examples include:

               •     Employee share schemes and other financial incentives
               •     Training and development programmes
               •     Providing appropriate work / life balance including flexible hours
               •     Keeping the team informed including effective appraisal processes.




          65 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          4.2.10                          STAFF & MANAGEMENT INCENTIVES (COMMISSIONS,
          BONUSES)
          Depending on the nature of your industry a considerable component of your employee costs
          will be variable and relate to performance based incentives –

          These incentives will relate to the achievement of a predefined target.

          For sales staff and managers this achievement could include any of the following, and more:

                     Calculated as a total company, as a team or as an individual:

                               •     Total sales
                               •     Total sales growth
                               •     Total growth in gross margin

                     Calculated as a total company

                               •     Profitability
                               •     Growth in profitability
                               •     Growth in business value (e.g. share price of a listed company)

          Performance based incentives may also apply to project staff for on time delivery of projects,
          production & warehouse staff for efficient scheduling and working capital management, and for
          a whole host of other individuals and teams in your company.

          You’ll need to design incentive schemes as part of the forecasting process. However, ensure
          that you take the following into consideration:

          Is the behaviour that you are trying to incentivise creating the most desirable outcome for the
          company in general? Will, for example, individuals:

               •     Achieve targets that may be detrimental to the performance of the company e.g. a
                     salesman targeted on revenue, may not care about the profitability of his / her
                     customer transactions.
               •     Defend the performance of their own silos instead of helping to shape action across the
                     whole organisation
               •     Tend to be ego driven and seek to enrich themselves at the expense of the organisation.




          66 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Ultimately, incentives and performance goals should be related to achieve best results. They
          will need to be constantly re‐evaluate as there may be circumstances where they can de‐
          motivate if the individual is not achieving goals or if the maximum earn outs has already been
          achieved and the individual is squirreling away some achievement for the next period!

          You may also consider another tool for rewarding and motivating employees‐ by providing
          them with shares or share options in the company via an ESOP (Employee Share Ownership
          Programme. Section 6 deals with this in more detail.

          Finally, incentives need not be financial in nature. Employee care, recognition and the
          opportunities for promotion can often be far greater incentives.


          4.2.11                          DIRECTOR / EXTERNAL ADVISOR PAYMENTS
          While evaluating personnel costs you must consider an allocation for non executive directors,
          and external advisers. For your company to prosper you must attract, motivate and retain
          highly skilled people for these roles.

          With the increased scrutiny of, and litigation against Directors in recent years, there are
          substantial risks in becoming a Director, as well as the requirement that a Director spends a
          good deal more time scrutinising the reports provided by management, questioning the
          strategic direction, sitting on committees and understanding the risks. The additional time
          dedicated has resulted in higher fees for skills personnel, plus higher costs as companies
          typically indemnify directors for breaches of laws (environmental, discrimination etc) for which
          they might be personally liable.

          A directors’ remuneration may be performance related and you could offer non‐executive
          directors and advisers a share plan where some of their fees are provided as shares in the
          company.


           4.2.12                         OTHER OPERATING EXPENSES
          Here we are concerned with the ongoing day to day costs for running a business for a
          predefined period of time – i.e. the next twelve months. They would include the following

               •     Motor Vehicles – lease, operations, petrol, parking, tolls
               •     Stationary & Office Supplies
               •     Signage


          67 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Staff Amenities
               •     Printing
               •     Postage
               •     Telecommunications
               •     Newspapers & Magazines including Subscriptions
               •     Travel
               •     Entertainment
               •     Cleaning
               •     Repairs & Maintenance
               •     Bank fees
               •     Regulatory compliance‐ lodgements, ASIC etc
               •     Professional services – accountant, bookkeepers, legal, consulting

          Your income statement (Profit & loss account) will also contain a component called
          “Depreciation”. This is the reduction in value in a particular period of the assets that were
          originally purchased under capital expenditure.

          Thus when your company purchases the following assets that will likely last for several years

               •     Computer & Office Equipment
               •     Office Furniture
               •     Office Fixtures and Fittings

          only the annual depreciation is expensed as depreciation.


          4.2.13                          BUILDING LEASE
          The size and functionality of premises for office space, manufacturing facilities and warehouses
          need to be constantly considered, and a forecast that assumes rapid growth must also take into
          account, the extent to which current premises may be stretched or dysfunctional in the event
          of that growth.

          Leases are a commitment on space and while premises may be subleased in the event they are
          inadequate, consider the following costs:

               •     Built in CPI (Consumer Price Index) increases
               •     Option to extend lease at a pre‐agreed pricing formula.
               •     Whether the lease includes services such as cleaning, security etc.

          68 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.



          Important to cost in proper control of your bookkeeping – importance of decent accounts
          package – what to look out for in accounts package – costs of not having decent package etc.


          4.2.14                          INSURANCE
          There are a wide range of different types of insurance required for your company. The purpose
          of most of this insurance is to transfer some of the risk within your operations onto an insurer
          in return for a premium. Some such as Workers Compensation are compulsory, others such as
          Professional Indemnity high recommended, and others such as Key person life insurance
          optional.

          They can be grouped into sections as follows:

                     •    Professional Indemnity –important if you are involved with providing special services
                          or advice where the consequences of following your advice could lead to
                          detrimental outcomes.
                     •    Public Liability – Either for the public to protect your company when customers
                          could suffer personal injury or property damage, or for employees to insure for
                          negligence against injuries resulting in the place of business or while travelling.
                     •    Workers compensation ‐ This insurance is usually required by the state in which the
                          company operates. It provides valuable protection to workers and their employers in
                          the event of a workplace‐related injury or disease.
                     •    Property Insurance ‐ This type of coverage will insure inventories, facilities,
                          furnishings, and equipment from fire, theft, etc.
                     •    Key person life ‐ This type of coverage insures for business interruptions and/or
                          financial loss due to the death of a key officer or owner.


          4.2.15               LEGAL COSTS
          Legal costs are often underestimated by high growth organisations, particularly where they are
          seeking to enter new markets, protect intellectual property, and form contractual relationships
          with suppliers and customers or change shareholder agreements. Consider and cost in some of
          the following:




          69 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Changes in ownership & structure of your company. Legal negotiation and agreement
                     may be required where the classes of shares and their rights change over time or where
                     commitments are honoured to provide shares, options or profit share.
               •     Trading Agreements: An expanding company will be subjected to the necessity to
                     create a wide range of trading agreements including franchisee / franchisor, exclusivity
                     on particular geographical territories or market sectors, royalties on revenues received,
                     licensing of product etc.
               •     Intellectual Property: The cost of researching, registering, protecting, enforcing and
                     litigating major IP forms IP such as patents, trademarks, copyright and designs can be
                     significant for a company on the cutting edge of research, design and prototype
                     manufacture. Such costs will multiply if seeking to have a full standard patents with up
                     to 20 years protection across a range of jurisdictions (countries)
               •     Environmental Regulation: Environmental considerations are important to proposed
                     developments in Australia and the continued operation of a project or venture.
                     Legislative controls cover a wide range of relevant areas including: land use and
                     development, environmental impact assessments, building and pollution, waste and
                     contamination.




          4.2.16               ACCOUNTING COSTS
          Accounting costs will include any outsourced services (e.g. bookkeeping) that you use in order
          that your company accounting records are in compliance with the required standards,
          accounting advice, any external independent audits that may be required to satisfy external
          parties, tax compliance services and any Due Diligence projects you are required to undertake.

          .


          4.2.17               TAXES
          To paraphrase Benjamin Franklin, nothing is certain except death and taxes. There are still a
          bewildering number of taxes, rates and duties bestowed on the company by a variety of local,
          state and federal jurisdictions and the statute book grows larger each financial year.


          4.2.18                          GST (GENERAL SALES TAX)


          70 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          GST is a broad‐based tax calculated at the rate of 10% on the value of the supply of a broad
          range of goods and services. It is paid at each step of the supply chain and the liability to pay is
          on the supplier of the GST items. Assuming your company is registered for GST (your projected
          annual turnover is > $50,000) you will claim an input tax credit which offsets the GST included
          in the price of GST items.

          Your forecasting process needs to take account of

               •     The GST component of each transaction.
               •     The due date (monthly, quarterly etc) when GST payables and receivables due are
                     netted out.


          4.2.19                          INCOME TAX
          The plethora of assumptions in the forecast needs to be continually updated with real figures if
          the cash flow needs of the company are to be adequately understood.

          The tax situation will vary whether your company is classed as a sole trader, partnership,
          company or trust.

          Company Income is taxed at the company tax rate of 30% and distributed to shareholders via
          dividends will be subject to top up tax at personal tax rates. However companies can retain
          after tax profits indefinitely. Tax rules are different for other forms of company structure such
          as a Partnership or Trust.

          Your forecasting will need to account of issues such as tax refunds due from previous trading
          activity, losses carried forward, tax concessions and timings of tax payments.

          Here’s a sample of income tax as part of the financial modelling process.




          71 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 19: Tax Modelling



          4.2.20                          OTHER TAXES
          You will also need to take the following additional taxes into account when forecasting:

               •     Fringe Benefits Tax (FBT) ‐ Levied in respect of the total value of taxable benefits
                     (technology, cars, discounted loans, family schooling) provided to your employees as
                     part of their package.
               •     Customs Duty ‐ imposed on various goods imported into Australia at rates prescribed in
                     the customs legislation.
               •     Payroll Tax ‐ imposed by the various States and Territories on wages paid or payable by
                     an employer to an employee.
               •     Stamp Duty ‐ levied by each of the States on documents and transactions such as
                     transfers of property (including businesses and other business assets), sales of
                     marketable securities which are not quoted on ASX (including shares and units in unit
                     trusts), leasing and hiring arrangements and most secured lending transactions and
                     some unsecured lending transactions.
               •     Land Tax – imposed by each of the States on the ownership of land within the State or
                     Territory.
               •     Municipal Rates ‐ a common levy imposed on the value of land serviced by local or
                     municipal governments.

          When operating internationally, your company will also need to factor in the various national
          and local taxes and other charge applicable within that jurisdiction.



          72 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          4.2.21                          TAX PLANNING
          Income Tax deductions can be claimed for a wide variety of expenses. Typically, any expense is
          tax deductable if it is incurred in order to run the company. These could typically include
          borrowing expenses, bad debts written off, and an increase in inventory value across the
          financial year, insurance, tax advice and recruitment costs.

          You can claim capital works deductions for property improvements. This applies to extensions,
          alterations and improvements to buildings and structural improvements. To qualify for the
          deduction, the building must be used for the production of assessable income.

          Naturally a range of opportunities to take advantage of tax breaks. Specialist advice is most
          appropriate here.

          One final message. Before entering overseas markets it is important to get professional tax
          advice as to your obligations and how to structure overseas transactions.




          73 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          5. BALANCE SHEET, WORKING CAPITAL & CAPITAL
          EXPENDITURE
          One of the key financial statements required to be produced by any private registered or
          publicly listed company is a Balance Sheet. The Balance Sheet shows the assets, liabilities and
          equity in your company as a snapshot at a particular point in time.

          The Balance Sheet is a snapshot of what you own and owe and

          Simply speaking – assets are what the company owns and liabilities are what it owes. The
          balance sheet equation can be expressed simply as




          And can be illustrated by the following forecasting balance sheet.




          74 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 20: Forecasted Balance Sheet




          Definitions of each are as follows:



                                                         ASSETS                                         LIABILITIES
          CURRENT                                        Assets, including cash,                        Liabilities, including payables,
                                                         inventories and receivables held               loans and taxes that will be
                                                         for the purpose of being realised              settled within the next 12
                                                         or traded within the next 12                   months
                                                         months
          NON CURRENT                                    Assets, including property, plant              Liabilities, including interest
                                                         and equipment, investment                      bearing loans and borrowings
                                                         properties and intangible assets               that will be held beyond the next

          75 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

                                                         that will be held beyond the next              12 months.
                                                         12 month reporting cycle



          The balance sheet shows the liquidity of your company, which is the ease in which assets can be
          converted into cash in order of liquidity.

          However the balance sheet does not show the value of the firm, quality of management, and
          economic and market conditions in which your company operates.




          76 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          5.1         BUSINESS CHALLENGES – MANAGING YOUR CASH FLOW



          Estimating and monitoring the future value of assets, liabilities and equity is a very important
          component of the forecasting process. You must consider the company’s capacity to fund the
          ownership or access to assets which help to create value for the company by generating profits
          and growth.

          Conversely it is possible to go broke while making a profit. How? Simply through shortages in
          working capital where continual growth consumes cash. Debts generated by increasing sales
          cannot be collected quickly enough to pay off the increasing bills from suppliers whose
          products you are selling more products from. You require more inventories to service the
          growing number of customers who will eventually purchase your goods, given a time lag. If you
          don't have enough cash fluidity in the working capital cycle, you capacity to fund expansion is
          severely limited.


          5.1.1                MANAGING WORKING CAPITAL
          Working capital measures the funds that are readily available to operate a company. Working
          capital comprises the total net current assets of a company, which are its stocks, debtors, and
          cash—minus its creditors.

          The working capital cycle describes capital (usually cash) as it moves through a company: it first
          flows from a company to pay for supplies, materials, finished goods inventory, and wages to
          workers who produce goods and services. It then flows into a company as goods and services
          are sold, and as new investment equity and loans are received. Each stage of this cycle
          consumes time. The more time the stages consume, the greater the demands on working
          capital.

          Early warning signs of insufficient working capital include:

               •     pressure on existing cash;
               •     exceptional cash‐ generating activities such as offering high discounts for early payment;
               •     increasing lines of credit;
               •     partial payments to suppliers and creditors;
               •     a preoccupation with surviving rather than managing;
               •     Frequent short‐ term emergency requests to the bank, for example, to help pay wages,
                     pending receipt of a cheque.

          77 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          We should now look in detail at the different components of working capital and review how
          they can be improved:




          5.1.2                MANAGING RECEIVABLES
          Your understanding the ability of a customer to pay, propensity to pay on time and how you
          can speed up the collections process is an essential part of the cash flow and profitability
          process.

          Firstly, consider the time lags that occur between when the customer originally orders a
          product or service and when revenue is collected from that customer




          Review the processes that you plan for your company, and build into your forecast how the
          transition between them can be speeded up. Here are some ideas, which may be applicable to
          you depending on your own company:



                     •    Introduce retainer payments – a guaranteed fixed sum payment, usually monthly
                          that enables the customer to call on you for regular work.
                     •    Try to have the customer make as much payment upfront e.g. ask for 1/3rd when the
                          job commences, 1/3rd while in progress and the remaining third on completion.

          78 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

                     •    Send the invoice as quickly as possible.
                     •    Offer discounts for early payments – say within seven days.
                     •    Ensure that your credit reference checking is stringent prior to offering credit terms.
                     •    Ensure that your customers know the payment terms and other credit policies.
                          Make them highly visible in the invoice.
                     •    Incentivise the customer to make payments using the method least costly to you –
                          direct debit to your bank account avoids the fees payable to the providers of credit
                          cards.
                     •    Use collections as a way to motivate your sales force. Delegate to them the
                          responsibility for timely receipt as a condition of bonuses.
                     •    Ensure that regular statements are sent to customers to act as a reminder.
                     •    Be prepared to follow up late payments with phone calls or emails.
                     •    Charge interest or service charges on overdue balances.
                     •    Aim for partial payment where you know that the customer may be experiencing
                          financial pain.
                     •    Keep records including client’s reasons for slow payment? It will make it easier for
                          you to validate the reasons the client gives the next time they pay late.
                     •    Don’t hesitate for too long in using debt collection services.

          Note that as you grow you may lack the capacity or inclination to manage accounts receivable
          processes internally. There are many professional services you can utilise by outsourcing the
          debt to a reputable collector.


          5.1.3                MANAGING PAYABLES
          Accounts payable is the process of paying your suppliers, and like accounts receivable there are
          plenty of opportunities to improve your cash flow and profitability here.

               •     Before looking at some simple ways to improve your cash flow, review first whether it is
                     necessary to buy the goods and services that you are purchasing in the first place.
                     Above all are your variable costs increasing faster than your revenue? Are you
                     predicting those sales accurately? Can you purchase second hand rather than new? In
                     the current economic downturn, the auction sites are spilling over with great bargains in
                     nearly new office furniture.




          79 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Don't be too hasty when paying suppliers. Dun &Bradstreet estimate that the average
                     largish company is taking more than 50 days to pay suppliers – and that those are
                     increasing as we head towards a downturn.
               •     Are you asking your supplier for discounts? Negotiate with each of them as you may be
                     surprised at what they can offer you, particularly if you are likely to purchase in
                     quantity, be a regular customer over time or when your supplier is operating in a
                     competitive market.
               •     Try to get credit rather than cash terms with suppliers, but ensure that your own
                     systems can cope with that.
               •     Make sure that you are being accurately billed. Suppliers do make mistakes. Their
                     invoice personnel may not know about the discount you were offered by the
                     salesperson.
               •     Have a good payments tracking system so that it makes it easier to go back to them for
                     better trading terms and bulk discounts.
               •     However, don't damage your credit rating or string out supplier payments too long. It
                     may not help in your future dealing with the supplier. If there was a shortage of product
                     that you normally rely on from that supplier, would you expect to receive your fair
                     allocation?


          5.1.4                MANAGING INVENTORY
          The ultimate key to success here is to ensure that you have sufficient stock in your warehouse
          or retail premises to meet your customer’s needs, that you are not holding onto unsold stock
          for long and that you can order and receive stock from supplier at just the right time to achieve
          this. Remember that your value of stock you carry can be magnified by slow moving items,
          which in turn tie up your cash in an unproductive way.

          Effective inventory management is imperative in ensuring proper cash flow management and
          profitability. You need to know how quickly items are selling, as well as what products are
          obsolete, what are trends, seasons and fashions depending on your products, what it costs you
          to store inventory and what your margins are on finished products.

          Consider your inventory in three categories




          80 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Now what can go wrong?

               •     Inadequate tracking system or a mismatch between supply and demand that could
                     result in too much overall stock, too much old or obsolete stock. There needs to be
                     proper control over inventory ordered, with optimal ordering cycles, supplier flexibility,
                     regular stock takes and efficient warehouse system. The challenges can be multiplied by
                     a factor of thousands when you consider all of the individual unique SKU’s
               •     Theft, shrinkage and spoilage are all important aspects and you should budgets for
                     proper physical safeguards over inventories including locked storage areas for high
                     value items, limited access to secured areas and adequate security at warehouse
                     locations.
               •     Review your supply base, could you rationalise the number of suppliers and thus
                     negotiate better discounts, service, quality or delivery lead times
               •     Inevitably you will have slow moving items. You will need to make allowance where the
                     value of the inventory falls below its cost e.g. when you need to respond to a
                     competitors price discounting initiative, when newer versions of products outdate
                     current stock. The magnitude of this will depend on the industry you operate within.
                     Fashion items may rapidly decrease in value over time, as will the value of newly
                     released DVD's

          81 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Ultimately, accept that you will never get things totally right. You’ll need a rule of thumb for a
          proportion of total items that are going to be sold for less than cost. This also include fixing or
          damaged inventory as well as staff discounts.

          When producing a forecast, it is important to consider that some costs will be variable and
          some fixed, and some costs will fluctuate more over time. Consider the longer term input costs
          and maintain the flexibility to transfer components of cost from variable to fixed such as
          building factories rather than outsourcing manufacturing.




          82 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          5.2        FUNDING WORKING CAPITAL AND GROWTH

          There are a wide range of options available if you are seeking to fund a growth in your working
          capital, either through finance of the equipment itself or the production facilities required to
          build your products. Loans, leasing and factoring are commonplace means, but consider also
          the availability of inventory, trade and production finance through more specialised finance
          providers.


          5.2.1                EQUIPMENT FINANCE – LOANS AND LEASING
          If you are seeking to acquire equipment to facilitate more rapid growth or your company, there
          are a wide range of leasing, loan and hire purchase options as illustrated:




          Figure 21: Equipment Lease & Own Options


          The options can be explained as follows:




          83 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.


                                      HIRE PURCHASE               EQUIPMENT                    FINANCE LEASE      OPERATING
                                                                  LOAN                                            LEASE


          DEFINITION                  Agreement to                Borrow money                 Agreement          Agreement to
                                      purchase                    to purchase                  where financier    rent equipment
                                      equipment over              equipment                    provides finance   for use in
                                      time                                                     for you to lease   business for
                                                                                               equipment.         fixed term, the
                                      Financier owns
                                                                                               Purchase usually   returned at term
                                      equipment until
                                                                                               possible at end    end.
                                      final payment is
                                                                                               of term.
                                      made


          BENEFITS                    Can choose what             Legal ownership,             100% finance       100% finance
                                      % you wish to               but mortgaged                provided.          provided.
                                      finance.                    to financier.
                                                                                               No interest rate   Can upgrade
                                      Can purchase at             Loan can be                  fluctuations       equipment
                                      any time                    repaid any time.                                without
                                                                                               Rental payments
                                                                                                                  concerns for
                                      Interest                    Able to utilise              tax deductible
                                                                                                                  disposing it.
                                      payments &                  balloon payment
                                                                                               Can claim input
                                      depreciation tax            at period end                                   Rental payments
                                                                                               tax credit via a
                                      deductible                                                                  tax deductible
                                                                  Interest                     GST BAS
                                      Able to utilise             payments &                                      Can claim input
                                      balloon payment             depreciation tax                                tax credit via a
                                      at period end               deductible                                      GST BAS

                                      No interest rate            Deposit is
                                      fluctuations                optional

                                      Can claim input             No GST on loan
                                      tax credit via a            or repayments
                                      GST BAS




          84 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.


          IS IT RIGHT?                Ideal if you wish           Ideal for claiming Ideal if you want            Ideal if you want
                                      to own at end of            input tax credits to lease                      to upgrade
                                      period.                                                                     equipment

          Table: Types of Loan & Lease – Adapted from Commonwealth Bank Table




          5.2.2                FACTORING
          This is typically arranged with a financial institution and involves them lending cash to you
          based a proportion of the face value of invoices. The institution provides a flexible line of credit
          and promptly pays up to 90% of your book debts in cash. The balance is paid to your company
          when the debt has been collected from your customer. This process creates a flexible line of
          credit, allowing you to fund your rising cost of working capital that will come from business
          expansion.

          Naturally this comes with costs attached and while it brings forward your cash receivables, it
          does so at the expense of the loss of some of the gross margin you would obtain from the
          customer.


          5.2.3                INVENTORY FINANCE
          Inventory Finance enables established businesses to finance their purchasing of stock – raw
          materials, work in progress or finished goods for resale to customers. Usually, the following is
          applicable:

               •     The inventory does not have to be presold.
               •     Flexibility on the matching of repayments to the speed that your stock is sold
               •     No security on assets or property is required
               •     A line of credit facility is usually established.

          Inventory Finance can resolve some of the cash flow issues when a rapidly growing company
          continually needs access to ever increasing working capital. In addition, access to larger stock
          levels may also provide you with the opportunity to negotiate bulk discounts and early
          payments rewards with suppliers, but this has to be offset against the additional costs that this
          finance brings.



          85 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          5.2.4                PRODUCTION FINANCE
          Finance arrangements may be available to fund your outsourced production costs. This may
          include manufacturing, processing or refining costs that add value to your goods for sale. Like
          inventory finance the following is usually applicable.

               •     The products to be produced don’t have to be presold.
               •     No security on assets or property is required
               •     A line of credit facility is usually established



          5.2.5                WAREHOUSE FINANCE

          Aligned with Production Finance, Warehouse Finance may be of value if you need to obtain and
          store bulk container loads, particularly for bulk buying. If you do not have the warehousing and
          storage space, you finance provider may assist you to form a partnership with a large logistics
          provider who can assist with storage and distribution of your products.



          5.2.6                VENDOR FINANCE
          Another form of finance which can also increase your revenue stream is vendor finance. Here’
          you will form a partnership with a large finance provider and through this partnership, offer
          your customer financial options when purchasing your products. As your customer has easier
          access to funds, their purchasing options may be greater. This is common with cars and office
          equipment such as computers, and is promoted to B2C customers as “no interest, no
          repayment” schemes.




          86 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          5.3        BUSINESS GROWTH – INVESTING IN THE FUTURE

          A key forecasting principle is that over the long term, the assets must generate profit. That rate
          of profit generated must be higher than the rate of interest incurred on the interest bearing
          liabilities. When you plan to purchase assets, review the long term value that will be derived
          from them, whether those assets are tangible (plant & equipment), intangible (patents,
          goodwill) or even entire companies in an acquisition.

               •     Sale & Leaseback: Opportunity to derive cash by selling property or large equipment
                     and leasing it back. You remain the tenants or continue to use the property and
                     equipment.
               •     Appreciating Assets: Certain assets particularly land and buildings may rapidly
                     appreciate in value over time. Other assets integral to the operation of the company
                     such plant & equipment and motor vehicles may depreciate.
               •     Intangibles: In certain industries, intangible may form a major part of your longer term
                     assets. These include patents and other intellectual property, brands and goodwill, and
                     can be the lifeblood of your company, the source of many of the high value sales and an
                     important item in the valuation of the company.
               •     Investment in associates or other non related businesses: Investments are additional
                     assets not needed for the main part of the company. They are generally acquired using
                     surplus cash that the company is not using for working capital or CapEx.
               •     Acquisitions: Your company may perceive that it needs to make strategic investments in
                     related companies‐ suppliers, customers and associates. These may in the future lead
                     to strategic acquisitions. This is covered in Section 8.
               •     Investments in unrelated property, shares, trusts and interest bearing securities: These
                     have no relationship to the core business, but may be a simpler way of obtaining higher
                     returns (at least in the short ‐ medium term) that deploying those funds in company
                     related activities.

          Throughout your forecasting period you may want to look at the structural nature of your
          organisation and how well it handles a given set of inputs (cash, resources, labour etc) in order
          to produce the most efficient set of outputs – finished products, profits and growth. The major
          outlays that you have to plan for come under the category of Capital Expenditure.



          5.3.1                CAPITAL EXPENDITURE

          87 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Capital Expenditure occurs when a company spend in order to purchase fixed assets, or
          upgrade existing fixed assets. These include property, equipment and industrial buildings and
          the outlay is made to increase the scope of the company’s operations. If the asset is going to
          be used beyond the immediate financial year, the cost must be capitalised. Those costs are
          then depreciated over the life of the asset.

          There are four types of costs relating to tangible assets that can be capitalised:

               •     Costs that produce a benefit lasting beyond the current tax year.
               •     New assets that have a life beyond one year.
               •     Improvements that prolong the life of an asset (enhancements, repairs etc)
               •     Adaptations that allow the asset to be used for a new or different purpose.

          For forecasting and modelling purposes here is a sample Capital Expenditure forecast of a chain
          store retailer that is opening up new branches, closing old ones, refurbishing existing ones and
          ensuring that the appropriate IT and warehousing expenditures of each are taken into
          consideration.

                                                                       FY 07‐08              FY 08‐09           FY 09‐10       FY 10‐11
           New Stores ‐ Greenfields                                            2.30                  2.57           2.53             2.44
           New Stores ‐ Acquisitions                                           3.10                  2.53           3.41             2.41
           New Stores ‐ Replacements                                           2.70                  3.00           2.97             2.85
           Store Refurbishments                                                1.90                  6.00           2.09             5.70
           Store Extensions                                                    3.10                  5.97           3.41             5.67
           Stay in Business ‐ R&M                                              2.60                  6.10           2.86             5.80
           Stay in Business ‐ Operational                                      3.30                  14.50          3.63            13.78
           MIS                                                                12.10                   6.00         13.31             5.70
           Distribution                                                        2.50                  2.58           2.75             2.45
           Property Developments                                               3.70                  11.33          4.07            10.77
           Gross Capex                                                        37.30                 60.58          41.03            57.55
           Property Sales                                                     ‐6.10                 ‐15.30         ‐10.00           ‐10.77
           Net Capex pre Fitout Leasing                                       43.40                 75.88          51.03            68.31
           Fitout Leasing                                                     ‐3.30                 ‐14.50          ‐3.63           ‐13.78
           Net Capex post Fitout Leasing                                      46.70                 90.38          54.66            82.09
           Acquisitions                                                       12.00                  3.60           5.20             5.60
           Total Capex & Acquisitions                                         58.70                 93.98          59.86            87.69

          Figure 22: Capital Expenditure Model




          88 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.


          The following are a series of questions that need to be addressed and include in your growth
          costings:




          5.3.2                MANUFACTURING CHALLENGES

               •     Can you make any improvements in efficiency?
               •     How close are the manufacturing facilities to your distribution channels? Is
                     responsiveness affected? Could you reduce transportation charges? Is there
                     government or other incentives for you to relocate company facilities?
               •     How available are raw materials and what are the likely cost fluctuations?
               •     What is the maintenance requirement of the manufacturing plant? Have they been
                     costed in, in downtime costs?
               •     What opportunities are there for vertical integrating your manufacturing? Can you
                     create efficiencies by manufacturing rather than sourcing components? If you supply
                     product to another manufacturer, can you enhance the value of their end product by
                     producing it yourself?
               •     How effective are your inventory control systems?
               •     How effective are your QA system?
               •     How old is your equipment? Can newer technologies create cost efficiencies?
               •     What is likely to be the turnover of key personnel? What value do these personnel
                     bring to your organisation and how dramatic is the learning curve for replacement
                     personnel?



          5.3.3                RESEARCH & DEVELOPMENT CHALLENGES


          One of the key challenges here is to ensure a pipeline of new product innovations that relace
          and enhance the current product offering. Dedicated resource in terms of research, market
          analysis, partner involvement and the development of business cases need to be costed and
          included in the forecast.

          For both new product development and general R&D consider the following:


          89 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     What is the research capability of your development team? Are there any skill sets that
                     you are lacking? How well equipped are your laboratories and development areas? Can
                     they be improved? What access can you have to superior, shared resources?
               •     What manufacturing support is there for R&D? Can tests and small production runs be
                     fed through to your plant?
               •     Do your research staff have a true vision of how the marketplace is evolving? Can their
                     managers inspire a vision and facilitate an innovative & creative environment? Do they
                     understand costs and benefits? Are they focused on market realities and optimise cost
                     with performance
               •     How able is your company to recruit and retain specialists? Tech managers who
                     understand financials,
               •     How proprietary is their technical knowledge and are there risks of that changing?
               •     Can they both create and shape future developments as well as act in the defensive
                     through lowering offensive manufacturing costs, low cost product improvements and
                     supporting economies of scale requirements?




          90 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          5.4        LIMITS TO GROWTH – CAN YOU GROW TOO QUICKLY?

          Economic downturns can challenge the most successful rapidly growing companies, but much
          of the problem could be that they grew too fast in the first place, by undertaking sub‐optimal
          growth. Recently Starbucks announced the closure of 75% of its Australian locations. These
          locations were opened during times of economic growth, but were built in the first place
          without rigid demographic analysis and without a clear understanding of the tastes of an
          Australian coffee drinker. It is possible to grow too fast when an investor’s demand for growth
          exceeds the strategic business rationale for doing so and it turns into growth only for the sake
          of growing.




          91 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          6           FINANCING
          The freeing up of excess working capital may be the cheapest form of financing. However,
          there will be some occasions as you grow where external finance is the most appropriate way
          of obtaining a large scale input of funds into your operations. You may be expanding your
          product range, processes, research capabilities or your geographical reach, and simply making
          internal adjustments will not give you the financial flexibility you need.

          As well as having an operational strategy in place, a rapidly growing company also requires a
          financial strategy, which is a set of policies that determines the sourcing and distribution of
          funds.

          Even smaller organisations must have a framework for assessing their financial strategy and
          ensuring that it is aligned with the operations of the company. Why?

               •     To assist in making acquisitions that can help grow the company through diversification,
                     horizontal / vertical integration or simply scale by acquiring competitors.
               •     Ensure that there is sufficient access to finance that the company can draw on in periods
                     of underachievement.
               •     Ensure that free cash flows are either profitably reinvested into the organisation, or
                     distributed to shareholders if such reinvestments cannot obtain a market rate of return.
               •     Ensure that the cash reserve is deployed appropriately.

          Key issues:

               •     Most companies will be financed by a mixture of debt and equity. A healthy growing
                     company should have an “appropriate” balance of debt (borrowings) and equity
                     (ownership). This “appropriate” capital structure needs to give consideration to your
                     company’s future revenues and investment requirements.
               •     Debt finance is less costly because debt holders expect a lower rate of return in
                     exchange for greater certainty of repayment and a preferential position in the event of
                     bankruptcy. Debt is also tax deductible, thus further reducing the cost of debt to the
                     company.



          92 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     One of the purposes of forecasting is to ensure that you have sufficient debt capacity in
                     place to be able to cope with a range of different scenarios that could occur. One key
                     issue is to watch the interest charges incurred by borrowings. Profits can be reduced or
                     even eliminated by borrowings which in turn have to be funded by a reduction in
                     owners’ equity. In the current economic circumstances with rising interest rates this is
                     all the more prevalent.

          The amount of debt in your company is known as its gearing ratio and may be simply calculated
          as follows:

           DEBTS
           Interest Bearing Loans & Borrowings                            500,000
           Redeemable Preference Shares                                    60,000
           Cash & Short Term Deposits                                    ‐250,000
           NET DEBT                                                       310,000
           TOTAL EQUITY                                                 1,000,000
           TOTAL CAPITAL EMPLOYED                                       1,310,000

           Gearing = Net Debt / Total Equity                                 31.00%

          Figure 23: Calculating Gearing


          An acceptable level of debt may be something that you and other shareholders / directors have
          agreed upon, or it may be imposed on the company by means of a banking covenant on the
          debt (see later).

          What is an acceptable level of debt? The finance text books are crowded with debate about this
          issue, but much of the answer depends on the industry that you are operating within, the
          growth stage of the company and your company’s capability to be able to cost efficiently access
          either one or both means. Here are some key pointers:

                                                         DEBT                                           EQUITY
          ADVANTAGES                                     Funds growth while avoiding                    Returns to the shareholder are
                                                         diluting the ownership interest                based on “best efforts” rather
                                                         of equity holders.                             than a legal obligation to repay
                                                         Tax efficient use of operating                 debt.
                                                         cash flows. The cost of debt is                Equity holders may be lower
                                                         tax deductible.                                expectations that debt holders in
                                                                                                        a recessionary environment.
          DISADVANTAGES                                  Debt must be serviced with                     Equity holding pattern likely to
                                                         interest payments that are                     be more volatile if company


          93 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

                                                         increasing in the current                      listed and traded on an
                                                         environment.                                   exchange.
                                                         Higher levels of debt (relative to
                                                         serviceability) can adverse affect
                                                         credit ratings.



          Overall, smaller organisations, particularly those that are enjoying rapid growth are more likely
          to be characterised by lower debt levels, simpler capital structures, mainly short maturity
          senior bank debt, lower dividend payouts and share based incentive compensation.


          Equity includes

                     •    The original share capital rose for the company
                     •    Any additional capital raisings
                     •    The accumulated profits from previous years not dispersed through dividends.




          94 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          6.1        DEBT



          Your company is more viable long term if the borrowings match the assets e.g. a company with
          mainly long term assets requires mainly long term borrowings. You should not arrange short
          term borrowings to acquire non current assets, as the short term cash inflows from revenues
          generated by the non current asset will more than likely not match the outflows from payments
          due on the asset.

          Loans have the potential to be substantially reduced if other cash flow components could be
          managed.

          You will need to consider appropriate levels of debt. Too much debt as a percentage of total
          company value can mean:

               •     Interest payments will swell and put pressure on your company to be able to cover
                     interest and principal repayments.
               •     A lower credit rating for companies who are rated by credit agencies such as Moody’s
                     and Standard & Poors

          A loan, usually obtained from a financial institution is a common form of debt. This loan will be
          either

               •     secured where you will pledge and asset such as a property as collateral, or

               •     unsecured such as an overdraft, credit card debt or a bond.



          The timing of borrowing repayments is important as sufficient cash will be required, or new
          borrowings arranged. You'll need to predict the likely cash situation at the time and the likely
          need to arrange new funds.

          You may also have given commitments to lenders, such as banks, that the company maintains
          certain pre‐agreed ratios for liquidity (cash buffers) and other criteria. These are known as
          covenants, and commit the company to agree limit other borrowing or to maintain a certain
          level of gearing. Other common limits include levels of interest cover, working capital and cash
          flow.



          95 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          The example below shows financial forecasting to take account of two covenant ratios

               a) That Group EBITDA must always remain more than three times the value of the interest
                  repayment on debt.
               b) That the leverage ratio (debt / total tangible assets) must not exceed 40%.

          Both these measures illustrate that the company directors will need to recast their forecasts in
          the light of the potential of both covenants being broken.




          96 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                                                                  The definitive eGuide for developing company financial forecasts.
           Covenant One - Group EBITDA >= 3x Net Interest Expense
                                           q1 07-08           q2 07-08          q3 07-08               q4 07-08          q1 08-09          q2 08-09        q3 08-09       q4 08-09          q1 09-10               q2 09-10       q3 09-10        q4 09-10
                                            Current            Forecast         Forecast               Forecast          Forecast          Forecast        Forecast       Forecast          Forecast               Forecast        Forecast        Forecast
           EBITDA                        4,082,982           1,460,022         2,003,966          3,018,251             3,466,860         3,114,287       1,883,344     1,774,560         1,669,881            1,435,217         1,287,166       1,411,923
           Net Interest Expense            867,111             867,111          867,111                836,778           806,444           806,444         776,111        745,778           745,778                715,444         685,111         685,111
           Forecast EBITDA Ratio                 4.71              1.68              2.31                 3.61               4.30              3.86            2.43          2.38                2.24                 2.01            1.88            2.06
           Covenant                                3                 3                 3                     3                 3                 3               3                3                3                     3               3                3



              5.00

              4.50

              4.00

              3.50

              3.00
                                                                                                                                                                                                                              Forecast EBITDA Ratio
              2.50
                                                                                                                                                                                                                              Covenant
              2.00

              1.50

              1.00

              0.50

              0.00
                          q1 07-08    q2 07-08          q3 07-08      q4 07-08          q1 08-09           q2 08-09        q3 08-09        q4 08-09      q1 09-10     q2 09-10        q3 09-10          q4 09-10




           Covenant Two - Leverage Ratio - Must be <=40%
                                           q1 07-08           q2 07-08          q3 07-08               q4 07-08          q1 08-09          q2 08-09        q3 08-09       q4 08-09          q1 09-10               q2 09-10       q3 09-10        q4 09-10
                                            Current            Forecast         Forecast               Forecast          Forecast          Forecast        Forecast       Forecast          Forecast               Forecast        Forecast        Forecast
           Senior Debt                  70,000,000          72,569,143        74,446,451         72,949,767           72,349,159         64,291,890      58,000,000    58,000,000        58,000,000          58,000,000         58,000,000      58,000,000
           Total Guarantees             14,225,000          14,225,000        14,225,001         14,225,001           14,225,001         14,225,001      14,225,002    14,225,002        14,225,002          14,225,002         14,225,003      14,225,003
           Total Senior Debt            84,225,000          86,794,143        88,671,451         87,174,768           86,574,160         78,516,891      72,225,002    72,225,002        72,225,002          72,225,002         72,225,003      72,225,003


           Total Assets                213,083,514         213,241,245      215,853,343         216,578,522        214,744,907          208,614,591     203,167,522   199,748,882       200,352,532         194,839,199        191,577,315     192,683,384
           Less Goodwill                12,593,811          12,593,811       12,593,811          12,593,811           12,593,811         12,593,811      12,593,811    12,593,811        12,593,811          12,593,811         12,593,811      12,593,811
           Total Tangible Assets       200,489,703         200,647,435      203,259,532         203,984,712        202,151,097          196,020,781     190,573,711   187,155,072       187,758,722         182,245,389        178,983,504     180,089,573


           Forecast Leverage Ratio               42%               43%               44%                  43%                43%               40%             38%           39%                 38%                  40%             40%             40%
           Covenant                              40%               40%               40%                  40%                40%               40%             40%           40%                 40%                  40%             40%             40%



              45%

              44%

              43%

              42%

              41%
                                                                                                                                                                                                                                Forecast Leverage Ratio
              40%
                                                                                                                                                                                                                                Covenant
              39%

              38%

              37%

              36%

              35%
                           q1 07-08   q2 07-08          q3 07-08          q4 07-08          q1 08-09         q2 08-09        q3 08-09        q4 08-09      q1 09-10    q2 09-10        q3 09-10           q4 09-10




          Figure 24: Covenant Modelling




          97 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          6.2        EQUITY



          Equity is the residual interest in the company’s assets after the deduction of liabilities. It is
          made up of contributions from owners; pre and post start up investors, retained earnings and
          reserves.

          Along your growth path, you are going to be reviewing a range of issues pertaining to
          ownership of your company. While you may start off being the 100% shareholder, your funding
          and control needs may change to where this ownership is diluted and

               •     ownership is split amongst a number of shareholders,
               •     an external investor such as a business angel or venture capitalist becomes involved as a
                     result of your funding and expansion needs
               •     you want to keep your own managers motivated and incentivised by offering employee
                     shares or options.

          The issues that surround deal making with external investors, convertible debt to equity shares
          and dilution provision in shareholder agreements all go beyond the scope of this eGuide.




          6.2.1 DIVIDENDS AND RETAINED PROFITS
          Dividends are the distribution to the shareholders of a certain amount of the profit made by the
          company. Whatever is not distributed is reinvested into the business as Retained Earnings.

          You will need to consider the necessity of declaring a dividend. Determinants include:

               •     How much cash is available ‐ liquidity
               •     Debt covenants restricting the payout amounts to shareholders
               •     Stability of earnings.

          Dividend policy revolves around public perception rather than rational company objectives‐ i.e.
          that the firm should maintain or increase its dividend payout every year. However, the real
          issue is whether the firm can gain a better return on those funds than the shareholder.


          98 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          The rational approach to dividend payments is that if the company cannot reinvest the earnings
          at a higher expected return that the shareholder would obtain through use of the money in an
          alternative investment proposition, then the company should pay the Dividend.

          Several factors should be considered when thinking about investing retained profits. These
          include

          RETURNS ‐ The percentage you earn on an investment is key. Some products, like bonds, offer a
          specific, guaranteed return. Some products offer a higher return, but it is not guaranteed.

          SAFETY ‐ What’s the risk factor? Conservative investors might choose a bank savings account
          because the return is safe. Aggressive investors might prefer to lean towards property or
          shares, but their money is not insured, nor is the return guaranteed.

          LIQUIDITY ‐ If and when you need your invested money, how quickly can you access it? Money
          market accounts and savings accounts are considered liquid assets because they can be turned
          into cash quickly. Products with staggered maturity dates give you access to cash at different
          times.

          DIVERSITY ‐ A smart way to reduce risk is by spreading your money among several types of
          investment products. For example, you could bonds and shares.


          6.2.2 EMPLOYEE SHARES & OPTIONS
          An employee ownership programme is a very useful motivational tool for helping your
          employees to have the same overall goals as the business. You may choose to have either a
          broad based scheme whereby all of your employees can own shares in your company via an
          ESOP (employee share ownership plan) or where you offer shares or share options to a few key
          employees.

          If you are considering proving shares to employees, you will want to consider the following:

               •     Will the scheme be motivational for the group of employees who now have shares, as
                     well as the entire company?




          99 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Will the shares be provided free or via a loan, known as an Employee Share Loan Plan
                     (ESLP)? How will the loan be structured and repaid? Will the employee have the
                     capability to accumulate more share, say via a regular saving and investment plan?
               •     What opportunities will there be for employee salary sacrifice to purchase shares?
               •     What are the tax implications from both the company and the employee’s perspective?
               •     How will the scheme grow? Could it be a lead in for the retirement of an owner, where
                     a team of employees acquire the company? (The leveraged ESOP) This is starting to
                     become a valid opportunity for the owner to exit the business without a trade sale of
                     public listing.
               •     What will the criteria be for an employee who wishes to sell their shares?

          Another alternative, share options give your managers the right (but not the obligation) to
          purchase company shares at a pre‐agreed fixed price for a specific period of time. Again, these
          act as a motivator to increase the value of the company, in order that these options have a true
          value.

          From a forecasting perspective, it enables the capital base of the company to expand, it
          encourages the reinvestment of company profits into the company to fund its further growth,
          and it requires the owner to provide finance or arrange financial sources for employees wishing
          to acquire shares.


          6.2.3 OTHER RESERVES
          There may be other reserves in the equity component of your Balance Sheet. These include:

          Types of Reserves
          Shareholder Contributions                  This includes
                                                     a) options, where investors subscribe funds to acquire an option that
                                                     gives them the right to acquire funds at a later date.
                                                     b) Forfeited shares reserve, where investors failed to pay a call on
                                                     partly paid shares.
          Realised Gains                             These include:
                                                     Gains made on disposal of capital types of profit
                                                     Retained earnings
                                                     General reserve
                                                     Capital profits reserve

          Unrealised Gains                           These include:
                                                     Asset revaluation reserves
                                                     Foreign currency transaction reserves


          100 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          101 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          6.3        HIGH GROWTH COMPANY’S – SPECIAL CONSIDERATION

          It is frequently said that company’s most able to raise capital are those least in need of it.
          Conversely, those growth companies with the highest potential to succeed in rapid business
          expansion are those least able to obtain the finance since their propositions will be the most
          untested and thus the highest risk.




          Figure 25: Financing a High Growth Business


          102 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Venture capital (or angel investing for start ups) is high‐risk capital directed towards new or
          young businesses with prospects of rapid growth and high rates of return. Venture capital
          companies will provide capital for R&D and new product development for an idea, and will
          cater for early stage and later stage expansion companies, as well as finance for management
          buyouts and buy‐ins of established companies.




          103 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          7 REPORTING & ANALYSIS
          Behind the financial statements sit a whole series of analysis about whether your company is
          heading in the right direction. This section is dedicated to:

               a)    Reviewing your cash flow forecast.
               b)    Reviewing your performance ratios.
               c)    Tracking your actual performance to your budget
               d)    Explaining the value of considering alternative scenarios for your company




          104 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          7.1        CASH FLOW & CASH MANAGEMENT FORECASTING

          “You can lose money for a while, but you only run out of cash once”

          The cash flow forecast is an absolutely essential part of your company reporting. Its proper
          management is a discipline that ensures a company is kept in a healthy state.

          Cash flow is simply the movement of cash in and out of the company. Cash flow management
          is essential as a discipline that tells you how much cash is in the company at any future point in
          time. It reduces the risk of insolvency and can reduce the cost of financing an entity. This is by
          reducing the amount of capital employed.

          Here’s a sample cash flow forecast outlining the forecasted inflows and outflows from a sample
          company.




          Figure 26: Cash Flow Forecast Modelling

          105 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          This will determine your financial capability to expand and whether external financing or tighter
          cash management is required for any financial shortfall.

          A properly formulated cash flow forecast will pinpoint whether you can afford your working
          capital requirements, pay your debts and reward your shareholders and whether you afford the
          asset purchases required to facilitate growth.

          The cash flow forecast shows where the cash is coming from and where it is used in the running
          of the company. It is in the form




          This statement provides an early warning of potential cash shortages, identify whether
          additional funds will be needed, identify potential surpluses that can be invested to generate
          additional income and assists in preparing requests for financiers for additional funding.

          The danger signals, of insufficient cash being generated include:


          106 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

               •     Net cash flows from operations are negative
               •     Receipts from customers are lower than payments to suppliers and employee.
               •     Cash flow from operating activities is lower than the after tax profit

          With this forecast, you must also take into account, various risk factors. If you’ve got very little
          set aside in your account, what percentage shortfall in revenues earned will make you unable
          to meet your month end payments?




          7.1.1 CASH FLOW & INVESTORS
          Finally viewing the cash flow statement from a potential investor’s standpoint, before investing
          the investor needs to be convinced that cash will be created, that can be eventually taken out
          of the business by the investor. The investor will seek a cash flow model incorporating the
          following variables with built in scenarios that can be changed in a “What If…?” Type format.

               •     The estimated costs of acquiring a customer
               •     pricing and gross margins,
               •     accounts receivables aging,
               •     realistic administrative costs,
               •     taxation
               •     depreciation.




          107 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          7.2        RATIO ANALYSIS

          You need to include within your forecast, a series of ratios that review the forecasted
          performance of your company across a range of criteria, as well as across a range of periods
          (years), in order to recognise critical areas where the company may be at risk. These include:

          Measure                            Explanation                                Ratio
          Short Term Solvency /              Can the company pay its                    •    Current Ratio = Current Assets /
          Liquidity                          due debts?                                      Current Liabilities
                                                                                        •    Quick Ratio = Quick Assets /
                                                                                             Current Liabilities

          Activity / Efficiency              How well is working                        •    Asset Turnover = Revenue / Total
                                             capital managed? How                            Assets
                                             well do your company’s                     •    Receivables Turnover = Revenue /
                                             assets generate sales?                          Receivables
                                                                                        •    Inventory Turnover = Cost of
                                                                                             Goods Sold / Average Inventory

          Financial Leverage                 How does your financial                    •    Debt ratio = Total Debt / Total
                                             structure change over                           Assets
                                             time? How much                             •    Debt/Equity Ratio = Total Debt /
                                             financial risk are you                          Total Equity
                                             exposed to?                                •    Debt / Capitalisation = Total Debt /
                                                                                             (Total Debt plus Equity
                                                                                        •    Interest Cover = Earnings before
                                                                                             interest and taxes (EBIT) / Interest
                                                                                             Expense
                                                                                        •    Profit margin = Profit / Revenue
                                                                                        •    Return on Assets (ROA or ROI) =
                                                                                             Profit / Total Assets
                                                                                        •    Return on Equity (ROE) = Profit /
                                                                                             Equity

          Market Value Ratios                If you are a listed                        •    P/E ratio = market price per share /
                                             company, what is the                            Earnings per share (EPS)
                                             market’s view of your                      •    Dividend Yield = Dividend per share
                                             company?                                        / Market price per share
                                                                                        •    Market / Book = Market price per
                                                                                             share / Book Value




          108 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          7.3        VARIANCE



          Simply forecasting your company’s finances is insufficient. You need to be continually
          monitoring how your actual performance is comparing to your forecast.

          Has your actual financial performance for the period lived up to the budgets and expectations
          you set at the beginning of the period? The difference is simply the variance and is a key set of
          statistics for presentation to the board, management and financiers.

          If your company has not performed to expectation, how much of this can be attributed to:

                     •    Unexpectedly high or low level of awareness or sales from promotional activity.
                     •    Poor purchasing policies or efficiency
                     •    Poor labour usage or efficiency
                     •    Poor distribution policies
                     •    Poor pricing strategy
                     •    Changes in consumer behaviour or attitudes
                     •    Unanticipated seasonal variations
                     •    Reputation of the company changing.

          And more important, what can be done to change this?

          It is important to be able to track your actual overhead costs to that which you had budgeted
          for. Costs have a way of spiralling out of control when there’s insufficient management
          scrutiny.

          The greater the risks and volatility in your overall industry, the greater the time and emphasis
          should be placed on tracking your performance to budget. The more unpredictable the future,
          the more often you need to be reforecasting and producing rolling forecasts in order to align
          your operating needs with the general competitive environment.

          Increasingly, board reporting is simplified by a series of pre‐developed digital dashboards
          illustrating the performance of key variables. Here is one such example:




          109 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 27: Variance Analysis in Reporting




          Finally, what kind of financial reviews take place, who undertakes and how frequently are they
          undertaken. These reviews could include:

          STRATEGIC: Is the company focused and focused in the right direction? Review by
          performance to budget, sales to expense ratios etc.

          PROFITABILITY: Where is the company making most of its profit? Review by product,
          customer, territory or channel.

          EFFICIENCY: How efficient is expenditures in different areas relative to results. Review by
          production, R&D, marketing, sales, accounts, customer service and pretty well every business
          function that has costs associated with its upkeep.




          110 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          7.4        SCENARIO ANALYSIS

          A complete financial forecast will have alternate results reflects alternate outcomes that could
          happen to the company. For example, they may reflect realism, optimism and pessimism in the
          financial plan

          The impact on a cash flow of a pessimistic forecast must be taken into account. Can the
          company withstand the shocks, in terms of its current liabilities (interest to be repaid, creditors
          etc) and reserves of one or more worse than expected reporting periods.

          With the results of a pessimistic cash flow forecast, consider your strategies for the following:

               •     Would you seek to maintain or downscale future capital expenditures for subsequent
                     periods?
               •     Do you have the flexibility to adjust the debt repayment schedules?
               •     What changes would you make to the operational side of the company in terms of
                     subsequent forecast periods of revenue and cost? In the end this would depend on the
                     reason for the performance shortfall relative to base case.
               •     Has the overall market for your products and services changed? (How did your
                     competitors perform?) Are there structural changes in the way that your customers
                     have their needs met (Airlines v Video & WebConferencing) or are there changes in the
                     overall economy (downturns in consumer spending)

          You may want to develop a more sophisticated modelling environment for forecasting:

               •     What would be the profit impact of delaying a product launch?
               •     What would be the impact on profits of offering discounts to increase sales volume?

          Consider applications that provide sophisticated and powerful modelling and "what if"
          calculations.

          The following layout compares the financial outcomes under a range of alternate scenarios.




          111 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 28: Graphical Analysis of Scenarios




          112 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          7.5        SENSITIVITY ANALYSIS

          Rather than creating alternative forecasts based on different perspectives on the future, you
          could select one or a few variables and later them in order to assess their impact on financial
          indicators such as earnings, cash flow or money‐in‐the bank.

          Key variables for adjustment would include:

               •     Expected Gross Margin. You may assume 30% of the ex‐GST selling price for an
                     electrical appliance, but what if price discounting occurs because retailers are fighting to
                     clear stock?
               •     Expected Sales Penetration: You may believe that 5% of a particular population will
                     purchase your patented drug at the prevailing price, but what if viral marketing and an
                     overly successful PR campaign increases consumer awareness more quickly than
                     expected?
               •     Market Share: You may consider that 10% market share is a reasonable 5 year target for
                     your product, but what if a customer’s become aware of a quality problem with a
                     competitor’s product?
               •     Distribution Payment / Royalties: What if you have to increase the margin you pay
                     distributors above 15% in order for them to be prepared to stock your product?
               •     Marketing Spend: what if the 20% of revenue that you have previously forecasted as
                     appropriate marketing spend turns out to be inadequate and you have to increase the
                     proportionate spend in order to create additional awareness?

          You may also wish to include various economic statistics in your forecasts. Interest Rates are a
          good example. If they adjust upwards or downwards, what is likely to be the effect on…?

               •     Sales Revenues – as consumers have altered purchasing power.
               •     Your company debt – as interest on repayments may be higher or lower.




          113 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          7.6        RISK MANAGEMENT



          A major component of forecasting is the understanding of risks that could adversely affect the
          cash flows of your company, as well as a strategy for mitigating them, even if (like most of these
          risks) they are outside of your control.


          7.6.1 BUSINESS RISKS
          There are a wide range of business risks to be considered when reviewing your business, your
          industry and market fluctuations. Every industry will have certain similar operational risks, but
          other different levels of risks depending on the nature of that industry.

          Some common risks include

               •     Highly volatile revenues, perhaps related to the general economic cycle.
               •     Challenges at maintaining internal systems
               •     Capability of management to handle growth
               •     Capability to integrate operations when expanding
               •     Market power of one or a few large customers
               •     Unproven revenue potential for new products
               •     Capacity constraints, particularly with manufacturing, R&D and skilled personnel
               •     Dangers of acquisitions / strategic alliances between competitors,
               •     Growing the business globally
               •     Loss of key personnel,
               •     Legal liabilities
               •     Capabilities to adopt changes in technology, or international standards
               •     Possibility of another company’s IP infringement
               •     Long lead times for commercialisation of new developments particularly in
                     biotechnology

          Increasingly uncertain times, greater competiveness and greater industry volatility calls for Risk
          Management processes even in the smallest of organisations.


          7.6.2                FINANCIAL RISKS


          114 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          Components such as interest rate fluctuations (both in Australia and overseas), changes in
          exchange rates and changes in the commodity prices, are all inevitable issues when doing
          business. They create an unanticipated mismatch between prices, costs and debt and most
          significantly affect trading margins and interest repayments.

          You need to

               a) considering where you are exposed to risk
               b) understand the size of that exposure
               c) Consider how this risk may be mitigated.

          Risks may be classified as follows:



          TYPE OF RISK                EXPLANATION                 DETAIL                       MITIGATION
          Liquidity Risk              Insufficient funds          Borrowed funds               Maintain unused funding sources in view
                                      to meet due                 not available at             of factors such as future debt repayment,
                                      liabilities.                acceptable terms.            capital expenditure, seasonal fluctuations,
                                                                  Loss of credit line          potential acquisitions and contingencies
                                                                  from funder.
          Interest Rate Risk          Movements in                                             Include sensitivity analysis in your
                                      interest rates will                                      forecasts.
                                      affect financial                                         Use of pre‐agreed fixed and locked in
                                      performance by                                           interest rates.
                                      increasing interest                                      Offsetting the increases in interest paid in
                                      expenses                                                 one part of business with interest
                                                                                               received on another.
                                                                                               Use of swaps – exchanging a floating rate
                                                                                               obligation for a fixed obligation.
          Foreign Exchange            Risk that exchange          Risk that these              Forward planning including buying
          Risk                        rate used to                movements make               forward currency
                                      convert foreign             your company’s               Other hedging against currency moves
                                      revenues and                products or                  e.g. foreign currency bank accounts.
                                      expenses and                services
                                      assets / liabilities        uncompetitive
                                      to Australian               internationally.
                                      dollars causes
                                      shareholder
                                      wealth to decline
          Commodity Price             Risk that a change                                       Reducing reliance on specific
          Risk                        in the price of a                                        commodities
                                      commodity that is                                        Forward buying
                                      a key input /

          115 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

                                      output of an
                                      organisations
                                      business will
                                      adversely affect
                                      financial
                                      performance
          Credit Risk                 Risk that the other         Could also be the            Assess counterparty risks prior to
                                      party in a                  consequence of               involvement. Use of prompt payments.
                                      transaction will            international                Avoid creating an undue dependency of a
                                      not be able to              government                   limited number of suppliers, distributors
                                      meet its financial          directives and               or customers
                                      obligations.                policies or a
                                                                  settlement
                                                                  delivery risk that
                                                                  destroys future
                                                                  business dealings



          Here’s where the key risk elements may be create:

               •     Who are your customers? How much of your total revenue is made up by the top five
                     spenders? Top ten? Top twenty?
               •     Where are your customers located?
               •     Where is your manufacturing done?
               •     How much are your interest expenses, are they fixed or floating and in what currency
                     denomination?
               •     What is the main currency denomination of your payables and receivables?
               •     What are the main currency denominations of your major competitors?




          116 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          7.6.3                RISK MANAGEMENT FRAMEWORK
          As part of a business plan, you may include a Financial Risk matrix, outlining the main financial
          risks, the probability of them occurring, their impact and what you would do to mitigate them:

          RISK                    PROBABILITY         IMPACT              RISK SCORE           PLAN OF          RESULTANT
                                  (1‐5)               (1‐5)                                    ACTION           FINANCIAL IMPACT
          Increasing              2                   3                   6                    Dual source      Lower quantities
          costs of raw                                                                         raw materials    ordered means higher
          materials                                                                                             cost price and longer
                                                                                                                lead times – see
                                                                                                                model (b)
          Competitor              2                   2                   4                    Bring forward    Access to new
          XYZ plc enters                                                                       Australian       revenue stream
          Australian                                                                           launch of new    earlier,
          Market                                                                               generation       cannibalisation of
                                                                                               product          existing revenue and
                                                                                                                high costs required for
                                                                                                                QA & customer
                                                                                                                service – see model
                                                                                                                (c)
          Failure to              1                   4                   4                    Ramp up          Reduce unit sales by
          interest                                                                             direct online    10%, but increase
          distribution                                                                         presence         gross margin from
          channels                                                                                              30% to 40% ‐ see
                                                                                                                model (d)




          117 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          8. ACQUIRING OR SELLING – VALUATION & OTHER
          CHALLENGES


          You may need to value a company for a whole range of reasons. These can include anything
          from a buy / sell proposition or an employee share option plan to a capital raising or a marital
          dissolution.

          Your prime business goal will probably be for you to maximise both the current value of that
          company and its future potential value.

          An updated cash flow forecast allows you to be able to use one of the more sophisticated
          methods of valuing a company, Discounted Cash Flow (DCF) to calculate your company value.
          This may also be appropriate when looking for additional shareholders or equity partners, or
          buying out existing partners in the company. It is particularly relevant for high growth
          companies where their current trading profit does not reflect their potential.

          A discounted cash flow simply values your company based on the expected future cash flow
          streams generated, adjusted for the level of risk inherent in achieving those forecasts. Reams
          have been written on this methodology, its applications and its limitations that would be out of
          place in a document of this nature, but simply stated, models that incorporate a valuation,
          require as inputs:

          •    Around five years of forecasted cash flows.
          •    A risk percentage rate required to discount these forecasts by – the higher the percentage
               risk rate, the riskier the business proposition. (Stable cash flows in a stable industry with
               high capital requirement and higher barriers to entry attract a lower discount rate than
               more volatile organisations and industries.
          •    An overall per annum anticipated growth in cash flows of the company, relative to the
               overall growth in the economy.)

               An alternative method for valuing a business with more stable revenues is applying a
               multiple to the normalised earnings (EBIT, EBITDA, PBT etc) of your company to arrive at a
               nominal value. Normalised earnings would exclude extraordinary or exceptional items, one
               off non recurring items and discontinued divisions or product lines.

          118 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.


               The following chart illustrates the average value of a business in different industries in the
               first quarter of 2008 as a multiple of their EBIT:




          Figure 29: Average Business Value by Industry. SOURCE: BizExchange Index March 2008 Quarter Results


          Generating forward cash flow figures and discounting them at the cost of capital enables you to
          calculate the present value of your company. Your software is a useful valuation tool, as the
          software helps you look ahead at those future cash flows and allows you to see what steps
          need to be taken to increase the valuation. Valuation is particularly important where future
          profit may be a long way out, or where your cash flows are irregular.

          Valuation is a versatile tool appropriate for buying or selling a company or as an important
          management focus and motivation tool. Agreeing and targeting a stream of anticipated future
          cash flows, is a far better measure of business value that accounting statements!



          119 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          8.1        INCREASING YOUR BUSINESS VALUE



          Your financial forecast should display numerical evidence that many of the following strategies
          are being adopted as you grow your company:



               •     Implementing a marketing strategy based on differentiation, quality, cost leadership,
                     innovation or extreme focus.
               •     Create entry barriers through economies of scale, product differentiation.
               •     Access to distribution channels.
               •     Design a strategy to maintain market share
               •     Reduce costs in line with industry demand reduction
               •     An effective relationship between total cumulative output and unit cost of your
                     production of products and/or services.
               •     Attempt to identify profitable niche
               •     The effective use of possible alliances/partnerships.

          The valuation of your company will adjust in accordance with general market conditions (boom
          versus slump), the prevailing value of similar enterprises, your forecasted and risk adjusted rate
          of growth and the degree with which your company possess the following capabilities.




          120 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 30: Increasing Business Value




          121 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          8.2        ACQUISITIONS

          It is estimated that only 17% of acquisitions add shareholder value, while 53% actually lose
          shareholder value and the remaining 30% produce no added value.

          An acquisition may be part of your “roll up” strategy to consolidate the number of players in
          your industry. The advantages of this may include:

               •     Revenue enhancements from improved marketing, less competition, capacity to enter
                     new markets and greater muscle when seeking large corporate or government
                     customers through tendering opportunities.
               •     Cost reductions from economies of scale, economies of vertical integration, elimination
                     of inefficient management, purchase economies and the capacity to make better use of
                     existing resources.
               •     Utilise the research and development capabilities of the acquired company.
               •     Risk diversification through having either a broader geographic operation, the capacity
                     to diversify into different customer segments
               •     Tax gains from transfer of operating losses, unused debt capacity and lower cost of
                     capital.

          A longer term strategy may also be the increase overall valuation of the combined company
          through obtaining the higher valuation multiples that a corporate will achieve relative to an
          SME. However undertaking an acquisition for this purpose alone is risky as economic boom /
          slump cycles also play a significant role in the determination of multiples.

          In addition, many of the more successful “roll up” acquisitions are under the guidance of a
          Private Equity team. While Private Equity clearly has its role in strategic planning, driving
          processes and financial structures etc, investors may well have different time horizons to
          owners and may be motivated more by the financial engineering than the long term business
          opportunities.

          With potential acquisitions, you should be able to see a financial opportunity through
          underperforming assets or bad management. But they may be more than offset by the Control
          Premium, the costs of acquisition, and post acquisition challenges such as potential
          diseconomies of scale including loss of key staff dissatisfied by the acquisition etc.

          Acquisition is only one of many alternatives for growth. Other quasi‐ integration strategies
          include technology licenses, strategic alliances, franchising, joint ventures or asset ownership.


          122 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          The chart in Chapter Three reviews the partnering and alliance process and argues that you
          could achieve similar objectives at a lower risk by considering this route.

          Acquisitions may also involve a Management Buy Out (MBO) of your company, where your
          incumbent management team raises capital to buy your company. Alongside your
          management team, an investor or VC will take a stake in the company, and arrange debt
          funding for the management team. The advantage of this is that the management team is now
          focussed on the same goals as the shareholders.


          8.2.1 VERTICAL INTEGRATION
          Vertical Integration is a means of co‐ordinating the different stages of an industry supply chain.
          Here your company may seek to own its upstream suppliers and its downstream buyers. It’s
          however a risky strategy, complex, expensive and hard to reverse.

          The main circumstances given when it can be good to integrate are:

               •     When the vertical supply chain “fails”, transactions between the players become too
                     risky and too costly, and there needs to be some “control” or market power in its place.
               •     When you can create an exploit market power, usually be creating barriers to entry for
                     other companies looking at competing in this space.
               •     Where the industry life cycle is either too young – and you have to forward integrate to
                     develop the market, or too old e.g. you have to fill gaps by others leaving market. (You
                     may need the reassurance of product supply from a company considering exiting the
                     industry).

          There are also spurious reasons for integration e.g. reducing cyclicality and assuring market
          access.

          In the end long‐term contracts, joint ventures, strategic alliances, technology licenses, asset
          ownership, and franchising tend to involve lower capital costs and greater flexibility than
          vertical integration.




          123 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          8.3        DUE DILIGENCE

          Due Diligence is a process undertaken by a buyer of a business in order to determine the
          attractiveness, risk and issues of that potential acquisition. The due diligence can be either
          external (assessing the future potential of that company in a competitive marketplace) or
          internal (assessing the key legal, financial and managerial issues within the company).

          If you are considering selling your business in the future it helps to address the key issues that
          buyers will look for when the sale time comes. Conversely, you may be looking at acquiring a
          business, in which case the MindMaps below can act as your checklist for what you should be
          looking out for.

          As part of the negotiation process it is also important to ascertain what the motives are of all of
          the other parties involved. In particular, why is the owner selling? What does the owners’
          management want to get out of this? Why does the owner want cash rather than shares? What
          are the motivations of the other parties?

          Due diligence is a large & complex subject in itself, but this series of MindMaps will graphically
          list the key areas that you need to be aware of:


          8.3.1                DUE DILIGENCE – ORGANISATIONAL & FINANCIAL
          A seller will necessarily provide financial projections through rose tinted glasses in order to
          maximise the value of their business. It’s important to compare these projects with actual
          trading history. If there is a major discrepancy, ask yourself, if the seller is so confident of this,
          why would he or she wait a couple of years until those projections had been realised and sell
          the business at that point?

          Ownership may not simply be a case of transfer 100% of a company over from one party to
          another. There may be other issues clouding the transactions including minority shareholders,
          commitments to management staff and suppliers, ownership of technologies and lender
          covenants.




          124 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 31: Organisational & Financial ‐ Due Diligence



          8.3.2                DUE DILIGENCE – MARKET OPPORTUNITY
          Assessing the market opportunity for a venture involves strategic due diligence, and in order to
          undertake this successfully, you will need to source more opinions than those of the owners.
          This analysis involves the size and growth potential of the market, the customers and potential
          customers accessible and the major current and potential customers.




          125 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 32: Due Diligence ‐ Market Opportunity



          8.3.3                DUE DILIGENCE – LEGAL, TECHNICAL & MANUFACTURING
          The incumbent management team of an existing company is frequently cited as being a major
          reason for the success of that company. If you are purchasing a company, will those individuals
          stay with the company, and if so, do you need to offer them incentives or “golden handcuffs”?
          Alternatively, you may not want them to stay, particularly if you are purchasing a company
          believing it to be undervalued because if the ineptitude of their current management?

          Technology also may or may not be important. For technology companies, technology will be
          the cornerstone of its competitive advantage, but you will need to look at most companies with
          a manufacturing facility to determine the state of their processes. How efficient are they?
          What capital expenditure may be required to ensure that obsolescence is not an issue?




          126 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          Figure 33: Organisational, Legal, Technical & Manufacturing Due Diligence




          127 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.

          8.4        EXITING YOUR BUSINESS

          Rarely do company owners consider what their exit strategy is while in the early stages of
          building their companies, yet it is one of the key factors that determine the value of their
          company. How you intend exiting from your business is fundamental to the way that you grow
          your company. Ask yourself the following:

               •     What large company has a significant customer base who would buy my products?

               •     If I develop a large customer base, what large company has a portfolio of products or
                     services that could be readily sold into my customer base?

               •     Could my products or my underlying technology be used to open up new markets for a
                     large company with the resources to fund market development?

               •     Can my products or services be easily modified or extended to create new products that
                     could be sold to the customer base of a large company?

               •     Can my company provide the catalyst for a large corporation to break into a new growth
                     market?

           Whether your exit is via a trade sale or via the longer process of a listing on the Australian
          Stock Exchange (remember with the latter, your remaining post‐float shares will likely be in
          “locked up”), the laws of supply and demand apply. The greater the number of potential
          purchasers, and the lower the number of similar company’s offering your range of products /
          services, the higher the valuation.




          128 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008
FORECASTING, FINANCING & FAST TRACING YOUR BUSINESS GROWTH

                                                                      The definitive eGuide for developing company financial forecasts.




          9          REVIEWING YOUR FORECAST
          How good a shape is your company in at the end of your forecast period? Have you costed in to
          your forecast, expenses that ensure the following are covered:

               •     Your manufacturing plant remains effective, productive and not facing technical
                     obsolescence.
               •     The next generation of those products have been developed to replace and enhance
                     your current revenue streams
               •     There is the potential spare capacity in manufacturing, or the flexibility to outsource in
                     order to cater for an upsurge in demand.
               •     You have the right skill set in your development division to respond to or create new
                     developments in your chosen market.
               •     You have made the right investment in environmental safeguards both
                        o Positively ‐ "green" products that will appeal to a more concerned public
                        o Negatively ‐ limit the potential for litigation for environmental damage caused by
                            products, manufacturing plants etc or via public opinion ‐ packaging etc.



          The final words go to Woody Allen:


                             “More than any time in history, mankind faces a crossroads. One path
                             leads to despair and utter hopelessness, the other to total extinction.
                             Let us pray we have the wisdom to choose correctly”




          129 | P a g e
© 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which
will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com
The above text contains generic financial information that does not constitute financial advice.
Last revised: September 2008

Forecasting, Financing &amp; Fast Tracking Your Business Growth

  • 2.
    TABLE OF CONTENTS TABLEOF FIGURES ............................................................................................................................................. 5 1 INTRODUCTION ......................................................................................................................................... 7 2 STRATEGIC VISION ..................................................................................................................................... 9 2.1 HAVE A VISION............................................................................................................................................11 2.2 WHY FORECAST? ............................................................................................................................................12 2.3 PROFILE OF SUCCESS.........................................................................................................................................14 2.4 MAKING FORECASTING EFFECTIVE .......................................................................................................................17 2.5 UNDERSTANDING CUSTOMERS ..................................................................................................................19 2.5.1 Market Segmentation ...........................................................................................................................19 2.6 REALISTIC ASSUMPTIONS ...........................................................................................................................21 2.7 GETTING STARTED WITH YOUR FORECAST ..............................................................................................................23 3. REVENUES ................................................................................................................................................28 3.1 PRODUCT SALES ..............................................................................................................................................30 3.2 PRICING ........................................................................................................................................................33 3.3 GEOGRAPHICAL EXPANSION ......................................................................................................................36 3.4 NEW PRODUCT REVENUES .............................................................................................................................38 3.5 ALLIANCES, PARTNERSHIPS, LICENSING AND DISTRIBUTION AGREEMENTS ..............................................39 3.5.1 Licensing ................................................................................................................................................40 3.5.2 Strategic Alliances ..................................................................................................................................41 3.5.3 Distribution Channels .............................................................................................................................41 3.6 FRANCHISING .............................................................................................................................................43 3.6.1 Being a Franchisor .................................................................................................................................43 3.6.2 Being a Franchisee .................................................................................................................................44 3.7 PROJECT MANAGEMENT ............................................................................................................................45 3.8 OTHER INCOME ..............................................................................................................................................47 3.8.1 Grants & Financial Assistance ...............................................................................................................47 3.8.2 Intellectual Property Income .................................................................................................................47 4. COSTS .......................................................................................................................................................49 4.1 COST OF SALE .................................................................................................................................................51 4.1.1 Refunds, Warranties and Guarantees ....................................................................................................52 4.1.2 Loyalty & Awards Programmes .............................................................................................................52 4.2 OPERATING EXPENSES / OVERHEADS ................................................................................................................54 4.2.1 Marketing ..............................................................................................................................................55 4.2.2 Marketing ‐ Market Research ...............................................................................................................56 4.2.3 Marketing‐ Marketing Effectiveness ..................................................................................................... 57 4.2.4 Competitive Intelligence .......................................................................................................................57 4.2.5 Marketing – Customer Retention ..........................................................................................................58 4.2.6 Marketing ‐ Branding ............................................................................................................................60
  • 3.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 4.2.7 Information Technology – As A Revenue & Profit Driver .......................................................................61 4.2.8 Information Technology – As A Cost Of Doing Business ........................................................................62 4.2.9 Employee / Personnel Costs ...................................................................................................................63 4.2.10 Staff & Management Incentives (Commissions, Bonuses)................................................................66 4.2.11 Director / External Advisor Payments ...............................................................................................67 4.2.12 Other Operating Expenses ................................................................................................................67 4.2.13 Building Lease ...................................................................................................................................68 4.2.14 Insurance ..........................................................................................................................................69 4.2.15 Legal Costs .........................................................................................................................................69 4.2.16 Accounting Costs ...............................................................................................................................70 4.2.17 Taxes..................................................................................................................................................70 4.2.18 GST (General Sales Tax) ....................................................................................................................70 4.2.19 Income Tax........................................................................................................................................71 4.2.20 Other taxes .......................................................................................................................................72 4.2.21 Tax Planning .....................................................................................................................................73 5. BALANCE SHEET, WORKING CAPITAL & CAPITAL EXPENDITURE .................................................................74 5.1 BUSINESS CHALLENGES – MANAGING YOUR CASH FLOW .......................................................................................77 5.1.1 Managing Working Capital ...............................................................................................................77 5.1.2 Managing Receivables ..........................................................................................................................78 5.1.3 Managing Payables ..............................................................................................................................79 5.1.4 Managing Inventory..............................................................................................................................80 5.2 FUNDING WORKING CAPITAL AND GROWTH ....................................................................................................83 5.2.1 EQUIPMENT FINANCE – LOANS AND LEASING......................................................................................83 5.2.2 Factoring ...............................................................................................................................................85 5.2.3 Inventory Finance ..................................................................................................................................85 5.2.4 Production Finance ...............................................................................................................................86 5.2.5 Warehouse Finance...............................................................................................................................86 5.2.6 Vendor Finance .....................................................................................................................................86 5.3 BUSINESS GROWTH – INVESTING IN THE FUTURE .......................................................................................87 5.3.1 Capital Expenditure ...............................................................................................................................87 5.3.2 Manufacturing Challenges ....................................................................................................................89 5.3.3 Research & Development challenges ....................................................................................................89 5.4 LIMITS TO GROWTH – CAN YOU GROW TOO QUICKLY? .............................................................................91 6 FINANCING ..............................................................................................................................................92 6.1 DEBT ...........................................................................................................................................................95 6.2 EQUITY .......................................................................................................................................................98 6.2.1 Dividends and Retained Profits ..............................................................................................................98 6.2.2 Employee Shares & Options ...................................................................................................................99 6.2.3 Other Reserves .....................................................................................................................................100 6.3 HIGH GROWTH COMPANY’S – SPECIAL CONSIDERATION .......................................................................................102 7 REPORTING & ANALYSIS ............................................................................................................................... 104 3|Page © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 4.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7.1 CASH FLOW & CASH MANAGEMENT FORECASTING .............................................................................................105 7.1.1 Cash Flow & Investors ..........................................................................................................................107 7.2 RATIO ANALYSIS............................................................................................................................................108 7.3 VARIANCE .................................................................................................................................................109 7.4 SCENARIO ANALYSIS .................................................................................................................................111 7.5 SENSITIVITY ANALYSIS ....................................................................................................................................113 7.6 RISK MANAGEMENT .................................................................................................................................114 7.6.1 Business Risks.......................................................................................................................................114 7.6.2 Financial Risks .....................................................................................................................................114 7.6.3 Risk Management Framework ............................................................................................................117 8. ACQUIRING OR SELLING – VALUATION & OTHER CHALLENGES ................................................................ 118 8.1 INCREASING YOUR BUSINESS VALUE ........................................................................................................120 8.2 ACQUISITIONS ..............................................................................................................................................122 8.2.1 Vertical Integration ..............................................................................................................................123 8.3 DUE DILIGENCE .........................................................................................................................................124 8.3.1 Due Diligence – Organisational & Financial ........................................................................................124 8.3.2 Due Diligence – Market Opportunity ..................................................................................................125 8.3.3 Due Diligence – Legal, Technical & Manufacturing ............................................................................ 126 8.4 EXITING YOUR BUSINESS ..........................................................................................................................128 9 REVIEWING YOUR FORECAST .................................................................................................................. 129 4|Page © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 5.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. TABLE OF FIGURES Figure 1 Company Stakeholders ..................................................................................................................................10 Figure 2: The Valuation Increases as the Company achieves its Milestones. .............................................................13 Figure 3: Porter's Five Forces Model ...........................................................................................................................15 Figure 4: Five Forces Model & Bread Producers .........................................................................................................16 Figure 5: Segmenting Your Market into Attackable Niches ........................................................................................20 Figure 6: Revenue Streams & Assumptions for an Airport .........................................................................................22 Figure 7: Front Cover to Aggregate Forecast ...............................................................................................................24 Figure 8: Linking Actuals from Accounting Software ...................................................................................................26 Figure 9: Overall Expenses ...........................................................................................................................................27 Figure 10: Expenses in Detail ......................................................................................................................................27 Figure 11: Forecasted Income Statement....................................................................................................................28 Figure 12: Revenues and Assumptions ‐ Charity ........................................................................................................32 Figure 13: Evaluating Growth Opportunities ..............................................................................................................37 Figure 14: Process for Assessing Alliance Opportunities ............................................................................................39 Figure 15: Process for Valuing IP ................................................................................................................................48 Figure 16: Fixed and Variable Costs ............................................................................................................................49 Figure 17: Strategies for Customer Retention ............................................................................................................59 Figure 18: Building a Financial Model to include new and existing Revenues ...........................................................60 Figure 19: Tax Modelling ............................................................................................................................................72 Figure 20: Forecasted Balance Sheet ..........................................................................................................................75 Figure 21: Equipment Lease & Own Options ...............................................................................................................83 Figure 22: Capital Expenditure Model ........................................................................................................................88 Figure 23: Calculating Gearing ....................................................................................................................................93 5|Page © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 6.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 24: Covenant Modelling...................................................................................................................................97 Figure 25: Financing a High Growth Business ...........................................................................................................102 Figure 26: Cash Flow Forecast Modelling .................................................................................................................105 Figure 27: Variance Analysis in Reporting ................................................................................................................110 Figure 28: Graphical Analysis of Scenarios ...............................................................................................................112 Figure 29: Average Business Value by Industry. SOURCE: BizExchange Index March 2008 Quarter Results .........119 Figure 30: Increasing Business Value ........................................................................................................................121 Figure 31: Organisational & Financial ‐ Due Diligence ..............................................................................................125 Figure 32: Due Diligence ‐ Market Opportunity .......................................................................................................126 Figure 33: Organisational, Legal, Technical & Manufacturing Due Diligence ...........................................................127 6|Page © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 7.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 1 INTRODUCTION Entrepreneurship has its glamour. However behind the world of intense negotiations, last minute deals and successful garage visionaries are the less glamorous concepts that you must get right – cash flow, working capital, pricing strategy etc. This eGuide is all about financial forecasting. It addresses the truism “failing to plan is planning to fail”. A forecast is simply a translation of the vision and strategy of your company into financial numbers. Many entrepreneurs and managers find this process tedious and intimidating. External support is not always there for you. This eGuide is here to assist you. Your company must be self‐sustaining over the short term and profitable over the long term. It must generate sufficient cash to pay the bills and maintain increasing levels of sales. I wrote this having spent many years working with fast growing dynamic Small & Medium Enterprises. These dynamic companies continually faced the longer term financial challenges which would help determine their success. Most businesses use adequate to good Management Accounting packages such as MYOB, and Quicken. These tools are perfect for audit and for a historical review of the enterprise, but do not address future challenges. How are key expansion questions such as the following answered? • What is our company worth today? How can we increase its value in the future? • How can we afford to fund our growth? How will our needs for ever increasing amount of working capital be addressed? • Should we purchase? Should we build / buy that new automation system or factory? • Our new venture? Should we pursue the opportunity to develop and market a new product range? • Buy versus build? Should we invest in the capacity to produce key inventory ourselves or outsource this? 7|Page © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 8.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Our acquisition plans? Will the anticipated future profit streams and the savings from synergies justify the cost of acquisition? The forecasting process is often one of iteration, where you can plan different ‘what if’ figures model and assess the different outcomes. If you increase the sales budget, how many additional sales people will you need to generate that level of extra sales? What will happen to your cash flow in the months that it takes for the salespeople to reach peak performance? Developing your forecast on a spreadsheet or custom building standalone or web‐based software allows you more flexibility and complexity in trying out these different scenarios. The different scenarios will also show the impact of relevant risk factors. How will interest rates affect the demand for housing? What is the relationship between the amount of rain next summer and my company’s ice cream sales? I’ll make a couple more points before getting into the detail: Firstly, there's no need to reinvent the wheel in regards to building your own forecasting spreadsheets. There are a wide range of software packages and spreadsheets commercially available. They vary in quality, robustness, price and applicability to your demands of your particular company or industry. I have not specifically mentioned any in this booklet, but my organisation would be delighted to understand more about your specific operating conditions and talk you through your options. Secondly, I’ve tried to cover as many different types of industry, position on the supply chain, and way of doing business as I can within the limited space below. I haven’t managed to cram in every variable for every company, but would be delighted to receive your feedback about what needs to be addressed. The booklet is only in PDF soft copy at present, meaning that I can update it whenever I need to. Hence your insights would be most welcome. Happy reading and most important of all, good luck with your venture! Mark Ostryn markostryn@knowledge2020.com September 2008 8|Page © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 9.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 2 STRATEGIC VISION It is often said that there are four types of company: • Those that make things happen. • Those that watch things happen and respond. • Those that watch things happen and don’t respond. • Those that didn’t notice that anything had happened. We’d all like to be in the first group, but no matter how visionary we are, much of our work is in responding to other’s first moves. We’ve even got it wrong from time to time, and not responded when we needed to! This eGuide is all about planning to make things happen – having a strategy. We’ll also try to help you with responding to market shifts – mainly by forecasting that they will occur and doing some scenario planning (what if….?), some sensitivity analysis (if interest rates increase by x% what will be the effects on sales?) and some risk management. A business entity is simply a collaboration of resources that is must make the greatest possible return on a flow of financial inputs provided to it. • These inputs are DEBT, primarily from financial institutions and EQUITY from shareholders. • The company itself is a collection of productive resources – brainpower, technology, manufacturing processes and intellectual property that must turn these financial inputs into productive assets. • The end financial output must represent either a greater or a more secure rate of return than competing investment proposition that also require those debt and equity inputs. Thus your company is only sustainable if, for a given level of risk: • A holder of EQUITY in your company (i.e. a part‐owner) can get a greater return on that investment compared with other investment opportunities • A holder of DEBT in your company earns a market competitive rate of interest for lending funds to your company. Along the way there are also other stakeholders in the company that also need to be satisfied 9|Page © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 10.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 1 Company Stakeholders While many of these stakeholders may not have a direct bearing on the performance measurements generated by the company, their indirect impact may be substantial e.g. • Requirement for environmental measures, sustainability etc. • Requirement to look at the community impact of decisions to locate in a particular city, provide employment to residents of that city • Requirement to look at “financial dispersements” made by the company which may not be “financial rational” to shareholders, but which may show the company as a good corporate citizen e.g. charity donations etc. 10 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 11.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 2.1 HAVE A VISION “You can analyse the past but you need to design the future. That is the difference between suffering the future and enjoying it” Edward de Bono Forecasting is more than looking at what you achieved last year and extrapolating it forward for the next few years. That’s called backcasting! Forecasting requires you to think about what you want to be in the future, consider what it going to take to get you there, and think about what how your industry, you customer and the world in general can change in the meantime. How will the following global trends affect your customers and your processes and Look how rapidly, new technologies and ideas are spreading. What will telecommunications and the internet look like in ten years time? How will substantially higher energy costs and green issues affect the way we all do business and consume? There are many, many of these big questions to ask: Globalisations of plagues and diseases, restrictions on alcohol and “junk” food, wealth disparities between rich and poor people, continued growth of China and India, increasing migration, evolution of cities, evolution in genetic research, development in nanotechnology, changes in life expectancy, exponential growth in innovations and inventions, changes to family life. The list is endless. What will impact on your business? 11 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 12.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 2.2 WHY FORECAST? As forecasts are invariable inaccurate or even wrong, is it worth going through the forecasting process? You must have a set of financial projections, a numerical statement of what you want your company to achieve. Additionally, lenders need to see a strong likelihood of repayment; angel investors and venture capitalists will calculate what they think is the value of your venture. These figures will be used by the investor to calculate the potential future value of your company based on a valuation technique such as multiples of earnings or profits or discounted cash flow. If they are convinced that your framework has been scrupulously prepared using best available information, they will have more confidence to invest in your company. The process of generating these figures also adds reality to your expansion plans. For example, if you want to open up a production facility in China you will need to research and allocate the costs for doing so. Having performed that financial analysis, you will be in a better position to assess alternatives such as outsourcing manufacture instead. A supplier of funds will also see where you are more financially vulnerable and where you are most likely to require financial injections. You may find that you do not require all of the $5m invested upfront and by having it staged over time you have the opportunity to obtain a higher valuation for your company as you move through from start up to expansionary phase. The following real life model has a series of performance milestones that the company is forecasted to achieve, prior to them receiving additional funding at the pre‐negotiated price per share 12 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 13.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 2: The Valuation Increases as the Company achieves its Milestones. In short, while no investor is expecting you to get your future projections "correct", the thought process discipline required to do the projections in the first place alerts you to potential opportunities or threats that you may not have otherwise considered. 13 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 14.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 2.3 PROFILE OF SUCCESS Successful growth companies will share many of the following characteristics: • Proprietary technology, owned by the company. This acts as a barrier to entry, preventing other players from coming into the market. That way margins can remain higher, and there is less need to discount price in the face of competition. • Entrepreneurs with a great track record – i.e. previous successful ventures. • Large and growing potential market for the product or service. Typically with a forecast, the demand curve will start off slowly as the product or service establishes itself as “needed” by its target market. Earlier versions may be slower sellers, and the company has to adjust its operating cost base in order to fulfil growing demand. Here, working capital pressures can be at their greatest. • Good potential sales and sustainable margins. This can be through ownership of Intellectual Property or proprietary know‐how. • A tendency for the company to remain innovative and on the cutting edge of technology • A proven market need for the product, established through researching and testing the market • A sustainable competitive advantage with high barriers to entry for potential competitors. • A greater possibility for strategic alliances to leverage the strengths of other companies An excellent framework for assessing where your company is in relation to its competitive environment is Porters Five Forces Model. Developed by Michael Porter, the model describes five forces that determine the competitive intensity and therefore the attractiveness of a market. These forces are continually changing and such continual changes also require that you continually reassess your marketplace. 14 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 15.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 3: Porter's Five Forces Model To illustrate this, imagine the competitive forces of a bread producer: • Their bargaining power with their customers – the supermarkets and catering firms. • The impact of health trends on the types of bread they produced. • The changing cost of raw materials such as grain and transportation charges. • Bread substitutes. What else can people eat for lunch apart from sandwiches? • The impact of local bakeries and local franchises on total demand. This and other factors can be mapped to the following diagram: 15 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 16.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 4: Five Forces Model & Bread Producers Prior to forecasting the number for your own venture, you may want to review the key forces that will affect your industry over the next five years or so, using the Five Forces framework. 16 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 17.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 2.4 MAKING FORECASTING EFFECTIVE Following in from this, consider the following: • Do you know how marketplace trends will affect your company over the short and longer term? • Have you established your company’s goals and priorities for the next financial year, and beyond to the next three to five years? • Have you set financial targets for the next financial year? • Do you have a method for measuring your company’s performance against your goals, priorities and financial targets? • Does your management team know your company’s goals and financial targets for the next financial year, and what they need to do to achieve them? • How frequently will these targets be reviewed? • What incentives do the key managers have to achieve these targets? "Planning differs between budgeting and forecasting in intent. While the budget is used to control, the forecast is used to predict, the plan sets out desired outcomes and expectations usually over a longer‐ term period. In essence plans are used to affect change." PA Consulting Group There are several major steps to ensure that the forecasting approach is effective and that the results are credible: • Forecasts imply a plan so your team should be familiar at least with the aims of their own functional or strategic area. Issues such as confidentiality which may preclude full openness should be ironed out prior to a session. • Parameters and assumptions such as the size of the market, major production or product changes, expected sales growth, exchange rates and so on should be set early and disseminated uniformly to form the basis of the plan. • The sales budget should be the first part to be tackled, as it reflects the economic and competitive forecasts and shapes all of the other component parts of the budget. All 17 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 18.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. other budgets should be developed consistently with the sales volumes. Manufacturing production targets, stock levels and product support are all dependent. • Once the forecast has shaped up, your cash flow forecast is needed to assess affordability. This will ensure that the forecast when finalised is consistent with broad financial parameters and does not, for example, assume unrealistic borrowing requirements. • Effective forecasting requires good communications throughout your organisation. The budgeting component may move up and down the organisation and sanity checks between senior managers of the various divisions may be required before all changes are agreed. • Once agreed, the final figures need to be reviewed and confirmed that at a corporate level the return on assets / investment is sufficiently high. If not, consideration needs to be given to cutting costs, selling more or increasing efficiency. 18 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 19.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 2.5 UNDERSTANDING CUSTOMERS An important aspect of forecasting is in understanding the makeup of customers who purchase your products. One key issue for planning is – are they profitable? Consider the types of products they purchase and the services that they may require with them. Consider also the implications of negotiating a volume deal over time with a large company. Will the discounted price, plus all of the free priority support and service offering they may require, make Big Company overall a viable customer? And what if Big Company doesn’t renew or repurchase in the future. Might you have lost the focus or even the contact of smaller customer companies? 2.5.1 MARKET SEGMENTATION Importantly, you will also need to consider what customers you effectively wish to target. Some target markets can be addressed more profitably than others. As a general rule, you can segment your market by dividing up your total market into a series of niches, and reviewing each niche (below) in order to rank the priority levels that you will address those markets. Some niches may never be cost effective, as it will cost you more to service them than the revenues you can expect from them. Take the potential market for a product such as a device to test water quality at the water source rather than back at the laboratory. There are several different niches that the product can be sold into, but the company has limited resources and cannot attach all niches simultaneously. 19 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 20.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 5: Segmenting Your Market into Attackable Niches Management and advisors have determined that given limited personnel, promotional; budget and R&D funds, it would be best to concentrate on two specific niches (1.3 and 2.1) initially, before attempting to grab the wider market. 20 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 21.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 2.6 REALISTIC ASSUMPTIONS Your forecast should document all assumptions used when you created this view of the market. Some of these assumptions may be controllable e.g. the per capita take up of a new medical device over time, and some uncontrollable, such as the future price of a barrel of oil. Taking the Australian car industry as an example, the total population of Australia is 21million and car ownership is at around 12 million. To forecast the total sales of a particular car brand, you would take into account: • The growth of total population of Australia in the forecasting period. • The number of people under 17, or those in the upper age bracket ineligible to drive. • The trend in car ownership per household. • The trends in type of car (sedan, convertible, 4WD) likely to occur. • The trends in public transport available. • The costs of car parking in major cities. • The reputation of the particular brand and model of the car • Relative running costs of that model compared with competing models And a whole host of other factors. It can often be informative to map out each of the key revenues and costs of your business, and place alongside them all of the assumptions that you have made. For example, an airport will have several revenue streams, each of which will depend on a range of future assumptions that you will have input. Some of these assumptions are general and will be made across a range of revenue streams (e.g. total passenger or freight traffic, which in turn will be partially based on general economic health), and some will be specific to a particular revenue stream e.g. the viability of Tax Free shops may depend on future adjustments to the consumption tax both in Australia and overseas in the future. A mapped out list of assumptions may look something like this: 21 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 22.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 6: Revenue Streams & Assumptions for an Airport 22 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 23.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 2.7 GETTING STARTED WITH YOUR FORECAST Before you calculate and type in your first numbers, you have to consider a series of issues pertaining to your forecast. These include: CUSTOM SOFTWARE OR EXCEL SPREADSHEET? The market for purpose built financial software is expanding, both as downloadable software or software‐as‐a‐service, where you log on to a provider via an internet connection. Amongst spreadsheets, typically Excel® based, you may choose to build your own from scratch (with its inherent time consuming challenges) or purchase ready made forecasting spreadsheets. The merits and pitfalls of each option call for another booklet worth of discussion! If you wish to consider alternatives to spreadsheets as a platform for your forecast, you may also want to review: • Software based pre‐built financial models that require you to simply input your forecast data. • Pre‐built financial models accessible on demand via the internet (software as a service) • And for large companies, a range of ERP, Business Performance and Business Intelligence tools TIME SPAN OF FORECAST How long do you want to forecast forward for (in years)? This answer will depend on what you want from your forecast. If you want to do a discounted cash flow for a valuation, or if you want to track the longer term performance of return on your assets, you’ll probably want to do at least five years. If you are about to commercialise a gold mine, it will be more like thirty years! Conversely, if your concern is running out of money and you want to track your end of month, or even end of week bank balance, you’ll need to focus on one year or less. LENGTH OF EACH PERIOD When you’ve decided how many months or years forward you wish to forecast, consider then, an ideal number of columns that are useful for your business and are not time consuming or unnecessary for you to fill in. A 60 column spreadsheet (monthly forecast for five years) is unnecessarily large, unwieldy to view on your screen and the monthly figures will likely become meaningless as your move toward the distant future. COMPANY STRUCTURE 23 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 24.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. How will you sub‐divide your forecast as to make it meaningful without overburdening yourself with data? Assume you have 10 product groups with a total of 700 SKU’s and sales offices in 10 territories in Australia and another 20 worldwide. Will you try and incorporate all of this data on a single spreadsheet? Will you create separate spreadsheets and feed in the macro data into a master spreadsheet? How will you make allowance for future products or territories? The following company has a model for each division (see the worksheet tabs) and the front cover simply aggregates the data from these worksheets: Figure 7: Front Cover to Aggregate Forecast Issues such as how the various financial statements, produced by your company, its subsidiaries and other wholly or partially owned trading entities consolidate. This is further complicated by inter‐company trading and borrowings, minority interests and joint ventures. COLLABORATION Are you producing this forecast alone or will parts of it be delegated to other individuals. If it’s the latter, will you be dividing it up into several sections or will more than one person be working on a particular section. Will your forecasting platform allow for version control or multi‐user inputs? Would you prefer that rights to edit the data are restricted, and a certain sub‐group can only have access in view mode? USABILITY Aligned with collaboration, on a slightly different subject, will other people who have not been involved in the construction of your forecast be able to intuitively understand your forecasting model if you weren’t there to guide them? Along with documenting the assumptions that you made when producing the figures, you will need to make abide by certain rules so that the logic 24 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 25.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. and process behind the model is transparent. This will range from including a Table of Contents in the forecast; to shading input cells yellow (normally) to differentiate them from calculate cells. DEALING WITH COMPLEXITY Producing a thorough forecasting model may be much more complex that you will have give allowance to. Consider some of the following challenges: • The phasing in of receipt and payment of Sales Taxes such as GST and their impact on cash flow. • Taking account of the time span between receiving an order, completion, delivery, invoicing and payment for the goods and services. • The capacity to produce meaningful working capital estimates when so many variables have to be factored in. • Applying depreciation and amortisation estimates to tangible and intangible assets. Accept the fact that these financial forecasts you produce will be a simple approximation, and resist the urge to try and make certain parts of the forecast unnecessarily detailed (coffee supplies in the staff room) when others can only be a simple approximation (extrapolated 20% growth in revenue between 2012 and 2013). HISTORICAL DATA You’ll need to have an up to date set of financial statements with sufficiently detailed background information behind them to get started. The key detail may also relate to trends in sales across product lines and seasonal fluctuations. Details of this data may help you detect and programme in growth trends. You’ll also need to know the detail behind your current status of payables, receivables, loans and other balance sheet items, as they will form a part of your near term forecast. Also you will need to factor out (or in) the following: • Historical items of income or expense that were unusual, non recurring or unlikely to have any influence within the forecasting period. • Revenue that was derived from assets no longer operating within the company. INTEGRATION WITH YOUR ACCOUNTING SOFTWARE 25 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 26.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Will you want to integrate a feed of the ACTUAL financial performance into your forecasting spreadsheet / software? This would: • Save manually rekeying to input your actual financials. • Provide comparisons between your actual financials and what you had previously forecast. Some forecasting packages provide a mapping function so that you can link Excel outputs from your accounting software into your forecasting software Figure 8: Linking Actuals from Accounting Software DESIGN AND USABILITY If you are opting to build your own forecasting spreadsheet, make sure that it is well designed, easy to manipulate, well documented and understood by other users. Design tips include: • Modularise the model into different sections with summary sheets that bring together the various components. • Ensure that you can support a simple sensitivity analysis, looking at the effects of a change in one variable on the financials. • Show clearly which cells are input cells and which cells are calculated by the software. • Document your assumptions separately. • Do not hard code variables into a formula. P (price) and Q (quantity) Here’s an example of the need to modularise your model into different sections in order to not have one overly complex summary sheet. You may have a summary sheet of overall operating expenses: 26 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 27.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 9: Overall Expenses But feeding in to that total Administrative Expense, there may be a sheet where these expenses are broken down into their individual components – salaries, leases, office equipment etc. This sheet in itself may also be a summary of what has be calculated at a lower level. For example, the staff costs would have been calculated by a lower level sub‐sheet: Figure 10: Expenses in Detail 27 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 28.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3. REVENUES Forecasts begin with your analysis of the revenue potential of your company’s products and services. The first, key financial statement is the Income Statement, often known as a Profit and Loss. The forecasted income statement is a summary of all of the expected revenues and expenses incurred during the forecast period. These includes the sales of major items, their cost of sales, operating expenses, a portion of the capital costs of operating the company, interest and tax. Figure 11: Forecasted Income Statement This statement takes account of when revenues and costs were earned or incurred, not when payment and receipts were made. Making a profit here, does not necessarily mean that your company won’t go broke. In business, cash is king and survival is only guaranteed if either your inflow of cash is greater than your outflow, or that you have the means to fund a 28 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 29.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. haemorrhaging company through external funding. We’ll discuss the all important cash flow statement in Section 7 Looking through each of the components of the Income Statement. 29 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 30.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3.1 PRODUCT SALES The sales revenues for each product / service line are a major component for the forecast. Everything else is geared around your company’s ability to exploit its sales potential. This is an easier process if you have historical sales data and the industry is relatively stable, compare to if you are a trailblazer launching a new product into a new market. One approach to forecasting product and service revenues for more difficult markets to assess is to look at the size of the addressable market in the next period, evaluate what the relative shares of competitors will be and then multiple units sold by price. Key factors affecting the sales volumes include: • Previous year’s sales – is there a trend? • Sales trends in the overall market • New promotions, sales initiatives or other marketing drives • New product launches 30 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 31.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Overall changes in the economy • Changes in consumer tastes • Seasonal trends – ice cream sales in summer compared to winter • Changes in competitive strategy • Varying competitor scenarios If you have multiple product lines, services, divisions or geographical locations, you’ll naturally be forecasting each as a separate line item. It is important to forecast each of the product lines. Consider also what the effects are on sales of one product line on another product line: • One product may be complementary to another in which case there is a direct relationship between one and the other. As one increases, so does the other. • Increases in sales for one product may negatively affect the sales of another product • The sales of two lines of product may both increase as a result of outside factors – sales of gym memberships generally increase at the beginning of the year after people make New Year resolutions. Then factor in all of the potential revenue streams that could accrue to your company in the coming years? These may be new revenue streams that you currently do not enjoy, including: • Existing products into new market • Complementary products • Packaged bundles of product • Upgrade revenues • Support revenues • Training revenues • Service revenues • Consulting revenues • Licensing revenues This is equally applicable in not‐for‐profit organisations where several revenue streams may accrue. One interest exercise may be for you to map each of the potential sources of revenue, along with their assumptions. For a charity this may include: 31 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 32.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 12: Revenues and Assumptions ‐ Charity When considering future revenues, it is important to keep a running total of the installed base of total users of your product or service. They may require service, upgrades or support at any time in the future. They would also be a great prospect for future company offerings, provided they are satisfied with their current products. So • How many people are out using your product (installed base)? • What is the propensity for customers (in % terms of installed base) to seek out additional products, services or support? • Can you increase the frequency of purchases for each customer? Or, the value of each purchase made. Total Revenue is simply price per unit x number of units sold. This can be increased in one of three ways: • Increasing the number of customers • Increasing the value of each sale • Increasing the volume of each sale. 32 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 33.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3.2 PRICING Price is a key business driver and a proper pricing policy can assist growth more than either increases in volume or cost reductions. Depending on your industry and your company’s strength within it, you may have the capability to set price. If not, you still may have the capacity to create your own niche (perhaps through sustainable product differentiation) in order to obtain economic profit. The introduction of 3,4, and now 5 bladed shavers have allowed producers such as Gillette to charge enormous price premiums on what was once a low margin industry. Here are some alternative pricing strategies. Consider which you would want to apply to what products or services you sell or intend to sell and how you’re pricing policy may change over time: PRICING DESCRIPTION ADVANTAGES DISADVANTAGES APPROACH Cost Plus Standard margin Easy to calculate and Doesn’t take market above cost administer conditions into account. Price may be lower than what many consumers are prepared to pay. Market Based Sets price to Higher profit margins. Determine the value that capture the full Flexibility to reduce as each customer places on value that competitive conditions change each of your products customers place across each geographical on your product territory. Penetration Setting price low Opportunity to grab market Risk of competitor Pricing to gain market share rapidly and hence deliver retaliation, and that the share or achieve those economies. product is successful at volume and Damage to competitors the low price point. economies of scale. Skimming Price high to High initial margins from Locking out a market maximise margin cashed up customers. unprepared to pay this from those price. customers willing Competitor me‐too’s to pay the most. You will also want to consider the impact of discounting your price on your Gross Margin over time 33 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 34.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. DISCOUNT PRICING IMPACT OVERVIEW (1) If your present margin is: 20% 30% 40% 50% (2) And you reduce price by 10,20, or even 30%: (3) Then to produce the same gross revenue your sales volume must increase by: 10% 100% 50% 33% 25% 20% ‐ 200% 100% 67% 30% ‐ ‐ 300% 150% If a company is operating on a 30% gross profit margin and introduces a 10% discount sale (10% discount on gross revenue), the company would need to generate an additional 50% in sales to maintain that 30% profitability level. This is optimistic at the best of times: 50% more sales, half as much again! Even more startling, at 25% discount strategy (25% discount on gross revenue at 30% margin); sales would have to increase by an enormous 500% to maintain that profitability. This would be unheard of and illustrates how ill advised such a discount would be. More broadly, does a particular customer’s sales volume justify the discounts, rebates, or promotion structure you provide to that customer? Conversely, if you adopt a premium pricing strategy PREMIUM PRICING IMPACT OVERVIEW (1) If your present margin is: 20% 30% 40% 50% (2) Then you increase price by 10,20% or even 30%: (3) Your sales could decline by the amount below before your gross profit 34 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 35.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. is reduced 10% 33% 25% 20% 17% 20% 50% 40% 33% 29% 30% 60% 50% 43% 38% This shows the amount by which your sales would have to decline following a price increase before your gross profit would be reduced below its present level. For example, at the same 40% margin, a 10% increase in price could sustain a 20% reduction in sales volume. Less work for more return! Finally, if competitive pressures are forcing you to evaluate your current pricing, consider some of the following options for offering “a better deal” to certain customers: • Discounts on volume. • Time dependent promotional bonuses. • If selling through channels, marketing allowances and co‐operative advertising • Alternate payment terms e.g. discount on early payments. • Bundling multiple products. • Money back guarantees All of these initiatives would need to be included in a forecast. 35 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 36.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3.3 GEOGRAPHICAL EXPANSION New markets may be alluring whether you are considering increasing sales, improvements in operational cost‐ effectiveness or new international customers, but your forecasting process need to rigorously assess their cost benefit. This is particularly so in the sales start up phases where it may be expensive to establish a brand and a suitable distribution channel in a market that may have little awareness of your products and services. In short, does my international expansion add value to the company or does it simply just grow my top line revenue figures? When considering expansion the forecast needs to evaluate the prioritisation of country’s (size and accessibility) and an entry plan for each including company expansion, acquisition or partnering with a local provider. When forecasting product revenues, you need to consider and evaluate the following • Determining the total customer base or market size. • Segmenting the market to identify what portion should be targeted by your product or service. • Expected penetration of the product or service into the market segment. • Competitive environment. • Respect for intellectual property and legal infrastructure. • Expected price per unit. • Expected distribution margin when selling through wholesalers, retailers or agents. • Relative pricing of incumbent suppliers. • Consumer affordability. • Regulatory approvals for foreign product. • Transportation costs. • Local labour costs. • Political & other risks (legal, currency, corruption, bureaucracy, IP protection). A local provider can be valuable when preparing an entry strategy, particularly if they have a privileged market position, brand recognition and access to powerbrokers, resources, transportation or distribution systems. In short there are four major ways that you can sell products in overseas markets 36 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 37.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Branch office – Gives control of the business, but establishing the infrastructure may be expensive • Distributor / Local Agent – Low risk and low investment, but distributor may not give your products much attention, while taking a proportion of your margin. • Joint Venture – Partner has already established infrastructure and risks / costs are share, however you must be prepared to give up some control of the operation • Online – May be cost effective, but it’s hard to get noticed. One of the first steps in considering the internationalisation of a venture would be to map out all of the issues that need to be researched, prior to making any substantial decisions on the above. A large English language provider of eShopping websites would be likely to produce something like the following when initially considering growth opportunities in China: Figure 13: Evaluating Growth Opportunities 37 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 38.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3.4 NEW PRODUCT REVENUES Forecasting the revenue potential of new products is more problematic than with existing products as you have no past history of sales figures to project from. Some considerations include: • Does the customer have to change behaviour? • Does purchase decision maker have to define a new budget for the item? • Are the technology standards of the product being universally adopted? • Will the product create other costs or complications for the customer? • Will there be obsolescence costs created by the customer changing their current way of doing things? Once the new product has launched: • How quickly will sales ramp up? • What are the costs of bringing this product to market? • How much will it cost to achieve adequate exposure in the market? The commercial viability for any new product needs to be established early in the new product development programme. Aside from the bottom line financial impact, consider the following: • Will it encourage customers to buy other products as well? • Can the development act as a catalyst for improvements in overall manufacturing efficiency and quality? • Can new intellectual property be generated or new manufacturing techniques exploited? 38 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 39.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3.5 ALLIANCES, PARTNERSHIPS, LICENSING AND DISTRIBUTION AGREEMENTS There are a wide range of alliances that can be formed using your or others unique know how, location, technology and intellectual property. These alliances can help you increase your revenues and profitability without the risk that “going direct” would assume. Broadly speaking such alliances and partnerships include: joint ventures, marketing alliances, licensing arrangements, selling/distribution agreements, channel partnerships and software agreements. These alliances and partnerships may give you a competitive advantage, create barriers to entry and help you reach customers more efficiently. The MindMap diagram below looks through the process timeframe for considering a partnership / alliance, through the evaluation of benefits, negotiation process and exit provisions. The process starts at 1 and runs clockwise to 9. Figure 14: Process for Assessing Alliance Opportunities 39 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 40.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. The alliances pathway may actually be a more flexible, less resource intensive and lower risk method of achieving your goals than a merger or acquisition. 3.5.1 LICENSING Licensing is the capacity to exploit other parties IP, processor technology in return for agreed fees. Licensing can generate a revenue stream by giving permission to others to sell your products or integrate your technology or know how into their products or services. This revenue stream may potentially be lower risk as many of the costs of market entry may be removed. In addition, the licensee may incorporate their own know‐how into the final solution that may be well targeted at their customer base. Licensing works by transferring technology to a licensee and fees can be generated through royalties, management assistance etc. These royalties can be either from upfront payments, running royalties or a combination of both. It is also possible to negotiate multiple non‐exclusive licenses or minimum guaranteed license revenues From a business and forecasting perspective, the following needs to be considered: • Is the license exclusive or nonexclusive? • How long should the license be granted for? • What is the size of the market and market penetration? • Without the license, what is the investment required for manufacture? • Does the market already exist or must it be created? • Without the license, how much will it cost to establish sales channels? • What is the prospective return on investment? • What are the nature and extent of competition to be expected? • What is the market life for the licensed technology? • What kind of lead time will the license afford? • What technical help, know‐how, or show‐how is provided? • Without the license, what would it cost to “reinvent the wheel”? • Will we create a new market or reduce production costs? • Are profit margins in the industry sufficiently high? • How do we wish to get paid? • Can the licensee sub‐license? 40 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 41.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Finally, there’s an often quoted 25% rule of thumb for licensing revenue. It’s 25% to licensor, 75% to licensee of an expected profit margin. Probably best used as a starting point for negotiations! 3.5.2 STRATEGIC ALLIANCES The world doesn’t come looking for a better mousetrap, and the economy is a machine that involves companies acting together as well as competing (co‐opetition). It’s very difficult to build a wholly self sufficient company, so it makes sense to assemble a group of companies together that form a sustainable force. Alliance opportunities enable: • INNOVATION: Generate new product ideas and accelerate commercialisation. • EXTENSION: enable your company to enter new channels and reach new custom segments. • GEOGRAPHIC EXPANSION: Enable your company to enter new markets or improve existing international or interstate operations using the alliance partner’s local assets. • PERFORMANCE IMPROVEMENT: Enable improvements in efficiency and lower operating costs and capital requirements through outsourcing. 3.5.3 DISTRIBUTION CHANNELS It’s easy to see why a food manufacturer would use wholesalers or supermarkets to sell their products, but a component of your forecast is to evaluate whether your financial interests are best served by using a channel strategy. If you were comparing product revenues and costs by using direct sales versus via indirect, here are some of the key considerations: • LOWER COST: Using resellers can save on the costs of a direct salesforce while extending the range of customers you are effectively speaking to. Similarly you may save on warehouse management, inventory management and logistics by taking up space in distributors facilities rather than building your own. • INTEGRATION WITH OTHER PRODUCTS: Your products may require integration or bundling with other products in order to provide a complete solution to customers’ requirements. In this instance you may require specialist resellers with integration skills to sell complementary technology and effectively support and advise customers. 41 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 42.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • CUSTOMER REACH: As your business grows you may require resellers to reach a diverse range of customers. If your product addresses many market segments and requires geographical coverage then customer convenience in accessing a reseller becomes a key criteria If you are considering using non‐direct sales, remember to evaluate a range of options, which ultimately will depend on your own industry structure. These include: master distributors, local distributors, value added resellers, integrators and the rapidly developing channel of online selling via the web (auction sites, catalogues etc) 42 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 43.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3.6 FRANCHISING With brand name backing and reliable systems in place, it’s no surprise that franchising is one of the fastest growing forms of business structure in Australia. In industries from fast food to accountancy advice, franchising removes much of the need for promotional expenditure to brand build and gives clients the reassurance that they can trust the products and services of the franchisee. Franchising works best for businesses that have a good past sales and profit history can be easily replicated in new territories are easy and inexpensive to operate and have good brand name recognition. 3.6.1 BEING A FRANCHISOR The "franchisor" authorizes the proven methods and trademarks of their business to the "franchisee" for a fee and a usually a percentage of gross monthly sales. In return for this, support systems, advertising, training and other benefits will be made available to the franchisee. The key financial benefits of franchising your operation are: • Once you have a methodology and a structure in place, it’s easier to open “cookie cutter” type operations through franchisees than doing it yourself. • Costas are substantially lower as the franchisees upfront fees will defray much of the risk. • The franchisee may have much greater experience dealing with their local market. • Greater motivation on the franchisees behalf to make it successful than if you were to do it through your own employees. The key downsides of franchising your operations are: • There may be some loss of control, as it may be more difficult to manage and get things done through an individual franchisee than through a staff member. • Getting the price right. Price it too high relative to the franchisees income streams and it’s a permanent de‐motivator to the franchisee. Price it too low, and you’ve left value on the table. • Potential for conflicts: An incompetent franchisee can damage the customers goodwill for the brand by providing inferior goods and services 43 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 44.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. The key issues and controls you need to put into place are: • Length of agreement – could be from five (sufficient time to realise returns from the initial outlay and the lean start up period) to twenty years. • What would trigger an early termination of a contract? • What is the extent of a territory? • Exclusive or non exclusive? 3.6.2 BEING A FRANCHISEE The key financial benefits of purchasing a franchise are: • You will most likely to have a recognised brand and an exclusive territory such that you can go to market and earn positive cash flows comparatively quickly. • Much of the expensive legwork in establishing this brand and promoting it will be done for you saving you time and money, while having customers directed to you. • The systems and processes created and developed by the franchisor will already be in place, saving you time and money in having to create your own. The key downsides of being a franchisee are: • An incompetent franchisor can destroy their franchisees by not promoting the brand adequately or being too aggressive for profits. • You may or may not respond favourably to the lack of independence from the franchisor, their methods and the controls they have in place for monitoring your business. • The success or otherwise of your operation may be due to factors outside of your control – e.g. the decisions and behaviour of the franchisor or of other franchisees. • There may be restrictions against the sale or transfer of the franchisees business. 44 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 45.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3.7 PROJECT MANAGEMENT Much of the emphasis of this book so far is on the production and sale of tangible goods and services. If your company’s business is based on the successful completion of specific projects including a whole series of different financial and forecasting considerations come into play. Your success is dependent on the successful management of a set of resources – people and expertise, materials, money in order to achieve the objectives of a project. The goal is profit; the classic constraints are time, quality and budget. Your initial analysis determines the price you will charge for the project based on an estimate of the costs involved. From a financial viewpoint the key risk is that the project timescales or costs overrun, and this can be partially mitigated by: • Thorough pre‐planning and consideration of each variable. • A clear understanding and alignment with the customers’ requirements. • Taking account of all potential risks and having a strategy in place to address them. • Having flexibility in the contract to be able to pass on unforseen challenges to the customer. • Effective people, process and budgetary management throughout the project phases, including sub‐contractors. To ensure that the project remains on cost and on time, consider the following: • What is the critical path and what are the interrelationships and interactions and interdependencies between the resources? • What key events, milestones, progress evaluations and critical activities been identified? • Has time been allocated for quality, customer and stakeholder involvement? • How has time contingency been incorporated into the plan? • How thoroughly have target or actual project costs been clearly identified and documented? • Does the project cost estimation involve cost related risks and how are these managed? • Is the project budget consistent with the project requirements, assumptions, risks and contingencies? How will the project costs be managed to ensure that the project is completed within budget? • Is there a satisfactory process for accounting of project purchasing and other expenditure? Has this purchasing process been documented? 45 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 46.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Can you identify the root causes for budget variances, both favourable and unfavourable? Is this reviewed? • How has cost contingency been incorporated into the plan? 46 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 47.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 3.8 OTHER INCOME There are a wide range of other items that can fall into the “Other Income” category of your Profit and loss. These can range from Grants from governments of private bodies, donations or even the proceeds of your intellectual property. Some examples follow, but they’ll depend on your own circumstances. 3.8.1 GRANTS & FINANCIAL ASSISTANCE Financial assistance programmes at a federal (AusIndustry), state and export body (Austrade) level can assist with grants and loans and tax offsets. Examples include: • AusIndustry’s support programs provide financial, managerial and technical support to innovative early stage companies, their R&D Tax Concession programmes allows tax concession of up to 125% of expenditure incurred on R&D and they offers specific industry support in areas such as Tourism, Automotive, Biofuels, Climate change and green based initiatives. • EFIC (Export Finance & Insurance Corporation) is Australia’s export cr3edit agency offers export guarantees and direct loans. • State governments offer a variety of programmes for SME’s. In NSW, for example, the Department of State & Regional Development (DSRD) provides assistance with commercialising R&D, regional relocation incentives, export incentives and payroll tax rebates. • Austrade, Australia’s export authority provides an Export Market Development Grant (EMDG), as a rebate on the proportion of total expenses incurred on eligible export promotion activities. • Regional, state and national governments worldwide may offer an incentive for company’s to locate or relocate their activities there, particularly where they provide employment (especially skilled employment) to local residents. 3.8.2 INTELLECTUAL PROPERTY INCOME Obtaining a royalty stream from your Intellectual Property can, once the IP has been developed, protected and marketed, be one of the significant income streams as it goes straight to the 47 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 48.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. bottom line. (IBM for example many billions of dollars of income annually accruing from their past IP). Here’s a MindMap checklist of the considerations when embarking on a route to market that involves the development and licensing of IP. Figure 15: Process for Valuing IP 48 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 49.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 4. COSTS This section looks at each of the key costs payable by your company, both variable (expenses that change in proportion to the activity of a business) and fixed (those which don’t change in proportion to the business). This simple diagram illustrates the two types of cost: TOTAL COSTS $ Costs Variable Costs Fixed Costs Units Produced Greater Fixed and Variable profit are achieved by greater revenues and less costs. The business Figure 16: margins and Costs challenge pre‐empted by your company forecast is to regularly eliminate unnecessary costs and reallocate resources to activities that will generate the greatest returns. Forecasting to reduce costs need to take the following into account: • Likely cost savings given risks of executing and variability of outcomes • Costs and investments required to achieve savings e.g. severance fees, new structures and technologies • Impact on revenue and earnings • Timing required to implement initiative and realize benefits 49 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 50.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Execution risks. 50 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 51.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 4.1 COST OF SALE Cost of sale refers to the direct costs attributed to the production of goods sold by your company, including the material costs and labour costs incurred when producing the goods. The formula for this is: In a retailing or wholesaling company a large proportion of your cost of sale will be finished goods inventory. A full discussion on reducing the risks from an extended working capital cycle may be found in the section on Risk Management. You may be reviewing your sourcing strategy as there may be substantial cost savings from sourcing from outside Australia, particularly in the Asia Pacific region. However, these reduced costs must be weighed up against • the costs and risks of a build‐up in inventory from having to purchase more, • the costs involved in having a lengthier supply chain with much of your stock “on the water” • advanced contractual commitments to produce more in remote manufacturing plants. Thus you have to weigh up reduced costs with the potential of carrying greater inventory and less flexibility. Also, a lower cost of sale will also result from making adjustments to the costs involved in serving a customer. This could result from automated order taking processes to reducing 51 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 52.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. delivery costs to automated purchasing set up based on minimum reorder quantities being reached by the customer. 4.1.1 REFUNDS, WARRANTIES AND GUARANTEES Having your company back the products that you sell with a money back guarantee or a warranty on product failure, are almost essential components of establishing a credible brand. Even if you don’t offer one, the legal system would probably step in to ensure that justifiably dissatisfied customers could enjoy a cooling off period, or that you were guilty under the Trade Practices Act of “misleading and deceptive conduct”. From a forecasting perspective, you need to consider the following: • The potential for faulty (or even non faulty) product to be returned as new. What is your policy for this? If you deal through channels, do they get a replacement product or money back guarantee? Will you refund customers money even if the product is perfect and the customer simply decides that they don’t want it? • The potential for product faults within warranty period. How much warranty will you provide? What is your process for fixing faulty product – service agents, back to manufacturer? What commercial arrangements will be in place for this? • The potential for product faults outside warranty period. Is it worth fixing the product? If so, by whom? What strategies do you have in place for replacing or upgrading the customer’s product? 4.1.2 LOYALTY & AWARDS PROGRAMMES They are both cost to the business, and a future revenue driver. An airline will give away free flights and upgrades to frequent fliers, but the act of accumulating points in the first place may have generated some brand loyalty – if only to get the free flights! The challenges are • Giving away something in return for engendering loyalty for the product, rather than merely getting something for nothing. • Making sure that the giveaway is actually redeemable. Qantas, like most airlines, face constant criticism for the non availability of free flights. • Accounting for the cost of freebies that have not yet been redeemed. 52 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 53.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. The latter is a forecasting issue, as there are liabilities created on the balance sheet. You need to give consideration to: • The probability that they will be redeemed at all. Some customers may simply not both with the free gift or service. • The cost of them being redeemed. Returning to the airline example, the marginal cost of giving away a seat on a plane that wasn’t full anyway is lower than the cost of turning away a paying passenger because their seat had already been taken by a free flight redeemer. • Expiry dates on redemption. This will lower the liability, but could also engender ill will when customers lose out when they simply don’t take up an offer prior to expiry. 53 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 54.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 4.2 OPERATING EXPENSES / OVERHEADS Overheads refer to the ongoing expenses involved in running a company. These refer to all of the necessary costs in running a company – rent, telecommunications, accounting fees that do not directly generate revenue. Included within the profit and loss account (income statement) are those Operating Expenses, i.e. the ongoing costs for running a business, plus a proportion of the Capital Expenses, known as depreciation for expenditures on assets that will give benefit beyond the current twelve month period. A component of your forecasting process should involve consideration of what percentage of revenues should be spent on overhead. More importantly, • How do they compare with other organisations in your market space? • How can you reduce this percentage over time, and therefore increase your profits, without affecting the efficiency of your company? In the long term, you may need to review your entire operating processes, ensuring that they can evolve to be the best in the industry and that they can see the company through both booms and busts in the economic cycle. Key issues include: • Where can work can conducted most cost effectively? Are there parts of your operation that can be relocated to other (non CBD) offices, interstate or overseas? • Can you shift work to a supplier based their capabilities? Do they have a superior cost structure compared to yours? • Can you outsource or use shared services? In recent years, internal telemarketing teams have been outsourced to call centres, while IT departments have been replaced by specialist IT service companies monitoring your network performance with back up facilities and timed response rates. • Can you transform your entire way of doing business? How can you optimise your workforce, processes and technology to provide the most productive and efficient environment for your company? The following sections look at all of the different components of your overheads. 54 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 55.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 4.2.1 MARKETING Budgets need to be developed in order to ensure that your products and services are exposed to your target audience. The methods of marketing used and the marketing spend / total revenue ratio will vary across firms and industries and across the life cycle of a particular product. First of all, seek out and use available data (online industry reports) to gauge an idea of a realistic cost of creating a brand, and creating an awareness and desire for them to purchase your goods. Managers frequently underestimate the costs of marketing, and in order to cut through the advertising clutter in order to obtain consumer awareness, these costs have to be maintained over an extended period of time. Within the marketing budget, has your company taken the following into account? Advertising Placements Fees, Concept Development, Channel or Industry Specific Bundling Cost of bundled product, Promotion, Packaging, Fulfilment, Support Channel Distributor & Reseller expenses including ‐ catalogues, co‐operative marketing, product management services, PR Programmes, publications, reseller presentations, technical training, trade show appearances, vendor nights, website listings Collaterals Logo, Domain Registration, Brochures, Case Studies, CD's, Demo Disks, folders, electronic presentation, Not For Resale Software, Merchandise (caps, mugs etc), Packaging Direct Marketing Direct Mail, Direct Fax, Infomercials, Telemarketing Electronic Marketing Website development & maintenance, Web ad development, CD ROM distribution, Search Engine costs. General Administration Training, Equipment Rental, Hardware, Meals & Entertainment, Research, Consulting, couriers, Resource Materials, Software, Travel, Web Hosting Public Relations Editorial Guides, launch events, Press Kits, PR Agency, Press Mailings Sales Promotions Bundling Costs, Design Development, Price Promotions, Seminars & Other Events 55 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 56.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Sponsorship Physical facilities, Causes, Events, Celebrities Trade Shows & Events Stand costs, Personnel costs, transport & accommodation, advertising Ultimately, your company will need to have a realistic proportion of forecast revenue set aside for promotional expenditure. This can be in the range of 15‐30% of total revenue and will depend on criteria like the number of new product releases, how competitive the market is etc. A good guide is to look at the financial statements of publicly listed companies to review the relationship between their marketing expenditure and revenue / profit. However, do not assume an instant correlation between promotional spend and revenue. It takes a lot of exposure and brand building before the effect on sales can be truly felt. Much of the wastage involved in marketing can be eliminated through intelligently Test Marketing a certain proportion of your target market by using short campaigns in certain, well defined geographical locations to ascertain whether the marketing message is understood, what media provides the best value for money (response per dollar spent) what the propensity is for the customer to buy and how satisfied is the customer with their purchase. Global brands will frequently use a test market such as Australia to determine the likelihood of success prior to investing in global marketing. In addition to the marketing spend involved in promoting current and forthcoming products, you will also need to allocate expenditure on the following: 4.2.2 MARKETING ‐ MARKET RESEARCH Understanding the consumer’s motivations, their need for your services and their perceptions of your products must be an essential part of the new product development, launch and sales cycle for your products. Some key questions need to be addressed within your Market Research brief: • What is the potential size of the market and the estimated level of sales? • Is this market growing or declining? What factors will affect this market? • Have you clearly defined the market sector for your product or service? • Have you researched your market territories been researched thoroughly? What local differences, customers, language and regulation are likely to affect your final product? 56 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 57.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • What is the consequence of making product changes for these different geographical territories? • If you are exporting, how competitive will your products remain if exchange rates change? • What are the appropriate channels to market? Direct selling, online, agents, distributors, retailers? What is the possibility of channel conflict if more than one route is utilised? • What branding and other promotional effort is required? • What is the shape of the competitive market place like now and what is it likely to look like in the future? What competitors and competing products have been identified? What future developments are there likely to be in these products and how will your competitor respond to your product launch? 4.2.3 MARKETING‐ MARKETING EFFECTIVENESS You should set some budget aside for measuring the effectiveness of alternative forms of promotion, and use the knowledge derived to plan alternate marketing strategies. With online marketing and Web analytics, it has become a whole lot easier in recent years to quantify key interrelationships between customer exposure – customer interest – leads and customer sales. 4.2.4 COMPETITIVE INTELLIGENCE It is important to invest in the capability to collect and analyse what is going on in your market. You can get swamped by all of accessible online information (websites, newsletters, search bots, share trading sites etc) about your competitors, future competitors, suppliers, customer trends etc. The challenge is not in finding it, it’s having the headspace to filter, analyse it and think about the repercussions of it for your own growth. To really understand what is going you will require a time and a financial commitment: • Purchasing filtered specialised news services that deliver relevant, industry specific news to your desktop. • Joining trade associations, networking forums and industry groups that allow you to network to find out what is going on. • Undertaking international reconnaissance. While you may not be a global firm at present, overseas trends may well impact your own market as well as alter the 57 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 58.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. landscape and potential for export. Jump on a plane and talk to people at international trade shows, exhibitions, industry forums etc. • Consider outsourcing information filtering to Information specialists well versus in reading, condensing market data and producing it for you in the form of updates, newsletters, alerts. • Developing an in‐house “Knowledge Base” and train your staff to listen to observations, rumours and opinions. 4.2.5 MARKETING – CUSTOMER RETENTION To grow your market, you naturally have to find new customers and much of the here is dedicated to the goal. However it is an often stated, yet important truism that it costs significant less to have an existing customer purchase from you that it is to source a new one. The growth in technology has made suppliers lazy in this goal and the use of impersonal technologies such as e‐mail newsletters and other one way electronic messaging can make us lose contact with the customer, their requirements, and whether indeed they are shopping elsewhere. Repeat purchases, upgrades, subscription renewals etc are then at stake. There are a wide number of Customer Retention strategies, but they can be summarised in the following ways: 58 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 59.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 17: Strategies for Customer Retention Customer retention and the capacity to provide them with new and additional services, renew their subscriptions, charge them retainer fees etc, provides some interesting financial modelling challenges. Here’s a sample Excel® based model for a company that sells hardware, software and services to both new and existing customers: 59 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 60.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 18: Building a Financial Model to include new and existing Revenues The model has been set up so only the yellow cells need to have an input. There is a known population of pieces of hardware out in the market at the beginning of a period, plus a forecasted assumption that around 65% of that existing population will purchase a “renewal”. This 65% renewal rate on existing customers plus the new customers acquired in that period then become the new hardware population at the beginning of the following period, and the calculation is made again at that point. 4.2.6 MARKETING ‐ BRANDING Creating a unique identity for your company or product is a business necessity in order to achieve customer recognition while fashioning an image for the offering. Established brands can have great intangible value in themselves, but the costs of establishing and sustaining a brand can easily be underestimated. These costs include: • Design and production of all elements of brand – stationery, signage, advertising etc. • Brand maintenance: Registering trademarks, providing permission for authorised usage of trademarks and tracking, litigating and threatening to litigate against unauthorised usage. 60 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 61.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 4.2.7 INFORMATION TECHNOLOGY – AS A REVENUE & PROFIT DRIVER The use of technology within your company can loosely fall under two categories – as an investment in driving revenue, profitability and growth, or as a cost of doing business. Excellence in information technology can drive real improvements to your company’s bottom line. IT must deliver value to your company, rather than simply be a cost that should be contained. The rapid adoption rate in E‐ Commerce, Enterprise Resource Planning (ERP) systems, Customer Relations Management (CRM), Knowledge Management, Business Intelligence & Analytics and many web based technologies elevate IT considerations from being merely a cost to being a driver of profitability and growth. Effective use of technology creates competitive advantage. IT expenditure tied to your company's business strategy will have the most clear‐cut business value, in terms of return on investment. Moreover, when IT solutions and business strategy are woven together, companies are finding that business benefits are often broader and deeper than expected. Investments in the following technologies can all have long term highly positive payback in terms of customer relationships and business efficiency: • E‐Commerce: including a web store, inventory management process, order fulfilment process and accounting system. • Customer Relationship Management (CRM): Systems for tracking customer data and customer interactions, as well as internal project tracking. • Enterprise Resource Planning (ERP): An integration suite of most of the internal processes within an organisation including manufacturing (scheduling, materials, workflow and quality), supply chain management (inventory, suppliers, scheduling), financials and project management. • Management Accounting Software. While common low cost generic software such as MYOB and Quicken may service your organisation for a while, at what point do you require the greater functionality of mid‐range accounting packages? As you grow, you will also need to cost in other applications such as purchasing management software, business process automation, document automation, asset management and other applications specific to your production, R&D and warehousing operations. 61 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 62.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Consider with each the following costs: the “per seat” licence, the implementation costs, the renewal costs, the additional customisation costs through their life, and the costs involved in migrating the data to larger systems should your growth take hold. 4.2.8 INFORMATION TECHNOLOGY – AS A COST OF DOING BUSINESS Outside of staffing costs, Information Technology costs can be one of the most significant operating costs of your company. As you grow your company, consider the future costs of some of the following necessities: • Hardware, software and networking products for your team • Connectivity solutions with customers, suppliers, distributors etc. • Disaster recovery and contingency planning requirements. • Network and data security. Even without the business benefits, there are commercial costs for not investing in technology. Consider the costs of the following lost hours due to printer problems, network problems, loss of unsaved work & failure to back‐up documents, equipment purchase delays, inadequate computer training, inefficient processing power, computer downtime (crashes/system failure) associated with inexpensive or inferior equipment, inefficient systems and double entry, poor document management and access, complicated systems or retrieval of data Also consider the lost revenue because your phone lines are engaged or your equipment is inefficient, because sales data is not immediately accessible to your sales team and because your sales team does not have a contact management system to remind them to call back potential clients. Key areas for considering appropriate levels of IT expense include: Personal Computers Considerations: Required power of a new computer Ability to upgrade PC’s versus purchasing new ones Rent v Lease v Buy equation Software Considerations: Are software upgrades always necessary? Are service / support agreements with software vendors being fully utilised? How many of your applications software can be utilised via SaaS (Software as a Service), whereby applications are accessible via the web rather than via the desktop*. Is there an appropriate level of documentation being purchased with the 62 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 63.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. software, particularly as most vendors no longer package documentation? Servers There is likely to continue to be a rapid increase in the number of servers that your company operates as it continues to grow. There are also technologies (e.g. virtualisation software) that can reduce the number of servers, as well as the use of distributed applications. Broadband Rapid increases in broadband take up in recent years. However the market will continue to become more competitive and technologies will ensure that “Moore’s Law” continues. Outsourcing The extent to which high fixed costs e.g. IT professionals can be outsourced. Wide range of personnel and procedures outsourced to specialised companies providing full system monitoring, application development etc. *‐ Established software providers such as salesforce.com (Sales Tracking) and NetSuite (integrated CRM, ERP and Ecommerce software) utilise the SaaS Model, enabling perpetual license fees rather than larger one off costs, automatic roll out of upgrades and effective disaster recovery. 4.2.9 EMPLOYEE / PERSONNEL COSTS Staff costs, including a reasonable “living wage” for yourself, the owner, can account for a large proportion of total business costs for your company. In addition to salaries, bonuses and commissions you will need to factor in the following other employee entitlements. • Superannuation • Annual Leave • Long Service Leave • Cumulative sick leave • Post employment benefits • Termination benefits Depending on how your organisation remunerates its employees there may also be share based benefits ‐ such as shares owned, options etc. According to a recent study (AMI‐ Partner Inc 2002) less than 50% of total human resources spending are on direct staff salaries and wages: • Staffing Services 49% • Legal, HR Services 16% 63 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 64.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Recruiting/ Benefits/ Administration / Miscellaneous 16% • Payroll Services 8% The key issues for consideration are: • Labour force required to service the level of sales and support activity within the company. • Use of commissioned staff • Use of overtime • Use of contractors rather than full time employees • Use of outsourcing • Possibilities of promotions or other changes in role necessitating change in salary rate. Like IT costs, training costs can be seen as either a cost of an investment in the skill set of your company’s employees. Consider when forecasting, ways to best allocate spending to improve effectiveness of your company’s learning and development processes. The training areas to be considered include: leadership; management development; professional skills; technology skills; and new product skills. One key forecasting question, given that staff costs are often the most significant single cost in a company, is – how many staff do you need? The answer can be clearer cut in some job functions than in others. For production, it may be whatever keeps the assembly line in operation if you decide to produce in‐house rather than outsource. In customer service however, you may passively say whatever it takes to answer every inbound customer call, but this passive approach needs to be considered in the light of having an active policy to perhaps: Discourage low value calls by improving the quality of web based documentation and FAQ’s. Or Encourage high value customers by having an outbound call centre that checks up on their levels of satisfaction. Another example where you need to evaluate your personnel resource is in the availability of sales people or pre‐sales engineers to close business. Particularly, what are the costs of getting a new customer or getting an existing customer to buy more? When looking at obtaining a new customer, you need to consider a Sales Funnel for your own company. How many initial contacts do you need to obtain one sale? What is the cost of 64 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 65.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. servicing those initial contacts (salesforce, presentations, proposals etc) in order to make that sale? In this example, 250 initial prospects, pipelines through to only 10 sales, but you must cost in the resource of making contact with all of those initial 250. A major cost in business is that of staff turnover. Every time one of your team members leaves, you lose their expertise, their experience and their knowledge of the customers, products and your internal systems. Whenever they leave you must incur costs of recruiting and hiring and the cost of time that it takes them to be fully effective. While a certain amount of staff turnover may be a good thing in terms of bringing in new individuals that could invigorate your company through fresh ideas, you must also factor in the expenditures required to keep good staff happy and motivated, thus reducing the turnover rate in the first place. Examples include: • Employee share schemes and other financial incentives • Training and development programmes • Providing appropriate work / life balance including flexible hours • Keeping the team informed including effective appraisal processes. 65 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 66.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 4.2.10 STAFF & MANAGEMENT INCENTIVES (COMMISSIONS, BONUSES) Depending on the nature of your industry a considerable component of your employee costs will be variable and relate to performance based incentives – These incentives will relate to the achievement of a predefined target. For sales staff and managers this achievement could include any of the following, and more: Calculated as a total company, as a team or as an individual: • Total sales • Total sales growth • Total growth in gross margin Calculated as a total company • Profitability • Growth in profitability • Growth in business value (e.g. share price of a listed company) Performance based incentives may also apply to project staff for on time delivery of projects, production & warehouse staff for efficient scheduling and working capital management, and for a whole host of other individuals and teams in your company. You’ll need to design incentive schemes as part of the forecasting process. However, ensure that you take the following into consideration: Is the behaviour that you are trying to incentivise creating the most desirable outcome for the company in general? Will, for example, individuals: • Achieve targets that may be detrimental to the performance of the company e.g. a salesman targeted on revenue, may not care about the profitability of his / her customer transactions. • Defend the performance of their own silos instead of helping to shape action across the whole organisation • Tend to be ego driven and seek to enrich themselves at the expense of the organisation. 66 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 67.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Ultimately, incentives and performance goals should be related to achieve best results. They will need to be constantly re‐evaluate as there may be circumstances where they can de‐ motivate if the individual is not achieving goals or if the maximum earn outs has already been achieved and the individual is squirreling away some achievement for the next period! You may also consider another tool for rewarding and motivating employees‐ by providing them with shares or share options in the company via an ESOP (Employee Share Ownership Programme. Section 6 deals with this in more detail. Finally, incentives need not be financial in nature. Employee care, recognition and the opportunities for promotion can often be far greater incentives. 4.2.11 DIRECTOR / EXTERNAL ADVISOR PAYMENTS While evaluating personnel costs you must consider an allocation for non executive directors, and external advisers. For your company to prosper you must attract, motivate and retain highly skilled people for these roles. With the increased scrutiny of, and litigation against Directors in recent years, there are substantial risks in becoming a Director, as well as the requirement that a Director spends a good deal more time scrutinising the reports provided by management, questioning the strategic direction, sitting on committees and understanding the risks. The additional time dedicated has resulted in higher fees for skills personnel, plus higher costs as companies typically indemnify directors for breaches of laws (environmental, discrimination etc) for which they might be personally liable. A directors’ remuneration may be performance related and you could offer non‐executive directors and advisers a share plan where some of their fees are provided as shares in the company. 4.2.12 OTHER OPERATING EXPENSES Here we are concerned with the ongoing day to day costs for running a business for a predefined period of time – i.e. the next twelve months. They would include the following • Motor Vehicles – lease, operations, petrol, parking, tolls • Stationary & Office Supplies • Signage 67 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 68.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Staff Amenities • Printing • Postage • Telecommunications • Newspapers & Magazines including Subscriptions • Travel • Entertainment • Cleaning • Repairs & Maintenance • Bank fees • Regulatory compliance‐ lodgements, ASIC etc • Professional services – accountant, bookkeepers, legal, consulting Your income statement (Profit & loss account) will also contain a component called “Depreciation”. This is the reduction in value in a particular period of the assets that were originally purchased under capital expenditure. Thus when your company purchases the following assets that will likely last for several years • Computer & Office Equipment • Office Furniture • Office Fixtures and Fittings only the annual depreciation is expensed as depreciation. 4.2.13 BUILDING LEASE The size and functionality of premises for office space, manufacturing facilities and warehouses need to be constantly considered, and a forecast that assumes rapid growth must also take into account, the extent to which current premises may be stretched or dysfunctional in the event of that growth. Leases are a commitment on space and while premises may be subleased in the event they are inadequate, consider the following costs: • Built in CPI (Consumer Price Index) increases • Option to extend lease at a pre‐agreed pricing formula. • Whether the lease includes services such as cleaning, security etc. 68 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 69.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Important to cost in proper control of your bookkeeping – importance of decent accounts package – what to look out for in accounts package – costs of not having decent package etc. 4.2.14 INSURANCE There are a wide range of different types of insurance required for your company. The purpose of most of this insurance is to transfer some of the risk within your operations onto an insurer in return for a premium. Some such as Workers Compensation are compulsory, others such as Professional Indemnity high recommended, and others such as Key person life insurance optional. They can be grouped into sections as follows: • Professional Indemnity –important if you are involved with providing special services or advice where the consequences of following your advice could lead to detrimental outcomes. • Public Liability – Either for the public to protect your company when customers could suffer personal injury or property damage, or for employees to insure for negligence against injuries resulting in the place of business or while travelling. • Workers compensation ‐ This insurance is usually required by the state in which the company operates. It provides valuable protection to workers and their employers in the event of a workplace‐related injury or disease. • Property Insurance ‐ This type of coverage will insure inventories, facilities, furnishings, and equipment from fire, theft, etc. • Key person life ‐ This type of coverage insures for business interruptions and/or financial loss due to the death of a key officer or owner. 4.2.15 LEGAL COSTS Legal costs are often underestimated by high growth organisations, particularly where they are seeking to enter new markets, protect intellectual property, and form contractual relationships with suppliers and customers or change shareholder agreements. Consider and cost in some of the following: 69 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 70.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Changes in ownership & structure of your company. Legal negotiation and agreement may be required where the classes of shares and their rights change over time or where commitments are honoured to provide shares, options or profit share. • Trading Agreements: An expanding company will be subjected to the necessity to create a wide range of trading agreements including franchisee / franchisor, exclusivity on particular geographical territories or market sectors, royalties on revenues received, licensing of product etc. • Intellectual Property: The cost of researching, registering, protecting, enforcing and litigating major IP forms IP such as patents, trademarks, copyright and designs can be significant for a company on the cutting edge of research, design and prototype manufacture. Such costs will multiply if seeking to have a full standard patents with up to 20 years protection across a range of jurisdictions (countries) • Environmental Regulation: Environmental considerations are important to proposed developments in Australia and the continued operation of a project or venture. Legislative controls cover a wide range of relevant areas including: land use and development, environmental impact assessments, building and pollution, waste and contamination. 4.2.16 ACCOUNTING COSTS Accounting costs will include any outsourced services (e.g. bookkeeping) that you use in order that your company accounting records are in compliance with the required standards, accounting advice, any external independent audits that may be required to satisfy external parties, tax compliance services and any Due Diligence projects you are required to undertake. . 4.2.17 TAXES To paraphrase Benjamin Franklin, nothing is certain except death and taxes. There are still a bewildering number of taxes, rates and duties bestowed on the company by a variety of local, state and federal jurisdictions and the statute book grows larger each financial year. 4.2.18 GST (GENERAL SALES TAX) 70 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 71.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. GST is a broad‐based tax calculated at the rate of 10% on the value of the supply of a broad range of goods and services. It is paid at each step of the supply chain and the liability to pay is on the supplier of the GST items. Assuming your company is registered for GST (your projected annual turnover is > $50,000) you will claim an input tax credit which offsets the GST included in the price of GST items. Your forecasting process needs to take account of • The GST component of each transaction. • The due date (monthly, quarterly etc) when GST payables and receivables due are netted out. 4.2.19 INCOME TAX The plethora of assumptions in the forecast needs to be continually updated with real figures if the cash flow needs of the company are to be adequately understood. The tax situation will vary whether your company is classed as a sole trader, partnership, company or trust. Company Income is taxed at the company tax rate of 30% and distributed to shareholders via dividends will be subject to top up tax at personal tax rates. However companies can retain after tax profits indefinitely. Tax rules are different for other forms of company structure such as a Partnership or Trust. Your forecasting will need to account of issues such as tax refunds due from previous trading activity, losses carried forward, tax concessions and timings of tax payments. Here’s a sample of income tax as part of the financial modelling process. 71 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 72.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 19: Tax Modelling 4.2.20 OTHER TAXES You will also need to take the following additional taxes into account when forecasting: • Fringe Benefits Tax (FBT) ‐ Levied in respect of the total value of taxable benefits (technology, cars, discounted loans, family schooling) provided to your employees as part of their package. • Customs Duty ‐ imposed on various goods imported into Australia at rates prescribed in the customs legislation. • Payroll Tax ‐ imposed by the various States and Territories on wages paid or payable by an employer to an employee. • Stamp Duty ‐ levied by each of the States on documents and transactions such as transfers of property (including businesses and other business assets), sales of marketable securities which are not quoted on ASX (including shares and units in unit trusts), leasing and hiring arrangements and most secured lending transactions and some unsecured lending transactions. • Land Tax – imposed by each of the States on the ownership of land within the State or Territory. • Municipal Rates ‐ a common levy imposed on the value of land serviced by local or municipal governments. When operating internationally, your company will also need to factor in the various national and local taxes and other charge applicable within that jurisdiction. 72 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 73.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 4.2.21 TAX PLANNING Income Tax deductions can be claimed for a wide variety of expenses. Typically, any expense is tax deductable if it is incurred in order to run the company. These could typically include borrowing expenses, bad debts written off, and an increase in inventory value across the financial year, insurance, tax advice and recruitment costs. You can claim capital works deductions for property improvements. This applies to extensions, alterations and improvements to buildings and structural improvements. To qualify for the deduction, the building must be used for the production of assessable income. Naturally a range of opportunities to take advantage of tax breaks. Specialist advice is most appropriate here. One final message. Before entering overseas markets it is important to get professional tax advice as to your obligations and how to structure overseas transactions. 73 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 74.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 5. BALANCE SHEET, WORKING CAPITAL & CAPITAL EXPENDITURE One of the key financial statements required to be produced by any private registered or publicly listed company is a Balance Sheet. The Balance Sheet shows the assets, liabilities and equity in your company as a snapshot at a particular point in time. The Balance Sheet is a snapshot of what you own and owe and Simply speaking – assets are what the company owns and liabilities are what it owes. The balance sheet equation can be expressed simply as And can be illustrated by the following forecasting balance sheet. 74 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 75.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 20: Forecasted Balance Sheet Definitions of each are as follows: ASSETS LIABILITIES CURRENT Assets, including cash, Liabilities, including payables, inventories and receivables held loans and taxes that will be for the purpose of being realised settled within the next 12 or traded within the next 12 months months NON CURRENT Assets, including property, plant Liabilities, including interest and equipment, investment bearing loans and borrowings properties and intangible assets that will be held beyond the next 75 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 76.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. that will be held beyond the next 12 months. 12 month reporting cycle The balance sheet shows the liquidity of your company, which is the ease in which assets can be converted into cash in order of liquidity. However the balance sheet does not show the value of the firm, quality of management, and economic and market conditions in which your company operates. 76 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 77.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 5.1 BUSINESS CHALLENGES – MANAGING YOUR CASH FLOW Estimating and monitoring the future value of assets, liabilities and equity is a very important component of the forecasting process. You must consider the company’s capacity to fund the ownership or access to assets which help to create value for the company by generating profits and growth. Conversely it is possible to go broke while making a profit. How? Simply through shortages in working capital where continual growth consumes cash. Debts generated by increasing sales cannot be collected quickly enough to pay off the increasing bills from suppliers whose products you are selling more products from. You require more inventories to service the growing number of customers who will eventually purchase your goods, given a time lag. If you don't have enough cash fluidity in the working capital cycle, you capacity to fund expansion is severely limited. 5.1.1 MANAGING WORKING CAPITAL Working capital measures the funds that are readily available to operate a company. Working capital comprises the total net current assets of a company, which are its stocks, debtors, and cash—minus its creditors. The working capital cycle describes capital (usually cash) as it moves through a company: it first flows from a company to pay for supplies, materials, finished goods inventory, and wages to workers who produce goods and services. It then flows into a company as goods and services are sold, and as new investment equity and loans are received. Each stage of this cycle consumes time. The more time the stages consume, the greater the demands on working capital. Early warning signs of insufficient working capital include: • pressure on existing cash; • exceptional cash‐ generating activities such as offering high discounts for early payment; • increasing lines of credit; • partial payments to suppliers and creditors; • a preoccupation with surviving rather than managing; • Frequent short‐ term emergency requests to the bank, for example, to help pay wages, pending receipt of a cheque. 77 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 78.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. We should now look in detail at the different components of working capital and review how they can be improved: 5.1.2 MANAGING RECEIVABLES Your understanding the ability of a customer to pay, propensity to pay on time and how you can speed up the collections process is an essential part of the cash flow and profitability process. Firstly, consider the time lags that occur between when the customer originally orders a product or service and when revenue is collected from that customer Review the processes that you plan for your company, and build into your forecast how the transition between them can be speeded up. Here are some ideas, which may be applicable to you depending on your own company: • Introduce retainer payments – a guaranteed fixed sum payment, usually monthly that enables the customer to call on you for regular work. • Try to have the customer make as much payment upfront e.g. ask for 1/3rd when the job commences, 1/3rd while in progress and the remaining third on completion. 78 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 79.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Send the invoice as quickly as possible. • Offer discounts for early payments – say within seven days. • Ensure that your credit reference checking is stringent prior to offering credit terms. • Ensure that your customers know the payment terms and other credit policies. Make them highly visible in the invoice. • Incentivise the customer to make payments using the method least costly to you – direct debit to your bank account avoids the fees payable to the providers of credit cards. • Use collections as a way to motivate your sales force. Delegate to them the responsibility for timely receipt as a condition of bonuses. • Ensure that regular statements are sent to customers to act as a reminder. • Be prepared to follow up late payments with phone calls or emails. • Charge interest or service charges on overdue balances. • Aim for partial payment where you know that the customer may be experiencing financial pain. • Keep records including client’s reasons for slow payment? It will make it easier for you to validate the reasons the client gives the next time they pay late. • Don’t hesitate for too long in using debt collection services. Note that as you grow you may lack the capacity or inclination to manage accounts receivable processes internally. There are many professional services you can utilise by outsourcing the debt to a reputable collector. 5.1.3 MANAGING PAYABLES Accounts payable is the process of paying your suppliers, and like accounts receivable there are plenty of opportunities to improve your cash flow and profitability here. • Before looking at some simple ways to improve your cash flow, review first whether it is necessary to buy the goods and services that you are purchasing in the first place. Above all are your variable costs increasing faster than your revenue? Are you predicting those sales accurately? Can you purchase second hand rather than new? In the current economic downturn, the auction sites are spilling over with great bargains in nearly new office furniture. 79 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 80.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Don't be too hasty when paying suppliers. Dun &Bradstreet estimate that the average largish company is taking more than 50 days to pay suppliers – and that those are increasing as we head towards a downturn. • Are you asking your supplier for discounts? Negotiate with each of them as you may be surprised at what they can offer you, particularly if you are likely to purchase in quantity, be a regular customer over time or when your supplier is operating in a competitive market. • Try to get credit rather than cash terms with suppliers, but ensure that your own systems can cope with that. • Make sure that you are being accurately billed. Suppliers do make mistakes. Their invoice personnel may not know about the discount you were offered by the salesperson. • Have a good payments tracking system so that it makes it easier to go back to them for better trading terms and bulk discounts. • However, don't damage your credit rating or string out supplier payments too long. It may not help in your future dealing with the supplier. If there was a shortage of product that you normally rely on from that supplier, would you expect to receive your fair allocation? 5.1.4 MANAGING INVENTORY The ultimate key to success here is to ensure that you have sufficient stock in your warehouse or retail premises to meet your customer’s needs, that you are not holding onto unsold stock for long and that you can order and receive stock from supplier at just the right time to achieve this. Remember that your value of stock you carry can be magnified by slow moving items, which in turn tie up your cash in an unproductive way. Effective inventory management is imperative in ensuring proper cash flow management and profitability. You need to know how quickly items are selling, as well as what products are obsolete, what are trends, seasons and fashions depending on your products, what it costs you to store inventory and what your margins are on finished products. Consider your inventory in three categories 80 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 81.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Now what can go wrong? • Inadequate tracking system or a mismatch between supply and demand that could result in too much overall stock, too much old or obsolete stock. There needs to be proper control over inventory ordered, with optimal ordering cycles, supplier flexibility, regular stock takes and efficient warehouse system. The challenges can be multiplied by a factor of thousands when you consider all of the individual unique SKU’s • Theft, shrinkage and spoilage are all important aspects and you should budgets for proper physical safeguards over inventories including locked storage areas for high value items, limited access to secured areas and adequate security at warehouse locations. • Review your supply base, could you rationalise the number of suppliers and thus negotiate better discounts, service, quality or delivery lead times • Inevitably you will have slow moving items. You will need to make allowance where the value of the inventory falls below its cost e.g. when you need to respond to a competitors price discounting initiative, when newer versions of products outdate current stock. The magnitude of this will depend on the industry you operate within. Fashion items may rapidly decrease in value over time, as will the value of newly released DVD's 81 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 82.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Ultimately, accept that you will never get things totally right. You’ll need a rule of thumb for a proportion of total items that are going to be sold for less than cost. This also include fixing or damaged inventory as well as staff discounts. When producing a forecast, it is important to consider that some costs will be variable and some fixed, and some costs will fluctuate more over time. Consider the longer term input costs and maintain the flexibility to transfer components of cost from variable to fixed such as building factories rather than outsourcing manufacturing. 82 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 83.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 5.2 FUNDING WORKING CAPITAL AND GROWTH There are a wide range of options available if you are seeking to fund a growth in your working capital, either through finance of the equipment itself or the production facilities required to build your products. Loans, leasing and factoring are commonplace means, but consider also the availability of inventory, trade and production finance through more specialised finance providers. 5.2.1 EQUIPMENT FINANCE – LOANS AND LEASING If you are seeking to acquire equipment to facilitate more rapid growth or your company, there are a wide range of leasing, loan and hire purchase options as illustrated: Figure 21: Equipment Lease & Own Options The options can be explained as follows: 83 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 84.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. HIRE PURCHASE EQUIPMENT FINANCE LEASE OPERATING LOAN LEASE DEFINITION Agreement to Borrow money Agreement Agreement to purchase to purchase where financier rent equipment equipment over equipment provides finance for use in time for you to lease business for equipment. fixed term, the Financier owns Purchase usually returned at term equipment until possible at end end. final payment is of term. made BENEFITS Can choose what Legal ownership, 100% finance 100% finance % you wish to but mortgaged provided. provided. finance. to financier. No interest rate Can upgrade Can purchase at Loan can be fluctuations equipment any time repaid any time. without Rental payments concerns for Interest Able to utilise tax deductible disposing it. payments & balloon payment Can claim input depreciation tax at period end Rental payments tax credit via a deductible tax deductible Interest GST BAS Able to utilise payments & Can claim input balloon payment depreciation tax tax credit via a at period end deductible GST BAS No interest rate Deposit is fluctuations optional Can claim input No GST on loan tax credit via a or repayments GST BAS 84 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 85.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. IS IT RIGHT? Ideal if you wish Ideal for claiming Ideal if you want Ideal if you want to own at end of input tax credits to lease to upgrade period. equipment Table: Types of Loan & Lease – Adapted from Commonwealth Bank Table 5.2.2 FACTORING This is typically arranged with a financial institution and involves them lending cash to you based a proportion of the face value of invoices. The institution provides a flexible line of credit and promptly pays up to 90% of your book debts in cash. The balance is paid to your company when the debt has been collected from your customer. This process creates a flexible line of credit, allowing you to fund your rising cost of working capital that will come from business expansion. Naturally this comes with costs attached and while it brings forward your cash receivables, it does so at the expense of the loss of some of the gross margin you would obtain from the customer. 5.2.3 INVENTORY FINANCE Inventory Finance enables established businesses to finance their purchasing of stock – raw materials, work in progress or finished goods for resale to customers. Usually, the following is applicable: • The inventory does not have to be presold. • Flexibility on the matching of repayments to the speed that your stock is sold • No security on assets or property is required • A line of credit facility is usually established. Inventory Finance can resolve some of the cash flow issues when a rapidly growing company continually needs access to ever increasing working capital. In addition, access to larger stock levels may also provide you with the opportunity to negotiate bulk discounts and early payments rewards with suppliers, but this has to be offset against the additional costs that this finance brings. 85 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 86.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 5.2.4 PRODUCTION FINANCE Finance arrangements may be available to fund your outsourced production costs. This may include manufacturing, processing or refining costs that add value to your goods for sale. Like inventory finance the following is usually applicable. • The products to be produced don’t have to be presold. • No security on assets or property is required • A line of credit facility is usually established 5.2.5 WAREHOUSE FINANCE Aligned with Production Finance, Warehouse Finance may be of value if you need to obtain and store bulk container loads, particularly for bulk buying. If you do not have the warehousing and storage space, you finance provider may assist you to form a partnership with a large logistics provider who can assist with storage and distribution of your products. 5.2.6 VENDOR FINANCE Another form of finance which can also increase your revenue stream is vendor finance. Here’ you will form a partnership with a large finance provider and through this partnership, offer your customer financial options when purchasing your products. As your customer has easier access to funds, their purchasing options may be greater. This is common with cars and office equipment such as computers, and is promoted to B2C customers as “no interest, no repayment” schemes. 86 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 87.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 5.3 BUSINESS GROWTH – INVESTING IN THE FUTURE A key forecasting principle is that over the long term, the assets must generate profit. That rate of profit generated must be higher than the rate of interest incurred on the interest bearing liabilities. When you plan to purchase assets, review the long term value that will be derived from them, whether those assets are tangible (plant & equipment), intangible (patents, goodwill) or even entire companies in an acquisition. • Sale & Leaseback: Opportunity to derive cash by selling property or large equipment and leasing it back. You remain the tenants or continue to use the property and equipment. • Appreciating Assets: Certain assets particularly land and buildings may rapidly appreciate in value over time. Other assets integral to the operation of the company such plant & equipment and motor vehicles may depreciate. • Intangibles: In certain industries, intangible may form a major part of your longer term assets. These include patents and other intellectual property, brands and goodwill, and can be the lifeblood of your company, the source of many of the high value sales and an important item in the valuation of the company. • Investment in associates or other non related businesses: Investments are additional assets not needed for the main part of the company. They are generally acquired using surplus cash that the company is not using for working capital or CapEx. • Acquisitions: Your company may perceive that it needs to make strategic investments in related companies‐ suppliers, customers and associates. These may in the future lead to strategic acquisitions. This is covered in Section 8. • Investments in unrelated property, shares, trusts and interest bearing securities: These have no relationship to the core business, but may be a simpler way of obtaining higher returns (at least in the short ‐ medium term) that deploying those funds in company related activities. Throughout your forecasting period you may want to look at the structural nature of your organisation and how well it handles a given set of inputs (cash, resources, labour etc) in order to produce the most efficient set of outputs – finished products, profits and growth. The major outlays that you have to plan for come under the category of Capital Expenditure. 5.3.1 CAPITAL EXPENDITURE 87 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 88.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Capital Expenditure occurs when a company spend in order to purchase fixed assets, or upgrade existing fixed assets. These include property, equipment and industrial buildings and the outlay is made to increase the scope of the company’s operations. If the asset is going to be used beyond the immediate financial year, the cost must be capitalised. Those costs are then depreciated over the life of the asset. There are four types of costs relating to tangible assets that can be capitalised: • Costs that produce a benefit lasting beyond the current tax year. • New assets that have a life beyond one year. • Improvements that prolong the life of an asset (enhancements, repairs etc) • Adaptations that allow the asset to be used for a new or different purpose. For forecasting and modelling purposes here is a sample Capital Expenditure forecast of a chain store retailer that is opening up new branches, closing old ones, refurbishing existing ones and ensuring that the appropriate IT and warehousing expenditures of each are taken into consideration. FY 07‐08 FY 08‐09 FY 09‐10 FY 10‐11 New Stores ‐ Greenfields 2.30 2.57 2.53 2.44 New Stores ‐ Acquisitions 3.10 2.53 3.41 2.41 New Stores ‐ Replacements 2.70 3.00 2.97 2.85 Store Refurbishments 1.90 6.00 2.09 5.70 Store Extensions 3.10 5.97 3.41 5.67 Stay in Business ‐ R&M 2.60 6.10 2.86 5.80 Stay in Business ‐ Operational 3.30 14.50 3.63 13.78 MIS 12.10 6.00 13.31 5.70 Distribution 2.50 2.58 2.75 2.45 Property Developments 3.70 11.33 4.07 10.77 Gross Capex 37.30 60.58 41.03 57.55 Property Sales ‐6.10 ‐15.30 ‐10.00 ‐10.77 Net Capex pre Fitout Leasing 43.40 75.88 51.03 68.31 Fitout Leasing ‐3.30 ‐14.50 ‐3.63 ‐13.78 Net Capex post Fitout Leasing 46.70 90.38 54.66 82.09 Acquisitions 12.00 3.60 5.20 5.60 Total Capex & Acquisitions 58.70 93.98 59.86 87.69 Figure 22: Capital Expenditure Model 88 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 89.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. The following are a series of questions that need to be addressed and include in your growth costings: 5.3.2 MANUFACTURING CHALLENGES • Can you make any improvements in efficiency? • How close are the manufacturing facilities to your distribution channels? Is responsiveness affected? Could you reduce transportation charges? Is there government or other incentives for you to relocate company facilities? • How available are raw materials and what are the likely cost fluctuations? • What is the maintenance requirement of the manufacturing plant? Have they been costed in, in downtime costs? • What opportunities are there for vertical integrating your manufacturing? Can you create efficiencies by manufacturing rather than sourcing components? If you supply product to another manufacturer, can you enhance the value of their end product by producing it yourself? • How effective are your inventory control systems? • How effective are your QA system? • How old is your equipment? Can newer technologies create cost efficiencies? • What is likely to be the turnover of key personnel? What value do these personnel bring to your organisation and how dramatic is the learning curve for replacement personnel? 5.3.3 RESEARCH & DEVELOPMENT CHALLENGES One of the key challenges here is to ensure a pipeline of new product innovations that relace and enhance the current product offering. Dedicated resource in terms of research, market analysis, partner involvement and the development of business cases need to be costed and included in the forecast. For both new product development and general R&D consider the following: 89 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 90.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • What is the research capability of your development team? Are there any skill sets that you are lacking? How well equipped are your laboratories and development areas? Can they be improved? What access can you have to superior, shared resources? • What manufacturing support is there for R&D? Can tests and small production runs be fed through to your plant? • Do your research staff have a true vision of how the marketplace is evolving? Can their managers inspire a vision and facilitate an innovative & creative environment? Do they understand costs and benefits? Are they focused on market realities and optimise cost with performance • How able is your company to recruit and retain specialists? Tech managers who understand financials, • How proprietary is their technical knowledge and are there risks of that changing? • Can they both create and shape future developments as well as act in the defensive through lowering offensive manufacturing costs, low cost product improvements and supporting economies of scale requirements? 90 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 91.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 5.4 LIMITS TO GROWTH – CAN YOU GROW TOO QUICKLY? Economic downturns can challenge the most successful rapidly growing companies, but much of the problem could be that they grew too fast in the first place, by undertaking sub‐optimal growth. Recently Starbucks announced the closure of 75% of its Australian locations. These locations were opened during times of economic growth, but were built in the first place without rigid demographic analysis and without a clear understanding of the tastes of an Australian coffee drinker. It is possible to grow too fast when an investor’s demand for growth exceeds the strategic business rationale for doing so and it turns into growth only for the sake of growing. 91 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 92.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 6 FINANCING The freeing up of excess working capital may be the cheapest form of financing. However, there will be some occasions as you grow where external finance is the most appropriate way of obtaining a large scale input of funds into your operations. You may be expanding your product range, processes, research capabilities or your geographical reach, and simply making internal adjustments will not give you the financial flexibility you need. As well as having an operational strategy in place, a rapidly growing company also requires a financial strategy, which is a set of policies that determines the sourcing and distribution of funds. Even smaller organisations must have a framework for assessing their financial strategy and ensuring that it is aligned with the operations of the company. Why? • To assist in making acquisitions that can help grow the company through diversification, horizontal / vertical integration or simply scale by acquiring competitors. • Ensure that there is sufficient access to finance that the company can draw on in periods of underachievement. • Ensure that free cash flows are either profitably reinvested into the organisation, or distributed to shareholders if such reinvestments cannot obtain a market rate of return. • Ensure that the cash reserve is deployed appropriately. Key issues: • Most companies will be financed by a mixture of debt and equity. A healthy growing company should have an “appropriate” balance of debt (borrowings) and equity (ownership). This “appropriate” capital structure needs to give consideration to your company’s future revenues and investment requirements. • Debt finance is less costly because debt holders expect a lower rate of return in exchange for greater certainty of repayment and a preferential position in the event of bankruptcy. Debt is also tax deductible, thus further reducing the cost of debt to the company. 92 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 93.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • One of the purposes of forecasting is to ensure that you have sufficient debt capacity in place to be able to cope with a range of different scenarios that could occur. One key issue is to watch the interest charges incurred by borrowings. Profits can be reduced or even eliminated by borrowings which in turn have to be funded by a reduction in owners’ equity. In the current economic circumstances with rising interest rates this is all the more prevalent. The amount of debt in your company is known as its gearing ratio and may be simply calculated as follows: DEBTS Interest Bearing Loans & Borrowings 500,000 Redeemable Preference Shares 60,000 Cash & Short Term Deposits ‐250,000 NET DEBT 310,000 TOTAL EQUITY 1,000,000 TOTAL CAPITAL EMPLOYED 1,310,000 Gearing = Net Debt / Total Equity 31.00% Figure 23: Calculating Gearing An acceptable level of debt may be something that you and other shareholders / directors have agreed upon, or it may be imposed on the company by means of a banking covenant on the debt (see later). What is an acceptable level of debt? The finance text books are crowded with debate about this issue, but much of the answer depends on the industry that you are operating within, the growth stage of the company and your company’s capability to be able to cost efficiently access either one or both means. Here are some key pointers: DEBT EQUITY ADVANTAGES Funds growth while avoiding Returns to the shareholder are diluting the ownership interest based on “best efforts” rather of equity holders. than a legal obligation to repay Tax efficient use of operating debt. cash flows. The cost of debt is Equity holders may be lower tax deductible. expectations that debt holders in a recessionary environment. DISADVANTAGES Debt must be serviced with Equity holding pattern likely to interest payments that are be more volatile if company 93 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 94.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. increasing in the current listed and traded on an environment. exchange. Higher levels of debt (relative to serviceability) can adverse affect credit ratings. Overall, smaller organisations, particularly those that are enjoying rapid growth are more likely to be characterised by lower debt levels, simpler capital structures, mainly short maturity senior bank debt, lower dividend payouts and share based incentive compensation. Equity includes • The original share capital rose for the company • Any additional capital raisings • The accumulated profits from previous years not dispersed through dividends. 94 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 95.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 6.1 DEBT Your company is more viable long term if the borrowings match the assets e.g. a company with mainly long term assets requires mainly long term borrowings. You should not arrange short term borrowings to acquire non current assets, as the short term cash inflows from revenues generated by the non current asset will more than likely not match the outflows from payments due on the asset. Loans have the potential to be substantially reduced if other cash flow components could be managed. You will need to consider appropriate levels of debt. Too much debt as a percentage of total company value can mean: • Interest payments will swell and put pressure on your company to be able to cover interest and principal repayments. • A lower credit rating for companies who are rated by credit agencies such as Moody’s and Standard & Poors A loan, usually obtained from a financial institution is a common form of debt. This loan will be either • secured where you will pledge and asset such as a property as collateral, or • unsecured such as an overdraft, credit card debt or a bond. The timing of borrowing repayments is important as sufficient cash will be required, or new borrowings arranged. You'll need to predict the likely cash situation at the time and the likely need to arrange new funds. You may also have given commitments to lenders, such as banks, that the company maintains certain pre‐agreed ratios for liquidity (cash buffers) and other criteria. These are known as covenants, and commit the company to agree limit other borrowing or to maintain a certain level of gearing. Other common limits include levels of interest cover, working capital and cash flow. 95 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 96.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. The example below shows financial forecasting to take account of two covenant ratios a) That Group EBITDA must always remain more than three times the value of the interest repayment on debt. b) That the leverage ratio (debt / total tangible assets) must not exceed 40%. Both these measures illustrate that the company directors will need to recast their forecasts in the light of the potential of both covenants being broken. 96 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 97.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Covenant One - Group EBITDA >= 3x Net Interest Expense q1 07-08 q2 07-08 q3 07-08 q4 07-08 q1 08-09 q2 08-09 q3 08-09 q4 08-09 q1 09-10 q2 09-10 q3 09-10 q4 09-10 Current Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast EBITDA 4,082,982 1,460,022 2,003,966 3,018,251 3,466,860 3,114,287 1,883,344 1,774,560 1,669,881 1,435,217 1,287,166 1,411,923 Net Interest Expense 867,111 867,111 867,111 836,778 806,444 806,444 776,111 745,778 745,778 715,444 685,111 685,111 Forecast EBITDA Ratio 4.71 1.68 2.31 3.61 4.30 3.86 2.43 2.38 2.24 2.01 1.88 2.06 Covenant 3 3 3 3 3 3 3 3 3 3 3 3 5.00 4.50 4.00 3.50 3.00 Forecast EBITDA Ratio 2.50 Covenant 2.00 1.50 1.00 0.50 0.00 q1 07-08 q2 07-08 q3 07-08 q4 07-08 q1 08-09 q2 08-09 q3 08-09 q4 08-09 q1 09-10 q2 09-10 q3 09-10 q4 09-10 Covenant Two - Leverage Ratio - Must be <=40% q1 07-08 q2 07-08 q3 07-08 q4 07-08 q1 08-09 q2 08-09 q3 08-09 q4 08-09 q1 09-10 q2 09-10 q3 09-10 q4 09-10 Current Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Forecast Senior Debt 70,000,000 72,569,143 74,446,451 72,949,767 72,349,159 64,291,890 58,000,000 58,000,000 58,000,000 58,000,000 58,000,000 58,000,000 Total Guarantees 14,225,000 14,225,000 14,225,001 14,225,001 14,225,001 14,225,001 14,225,002 14,225,002 14,225,002 14,225,002 14,225,003 14,225,003 Total Senior Debt 84,225,000 86,794,143 88,671,451 87,174,768 86,574,160 78,516,891 72,225,002 72,225,002 72,225,002 72,225,002 72,225,003 72,225,003 Total Assets 213,083,514 213,241,245 215,853,343 216,578,522 214,744,907 208,614,591 203,167,522 199,748,882 200,352,532 194,839,199 191,577,315 192,683,384 Less Goodwill 12,593,811 12,593,811 12,593,811 12,593,811 12,593,811 12,593,811 12,593,811 12,593,811 12,593,811 12,593,811 12,593,811 12,593,811 Total Tangible Assets 200,489,703 200,647,435 203,259,532 203,984,712 202,151,097 196,020,781 190,573,711 187,155,072 187,758,722 182,245,389 178,983,504 180,089,573 Forecast Leverage Ratio 42% 43% 44% 43% 43% 40% 38% 39% 38% 40% 40% 40% Covenant 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 45% 44% 43% 42% 41% Forecast Leverage Ratio 40% Covenant 39% 38% 37% 36% 35% q1 07-08 q2 07-08 q3 07-08 q4 07-08 q1 08-09 q2 08-09 q3 08-09 q4 08-09 q1 09-10 q2 09-10 q3 09-10 q4 09-10 Figure 24: Covenant Modelling 97 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 98.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 6.2 EQUITY Equity is the residual interest in the company’s assets after the deduction of liabilities. It is made up of contributions from owners; pre and post start up investors, retained earnings and reserves. Along your growth path, you are going to be reviewing a range of issues pertaining to ownership of your company. While you may start off being the 100% shareholder, your funding and control needs may change to where this ownership is diluted and • ownership is split amongst a number of shareholders, • an external investor such as a business angel or venture capitalist becomes involved as a result of your funding and expansion needs • you want to keep your own managers motivated and incentivised by offering employee shares or options. The issues that surround deal making with external investors, convertible debt to equity shares and dilution provision in shareholder agreements all go beyond the scope of this eGuide. 6.2.1 DIVIDENDS AND RETAINED PROFITS Dividends are the distribution to the shareholders of a certain amount of the profit made by the company. Whatever is not distributed is reinvested into the business as Retained Earnings. You will need to consider the necessity of declaring a dividend. Determinants include: • How much cash is available ‐ liquidity • Debt covenants restricting the payout amounts to shareholders • Stability of earnings. Dividend policy revolves around public perception rather than rational company objectives‐ i.e. that the firm should maintain or increase its dividend payout every year. However, the real issue is whether the firm can gain a better return on those funds than the shareholder. 98 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 99.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. The rational approach to dividend payments is that if the company cannot reinvest the earnings at a higher expected return that the shareholder would obtain through use of the money in an alternative investment proposition, then the company should pay the Dividend. Several factors should be considered when thinking about investing retained profits. These include RETURNS ‐ The percentage you earn on an investment is key. Some products, like bonds, offer a specific, guaranteed return. Some products offer a higher return, but it is not guaranteed. SAFETY ‐ What’s the risk factor? Conservative investors might choose a bank savings account because the return is safe. Aggressive investors might prefer to lean towards property or shares, but their money is not insured, nor is the return guaranteed. LIQUIDITY ‐ If and when you need your invested money, how quickly can you access it? Money market accounts and savings accounts are considered liquid assets because they can be turned into cash quickly. Products with staggered maturity dates give you access to cash at different times. DIVERSITY ‐ A smart way to reduce risk is by spreading your money among several types of investment products. For example, you could bonds and shares. 6.2.2 EMPLOYEE SHARES & OPTIONS An employee ownership programme is a very useful motivational tool for helping your employees to have the same overall goals as the business. You may choose to have either a broad based scheme whereby all of your employees can own shares in your company via an ESOP (employee share ownership plan) or where you offer shares or share options to a few key employees. If you are considering proving shares to employees, you will want to consider the following: • Will the scheme be motivational for the group of employees who now have shares, as well as the entire company? 99 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 100.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Will the shares be provided free or via a loan, known as an Employee Share Loan Plan (ESLP)? How will the loan be structured and repaid? Will the employee have the capability to accumulate more share, say via a regular saving and investment plan? • What opportunities will there be for employee salary sacrifice to purchase shares? • What are the tax implications from both the company and the employee’s perspective? • How will the scheme grow? Could it be a lead in for the retirement of an owner, where a team of employees acquire the company? (The leveraged ESOP) This is starting to become a valid opportunity for the owner to exit the business without a trade sale of public listing. • What will the criteria be for an employee who wishes to sell their shares? Another alternative, share options give your managers the right (but not the obligation) to purchase company shares at a pre‐agreed fixed price for a specific period of time. Again, these act as a motivator to increase the value of the company, in order that these options have a true value. From a forecasting perspective, it enables the capital base of the company to expand, it encourages the reinvestment of company profits into the company to fund its further growth, and it requires the owner to provide finance or arrange financial sources for employees wishing to acquire shares. 6.2.3 OTHER RESERVES There may be other reserves in the equity component of your Balance Sheet. These include: Types of Reserves Shareholder Contributions This includes a) options, where investors subscribe funds to acquire an option that gives them the right to acquire funds at a later date. b) Forfeited shares reserve, where investors failed to pay a call on partly paid shares. Realised Gains These include: Gains made on disposal of capital types of profit Retained earnings General reserve Capital profits reserve Unrealised Gains These include: Asset revaluation reserves Foreign currency transaction reserves 100 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 101.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 101 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 102.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 6.3 HIGH GROWTH COMPANY’S – SPECIAL CONSIDERATION It is frequently said that company’s most able to raise capital are those least in need of it. Conversely, those growth companies with the highest potential to succeed in rapid business expansion are those least able to obtain the finance since their propositions will be the most untested and thus the highest risk. Figure 25: Financing a High Growth Business 102 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 103.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Venture capital (or angel investing for start ups) is high‐risk capital directed towards new or young businesses with prospects of rapid growth and high rates of return. Venture capital companies will provide capital for R&D and new product development for an idea, and will cater for early stage and later stage expansion companies, as well as finance for management buyouts and buy‐ins of established companies. 103 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 104.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7 REPORTING & ANALYSIS Behind the financial statements sit a whole series of analysis about whether your company is heading in the right direction. This section is dedicated to: a) Reviewing your cash flow forecast. b) Reviewing your performance ratios. c) Tracking your actual performance to your budget d) Explaining the value of considering alternative scenarios for your company 104 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 105.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7.1 CASH FLOW & CASH MANAGEMENT FORECASTING “You can lose money for a while, but you only run out of cash once” The cash flow forecast is an absolutely essential part of your company reporting. Its proper management is a discipline that ensures a company is kept in a healthy state. Cash flow is simply the movement of cash in and out of the company. Cash flow management is essential as a discipline that tells you how much cash is in the company at any future point in time. It reduces the risk of insolvency and can reduce the cost of financing an entity. This is by reducing the amount of capital employed. Here’s a sample cash flow forecast outlining the forecasted inflows and outflows from a sample company. Figure 26: Cash Flow Forecast Modelling 105 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 106.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. This will determine your financial capability to expand and whether external financing or tighter cash management is required for any financial shortfall. A properly formulated cash flow forecast will pinpoint whether you can afford your working capital requirements, pay your debts and reward your shareholders and whether you afford the asset purchases required to facilitate growth. The cash flow forecast shows where the cash is coming from and where it is used in the running of the company. It is in the form This statement provides an early warning of potential cash shortages, identify whether additional funds will be needed, identify potential surpluses that can be invested to generate additional income and assists in preparing requests for financiers for additional funding. The danger signals, of insufficient cash being generated include: 106 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 107.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. • Net cash flows from operations are negative • Receipts from customers are lower than payments to suppliers and employee. • Cash flow from operating activities is lower than the after tax profit With this forecast, you must also take into account, various risk factors. If you’ve got very little set aside in your account, what percentage shortfall in revenues earned will make you unable to meet your month end payments? 7.1.1 CASH FLOW & INVESTORS Finally viewing the cash flow statement from a potential investor’s standpoint, before investing the investor needs to be convinced that cash will be created, that can be eventually taken out of the business by the investor. The investor will seek a cash flow model incorporating the following variables with built in scenarios that can be changed in a “What If…?” Type format. • The estimated costs of acquiring a customer • pricing and gross margins, • accounts receivables aging, • realistic administrative costs, • taxation • depreciation. 107 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 108.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7.2 RATIO ANALYSIS You need to include within your forecast, a series of ratios that review the forecasted performance of your company across a range of criteria, as well as across a range of periods (years), in order to recognise critical areas where the company may be at risk. These include: Measure Explanation Ratio Short Term Solvency / Can the company pay its • Current Ratio = Current Assets / Liquidity due debts? Current Liabilities • Quick Ratio = Quick Assets / Current Liabilities Activity / Efficiency How well is working • Asset Turnover = Revenue / Total capital managed? How Assets well do your company’s • Receivables Turnover = Revenue / assets generate sales? Receivables • Inventory Turnover = Cost of Goods Sold / Average Inventory Financial Leverage How does your financial • Debt ratio = Total Debt / Total structure change over Assets time? How much • Debt/Equity Ratio = Total Debt / financial risk are you Total Equity exposed to? • Debt / Capitalisation = Total Debt / (Total Debt plus Equity • Interest Cover = Earnings before interest and taxes (EBIT) / Interest Expense • Profit margin = Profit / Revenue • Return on Assets (ROA or ROI) = Profit / Total Assets • Return on Equity (ROE) = Profit / Equity Market Value Ratios If you are a listed • P/E ratio = market price per share / company, what is the Earnings per share (EPS) market’s view of your • Dividend Yield = Dividend per share company? / Market price per share • Market / Book = Market price per share / Book Value 108 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 109.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7.3 VARIANCE Simply forecasting your company’s finances is insufficient. You need to be continually monitoring how your actual performance is comparing to your forecast. Has your actual financial performance for the period lived up to the budgets and expectations you set at the beginning of the period? The difference is simply the variance and is a key set of statistics for presentation to the board, management and financiers. If your company has not performed to expectation, how much of this can be attributed to: • Unexpectedly high or low level of awareness or sales from promotional activity. • Poor purchasing policies or efficiency • Poor labour usage or efficiency • Poor distribution policies • Poor pricing strategy • Changes in consumer behaviour or attitudes • Unanticipated seasonal variations • Reputation of the company changing. And more important, what can be done to change this? It is important to be able to track your actual overhead costs to that which you had budgeted for. Costs have a way of spiralling out of control when there’s insufficient management scrutiny. The greater the risks and volatility in your overall industry, the greater the time and emphasis should be placed on tracking your performance to budget. The more unpredictable the future, the more often you need to be reforecasting and producing rolling forecasts in order to align your operating needs with the general competitive environment. Increasingly, board reporting is simplified by a series of pre‐developed digital dashboards illustrating the performance of key variables. Here is one such example: 109 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 110.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 27: Variance Analysis in Reporting Finally, what kind of financial reviews take place, who undertakes and how frequently are they undertaken. These reviews could include: STRATEGIC: Is the company focused and focused in the right direction? Review by performance to budget, sales to expense ratios etc. PROFITABILITY: Where is the company making most of its profit? Review by product, customer, territory or channel. EFFICIENCY: How efficient is expenditures in different areas relative to results. Review by production, R&D, marketing, sales, accounts, customer service and pretty well every business function that has costs associated with its upkeep. 110 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 111.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7.4 SCENARIO ANALYSIS A complete financial forecast will have alternate results reflects alternate outcomes that could happen to the company. For example, they may reflect realism, optimism and pessimism in the financial plan The impact on a cash flow of a pessimistic forecast must be taken into account. Can the company withstand the shocks, in terms of its current liabilities (interest to be repaid, creditors etc) and reserves of one or more worse than expected reporting periods. With the results of a pessimistic cash flow forecast, consider your strategies for the following: • Would you seek to maintain or downscale future capital expenditures for subsequent periods? • Do you have the flexibility to adjust the debt repayment schedules? • What changes would you make to the operational side of the company in terms of subsequent forecast periods of revenue and cost? In the end this would depend on the reason for the performance shortfall relative to base case. • Has the overall market for your products and services changed? (How did your competitors perform?) Are there structural changes in the way that your customers have their needs met (Airlines v Video & WebConferencing) or are there changes in the overall economy (downturns in consumer spending) You may want to develop a more sophisticated modelling environment for forecasting: • What would be the profit impact of delaying a product launch? • What would be the impact on profits of offering discounts to increase sales volume? Consider applications that provide sophisticated and powerful modelling and "what if" calculations. The following layout compares the financial outcomes under a range of alternate scenarios. 111 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 112.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 28: Graphical Analysis of Scenarios 112 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 113.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7.5 SENSITIVITY ANALYSIS Rather than creating alternative forecasts based on different perspectives on the future, you could select one or a few variables and later them in order to assess their impact on financial indicators such as earnings, cash flow or money‐in‐the bank. Key variables for adjustment would include: • Expected Gross Margin. You may assume 30% of the ex‐GST selling price for an electrical appliance, but what if price discounting occurs because retailers are fighting to clear stock? • Expected Sales Penetration: You may believe that 5% of a particular population will purchase your patented drug at the prevailing price, but what if viral marketing and an overly successful PR campaign increases consumer awareness more quickly than expected? • Market Share: You may consider that 10% market share is a reasonable 5 year target for your product, but what if a customer’s become aware of a quality problem with a competitor’s product? • Distribution Payment / Royalties: What if you have to increase the margin you pay distributors above 15% in order for them to be prepared to stock your product? • Marketing Spend: what if the 20% of revenue that you have previously forecasted as appropriate marketing spend turns out to be inadequate and you have to increase the proportionate spend in order to create additional awareness? You may also wish to include various economic statistics in your forecasts. Interest Rates are a good example. If they adjust upwards or downwards, what is likely to be the effect on…? • Sales Revenues – as consumers have altered purchasing power. • Your company debt – as interest on repayments may be higher or lower. 113 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 114.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7.6 RISK MANAGEMENT A major component of forecasting is the understanding of risks that could adversely affect the cash flows of your company, as well as a strategy for mitigating them, even if (like most of these risks) they are outside of your control. 7.6.1 BUSINESS RISKS There are a wide range of business risks to be considered when reviewing your business, your industry and market fluctuations. Every industry will have certain similar operational risks, but other different levels of risks depending on the nature of that industry. Some common risks include • Highly volatile revenues, perhaps related to the general economic cycle. • Challenges at maintaining internal systems • Capability of management to handle growth • Capability to integrate operations when expanding • Market power of one or a few large customers • Unproven revenue potential for new products • Capacity constraints, particularly with manufacturing, R&D and skilled personnel • Dangers of acquisitions / strategic alliances between competitors, • Growing the business globally • Loss of key personnel, • Legal liabilities • Capabilities to adopt changes in technology, or international standards • Possibility of another company’s IP infringement • Long lead times for commercialisation of new developments particularly in biotechnology Increasingly uncertain times, greater competiveness and greater industry volatility calls for Risk Management processes even in the smallest of organisations. 7.6.2 FINANCIAL RISKS 114 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 115.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Components such as interest rate fluctuations (both in Australia and overseas), changes in exchange rates and changes in the commodity prices, are all inevitable issues when doing business. They create an unanticipated mismatch between prices, costs and debt and most significantly affect trading margins and interest repayments. You need to a) considering where you are exposed to risk b) understand the size of that exposure c) Consider how this risk may be mitigated. Risks may be classified as follows: TYPE OF RISK EXPLANATION DETAIL MITIGATION Liquidity Risk Insufficient funds Borrowed funds Maintain unused funding sources in view to meet due not available at of factors such as future debt repayment, liabilities. acceptable terms. capital expenditure, seasonal fluctuations, Loss of credit line potential acquisitions and contingencies from funder. Interest Rate Risk Movements in Include sensitivity analysis in your interest rates will forecasts. affect financial Use of pre‐agreed fixed and locked in performance by interest rates. increasing interest Offsetting the increases in interest paid in expenses one part of business with interest received on another. Use of swaps – exchanging a floating rate obligation for a fixed obligation. Foreign Exchange Risk that exchange Risk that these Forward planning including buying Risk rate used to movements make forward currency convert foreign your company’s Other hedging against currency moves revenues and products or e.g. foreign currency bank accounts. expenses and services assets / liabilities uncompetitive to Australian internationally. dollars causes shareholder wealth to decline Commodity Price Risk that a change Reducing reliance on specific Risk in the price of a commodities commodity that is Forward buying a key input / 115 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 116.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. output of an organisations business will adversely affect financial performance Credit Risk Risk that the other Could also be the Assess counterparty risks prior to party in a consequence of involvement. Use of prompt payments. transaction will international Avoid creating an undue dependency of a not be able to government limited number of suppliers, distributors meet its financial directives and or customers obligations. policies or a settlement delivery risk that destroys future business dealings Here’s where the key risk elements may be create: • Who are your customers? How much of your total revenue is made up by the top five spenders? Top ten? Top twenty? • Where are your customers located? • Where is your manufacturing done? • How much are your interest expenses, are they fixed or floating and in what currency denomination? • What is the main currency denomination of your payables and receivables? • What are the main currency denominations of your major competitors? 116 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 117.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 7.6.3 RISK MANAGEMENT FRAMEWORK As part of a business plan, you may include a Financial Risk matrix, outlining the main financial risks, the probability of them occurring, their impact and what you would do to mitigate them: RISK PROBABILITY IMPACT RISK SCORE PLAN OF RESULTANT (1‐5) (1‐5) ACTION FINANCIAL IMPACT Increasing 2 3 6 Dual source Lower quantities costs of raw raw materials ordered means higher materials cost price and longer lead times – see model (b) Competitor 2 2 4 Bring forward Access to new XYZ plc enters Australian revenue stream Australian launch of new earlier, Market generation cannibalisation of product existing revenue and high costs required for QA & customer service – see model (c) Failure to 1 4 4 Ramp up Reduce unit sales by interest direct online 10%, but increase distribution presence gross margin from channels 30% to 40% ‐ see model (d) 117 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 118.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 8. ACQUIRING OR SELLING – VALUATION & OTHER CHALLENGES You may need to value a company for a whole range of reasons. These can include anything from a buy / sell proposition or an employee share option plan to a capital raising or a marital dissolution. Your prime business goal will probably be for you to maximise both the current value of that company and its future potential value. An updated cash flow forecast allows you to be able to use one of the more sophisticated methods of valuing a company, Discounted Cash Flow (DCF) to calculate your company value. This may also be appropriate when looking for additional shareholders or equity partners, or buying out existing partners in the company. It is particularly relevant for high growth companies where their current trading profit does not reflect their potential. A discounted cash flow simply values your company based on the expected future cash flow streams generated, adjusted for the level of risk inherent in achieving those forecasts. Reams have been written on this methodology, its applications and its limitations that would be out of place in a document of this nature, but simply stated, models that incorporate a valuation, require as inputs: • Around five years of forecasted cash flows. • A risk percentage rate required to discount these forecasts by – the higher the percentage risk rate, the riskier the business proposition. (Stable cash flows in a stable industry with high capital requirement and higher barriers to entry attract a lower discount rate than more volatile organisations and industries. • An overall per annum anticipated growth in cash flows of the company, relative to the overall growth in the economy.) An alternative method for valuing a business with more stable revenues is applying a multiple to the normalised earnings (EBIT, EBITDA, PBT etc) of your company to arrive at a nominal value. Normalised earnings would exclude extraordinary or exceptional items, one off non recurring items and discontinued divisions or product lines. 118 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 119.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. The following chart illustrates the average value of a business in different industries in the first quarter of 2008 as a multiple of their EBIT: Figure 29: Average Business Value by Industry. SOURCE: BizExchange Index March 2008 Quarter Results Generating forward cash flow figures and discounting them at the cost of capital enables you to calculate the present value of your company. Your software is a useful valuation tool, as the software helps you look ahead at those future cash flows and allows you to see what steps need to be taken to increase the valuation. Valuation is particularly important where future profit may be a long way out, or where your cash flows are irregular. Valuation is a versatile tool appropriate for buying or selling a company or as an important management focus and motivation tool. Agreeing and targeting a stream of anticipated future cash flows, is a far better measure of business value that accounting statements! 119 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 120.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 8.1 INCREASING YOUR BUSINESS VALUE Your financial forecast should display numerical evidence that many of the following strategies are being adopted as you grow your company: • Implementing a marketing strategy based on differentiation, quality, cost leadership, innovation or extreme focus. • Create entry barriers through economies of scale, product differentiation. • Access to distribution channels. • Design a strategy to maintain market share • Reduce costs in line with industry demand reduction • An effective relationship between total cumulative output and unit cost of your production of products and/or services. • Attempt to identify profitable niche • The effective use of possible alliances/partnerships. The valuation of your company will adjust in accordance with general market conditions (boom versus slump), the prevailing value of similar enterprises, your forecasted and risk adjusted rate of growth and the degree with which your company possess the following capabilities. 120 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 121.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 30: Increasing Business Value 121 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 122.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 8.2 ACQUISITIONS It is estimated that only 17% of acquisitions add shareholder value, while 53% actually lose shareholder value and the remaining 30% produce no added value. An acquisition may be part of your “roll up” strategy to consolidate the number of players in your industry. The advantages of this may include: • Revenue enhancements from improved marketing, less competition, capacity to enter new markets and greater muscle when seeking large corporate or government customers through tendering opportunities. • Cost reductions from economies of scale, economies of vertical integration, elimination of inefficient management, purchase economies and the capacity to make better use of existing resources. • Utilise the research and development capabilities of the acquired company. • Risk diversification through having either a broader geographic operation, the capacity to diversify into different customer segments • Tax gains from transfer of operating losses, unused debt capacity and lower cost of capital. A longer term strategy may also be the increase overall valuation of the combined company through obtaining the higher valuation multiples that a corporate will achieve relative to an SME. However undertaking an acquisition for this purpose alone is risky as economic boom / slump cycles also play a significant role in the determination of multiples. In addition, many of the more successful “roll up” acquisitions are under the guidance of a Private Equity team. While Private Equity clearly has its role in strategic planning, driving processes and financial structures etc, investors may well have different time horizons to owners and may be motivated more by the financial engineering than the long term business opportunities. With potential acquisitions, you should be able to see a financial opportunity through underperforming assets or bad management. But they may be more than offset by the Control Premium, the costs of acquisition, and post acquisition challenges such as potential diseconomies of scale including loss of key staff dissatisfied by the acquisition etc. Acquisition is only one of many alternatives for growth. Other quasi‐ integration strategies include technology licenses, strategic alliances, franchising, joint ventures or asset ownership. 122 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 123.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. The chart in Chapter Three reviews the partnering and alliance process and argues that you could achieve similar objectives at a lower risk by considering this route. Acquisitions may also involve a Management Buy Out (MBO) of your company, where your incumbent management team raises capital to buy your company. Alongside your management team, an investor or VC will take a stake in the company, and arrange debt funding for the management team. The advantage of this is that the management team is now focussed on the same goals as the shareholders. 8.2.1 VERTICAL INTEGRATION Vertical Integration is a means of co‐ordinating the different stages of an industry supply chain. Here your company may seek to own its upstream suppliers and its downstream buyers. It’s however a risky strategy, complex, expensive and hard to reverse. The main circumstances given when it can be good to integrate are: • When the vertical supply chain “fails”, transactions between the players become too risky and too costly, and there needs to be some “control” or market power in its place. • When you can create an exploit market power, usually be creating barriers to entry for other companies looking at competing in this space. • Where the industry life cycle is either too young – and you have to forward integrate to develop the market, or too old e.g. you have to fill gaps by others leaving market. (You may need the reassurance of product supply from a company considering exiting the industry). There are also spurious reasons for integration e.g. reducing cyclicality and assuring market access. In the end long‐term contracts, joint ventures, strategic alliances, technology licenses, asset ownership, and franchising tend to involve lower capital costs and greater flexibility than vertical integration. 123 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 124.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 8.3 DUE DILIGENCE Due Diligence is a process undertaken by a buyer of a business in order to determine the attractiveness, risk and issues of that potential acquisition. The due diligence can be either external (assessing the future potential of that company in a competitive marketplace) or internal (assessing the key legal, financial and managerial issues within the company). If you are considering selling your business in the future it helps to address the key issues that buyers will look for when the sale time comes. Conversely, you may be looking at acquiring a business, in which case the MindMaps below can act as your checklist for what you should be looking out for. As part of the negotiation process it is also important to ascertain what the motives are of all of the other parties involved. In particular, why is the owner selling? What does the owners’ management want to get out of this? Why does the owner want cash rather than shares? What are the motivations of the other parties? Due diligence is a large & complex subject in itself, but this series of MindMaps will graphically list the key areas that you need to be aware of: 8.3.1 DUE DILIGENCE – ORGANISATIONAL & FINANCIAL A seller will necessarily provide financial projections through rose tinted glasses in order to maximise the value of their business. It’s important to compare these projects with actual trading history. If there is a major discrepancy, ask yourself, if the seller is so confident of this, why would he or she wait a couple of years until those projections had been realised and sell the business at that point? Ownership may not simply be a case of transfer 100% of a company over from one party to another. There may be other issues clouding the transactions including minority shareholders, commitments to management staff and suppliers, ownership of technologies and lender covenants. 124 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 125.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 31: Organisational & Financial ‐ Due Diligence 8.3.2 DUE DILIGENCE – MARKET OPPORTUNITY Assessing the market opportunity for a venture involves strategic due diligence, and in order to undertake this successfully, you will need to source more opinions than those of the owners. This analysis involves the size and growth potential of the market, the customers and potential customers accessible and the major current and potential customers. 125 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 126.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 32: Due Diligence ‐ Market Opportunity 8.3.3 DUE DILIGENCE – LEGAL, TECHNICAL & MANUFACTURING The incumbent management team of an existing company is frequently cited as being a major reason for the success of that company. If you are purchasing a company, will those individuals stay with the company, and if so, do you need to offer them incentives or “golden handcuffs”? Alternatively, you may not want them to stay, particularly if you are purchasing a company believing it to be undervalued because if the ineptitude of their current management? Technology also may or may not be important. For technology companies, technology will be the cornerstone of its competitive advantage, but you will need to look at most companies with a manufacturing facility to determine the state of their processes. How efficient are they? What capital expenditure may be required to ensure that obsolescence is not an issue? 126 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 127.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. Figure 33: Organisational, Legal, Technical & Manufacturing Due Diligence 127 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 128.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 8.4 EXITING YOUR BUSINESS Rarely do company owners consider what their exit strategy is while in the early stages of building their companies, yet it is one of the key factors that determine the value of their company. How you intend exiting from your business is fundamental to the way that you grow your company. Ask yourself the following: • What large company has a significant customer base who would buy my products? • If I develop a large customer base, what large company has a portfolio of products or services that could be readily sold into my customer base? • Could my products or my underlying technology be used to open up new markets for a large company with the resources to fund market development? • Can my products or services be easily modified or extended to create new products that could be sold to the customer base of a large company? • Can my company provide the catalyst for a large corporation to break into a new growth market? Whether your exit is via a trade sale or via the longer process of a listing on the Australian Stock Exchange (remember with the latter, your remaining post‐float shares will likely be in “locked up”), the laws of supply and demand apply. The greater the number of potential purchasers, and the lower the number of similar company’s offering your range of products / services, the higher the valuation. 128 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008
  • 129.
    FORECASTING, FINANCING &FAST TRACING YOUR BUSINESS GROWTH The definitive eGuide for developing company financial forecasts. 9 REVIEWING YOUR FORECAST How good a shape is your company in at the end of your forecast period? Have you costed in to your forecast, expenses that ensure the following are covered: • Your manufacturing plant remains effective, productive and not facing technical obsolescence. • The next generation of those products have been developed to replace and enhance your current revenue streams • There is the potential spare capacity in manufacturing, or the flexibility to outsource in order to cater for an upsurge in demand. • You have the right skill set in your development division to respond to or create new developments in your chosen market. • You have made the right investment in environmental safeguards both o Positively ‐ "green" products that will appeal to a more concerned public o Negatively ‐ limit the potential for litigation for environmental damage caused by products, manufacturing plants etc or via public opinion ‐ packaging etc. The final words go to Woody Allen: “More than any time in history, mankind faces a crossroads. One path leads to despair and utter hopelessness, the other to total extinction. Let us pray we have the wisdom to choose correctly” 129 | P a g e © 2007‐ 2008. Knowledge 2020 Pty Ltd. Please do not reproduce any of the text without prior permission, which will often be granted. Contact markostryn@knowledge2020.com or visit online at http://www.forecastvision.com The above text contains generic financial information that does not constitute financial advice. Last revised: September 2008