presented at the COAR NOTIFY WG on 26th Jan 2022
2
The Notify Workflow
ITEM
Rev. Service 1
Rev. Service 2
Submission Step
DSpace
LDN Inbox
During the submission
The intent to request the review is stored
Librarians can modify / remove / add the
Review requests if needed
acknowledgement
review
endorsement
Review / endorsement are stored
in the Item’s metadata
Start
Workflow
DSpace send a LDN to each selected services
requesting the review
3
The Notify Workflow
ITEM
Rev. Service 1
Rev. Service 2
Submission Step
DSpace
LDN Inbox
The review may not be explicitly requested
Submission
produces
an Item
The LDN Inbox is reached
when a review or endorsement
is available
The LDN Inbox stores
the metadata on the Item
Start
Workflow
4
JSON-LD (LINKED DATA)
An example of the JSON sent to
request a review
The field ‘type’ identifies the kind of request
The field ‘object’ contains the information about
the item we are requesting the review for
5
The LDN Inbox Architecture
LDN Inbox
Chooses
Action
Save Metadata
Send Email Notification
Other Configurable Action
Other Configurable Action
Using the field ‘type’ of the received JSON-LD
the proper action is retrieved and executed
Action Structure
Configurable Action
The Action structure provides a way to configure further
action when a certain request type is received
6
JSON-LD for review
An example of the received JSON-LD
when announcing a review
The type identifies a received review
inReplyTo is present if the service is
replying to a received review request
object contains the review link
7
JSON-LD for endorsement
An example of the received JSON-LD
when announcing an endorsement
The type identifies a
received endorsement
inReplyTo is present if the service is
replying to a received review request
object contains the
endorsement link
8
Asking Review during
the submission is the
first step
9
A report page show
the items for each
status
10
The Item goes in
Pending Review
for the selected 3
services
11
The Item goes in
Pending
Endorsement
for the selected
services that
supports
Endorsement
12
On the Item’s page
we can see a full
report of each status
the Item is in
13
When an Item is
reviewed or endorsed
by a service the status
is updated and a link is
displayed
SHARE YOUR KNOWLEDGE
Thanks For Your
Attention
Stefano Maffei (stefano.maffei@4science.com)

More Related Content

What's hot

Introducción a OAI-PMH
Introducción a OAI-PMHIntroducción a OAI-PMH
Introducción a OAI-PMH
Rodrigo Torrens
 
DSpace-CRIS technical level introduction
DSpace-CRIS technical level introductionDSpace-CRIS technical level introduction
DSpace-CRIS technical level introduction
4Science
 
Web 2.0 in Libraries
Web 2.0 in LibrariesWeb 2.0 in Libraries
Web 2.0 in Libraries
Anupama Saini
 
DSpace standard Data model and DSpace-CRIS
DSpace standard Data model and DSpace-CRISDSpace standard Data model and DSpace-CRIS
DSpace standard Data model and DSpace-CRIS
4Science
 
NewGenLib 3.0 Presentation
NewGenLib 3.0 PresentationNewGenLib 3.0 Presentation
NewGenLib 3.0 Presentation
Verus Solutions Pvt ltd
 
Dspace
DspaceDspace
Dspace
badival
 
RDA (Resource Description & Access)
RDA (Resource Description & Access)RDA (Resource Description & Access)
RDA (Resource Description & Access)
Jennifer Joyner
 
Catalogación ejemplos
Catalogación ejemplosCatalogación ejemplos
Catalogación ejemplos
Isabel2013
 
Greenstone Digital Library
Greenstone Digital LibraryGreenstone Digital Library
Greenstone Digital Library
Imran Mansuri
 
DSpace 7 - The Power of Configurable Entities
DSpace 7 - The Power of Configurable EntitiesDSpace 7 - The Power of Configurable Entities
DSpace 7 - The Power of Configurable Entities
Atmire
 
RDA vs. AACR2
RDA vs. AACR2RDA vs. AACR2
RDA vs. AACR2
stacimnovak
 
Dublin Core Intro
Dublin Core IntroDublin Core Intro
Dublin Core Intro
Rich Wisneski
 
Apache flink
Apache flinkApache flink
Apache flink
pranay kumar
 
DOMAINS OF USER STUDIES (User Studies and User Education)
DOMAINS OF USER STUDIES (User Studies and User Education)DOMAINS OF USER STUDIES (User Studies and User Education)
DOMAINS OF USER STUDIES (User Studies and User Education)
Libcorpio
 
Building Linked Data Applications
Building Linked Data ApplicationsBuilding Linked Data Applications
Building Linked Data Applications
EUCLID project
 
Kafka Summit SF 2017 - Kafka Connect Best Practices – Advice from the Field
Kafka Summit SF 2017 - Kafka Connect Best Practices – Advice from the FieldKafka Summit SF 2017 - Kafka Connect Best Practices – Advice from the Field
Kafka Summit SF 2017 - Kafka Connect Best Practices – Advice from the Field
confluent
 
INTRODUCTION INFORMATION RETRIEVAL EVALUVATION
 INTRODUCTION INFORMATION RETRIEVAL EVALUVATION INTRODUCTION INFORMATION RETRIEVAL EVALUVATION
INTRODUCTION INFORMATION RETRIEVAL EVALUVATION
Premsankar Chakkingal
 
Digital Libray
Digital LibrayDigital Libray
Digital Libray
Sheila Echaluce
 
FRBR, FRAD and RDA I don't speak cataloging why should I care
FRBR, FRAD and RDA   I don't speak cataloging why should I careFRBR, FRAD and RDA   I don't speak cataloging why should I care
FRBR, FRAD and RDA I don't speak cataloging why should I care
Deann Trebbe
 
Functional Requirements For Bibliographic Records - FRBR
Functional Requirements For Bibliographic Records - FRBRFunctional Requirements For Bibliographic Records - FRBR
Functional Requirements For Bibliographic Records - FRBR
Islamic University of Lebanon
 

What's hot (20)

Introducción a OAI-PMH
Introducción a OAI-PMHIntroducción a OAI-PMH
Introducción a OAI-PMH
 
DSpace-CRIS technical level introduction
DSpace-CRIS technical level introductionDSpace-CRIS technical level introduction
DSpace-CRIS technical level introduction
 
Web 2.0 in Libraries
Web 2.0 in LibrariesWeb 2.0 in Libraries
Web 2.0 in Libraries
 
DSpace standard Data model and DSpace-CRIS
DSpace standard Data model and DSpace-CRISDSpace standard Data model and DSpace-CRIS
DSpace standard Data model and DSpace-CRIS
 
NewGenLib 3.0 Presentation
NewGenLib 3.0 PresentationNewGenLib 3.0 Presentation
NewGenLib 3.0 Presentation
 
Dspace
DspaceDspace
Dspace
 
RDA (Resource Description & Access)
RDA (Resource Description & Access)RDA (Resource Description & Access)
RDA (Resource Description & Access)
 
Catalogación ejemplos
Catalogación ejemplosCatalogación ejemplos
Catalogación ejemplos
 
Greenstone Digital Library
Greenstone Digital LibraryGreenstone Digital Library
Greenstone Digital Library
 
DSpace 7 - The Power of Configurable Entities
DSpace 7 - The Power of Configurable EntitiesDSpace 7 - The Power of Configurable Entities
DSpace 7 - The Power of Configurable Entities
 
RDA vs. AACR2
RDA vs. AACR2RDA vs. AACR2
RDA vs. AACR2
 
Dublin Core Intro
Dublin Core IntroDublin Core Intro
Dublin Core Intro
 
Apache flink
Apache flinkApache flink
Apache flink
 
DOMAINS OF USER STUDIES (User Studies and User Education)
DOMAINS OF USER STUDIES (User Studies and User Education)DOMAINS OF USER STUDIES (User Studies and User Education)
DOMAINS OF USER STUDIES (User Studies and User Education)
 
Building Linked Data Applications
Building Linked Data ApplicationsBuilding Linked Data Applications
Building Linked Data Applications
 
Kafka Summit SF 2017 - Kafka Connect Best Practices – Advice from the Field
Kafka Summit SF 2017 - Kafka Connect Best Practices – Advice from the FieldKafka Summit SF 2017 - Kafka Connect Best Practices – Advice from the Field
Kafka Summit SF 2017 - Kafka Connect Best Practices – Advice from the Field
 
INTRODUCTION INFORMATION RETRIEVAL EVALUVATION
 INTRODUCTION INFORMATION RETRIEVAL EVALUVATION INTRODUCTION INFORMATION RETRIEVAL EVALUVATION
INTRODUCTION INFORMATION RETRIEVAL EVALUVATION
 
Digital Libray
Digital LibrayDigital Libray
Digital Libray
 
FRBR, FRAD and RDA I don't speak cataloging why should I care
FRBR, FRAD and RDA   I don't speak cataloging why should I careFRBR, FRAD and RDA   I don't speak cataloging why should I care
FRBR, FRAD and RDA I don't speak cataloging why should I care
 
Functional Requirements For Bibliographic Records - FRBR
Functional Requirements For Bibliographic Records - FRBRFunctional Requirements For Bibliographic Records - FRBR
Functional Requirements For Bibliographic Records - FRBR
 

Similar to DSpace implementation of the COAR Notify Project - status update

10 01 containersbindings
10 01 containersbindings10 01 containersbindings
10 01 containersbindings
tflung
 
Do you really need to reload?
Do you really need to reload?Do you really need to reload?
Do you really need to reload?
Visuality
 
Rated Ranking Evaluator Enterprise: the next generation of free Search Qualit...
Rated Ranking Evaluator Enterprise: the next generation of free Search Qualit...Rated Ranking Evaluator Enterprise: the next generation of free Search Qualit...
Rated Ranking Evaluator Enterprise: the next generation of free Search Qualit...
Sease
 
First Approval Flow - Microsoft Flow
First Approval Flow - Microsoft FlowFirst Approval Flow - Microsoft Flow
First Approval Flow - Microsoft Flow
Priority SharePoint
 
R12
R12R12
Introduction to the SharePoint 2013 REST API
Introduction to the SharePoint 2013 REST APIIntroduction to the SharePoint 2013 REST API
Introduction to the SharePoint 2013 REST API
Sparkhound Inc.
 
Step types
Step typesStep types
Step types
vamshimahi
 
Validate your entities with symfony validator and entity validation api
Validate your entities with symfony validator and entity validation apiValidate your entities with symfony validator and entity validation api
Validate your entities with symfony validator and entity validation api
Raffaele Chiocca
 
Infolets and OTBI Deep link Actionable Reports - Configuration Work Book
Infolets and OTBI Deep link Actionable Reports - Configuration Work Book Infolets and OTBI Deep link Actionable Reports - Configuration Work Book
Infolets and OTBI Deep link Actionable Reports - Configuration Work Book
Feras Ahmad
 
Day 15: Content Provider: Using Contacts API
Day 15: Content Provider: Using Contacts APIDay 15: Content Provider: Using Contacts API
Day 15: Content Provider: Using Contacts API
Ahsanul Karim
 
LeVan, "Search Web Services"
LeVan, "Search Web Services"LeVan, "Search Web Services"

Similar to DSpace implementation of the COAR Notify Project - status update (11)

10 01 containersbindings
10 01 containersbindings10 01 containersbindings
10 01 containersbindings
 
Do you really need to reload?
Do you really need to reload?Do you really need to reload?
Do you really need to reload?
 
Rated Ranking Evaluator Enterprise: the next generation of free Search Qualit...
Rated Ranking Evaluator Enterprise: the next generation of free Search Qualit...Rated Ranking Evaluator Enterprise: the next generation of free Search Qualit...
Rated Ranking Evaluator Enterprise: the next generation of free Search Qualit...
 
First Approval Flow - Microsoft Flow
First Approval Flow - Microsoft FlowFirst Approval Flow - Microsoft Flow
First Approval Flow - Microsoft Flow
 
R12
R12R12
R12
 
Introduction to the SharePoint 2013 REST API
Introduction to the SharePoint 2013 REST APIIntroduction to the SharePoint 2013 REST API
Introduction to the SharePoint 2013 REST API
 
Step types
Step typesStep types
Step types
 
Validate your entities with symfony validator and entity validation api
Validate your entities with symfony validator and entity validation apiValidate your entities with symfony validator and entity validation api
Validate your entities with symfony validator and entity validation api
 
Infolets and OTBI Deep link Actionable Reports - Configuration Work Book
Infolets and OTBI Deep link Actionable Reports - Configuration Work Book Infolets and OTBI Deep link Actionable Reports - Configuration Work Book
Infolets and OTBI Deep link Actionable Reports - Configuration Work Book
 
Day 15: Content Provider: Using Contacts API
Day 15: Content Provider: Using Contacts APIDay 15: Content Provider: Using Contacts API
Day 15: Content Provider: Using Contacts API
 
LeVan, "Search Web Services"
LeVan, "Search Web Services"LeVan, "Search Web Services"
LeVan, "Search Web Services"
 

More from 4Science

From Digital Records to Digital Cultural Landscapes. Beyond Digital Library b...
From Digital Records to Digital Cultural Landscapes. Beyond Digital Library b...From Digital Records to Digital Cultural Landscapes. Beyond Digital Library b...
From Digital Records to Digital Cultural Landscapes. Beyond Digital Library b...
4Science
 
“Adoption DSpace 7 and 8 Challenges and Solutions from Real Migration Experie...
“Adoption DSpace 7 and 8 Challenges and Solutions from Real Migration Experie...“Adoption DSpace 7 and 8 Challenges and Solutions from Real Migration Experie...
“Adoption DSpace 7 and 8 Challenges and Solutions from Real Migration Experie...
4Science
 
DSpace-CRIS design & Implementation
DSpace-CRIS design & ImplementationDSpace-CRIS design & Implementation
DSpace-CRIS design & Implementation
4Science
 
Status of discussions with repository platforms_ DSpace.pdf
Status of discussions with repository platforms_ DSpace.pdfStatus of discussions with repository platforms_ DSpace.pdf
Status of discussions with repository platforms_ DSpace.pdf
4Science
 
DSpace GLAM Infographic.pdf
DSpace GLAM Infographic.pdfDSpace GLAM Infographic.pdf
DSpace GLAM Infographic.pdf
4Science
 
DSpace CRIS EFS Miami.pdf
DSpace CRIS EFS Miami.pdfDSpace CRIS EFS Miami.pdf
DSpace CRIS EFS Miami.pdf
4Science
 
IIIF and DSpace 7 - IIIF Conference 2023.pdf
IIIF and DSpace 7 - IIIF Conference 2023.pdfIIIF and DSpace 7 - IIIF Conference 2023.pdf
IIIF and DSpace 7 - IIIF Conference 2023.pdf
4Science
 
DSpace 7 ORCID Integration
DSpace 7 ORCID IntegrationDSpace 7 ORCID Integration
DSpace 7 ORCID Integration
4Science
 
Bringing IIIF to the DSpace community
Bringing IIIF to the DSpace communityBringing IIIF to the DSpace community
Bringing IIIF to the DSpace community
4Science
 
Implementing the Notify protocol and standard practices in DSpace
Implementing the Notify protocol and standard practices in DSpaceImplementing the Notify protocol and standard practices in DSpace
Implementing the Notify protocol and standard practices in DSpace
4Science
 
The EOSC DIH "ELD Advance" project
The EOSC DIH "ELD Advance" projectThe EOSC DIH "ELD Advance" project
The EOSC DIH "ELD Advance" project
4Science
 
Convegno Stelline 2020 - 4Science -16 settembre _ pubbliche
Convegno Stelline 2020 - 4Science -16 settembre _ pubblicheConvegno Stelline 2020 - 4Science -16 settembre _ pubbliche
Convegno Stelline 2020 - 4Science -16 settembre _ pubbliche
4Science
 
Convegno Stelline 2020 - 4Science -16 settembre _ accademiche
Convegno Stelline 2020 - 4Science -16 settembre _ accademicheConvegno Stelline 2020 - 4Science -16 settembre _ accademiche
Convegno Stelline 2020 - 4Science -16 settembre _ accademiche
4Science
 
Convegno Stelline 2020 - 4Science
Convegno Stelline 2020 - 4Science Convegno Stelline 2020 - 4Science
Convegno Stelline 2020 - 4Science
4Science
 
DSpace-CRIS 7: What is Coming? OR2020
DSpace-CRIS 7: What is Coming? OR2020DSpace-CRIS 7: What is Coming? OR2020
DSpace-CRIS 7: What is Coming? OR2020
4Science
 
News about DSpace-CRIS Anwendertreffen 2020
News about DSpace-CRIS Anwendertreffen 2020News about DSpace-CRIS Anwendertreffen 2020
News about DSpace-CRIS Anwendertreffen 2020
4Science
 
Digital library: riflessioni su scelte e obiettivi. Visibilità delle collezio...
Digital library: riflessioni su scelte e obiettivi. Visibilità delle collezio...Digital library: riflessioni su scelte e obiettivi. Visibilità delle collezio...
Digital library: riflessioni su scelte e obiettivi. Visibilità delle collezio...
4Science
 
How to enhance your DSpace repository: use cases for DSpace-CRIS, DSpace-RDM,...
How to enhance your DSpace repository: use cases for DSpace-CRIS, DSpace-RDM,...How to enhance your DSpace repository: use cases for DSpace-CRIS, DSpace-RDM,...
How to enhance your DSpace repository: use cases for DSpace-CRIS, DSpace-RDM,...
4Science
 
DSpace-CRIS & OpenAIRE
DSpace-CRIS & OpenAIREDSpace-CRIS & OpenAIRE
DSpace-CRIS & OpenAIRE
4Science
 
Enhancing Interoperability: The Implementation of OpenAIRE Guidelines and COA...
Enhancing Interoperability: The Implementation of OpenAIRE Guidelines and COA...Enhancing Interoperability: The Implementation of OpenAIRE Guidelines and COA...
Enhancing Interoperability: The Implementation of OpenAIRE Guidelines and COA...
4Science
 

More from 4Science (20)

From Digital Records to Digital Cultural Landscapes. Beyond Digital Library b...
From Digital Records to Digital Cultural Landscapes. Beyond Digital Library b...From Digital Records to Digital Cultural Landscapes. Beyond Digital Library b...
From Digital Records to Digital Cultural Landscapes. Beyond Digital Library b...
 
“Adoption DSpace 7 and 8 Challenges and Solutions from Real Migration Experie...
“Adoption DSpace 7 and 8 Challenges and Solutions from Real Migration Experie...“Adoption DSpace 7 and 8 Challenges and Solutions from Real Migration Experie...
“Adoption DSpace 7 and 8 Challenges and Solutions from Real Migration Experie...
 
DSpace-CRIS design & Implementation
DSpace-CRIS design & ImplementationDSpace-CRIS design & Implementation
DSpace-CRIS design & Implementation
 
Status of discussions with repository platforms_ DSpace.pdf
Status of discussions with repository platforms_ DSpace.pdfStatus of discussions with repository platforms_ DSpace.pdf
Status of discussions with repository platforms_ DSpace.pdf
 
DSpace GLAM Infographic.pdf
DSpace GLAM Infographic.pdfDSpace GLAM Infographic.pdf
DSpace GLAM Infographic.pdf
 
DSpace CRIS EFS Miami.pdf
DSpace CRIS EFS Miami.pdfDSpace CRIS EFS Miami.pdf
DSpace CRIS EFS Miami.pdf
 
IIIF and DSpace 7 - IIIF Conference 2023.pdf
IIIF and DSpace 7 - IIIF Conference 2023.pdfIIIF and DSpace 7 - IIIF Conference 2023.pdf
IIIF and DSpace 7 - IIIF Conference 2023.pdf
 
DSpace 7 ORCID Integration
DSpace 7 ORCID IntegrationDSpace 7 ORCID Integration
DSpace 7 ORCID Integration
 
Bringing IIIF to the DSpace community
Bringing IIIF to the DSpace communityBringing IIIF to the DSpace community
Bringing IIIF to the DSpace community
 
Implementing the Notify protocol and standard practices in DSpace
Implementing the Notify protocol and standard practices in DSpaceImplementing the Notify protocol and standard practices in DSpace
Implementing the Notify protocol and standard practices in DSpace
 
The EOSC DIH "ELD Advance" project
The EOSC DIH "ELD Advance" projectThe EOSC DIH "ELD Advance" project
The EOSC DIH "ELD Advance" project
 
Convegno Stelline 2020 - 4Science -16 settembre _ pubbliche
Convegno Stelline 2020 - 4Science -16 settembre _ pubblicheConvegno Stelline 2020 - 4Science -16 settembre _ pubbliche
Convegno Stelline 2020 - 4Science -16 settembre _ pubbliche
 
Convegno Stelline 2020 - 4Science -16 settembre _ accademiche
Convegno Stelline 2020 - 4Science -16 settembre _ accademicheConvegno Stelline 2020 - 4Science -16 settembre _ accademiche
Convegno Stelline 2020 - 4Science -16 settembre _ accademiche
 
Convegno Stelline 2020 - 4Science
Convegno Stelline 2020 - 4Science Convegno Stelline 2020 - 4Science
Convegno Stelline 2020 - 4Science
 
DSpace-CRIS 7: What is Coming? OR2020
DSpace-CRIS 7: What is Coming? OR2020DSpace-CRIS 7: What is Coming? OR2020
DSpace-CRIS 7: What is Coming? OR2020
 
News about DSpace-CRIS Anwendertreffen 2020
News about DSpace-CRIS Anwendertreffen 2020News about DSpace-CRIS Anwendertreffen 2020
News about DSpace-CRIS Anwendertreffen 2020
 
Digital library: riflessioni su scelte e obiettivi. Visibilità delle collezio...
Digital library: riflessioni su scelte e obiettivi. Visibilità delle collezio...Digital library: riflessioni su scelte e obiettivi. Visibilità delle collezio...
Digital library: riflessioni su scelte e obiettivi. Visibilità delle collezio...
 
How to enhance your DSpace repository: use cases for DSpace-CRIS, DSpace-RDM,...
How to enhance your DSpace repository: use cases for DSpace-CRIS, DSpace-RDM,...How to enhance your DSpace repository: use cases for DSpace-CRIS, DSpace-RDM,...
How to enhance your DSpace repository: use cases for DSpace-CRIS, DSpace-RDM,...
 
DSpace-CRIS & OpenAIRE
DSpace-CRIS & OpenAIREDSpace-CRIS & OpenAIRE
DSpace-CRIS & OpenAIRE
 
Enhancing Interoperability: The Implementation of OpenAIRE Guidelines and COA...
Enhancing Interoperability: The Implementation of OpenAIRE Guidelines and COA...Enhancing Interoperability: The Implementation of OpenAIRE Guidelines and COA...
Enhancing Interoperability: The Implementation of OpenAIRE Guidelines and COA...
 

Recently uploaded

Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...
Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...
Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...
XfilesPro
 
Kubernetes at Scale: Going Multi-Cluster with Istio
Kubernetes at Scale:  Going Multi-Cluster  with IstioKubernetes at Scale:  Going Multi-Cluster  with Istio
Kubernetes at Scale: Going Multi-Cluster with Istio
Severalnines
 
Safelyio Toolbox Talk Softwate & App (How To Digitize Safety Meetings)
Safelyio Toolbox Talk Softwate & App (How To Digitize Safety Meetings)Safelyio Toolbox Talk Softwate & App (How To Digitize Safety Meetings)
Safelyio Toolbox Talk Softwate & App (How To Digitize Safety Meetings)
safelyiotech
 
What’s New in Odoo 17 – A Complete Roadmap
What’s New in Odoo 17 – A Complete RoadmapWhat’s New in Odoo 17 – A Complete Roadmap
What’s New in Odoo 17 – A Complete Roadmap
Envertis Software Solutions
 
Webinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for EmbeddedWebinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for Embedded
ICS
 
一比一原版(UMN毕业证)明尼苏达大学毕业证如何办理
一比一原版(UMN毕业证)明尼苏达大学毕业证如何办理一比一原版(UMN毕业证)明尼苏达大学毕业证如何办理
一比一原版(UMN毕业证)明尼苏达大学毕业证如何办理
dakas1
 
Modelling Up - DDDEurope 2024 - Amsterdam
Modelling Up - DDDEurope 2024 - AmsterdamModelling Up - DDDEurope 2024 - Amsterdam
Modelling Up - DDDEurope 2024 - Amsterdam
Alberto Brandolini
 
如何办理(hull学位证书)英国赫尔大学毕业证硕士文凭原版一模一样
如何办理(hull学位证书)英国赫尔大学毕业证硕士文凭原版一模一样如何办理(hull学位证书)英国赫尔大学毕业证硕士文凭原版一模一样
如何办理(hull学位证书)英国赫尔大学毕业证硕士文凭原版一模一样
gapen1
 
Unlock the Secrets to Effortless Video Creation with Invideo: Your Ultimate G...
Unlock the Secrets to Effortless Video Creation with Invideo: Your Ultimate G...Unlock the Secrets to Effortless Video Creation with Invideo: Your Ultimate G...
Unlock the Secrets to Effortless Video Creation with Invideo: Your Ultimate G...
The Third Creative Media
 
UI5con 2024 - Bring Your Own Design System
UI5con 2024 - Bring Your Own Design SystemUI5con 2024 - Bring Your Own Design System
UI5con 2024 - Bring Your Own Design System
Peter Muessig
 
All you need to know about Spring Boot and GraalVM
All you need to know about Spring Boot and GraalVMAll you need to know about Spring Boot and GraalVM
All you need to know about Spring Boot and GraalVM
Alina Yurenko
 
E-commerce Development Services- Hornet Dynamics
E-commerce Development Services- Hornet DynamicsE-commerce Development Services- Hornet Dynamics
E-commerce Development Services- Hornet Dynamics
Hornet Dynamics
 
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
kalichargn70th171
 
A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...
A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...
A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...
kalichargn70th171
 
The Rising Future of CPaaS in the Middle East 2024
The Rising Future of CPaaS in the Middle East 2024The Rising Future of CPaaS in the Middle East 2024
The Rising Future of CPaaS in the Middle East 2024
Yara Milbes
 
Project Management: The Role of Project Dashboards.pdf
Project Management: The Role of Project Dashboards.pdfProject Management: The Role of Project Dashboards.pdf
Project Management: The Role of Project Dashboards.pdf
Karya Keeper
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
dakas1
 
Unveiling the Advantages of Agile Software Development.pdf
Unveiling the Advantages of Agile Software Development.pdfUnveiling the Advantages of Agile Software Development.pdf
Unveiling the Advantages of Agile Software Development.pdf
brainerhub1
 
Oracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptxOracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptx
Remote DBA Services
 
Measures in SQL (SIGMOD 2024, Santiago, Chile)
Measures in SQL (SIGMOD 2024, Santiago, Chile)Measures in SQL (SIGMOD 2024, Santiago, Chile)
Measures in SQL (SIGMOD 2024, Santiago, Chile)
Julian Hyde
 

Recently uploaded (20)

Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...
Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...
Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...
 
Kubernetes at Scale: Going Multi-Cluster with Istio
Kubernetes at Scale:  Going Multi-Cluster  with IstioKubernetes at Scale:  Going Multi-Cluster  with Istio
Kubernetes at Scale: Going Multi-Cluster with Istio
 
Safelyio Toolbox Talk Softwate & App (How To Digitize Safety Meetings)
Safelyio Toolbox Talk Softwate & App (How To Digitize Safety Meetings)Safelyio Toolbox Talk Softwate & App (How To Digitize Safety Meetings)
Safelyio Toolbox Talk Softwate & App (How To Digitize Safety Meetings)
 
What’s New in Odoo 17 – A Complete Roadmap
What’s New in Odoo 17 – A Complete RoadmapWhat’s New in Odoo 17 – A Complete Roadmap
What’s New in Odoo 17 – A Complete Roadmap
 
Webinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for EmbeddedWebinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for Embedded
 
一比一原版(UMN毕业证)明尼苏达大学毕业证如何办理
一比一原版(UMN毕业证)明尼苏达大学毕业证如何办理一比一原版(UMN毕业证)明尼苏达大学毕业证如何办理
一比一原版(UMN毕业证)明尼苏达大学毕业证如何办理
 
Modelling Up - DDDEurope 2024 - Amsterdam
Modelling Up - DDDEurope 2024 - AmsterdamModelling Up - DDDEurope 2024 - Amsterdam
Modelling Up - DDDEurope 2024 - Amsterdam
 
如何办理(hull学位证书)英国赫尔大学毕业证硕士文凭原版一模一样
如何办理(hull学位证书)英国赫尔大学毕业证硕士文凭原版一模一样如何办理(hull学位证书)英国赫尔大学毕业证硕士文凭原版一模一样
如何办理(hull学位证书)英国赫尔大学毕业证硕士文凭原版一模一样
 
Unlock the Secrets to Effortless Video Creation with Invideo: Your Ultimate G...
Unlock the Secrets to Effortless Video Creation with Invideo: Your Ultimate G...Unlock the Secrets to Effortless Video Creation with Invideo: Your Ultimate G...
Unlock the Secrets to Effortless Video Creation with Invideo: Your Ultimate G...
 
UI5con 2024 - Bring Your Own Design System
UI5con 2024 - Bring Your Own Design SystemUI5con 2024 - Bring Your Own Design System
UI5con 2024 - Bring Your Own Design System
 
All you need to know about Spring Boot and GraalVM
All you need to know about Spring Boot and GraalVMAll you need to know about Spring Boot and GraalVM
All you need to know about Spring Boot and GraalVM
 
E-commerce Development Services- Hornet Dynamics
E-commerce Development Services- Hornet DynamicsE-commerce Development Services- Hornet Dynamics
E-commerce Development Services- Hornet Dynamics
 
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
 
A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...
A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...
A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...
 
The Rising Future of CPaaS in the Middle East 2024
The Rising Future of CPaaS in the Middle East 2024The Rising Future of CPaaS in the Middle East 2024
The Rising Future of CPaaS in the Middle East 2024
 
Project Management: The Role of Project Dashboards.pdf
Project Management: The Role of Project Dashboards.pdfProject Management: The Role of Project Dashboards.pdf
Project Management: The Role of Project Dashboards.pdf
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Unveiling the Advantages of Agile Software Development.pdf
Unveiling the Advantages of Agile Software Development.pdfUnveiling the Advantages of Agile Software Development.pdf
Unveiling the Advantages of Agile Software Development.pdf
 
Oracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptxOracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptx
 
Measures in SQL (SIGMOD 2024, Santiago, Chile)
Measures in SQL (SIGMOD 2024, Santiago, Chile)Measures in SQL (SIGMOD 2024, Santiago, Chile)
Measures in SQL (SIGMOD 2024, Santiago, Chile)
 

DSpace implementation of the COAR Notify Project - status update

  • 1. Notify on DSpace v.5 – v.6 presented at the COAR NOTIFY WG on 26th Jan 2022
  • 2. 2 The Notify Workflow ITEM Rev. Service 1 Rev. Service 2 Submission Step DSpace LDN Inbox During the submission The intent to request the review is stored Librarians can modify / remove / add the Review requests if needed acknowledgement review endorsement Review / endorsement are stored in the Item’s metadata Start Workflow DSpace send a LDN to each selected services requesting the review
  • 3. 3 The Notify Workflow ITEM Rev. Service 1 Rev. Service 2 Submission Step DSpace LDN Inbox The review may not be explicitly requested Submission produces an Item The LDN Inbox is reached when a review or endorsement is available The LDN Inbox stores the metadata on the Item Start Workflow
  • 4. 4 JSON-LD (LINKED DATA) An example of the JSON sent to request a review The field ‘type’ identifies the kind of request The field ‘object’ contains the information about the item we are requesting the review for
  • 5. 5 The LDN Inbox Architecture LDN Inbox Chooses Action Save Metadata Send Email Notification Other Configurable Action Other Configurable Action Using the field ‘type’ of the received JSON-LD the proper action is retrieved and executed Action Structure Configurable Action The Action structure provides a way to configure further action when a certain request type is received
  • 6. 6 JSON-LD for review An example of the received JSON-LD when announcing a review The type identifies a received review inReplyTo is present if the service is replying to a received review request object contains the review link
  • 7. 7 JSON-LD for endorsement An example of the received JSON-LD when announcing an endorsement The type identifies a received endorsement inReplyTo is present if the service is replying to a received review request object contains the endorsement link
  • 8. 8 Asking Review during the submission is the first step
  • 9. 9 A report page show the items for each status
  • 10. 10 The Item goes in Pending Review for the selected 3 services
  • 11. 11 The Item goes in Pending Endorsement for the selected services that supports Endorsement
  • 12. 12 On the Item’s page we can see a full report of each status the Item is in
  • 13. 13 When an Item is reviewed or endorsed by a service the status is updated and a link is displayed
  • 14. SHARE YOUR KNOWLEDGE Thanks For Your Attention Stefano Maffei (stefano.maffei@4science.com)