Skip to main content
BTEC ExtendedDiplomainCreativeMediaProduction
IG4 Final MajorProject
ProductionDiary
Alex Nesbit PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (IncludingPossible
Contingency Plans If ProblemsAnticipated)
Mon W/B 05/01/15
(Detailed Weekly Summary)
Planningthe projectandwhatishappeningwhenusingthe
schedule,discussedwhatthe projectwasgoingtobe,lookingat an
example of aschedule todifferfromthe actual schedule
Hopefullyresearchbyfindingsimilarfilmsrelevantto
the genre of the same as my shortfilm,audience that
wouldwhatthe type of genre.
Mon W/B 12/01/15
(Detailed Weekly Summary)
Didget any revisiondue todoingtaskone whichmeansIfailedon
doingmyplan fromlastweekbutI was able toget the definitions
downfor the differentbriefs.
Hopefullyfinishtaskone butgeton with researchthat I
shouldhave done thisweek.
Mon W/B 19/01/15
(Detailed Weekly Summary)
NearlyFinishedtaskone,Didn’tgetanyrevisiondone,didasmall
Ideasgenerationwithpartnertogetan ideaonwhat one another
were thinking.
Finishingtaskone onthe weekendsonextweekcan
start withrevision.
Mon W/B 26/01/15
(Detailed Weekly Summary)
FinishedtaskOne ontoresearchnow,watchingsome filmson
weekendtowatchscenesthatwouldrelate tothe type of genre
the same as my ownshort film
Startingto create a surveyandhandingitoutfor people
to understandtheirthoughtsonthe type of genre,find
out whattarget audience the type of genre is,relate to
survey.
Mon W/B 02/02/15
(Detailed Weekly Summary)
Finishedamoodboardthat showed differentscenesyou’dseein
an actionfilm,alsofoundfilmsthatare similartothe type of genre
by watchingthe Raidfranchise.
Creatinga surveyandby usingthose resultsI’ll seewhat
type of an audience attractsby an actionfilm.
Mon W/B 09/02/15
(Detailed Weekly Summary)
Createda surveyandgot answersandcreatedsome moodboards
but alsostarteda proposal,shouldmake the proposal aswell just
incase of anyproblems.
Startingon a scriptand findingoutwhattargetaudience
iswithresults of surveyandif not finish,finishthe
proposal inorderto start script. Partnerwasn’tin most
of weekwhichmade me unable tofinishthe proposal,
so nexttime makessure itison the sharedfolder.
Mon W/B 16/02/15
(Detailed Weekly Summary)
Was unable toget anywork done due to partnerbeinginwhich
made me unable to accessthe proposal inorderto finishitto
progressoncreatingthe Script
Finishingof the audiencefeedbackonsurveyand
producingthe script.
Mon W/B 23/02/15
(Detailed Weekly Summary)
Finishedproposalwhenweekstartedworkedonpreparingfor
pitchfor the projectcreatingthe presentationandscriptsoI know
whatI have to do whenthe pitchcomesnextweek,goingtostart
scriptfor projecton weekend
Finishscript, dopitchon Monday and speak with
partnerfor a final scriptso we bothcan work on
togetherbutalsocreate story board.
Mon W/B 02/03/15
(Detailed Weekly Summary)
Presentedthe presentationonmyownbecause partnerwas Nextweekdiscussonscriptsandfinishscriptthengo
BTEC ExtendedDiplomainCreativeMediaProduction
IG4 Final MajorProject
ProductionDiary
unable tomake it so I didit myself,finishingScriptforNextweek
and couldhave done betternotsayingthe same thingsinthe
presentationandcouldhave gota bettergrade.
ontostory board produce call sheetandfindanyrisk
assessmentsforthe projectahead.
Mon W/B 09/03/15
(Detailed Weekly Summary)
I completedscriptonthe otherhand my partnerwasn’tinso I
couldn’tdomuch workso I decidedtoworkon myown andcreate
a posterfor the filminsteadandexperimenton movingposter.
I will have alookat the equipmentIneedthe peopleI
am goingto use and the locationIam using.
Mon W/B 16/03/15
(Detailed Weekly Summary)
Thoughtup placesI wantedtolookat, createddocumenton
differentinspirations.
Look at locations,visitlocations,putinformationon
equipment
Mon W/B 23/03/15
(Detailed Weekly Summary)
Almostcompletedall pre-productiononlyhave the locationrecce
to complete equipmenthiringwouldbe whenIgetthe camera
Finishlocationrecce andvisitlocationsandmaybe start
shooting
Mon W/B 30/03/15
(Detailed Weekly Summary)
Completedall the pre-production,the locationrecce isdone itis
onlyneedtoadd one more place because contactedthe place to
getpermissiononce Ihave permissionIcan addit to the location
recce.
Start shootingatlocations,that’sif friendsare available
thiscouldbe a problemif notbecause thenIwill have to
change the timesdependingonmyfriendsif theyare
free or not.
Mon W/B 06/04/15
(Detailed Weekly Summary)
Couldn’tcomplete anyproductiondue tounable togetintouch
withpeople Iknowinorderto take the photos.
Make progressbymeetingupandtakingthe photos
Mon W/B 13/04/15
(Detailed Weekly Summary)
I tooksome of the photosfor themtoedit,unfortunatelysome
mightnot lookgoodenoughsomighthave to take more nextweek
Have a lookat the photosand see if theyneedtobe re-
done or needtake more lackof locationsdone.
Mon W/B 20/04/15
(Detailed Weekly Summary)
Takingsome more photoson the weekendsothenIcan create
contact sheets.
Start editing,creatingthe contactsheets,maybe
changingthe layoutplanhave to see as I go along.
Mon W/B 27/04/15
(Detailed Weekly Summary)
Got the photo createdona contact sheet,started onthe layoutso
that I knowwhatit will looklike before addingthe editedphotos.
Findingafontthat will workwithwhatI am thinkingof.
Goingto editthe photosand continue onthe layoutif
needto, mightstill needtofindagood fontforthe title.
Mon W/B 04/05/15
(Detailed Weekly Summary)
Was able to gatherall the fontsfor the posterstartingon the page
layoutandseeingwhichfontwill Iuse onthe posters
Start editingthe imagestogoon the posters.
Mon W/B 11/05/15
(Detailed Weekly Summary)
Editedthe firstposter,almostfinishedwithitbutmightimplement
a betterlookdependingonhowitlooksat endof the editing
Keepgoingwitheditingthe imageshopefullyfinishthe
editingbynextweeksothatI can start evaluatingthe
BTEC ExtendedDiplomainCreativeMediaProduction
IG4 Final MajorProject
ProductionDiary
finishwork.
Mon W/B 18/05/15
(Detailed Weekly Summary)
Finishedall editsanduploadedtoblogdon’tneedtore-editthem
as theyare alreadyfinished.
Will re-checkthroughotherunits andmake sure
everythingisthere before starton evaluation.
Mon W/B 25/05/15
(Detailed Weekly Summary)
Checkedworkeverythingseemstobe ontheirexpectthe
evaluation
Startingon evaluationandgatherquestionsforfocus
group
Mon W/B 01/06/15
(Detailed Weekly Summary)
Halfwaythroughevaluation goingto create a group chat on social mediafor
audience feedback
Mon W/B 08/06/15
(Detailed Weekly Summary)
Completedassignment Completedassignment
PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (IncludingPossible
ContingencyPlans)