Electric People Mover in Central Vista
PC: The Print
By: Amritanshu Raj
About underground people mover
❖ The proposed Central Vista Project Includes
an underground people mover directly
connected to two Metro stations on the vista
layout.
❖ A dedicated transit system connecting the 10
buildings is being built as part of the new
Central Secretariat complex, itself part of the
ongoing Central Vista redevelopment.
❖ A people mover is a small scale transit
system mainly used to serve a small area
such as airports and parks.
❖ It will be accessible from the Central
Secretariat Metro station and ferry up to
20,000 people during peak hours.
10 buildings to be connected.
PC: HCP Design
Feasibility and accessibility
❖ It will help avoid the traffic of peak hours of a
metro city like New Delhi by keeping much of
the movement between the buildings
underground.
❖ The people mover, a 3-km-long
(approximately) underground transit facility
is initially meant to connect to two Metro
stations -- Central Secretariat and Udyog
Bhawan. However Udyog Bhawan is yet not
fixed.
❖ The people mover will connect all 10
buildings in the new Central Secretariat,
which will house 51 ministries, it will not be
connected to the new Parliament building.
Aerial view of proposed people
mover. PC: neo (YT channel)
Features
❖ The people mover will have four stations —
one for every cluster of three buildings of the
Central Secretariat.
❖ Net Proposed length: 3 Km
❖ Proposed Capacity: 20000 People/day
❖ The cluster of three buildings will be
connected to the station by a walkway with
travelators in the basement to ensure safe,
secure and seamless movement of people.
❖ The people mover will have coaches and run
on electricity just like the Metro, but the
technology it will run on is yet to be worked
out by Central Public Works Department.
A similar system at Chicago airport.
PC: Wikipedia
“A developed country is not a place
where the poor have cars. It’s where
the rich use public transportation”
- Gustavo Petro.

More Related Content

Similar to Electric people mover in central vista

ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
ISCN_Secretariat
 
Draft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiDraft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in Karachi
Umer Mover
 
Rethinking the Jonio Metro station as a Transport Hub
Rethinking the Jonio Metro station as a Transport HubRethinking the Jonio Metro station as a Transport Hub
Rethinking the Jonio Metro station as a Transport Hub
Oleg Buyanov
 
Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht v...
Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht v...Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht v...
Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht v...
Ronald Tamse
 
Seoul metropolitan rapid transit
Seoul metropolitan rapid transit Seoul metropolitan rapid transit
Seoul metropolitan rapid transit
simrc
 
Alternative for BRTS.pdf
Alternative for BRTS.pdfAlternative for BRTS.pdf
Alternative for BRTS.pdf
KRISHNAKANTH MALLIKARJUN
 
BRTS Impact.pdf
BRTS Impact.pdfBRTS Impact.pdf
BRTS Impact.pdf
krishnakanth648816
 
BRTS Alternative.pdf
BRTS Alternative.pdfBRTS Alternative.pdf
BRTS Alternative.pdf
krishnakanth648816
 
final_incl_annexure_19082017.pdf
final_incl_annexure_19082017.pdffinal_incl_annexure_19082017.pdf
final_incl_annexure_19082017.pdf
Shishirrai
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
libin paul
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
Anush verma
 
A Review on
A Review onA Review on
A Review on
ijsrd.com
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
Asjad Khuram
 
Disadvantages Of Rail Industry
Disadvantages Of Rail IndustryDisadvantages Of Rail Industry
Disadvantages Of Rail Industry
Brenda Thomas
 
vikanksh
vikankshvikanksh
vikanksh
Vikanksh Nath
 
final report
final reportfinal report
final report
vivek27594
 
Urban Planning Related Issues.pdf
Urban Planning Related Issues.pdfUrban Planning Related Issues.pdf
Urban Planning Related Issues.pdf
KRISHNAKANTH MALLIKARJUN
 
Feetf
FeetfFeetf
Feetf
Sid Art
 
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Clifton M. Hasegawa & Associates, LLC
 
NH-47 Six laning
NH-47 Six laningNH-47 Six laning
NH-47 Six laning
Ajay Prasad
 

Similar to Electric people mover in central vista (20)

ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
 
Draft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiDraft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in Karachi
 
Rethinking the Jonio Metro station as a Transport Hub
Rethinking the Jonio Metro station as a Transport HubRethinking the Jonio Metro station as a Transport Hub
Rethinking the Jonio Metro station as a Transport Hub
 
Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht v...
Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht v...Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht v...
Presentatie integration pt and bike, 2011 10 17, rail_volution usa (utrecht v...
 
Seoul metropolitan rapid transit
Seoul metropolitan rapid transit Seoul metropolitan rapid transit
Seoul metropolitan rapid transit
 
Alternative for BRTS.pdf
Alternative for BRTS.pdfAlternative for BRTS.pdf
Alternative for BRTS.pdf
 
BRTS Impact.pdf
BRTS Impact.pdfBRTS Impact.pdf
BRTS Impact.pdf
 
BRTS Alternative.pdf
BRTS Alternative.pdfBRTS Alternative.pdf
BRTS Alternative.pdf
 
final_incl_annexure_19082017.pdf
final_incl_annexure_19082017.pdffinal_incl_annexure_19082017.pdf
final_incl_annexure_19082017.pdf
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
A Review on
A Review onA Review on
A Review on
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Disadvantages Of Rail Industry
Disadvantages Of Rail IndustryDisadvantages Of Rail Industry
Disadvantages Of Rail Industry
 
vikanksh
vikankshvikanksh
vikanksh
 
final report
final reportfinal report
final report
 
Urban Planning Related Issues.pdf
Urban Planning Related Issues.pdfUrban Planning Related Issues.pdf
Urban Planning Related Issues.pdf
 
Feetf
FeetfFeetf
Feetf
 
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
Honolulu Authority for Rapid Transit (HART) - The Hard Reality - When All Els...
 
NH-47 Six laning
NH-47 Six laningNH-47 Six laning
NH-47 Six laning
 

Recently uploaded

Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
CE19KaushlendraKumar
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
PreethaV16
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 

Recently uploaded (20)

Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 

Electric people mover in central vista

  • 1. Electric People Mover in Central Vista PC: The Print By: Amritanshu Raj
  • 2. About underground people mover ❖ The proposed Central Vista Project Includes an underground people mover directly connected to two Metro stations on the vista layout. ❖ A dedicated transit system connecting the 10 buildings is being built as part of the new Central Secretariat complex, itself part of the ongoing Central Vista redevelopment. ❖ A people mover is a small scale transit system mainly used to serve a small area such as airports and parks. ❖ It will be accessible from the Central Secretariat Metro station and ferry up to 20,000 people during peak hours. 10 buildings to be connected. PC: HCP Design
  • 3. Feasibility and accessibility ❖ It will help avoid the traffic of peak hours of a metro city like New Delhi by keeping much of the movement between the buildings underground. ❖ The people mover, a 3-km-long (approximately) underground transit facility is initially meant to connect to two Metro stations -- Central Secretariat and Udyog Bhawan. However Udyog Bhawan is yet not fixed. ❖ The people mover will connect all 10 buildings in the new Central Secretariat, which will house 51 ministries, it will not be connected to the new Parliament building. Aerial view of proposed people mover. PC: neo (YT channel)
  • 4. Features ❖ The people mover will have four stations — one for every cluster of three buildings of the Central Secretariat. ❖ Net Proposed length: 3 Km ❖ Proposed Capacity: 20000 People/day ❖ The cluster of three buildings will be connected to the station by a walkway with travelators in the basement to ensure safe, secure and seamless movement of people. ❖ The people mover will have coaches and run on electricity just like the Metro, but the technology it will run on is yet to be worked out by Central Public Works Department. A similar system at Chicago airport. PC: Wikipedia “A developed country is not a place where the poor have cars. It’s where the rich use public transportation” - Gustavo Petro.