      Franklin’s Water
   Where we were, Where we are, Where we are going

                 July 2009
Overview
 Budget
 Distribution System
 Treatment
 Testing Requirements
 DEP Permitting
 Improvements
 Goals and Plans
Budget

   Enterprise Fund
   FY 2010 – $4,950,000
   Personnel, Expenses, Equipment, Debt
   14 Full Time Employees
   Factors
       Inflation (since 2002)
         • Treatment Chemicals +178%
         • Electricity +76%
         • Increased Regulatory Demands
Distribution System

   6 Storage Tanks (11.52 MG)
   8 Booster Pump Stations
   10 Wells
   158 Miles of Water Pipe
   1700 Hydrants
   3300 Main Gates
   9700 Service Connections
   998,646,000 Gallons Pumped
Treatment
 Potassium Hydroxide – for pH regulation and
  corrosion control
 Fluoride – for teeth and bones
 Chlorine – for water quality
 Sodium Hexametaphosphate – to aid in Iron
  and Manganese control
 Ozone / Ultrafiltration – for Iron and Manganese
  control (Wells 1&2 Only)
Increase in Testing Requirements
     Year       Number of tests performed             Cost

    2002                    126                   $10,000
    2008                    676                  $55,000*
   * Does not include additional man hours to administer testing
DEP Permitting
   Reduced Withdrawal Amount
         • Old Permit – 4.1 MGD
         • New Permit – 3.64 MGD
       65 / 10 Requirements
         • 65 Residential GPD
         • 10% Accounted for Water Loss
       Increased Conservation Efforts
         • Seasonal Water Restrictions
   Results
       Reduction in pumping amounts
         • 2001 – 3.1 MGD
         • 2009 – 2.7 MGD
       Reduced Consumption = Reduced Revenue
Improvements
   20/20 Plan was implemented by Town Council for water system
    improvements – 10M
   New Water Treatment Facility
       Treats 1/3 of water pumped daily (on average)

   Replaced over 15 miles of water main
       Replacement of antiquated Cast Iron / Asbestos Cement pipe
         • (60-80+ years old)
       Improved Water Quality
       Reduced service interruptions
       Improved Fire Flow pressure rates

   Meter Replacement Program
       90% Residential Replacement – 100% Automation
       100% Commercial Replacement
   Renovation of Existing Wells
Goals and Plans
   Continued Water Main Replacement
       Emmons & Main Streets
       Sahlin Circle
       Lincoln Street (multiple phases)
   Life-Cycle Repairs and Renovations for Wells 3,7,8
   Permitting for and approval for Well #12
       Improved Watershed Management
       System balancing
   Renew FIP Water Tank
   Continued water conservation, efficiency and public
    awareness efforts