Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Promoting Climate Resilient
Rural Infrastructure in
Northern Vietnam
ADB Technical Assistance Project
TA 8102-VIE : Introd...
River erosion
Bac Kan
The problem: riverbank erosion
River erosion
Bac Kan
The solution: expensive engineering
1 of 44 Ad
1 of 44 Ad