Exploring Philippine Creative Industries and GRASPS Model for Creative Work Planning
Grade 10 Music and Arts lesson on Philippine Creative Industries, creative economy, performance analysis, and planning creative projects using the GRASPS model for authentic audience engagement.
Exploring Philippine Creative Industries and GRASPS Model for Creative Work Planning
1.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Grade 10 • Music and Arts • Term 1 Week 6
Philippine Creative
Industries within the
Creative Economy
Creative Work Planning Using the
GRASPS Model
Essential idea: Creative work becomes
stronger when purpose, audience, technique,
process, and standards are planned before
production.
Grade 10 | Music and Arts | Term 1 Week 6 1
2.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Whole-Lesson Table of Contents
Grade 10 | Music and Arts | Term 1 Week 6 2
Session Actual Session Topic Main Discussion Focus / BOW Coverage Skill / Output Focus
1
Music
Philippine Creative Industries
and Creative Economy
Emerging concepts, techniques, processes, performance-
viewing analysis, purpose, themes, audience impact
Creative Industry Insight Chart
and viewing reflection
2
Arts
Creative Work Planning Using
GRASPS
Authentic task vocabulary, production/design elements,
Goal–Role–Audience–Situation–Product–Standards
Mini-GRASPS creative work plan
for a school context
This week bridges Music and Arts through one performance task: planning a creative
output based on Philippine Creative Industry practices.
3.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Big Goals for This Lesson
Grade 10 | Music and Arts | Term 1 Week 6 3
Understand
Philippine Creative Industries use creativity,
culture, talent, technology, and production
processes to create goods, services, and
experiences.
Analyze
A creative work can be studied through
purpose, theme, audience, production/design
elements, and cultural value.
Plan
The GRASPS Model helps turn an idea into an
authentic, feasible, standards-based creative
project.
Show
Learners will draft a creative work plan
connected to a real school or community
context.
Observe Analyze Plan Create
4.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Essential Question
Grade 10 | Music and Arts | Term 1 Week 6 4
How can Philippine Creative Industry practices help
us plan a creative work that is authentic,
meaningful, and ready for an audience?
Use correct creative-industry terms.
Point to evidence from a performance or output.
Explain how planning choices serve a real audience.
5.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
SESSION 1: Music
How do creative industries turn ideas into audience-ready experiences?
Grade 10 | Music and Arts | Term 1 Week 6 5
Philippine Creative
Industries and Creative
Economy
Focus: identify emerging concepts,
techniques, and processes, then analyze how
performance choices communicate purpose
and cultural meaning.
MUSIC
6.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Session Roadmap: From Industry Ideas to Performance Insight
Grade 10 | Music and Arts | Term 1 Week 6 6
Recall PCI
sectors
Study a
performan
ce
Analyze
purpose &
themes
Connect to
planning
Complete
a check
First, we list concepts, techniques, and processes in selected creative industry
sectors.
Next, we watch and analyze a cultural performance excerpt.
Then, we study three reinforced examples: music, game development, and
fashion.
Finally, we check understanding and prepare a creative industry insight chart.
7.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Motivation: Sharing Is Caring
Grade 10 | Music and Arts | Term 1 Week 6 7
In three minutes, choose one sector and list what is new, what techniques are used, and
how the work reaches an audience.
Sector Emerging Concepts Techniques Processes
Music Industry Short-form promotion, indie releases,
remix culture
Recording, arranging, mixing,
mastering
Song choice rehearsal recording
→ → →
publishing
Game Development Story-rich local games, esports,
interactive worlds
Coding, level design, animation, sound
design
Concept prototype playtest revise
→ → →
Fashion Industry Sustainable fashion, local textiles,
digital lookbooks
Sketching, draping, styling,
photography
Design brief sample fitting showcase
→ → →
Processing question: What similarities and differences do you notice in innovation,
community engagement, and monetization?
8.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Learning Goals: I Can Statements
Grade 10 | Music and Arts | Term 1 Week 6 8
I can identify emerging concepts, techniques, and processes in selected
Philippine Creative Industry sectors.
I can compare how sectors approach innovation, community
engagement, and monetization.
I can analyze a cultural performance by noticing purpose, theme,
audience, and production choices.
I can explain how viewing a performance can guide the planning of a
creative work.
9.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Key Words for Session 1
Grade 10 | Music and Arts | Term 1 Week 6 9
Creative Industry
A sector that uses creativity, talent, culture, and
skill to produce goods, services, or experiences.
Emerging Concept
A new or developing idea that shapes creative
work, such as remixing, sustainability, or digital
storytelling.
Technique
A specific skill or method used to make the
work, such as mixing audio, sketching
costumes, or animating sprites.
Process
The ordered steps used to plan, create, revise,
present, and evaluate a creative output.
10.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
What Is the Creative Economy?
Grade 10 | Music and Arts | Term 1 Week 6 10
The creative economy is the system where ideas, culture, talent, design, performance, and
technology become products, services, or experiences that people value.
It includes music, visual arts, performing arts, design, publishing, animation,
games, fashion, film, and related sectors.
It connects culture and livelihood: creative work can preserve heritage while
also creating jobs and opportunities.
For learners, it is a way to see possible career paths as performers, designers,
editors, producers, illustrators, developers, and creative entrepreneurs.
Remember
A creative product is not just “pretty” or “entertaining.” It has purpose, audience,
process, and standards.
11.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Watch and Learn: Performance Viewing Lens
Grade 10 | Music and Arts | Term 1 Week 6 11
Viewing prompt: Watch a selected excerpt from “Palihang Pambata sa Bahay ni Kuya
Mon 2021.” Use the lens below while watching.
Purpose
Is the performance meant
to educate, entertain,
persuade, preserve
culture, or combine these?
Theme
What ideas appear:
creativity, perseverance,
cultural identity, self-
expression, or community?
Production
How do music, movement,
costume, staging, space,
and audience awareness
shape the impact?
Quick task: Write one detail you noticed and what it helped
communicate.
12.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
How to Analyze a Cultural Performance
Grade 10 | Music and Arts | Term 1 Week 6 12
Observe details
Name the
element
Explain the
effect
Connect to
purpose
Do not stop at “maganda” or “interesting.” Name the specific detail: rhythm,
costume, stage space, movement, lighting, or audience appeal.
Ask what the detail does: Does it highlight culture? Make the mood joyful?
Help children understand? Attract attention?
Connect your observation to the creative goal. A strong analysis explains how
the element helps the work succeed.
Sentence frame: “The use of _____ helps communicate _____ because _____.”
13.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Modeled Analysis: From Detail to Creative Insight
Grade 10 | Music and Arts | Term 1 Week 6 13
Detail Observed Possible Effect Creative Planning Insight
Costume or cultural attire Shows cultural identity and makes the
performance visually memorable
Plan visual elements that fit the theme, not random
decoration
Clear rhythm or repeated
movement
Helps learners follow the performance and
remember the pattern
Use repetition when the audience needs to learn or
join in
Friendly child-centered format Makes the performance accessible and
engaging for young audiences
Match tone and complexity to the target audience
Transfer: When you plan your own creative work, each element should answer: “Why is
this here?”
14.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Reinforced Example 1: Music Industry Planning
Grade 10 | Music and Arts | Term 1 Week 6 14
Visible example
A student group plans a tribute
song for National Teacher’s Month.
They need lyrics, melody,
rehearsal, recording, mixing, and a
short launch post.
What to notice: The process moves from
idea to audience.
Quick task: Identify one technique and
one process in the example.
Explanation
The creative work is not only the song.
The industry process includes
planning the message, choosing
musical style, rehearsing, recording,
improving sound quality, and
presenting the work to a target
audience. The same thinking helps
learners plan outputs that are feasible
and complete.
Transfer For any creative work, list the steps
from first idea to final presentation.
15.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Reinforced Example 2: Game Development Planning
Grade 10 | Music and Arts | Term 1 Week 6 15
Visible example
A group designs a simple game
concept about protecting a local
river. The player chooses actions
that affect the community’s health
and environment.
What to notice: Interactivity is part of the
technique.
Quick task: What audience could learn
from this game?
Explanation
In game development, the creative
idea must become a playable
experience. The process includes
concept art, rules, story, prototype,
testing, feedback, and revision. A
game can educate and entertain
because the audience learns by
making choices.
Transfer Ask how your audience will
participate, respond, or feel
involved.
16.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Reinforced Example 3: Fashion and Visual Identity
Grade 10 | Music and Arts | Term 1 Week 6 16
Visible example
A student designer sketches a
wearable pin or sash inspired by
local patterns and colors for a
school celebration.
What to notice: Visual identity connects
design to meaning.
Quick task: Name one cultural or school
symbol that could guide the design.
Explanation
Fashion is not only clothing. It
communicates identity, occasion,
culture, and audience. The process
involves research, sketching,
materials, fitting, styling, and
presentation. Creative choices should
be respectful and purposeful.
Transfer Choose colors, forms, and materials
that support the message.
17.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Watch-Out: Inspiration Is Not Copying
Grade 10 | Music and Arts | Term 1 Week 6 17
Near-miss
“We will just copy a music
video we saw online and
change the title.”
Why this does not fit: It lacks
originality, ethical use, local
connection, and thoughtful creative
process.
Better thinking
Study examples to learn
techniques, then create an
original work with your own
purpose, context, and
audience.
Reminder: Credit sources, avoid
stereotypes, and make sure every
borrowed idea is transformed into your
own creative plan.
18.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Check Your Understanding: Creative Industry Analysis
Grade 10 | Music and Arts | Term 1 Week 6 18
Model item
Question: Why is watching a
cultural performance useful in
planning a creative work?
Model answer: It shows how
purpose, audience, theme,
and production elements
work together.
Clue Look for details that
support the intended
audience experience.
1. Which best describes a creative industry?
2. Name one process commonly used in producing a
song.
3. What question helps a group think about audience
impact?
4. Which value is strengthened when learners appreciate
Philippine cultural performances?
5. Write one production element you can analyze in a
performance.
Expected responses may include: creativity/culture/skill-based sector; mixing/mastering; Who
will watch?; cultural preservation; costume, lighting, set, movement, sound.
19.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Remember These Ideas: Session 1
Grade 10 | Music and Arts | Term 1 Week 6 19
Philippine Creative Industries create value through creativity, culture, skill,
technology, and audience experience.
Emerging concepts, techniques, and processes differ across music,
games, fashion, design, and performance, but all require planning.
A performance can be analyzed through purpose, theme, audience, and
production elements.
Reviewer sentence: A strong creative plan explains what will be made,
why it matters, how it will be made, and who it is for.
20.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
After-Class Challenge: Observe a Creative Work
Grade 10 | Music and Arts | Term 1 Week 6 20
Task: Watch, listen to, or examine one local music, dance, performance,
fashion, game, poster, or online creative output.
Observation Your Notes
Purpose What is it trying to do?
Audience Who is it for?
Techniques What skills or methods are visible?
Process clue What steps might the creators have followed?
Output: Bring 3–5 notes that can help your group build a GRASPS plan.
21.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
SESSION 2: Arts
How does GRASPS turn a creative idea into an authentic project plan?
Grade 10 | Music and Arts | Term 1 Week 6 21
Creative Work Planning
Using the GRASPS Model
Focus: use arts vocabulary, production/design
elements, and GRASPS components to draft a
project plan for an authentic creative work.
ARTS
22.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
ession Roadmap: From Vocabulary to Mini-GRASPS Plan
Grade 10 | Music and Arts | Term 1 Week 6 22
Build
vocabulary
Study
design
elements
Learn
GRASPS
Draft a
plan
Check &
revise
First, we unlock key vocabulary: authentic, context, rubrics, and scenario.
Next, we revisit performance and design elements from an Arts perspective.
Then, we study the GRASPS Model and three reinforced project-plan examples.
Finally, we draft, check, and improve a Mini-GRASPS plan.
23.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Motivation: Shake, Rearrange, and Read
Grade 10 | Music and Arts | Term 1 Week 6 23
Arrange the scrambled letters into key planning words. Then use each word in a
sentence related to creative work.
AUTHENTIC CONTEXT RUBRICS SCENARIO
Starter: “A creative work is authentic when ____.” “The context of our project is ____.”
24.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Learning Goals: I Can Statements
Grade 10 | Music and Arts | Term 1 Week 6 24
I can define and use the words authentic, context, rubrics, and scenario in
planning a creative work.
I can analyze Arts-related production elements such as set design,
lighting, costume, space, visual composition, and audience impact.
I can explain how Goal, Role, Audience, Situation, Product, and Standards
organize a project-based creative task.
I can draft initial GRASPS components for a creative work connected to
National Teacher’s Month or a similar school context.
25.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Key Words for Creative Work Planning
Grade 10 | Music and Arts | Term 1 Week 6 25
Authentic
Genuine, real, and connected to an actual
purpose or audience.
Context
The conditions, place, event, audience, or
situation around the task.
Rubrics
Clear scoring guides that describe criteria
and levels of quality.
Scenario
A described situation used for planning,
discussion, or analysis.
26.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Arts Lens: Design Elements That Shape Impact
Grade 10 | Music and Arts | Term 1 Week 6 26
When analyzing a creative work, look for visible and sensory choices that guide the
audience’s response.
Set / Space Where are objects,
performers, and audience
attention placed?
Lighting /
Color
What mood or focus do light
and color create?
Costume /
Props
What identity, culture, role,
or theme is shown?
Visual
Composition
How do shape, balance,
contrast, and arrangement
affect meaning?
Quick task: Choose one design element and explain how it could help a Teacher’s
Month creative output feel more meaningful.
27.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Why Planning Comes Before Production
Grade 10 | Music and Arts | Term 1 Week 6 27
Idea Purpose
Audienc
e
Materia
ls
Standar
ds
Revisio
n
Planning helps a group agree on what the project is for, who it serves, and
what “quality” will look like.
Planning prevents common problems: unclear roles, rushed output,
mismatched design, missing materials, and weak audience impact.
In the creative industries, planning is also professional practice: creators
pitch ideas, make drafts, test concepts, revise, and present.
Guiding question: What skills are needed to plan a culminating activity based on emerging
creative industry practices?
28.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
GRASPS Model: A Framework for Authentic Projects
Grade 10 | Music and Arts | Term 1 Week 6 28
G Goal
What problem or purpose will the
project address?
R Role
What role will learners take?
A Audience
Who will experience the work?
S Situation
What real context or scenario frames
the task?
P Product
What creative output will be produced?
S Standards
What rubric or criteria will judge
quality?
GRASPS helps learners understand what they are trying to accomplish and how their
work will be judged.
29.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Worked Example: National Music Week Scenario
Grade 10 | Music and Arts | Term 1 Week 6 29
Scenario: Your grade level organizes a one-day concert for elementary learners. Your group
performs one song from Cordillera, Visayas, or Palawan and helps create a 60-second trailer
for promotion.
GRASPS Part How it appears in the scenario
Goal Promote cultural literacy and showcase musical talents
Role Performers and event collaborators
Audience Elementary learners attending the concert
Situation National Music Week celebration
Product Song performance and 60-second trailer
Standards Mastery of musical elements and integration of dance/costume
30.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Drafting a Mini-GRASPS Plan
Grade 10 | Music and Arts | Term 1 Week 6 30
Current task: Plan a creative work for National Teacher’s Month or another
meaningful school event.
G Goal
What problem or purpose will the
project address?
R Role
What role will learners take?
A Audience
Who will experience the work?
S Situation
What real context or scenario frames
the task?
P Product
What creative output will be
produced?
S Standards
What rubric or criteria will judge
quality?
Ask: Is the task authentic? Is the context clear? Is the product feasible? Are the standards
visible?
31.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Reinforced Example 1: Poster Series for Teacher Appreciation
Grade 10 | Music and Arts | Term 1 Week 6 31
Visible plan idea
A group creates a poster series
showing teachers as “guides,
mentors, and innovators.” Posters
use school colors and student-
made illustrations.
What to notice: The product, audience,
and standards are clear.
Quick task: Write one rubric criterion for
this poster series.
GRASPS transfer
Goal: honor teachers. Role: student
designers. Audience: school community.
Situation: Teacher’s Month. Product:
poster series. Standards: creativity,
clarity, visual impact, and respectful
message. This example shows how
GRASPS turns a general idea into a
doable plan.
32.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
inforced Example 2: Mini-Performance with Music and Moveme
Grade 10 | Music and Arts | Term 1 Week 6 32
Visible plan idea
A group creates a two-minute
performance using rhythm,
spoken lines, and simple
movement to thank teachers for
patience, guidance, and care.
What to notice: Music and Arts processes
can be combined.
Quick task: What production element
should the group plan first?
GRASPS transfer
The Goal is emotional and public
appreciation. The Role may be
performers and directors. The Audience
is teachers and students. The Situation is
a school celebration. The Product is a live
or recorded mini-performance. The
Standards can include timing, clarity,
teamwork, and audience connection.
33.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
nforced Example 3: Digital Tribute or Mixed-Media Boa
Grade 10 | Music and Arts | Term 1 Week 6 33
Visible plan idea
A group builds a digital tribute or
mixed-media concept board
combining student messages,
photos of school spaces, drawings,
and short captions.
What to notice: The format must fit
available tools.
Quick task: Identify one low-tech
alternative if devices are limited.
GRASPS transfer
An authentic creative plan considers
resources. If digital tools are available,
the product can be an online tribute. If
not, the same Goal and Audience can be
served through a printed collage,
hallway board, or classroom exhibit.
GRASPS supports flexible but purposeful
planning.
34.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Standards and Rubric: What Makes the Work Strong?
Grade 10 | Music and Arts | Term 1 Week 6 34
Criteria Excellent work shows... Needs improvement when...
Creativity Original choices, fresh ideas, strong connection to
purpose
The work copies familiar ideas without
transformation
Technical Proficiency Control of needed skills, materials, sound, visuals, or
performance
Technical problems affect the quality or clarity
Presentation &
Communication
Clear, engaging, professional presentation for the
target audience
The audience cannot easily understand or
appreciate the work
Rubrics do not remove creativity. They help the group know what quality means and how to
improve before presenting.
35.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Check Your Understanding: GRASPS and Planning
Grade 10 | Music and Arts | Term 1 Week 6 35
Model item
Question: Which GRASPS
component identifies the people
who will view or receive the
creative work?
Answer: Audience.
Reason: The audience tells the
group who the product is for
and what level, tone, and design
choices may work.
1. In GRASPS, what does G stand for?
2. Which component describes the final creative output?
3. What is a rubric used for?
4. Give one example of an authentic creative task.
5. Why should a group know the context before
creating?
Expected responses: Goal; Product; evaluating with criteria; real school
poster/performance/tribute; context guides purpose, design, and audience fit.
36.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Output: Draft Your Mini-GRASPS Plan
Grade 10 | Music and Arts | Term 1 Week 6 36
Choose one creative work for Teacher’s Month or another school event.
Complete each part in one clear sentence.
G Goal What do you want your creative work to accomplish?
R Role What creative role will your group take?
A Audience Who will view, listen to, or experience your work?
S Situation What school or community context gives the task meaning?
P Product What exactly will you create?
S Standards What criteria will show that the work is successful?
37.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Remember These Ideas: Session 2
Grade 10 | Music and Arts | Term 1 Week 6 37
Authentic creative tasks connect to a real purpose, audience, and context.
Arts and production elements—space, color, costume, lighting,
composition, and presentation—shape how audiences understand a
work.
GRASPS organizes creative planning through Goal, Role, Audience,
Situation, Product, and Standards.
Reviewer sentence: A clear project plan tells creators what to make, why it
matters, who it is for, and how quality will be judged.
38.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Whole-Lesson Review
Grade 10 | Music and Arts | Term 1 Week 6 38
What creative industry sector did you understand best today, and why?
How do purpose, audience, theme, and production elements work
together in a creative output?
Which GRASPS component is easiest for your group to write? Which needs
more revision?
How can your creative work show respect for Philippine culture, school
values, and your intended audience?
Exit Thought
“Our creative plan will be stronger if we first understand our audience and
standards.”
39.
Prepared By: DepEdClub Team - DEPEDCLUB.COM
Prepared By: DepEd Club Team - DEPEDCLUB.COM
Appendix: Teacher Cues / Suggested Answers
Grade 10 | Music and Arts | Term 1 Week 6 39
This slide may be hidden before classroom presentation.
Session 1 quick check: creative industry = creativity/talent/culture/skills; music process =
recording/mixing/mastering; audience question = Who will watch or experience the work?;
cultural value = cultural preservation.
Session 2 quick check: G = Goal; Product = final output; Rubric = criteria and performance
levels; authentic task = real school or community purpose; context guides purpose, design,
audience fit, and feasibility.
Mini-GRASPS plans may vary. Give feedback on clarity, feasibility, respectful use of culture,
audience alignment, and visible standards.