A re

we there yet? And, if we are not there, where are we? It may sound like a line from
any of a number of comedy films, but woe be unto the IT department that goes full speed
ahead to implement a service change, only to find it does not deliver value to the
business.
Get back on track with the Evaluation Process, introduced in ITIL V3's Service Transition
phase.
Charged with the nominal responsibility for ensuring that a service change is acceptable, Evaluation extends far beyond a
single process performed during a service implementation and checked off on a task-completed list. In fact, it is performed
several times, and unlike a checked-off task, it never goes away.
This DITY explores what the Evaluation process is, when to use it, and – most importantly – what to do with the
evaluation results.

Evaluation and the Service Transition Phase.
Evaluation is a natural fit with Service Transition. Even ITIL V2 addressed Evaluation – only it did not call it that,
preferring the more benign term 'Assessment' within Change Management.
Evaluation wraps around the entire Service Transition phase, but it plays an especially critical role at three points within
Service Transition:
Service Design Evaluation – ITIL recommends that the Service Design phase 'borrow' a bit of Service Transition’s
evaluation expertise to ensure the effectiveness of the Service Design Package's (SDP) Acceptance criteria.
Release and Deployment – This step evaluates the release and deployment processes prior to release of a service
change. In essence, it ensures that these processes will foster an effective deployment.
Acceptance – This is the final step in the Change Management process. Previously known as the Post
Implementation Review, this step evaluates the service change against the Service Acceptance Criteria (SAC) prior
to closing out the Change Request.

What Goes into an Evaluation?
It is always easy to specify an event that will trigger an evaluation, but by following these rules you can also ensure that
it is an effective evaluation:
Start early. This is not really a 'what' rule, but a 'when' rule. Build the evaluation into the Service Design or Change
as early as possible.
Different points within the evaluation require different evaluations. One size does not fit all. Change Management's
evaluation to decide whether to proceed with a change is far different than Release and Deployment’s evaluation of
whether its processes are appropriate for a particular change.
As always, do evaluations in the context of the customer by defining interactions, responsibilities and deliverables.
Define the scope of the evaluation. Be setting boundaries, you can more easily see what other processes and services
interact with these boundaries and better understand the scope of both intended and unintended consequences of
the change.
Do a risk profile to understand what risks the business must accept as part of the change.
Do a deviation analysis of the differences between the change’s predicted performance and its actual performance.
Qualify the environment and IT infrastructure. Are required elements in place?
Use the Service Validation and Testing Process to validate that changed application or service can go into
production.
Recommend the action to take based on the evaluation.
Update the Knowledge Management Database with the results and recommendation. That makes it easier to travel
this route in the future.

Now That You're Here, What Do You Do?
As simplistic as it may seem, the Evaluation process can only lead to three possible courses of action, but only the
customer can best define how the change's Utility and Warranty levels will lead to the creation of Value to the business.
The possible outcomes are:
Accept the change;
Reject the change;
Require a new change with revised predicted performance

Summary
The objective of the Evaluation process is to build an environment that enables the Customer and IT to make informed
decisions about the merit of a service change in the context of its actual vs. projected performance in the IT Service
Portfolio.

Entire Contents © 2008 itSM Solutions® LLC. All Rights Reserved.
ITIL ® and IT Infrastructure Library ® are Registered Trade Marks of the Office of Government Commerce and is used here by itSM Solutions LLC under license from and with the permission of OGC
(Trade Mark License No. 0002).

More Related Content

What's hot

Agile fix cost_pecha_kucha
Agile fix cost_pecha_kuchaAgile fix cost_pecha_kucha
Agile fix cost_pecha_kucha
Viresh Suri
 
Calibration Singapore
Calibration SingaporeCalibration Singapore
Calibration Singapore
Dakshinamoorthy R
 
QPEX Introduction
QPEX IntroductionQPEX Introduction
QPEX Introduction
Peter Zhou
 
BCAD QS PPT.10.10.16NMFV5ITES_QA_V3Final (3)
BCAD QS PPT.10.10.16NMFV5ITES_QA_V3Final (3)BCAD QS PPT.10.10.16NMFV5ITES_QA_V3Final (3)
BCAD QS PPT.10.10.16NMFV5ITES_QA_V3Final (3)
Nicole Mckinney
 
Nesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma autumn conference - Contracting & Performance management - Cees KuijpersNesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma
 
Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010
mseaborn
 
Enabling Continuous Delivery
Enabling Continuous DeliveryEnabling Continuous Delivery
Enabling Continuous Delivery
Ramchandra Koty
 
Digital transformation-It's not all about Digital Technologies
Digital transformation-It's not all about Digital TechnologiesDigital transformation-It's not all about Digital Technologies
Digital transformation-It's not all about Digital Technologies
pradeeppatelpmp
 
Compliance watcher A legal compliance tool
Compliance watcher A legal compliance toolCompliance watcher A legal compliance tool
Compliance watcher A legal compliance tool
karisma hirapara
 
Service Levels - the Star Rating
Service Levels - the Star RatingService Levels - the Star Rating
Service Levels - the Star Rating
ColinSymonds
 
Nesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
Nesma autumn conference - the gains of unit based pricing - Sytse van der SchaafNesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
Nesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
Nesma
 
Agile Load Testing in the Real World
Agile Load Testing in the Real WorldAgile Load Testing in the Real World
Agile Load Testing in the Real World
Lee Barnes
 
Patching at Scale
Patching at ScalePatching at Scale
Patching at Scale
Jason O'Rourke
 
Test Environment Management- An Emerging Truth Of DevOps
Test Environment Management- An Emerging Truth Of DevOpsTest Environment Management- An Emerging Truth Of DevOps
Test Environment Management- An Emerging Truth Of DevOps
Enov8
 
Test & measurement; importance of test and measurement in electronics; measur...
Test & measurement; importance of test and measurement in electronics; measur...Test & measurement; importance of test and measurement in electronics; measur...
Test & measurement; importance of test and measurement in electronics; measur...
SHIV DUTT
 
Reliability Value FMS Reliability
Reliability Value FMS ReliabilityReliability Value FMS Reliability
Reliability Value FMS Reliability
Accendo Reliability
 
Why to outsource qa services
Why to outsource qa servicesWhy to outsource qa services
Why to outsource qa services
TestingXperts
 
Adaptive case study on setting up of PMO for large it organization
Adaptive case study on setting up of PMO for large it organizationAdaptive case study on setting up of PMO for large it organization
Adaptive case study on setting up of PMO for large it organization
LN Mishra CBAP
 
Ac2017 3. cast software-metricsincontracts
Ac2017   3. cast software-metricsincontractsAc2017   3. cast software-metricsincontracts
Ac2017 3. cast software-metricsincontracts
Nesma
 
global 1
global 1global 1
global 1
Ada Ejika
 

What's hot (20)

Agile fix cost_pecha_kucha
Agile fix cost_pecha_kuchaAgile fix cost_pecha_kucha
Agile fix cost_pecha_kucha
 
Calibration Singapore
Calibration SingaporeCalibration Singapore
Calibration Singapore
 
QPEX Introduction
QPEX IntroductionQPEX Introduction
QPEX Introduction
 
BCAD QS PPT.10.10.16NMFV5ITES_QA_V3Final (3)
BCAD QS PPT.10.10.16NMFV5ITES_QA_V3Final (3)BCAD QS PPT.10.10.16NMFV5ITES_QA_V3Final (3)
BCAD QS PPT.10.10.16NMFV5ITES_QA_V3Final (3)
 
Nesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma autumn conference - Contracting & Performance management - Cees KuijpersNesma autumn conference - Contracting & Performance management - Cees Kuijpers
Nesma autumn conference - Contracting & Performance management - Cees Kuijpers
 
Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010Electrical Assurance Presentation 2010
Electrical Assurance Presentation 2010
 
Enabling Continuous Delivery
Enabling Continuous DeliveryEnabling Continuous Delivery
Enabling Continuous Delivery
 
Digital transformation-It's not all about Digital Technologies
Digital transformation-It's not all about Digital TechnologiesDigital transformation-It's not all about Digital Technologies
Digital transformation-It's not all about Digital Technologies
 
Compliance watcher A legal compliance tool
Compliance watcher A legal compliance toolCompliance watcher A legal compliance tool
Compliance watcher A legal compliance tool
 
Service Levels - the Star Rating
Service Levels - the Star RatingService Levels - the Star Rating
Service Levels - the Star Rating
 
Nesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
Nesma autumn conference - the gains of unit based pricing - Sytse van der SchaafNesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
Nesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
 
Agile Load Testing in the Real World
Agile Load Testing in the Real WorldAgile Load Testing in the Real World
Agile Load Testing in the Real World
 
Patching at Scale
Patching at ScalePatching at Scale
Patching at Scale
 
Test Environment Management- An Emerging Truth Of DevOps
Test Environment Management- An Emerging Truth Of DevOpsTest Environment Management- An Emerging Truth Of DevOps
Test Environment Management- An Emerging Truth Of DevOps
 
Test & measurement; importance of test and measurement in electronics; measur...
Test & measurement; importance of test and measurement in electronics; measur...Test & measurement; importance of test and measurement in electronics; measur...
Test & measurement; importance of test and measurement in electronics; measur...
 
Reliability Value FMS Reliability
Reliability Value FMS ReliabilityReliability Value FMS Reliability
Reliability Value FMS Reliability
 
Why to outsource qa services
Why to outsource qa servicesWhy to outsource qa services
Why to outsource qa services
 
Adaptive case study on setting up of PMO for large it organization
Adaptive case study on setting up of PMO for large it organizationAdaptive case study on setting up of PMO for large it organization
Adaptive case study on setting up of PMO for large it organization
 
Ac2017 3. cast software-metricsincontracts
Ac2017   3. cast software-metricsincontractsAc2017   3. cast software-metricsincontracts
Ac2017 3. cast software-metricsincontracts
 
global 1
global 1global 1
global 1
 

Viewers also liked

Η ζωή της κύπριας γυναίκας
Η ζωή της κύπριας γυναίκαςΗ ζωή της κύπριας γυναίκας
Η ζωή της κύπριας γυναίκας
Charalambos Papadouris
 
7강 backcountry skiing
7강 backcountry skiing7강 backcountry skiing
7강 backcountry skiing
Max Kim
 
Dit yvol2iss2
Dit yvol2iss2Dit yvol2iss2
Dit yvol2iss2
Rick Lemieux
 
Presentacion all star fgx en español forever green express - fg-xpress - pe...
Presentacion all star fgx en español   forever green express - fg-xpress - pe...Presentacion all star fgx en español   forever green express - fg-xpress - pe...
Presentacion all star fgx en español forever green express - fg-xpress - pe...
Raoni Claro
 
TESTIMIONIALS
TESTIMIONIALSTESTIMIONIALS
TESTIMIONIALS
Lori Thompson
 
Dit yvol5iss10
Dit yvol5iss10Dit yvol5iss10
Dit yvol5iss10
Rick Lemieux
 
Dit yvol3iss6
Dit yvol3iss6Dit yvol3iss6
Dit yvol3iss6
Rick Lemieux
 
Navidad Dinacaf
Navidad DinacafNavidad Dinacaf
Navidad Dinacaf
dinacaf
 
Dit yvol3iss11
Dit yvol3iss11Dit yvol3iss11
Dit yvol3iss11
Rick Lemieux
 
Dit yvol2iss17
Dit yvol2iss17Dit yvol2iss17
Dit yvol2iss17
Rick Lemieux
 
Dit yvol6iss23
Dit yvol6iss23Dit yvol6iss23
Dit yvol6iss23
Rick Lemieux
 
Dit yvol2iss33
Dit yvol2iss33Dit yvol2iss33
Dit yvol2iss33
Rick Lemieux
 
Dit yvol2iss48
Dit yvol2iss48Dit yvol2iss48
Dit yvol2iss48
Rick Lemieux
 
Fg xpress strategic plan recognition events and leadership copia (44) - copia
Fg xpress strategic plan recognition events and leadership   copia (44) - copiaFg xpress strategic plan recognition events and leadership   copia (44) - copia
Fg xpress strategic plan recognition events and leadership copia (44) - copia
Raoni Claro
 
Social Media Shakedown of Top Brands in November 2013
Social Media Shakedown of Top Brands in November 2013Social Media Shakedown of Top Brands in November 2013
Social Media Shakedown of Top Brands in November 2013
Unmetric
 
Application software
Application softwareApplication software
Application software
Eduwali khan
 
Dit yvol3iss19
Dit yvol3iss19Dit yvol3iss19
Dit yvol3iss19
Rick Lemieux
 
Dit yvol1iss3
Dit yvol1iss3Dit yvol1iss3
Dit yvol1iss3
Rick Lemieux
 
Fg xpress strategic plan recognition events and leadership copia (46) - copia
Fg xpress strategic plan recognition events and leadership   copia (46) - copiaFg xpress strategic plan recognition events and leadership   copia (46) - copia
Fg xpress strategic plan recognition events and leadership copia (46) - copia
Raoni Claro
 
Presentacion all star fgx en español forever green express - fg-xpress - pe...
Presentacion all star fgx en español   forever green express - fg-xpress - pe...Presentacion all star fgx en español   forever green express - fg-xpress - pe...
Presentacion all star fgx en español forever green express - fg-xpress - pe...
Raoni Claro
 

Viewers also liked (20)

Η ζωή της κύπριας γυναίκας
Η ζωή της κύπριας γυναίκαςΗ ζωή της κύπριας γυναίκας
Η ζωή της κύπριας γυναίκας
 
7강 backcountry skiing
7강 backcountry skiing7강 backcountry skiing
7강 backcountry skiing
 
Dit yvol2iss2
Dit yvol2iss2Dit yvol2iss2
Dit yvol2iss2
 
Presentacion all star fgx en español forever green express - fg-xpress - pe...
Presentacion all star fgx en español   forever green express - fg-xpress - pe...Presentacion all star fgx en español   forever green express - fg-xpress - pe...
Presentacion all star fgx en español forever green express - fg-xpress - pe...
 
TESTIMIONIALS
TESTIMIONIALSTESTIMIONIALS
TESTIMIONIALS
 
Dit yvol5iss10
Dit yvol5iss10Dit yvol5iss10
Dit yvol5iss10
 
Dit yvol3iss6
Dit yvol3iss6Dit yvol3iss6
Dit yvol3iss6
 
Navidad Dinacaf
Navidad DinacafNavidad Dinacaf
Navidad Dinacaf
 
Dit yvol3iss11
Dit yvol3iss11Dit yvol3iss11
Dit yvol3iss11
 
Dit yvol2iss17
Dit yvol2iss17Dit yvol2iss17
Dit yvol2iss17
 
Dit yvol6iss23
Dit yvol6iss23Dit yvol6iss23
Dit yvol6iss23
 
Dit yvol2iss33
Dit yvol2iss33Dit yvol2iss33
Dit yvol2iss33
 
Dit yvol2iss48
Dit yvol2iss48Dit yvol2iss48
Dit yvol2iss48
 
Fg xpress strategic plan recognition events and leadership copia (44) - copia
Fg xpress strategic plan recognition events and leadership   copia (44) - copiaFg xpress strategic plan recognition events and leadership   copia (44) - copia
Fg xpress strategic plan recognition events and leadership copia (44) - copia
 
Social Media Shakedown of Top Brands in November 2013
Social Media Shakedown of Top Brands in November 2013Social Media Shakedown of Top Brands in November 2013
Social Media Shakedown of Top Brands in November 2013
 
Application software
Application softwareApplication software
Application software
 
Dit yvol3iss19
Dit yvol3iss19Dit yvol3iss19
Dit yvol3iss19
 
Dit yvol1iss3
Dit yvol1iss3Dit yvol1iss3
Dit yvol1iss3
 
Fg xpress strategic plan recognition events and leadership copia (46) - copia
Fg xpress strategic plan recognition events and leadership   copia (46) - copiaFg xpress strategic plan recognition events and leadership   copia (46) - copia
Fg xpress strategic plan recognition events and leadership copia (46) - copia
 
Presentacion all star fgx en español forever green express - fg-xpress - pe...
Presentacion all star fgx en español   forever green express - fg-xpress - pe...Presentacion all star fgx en español   forever green express - fg-xpress - pe...
Presentacion all star fgx en español forever green express - fg-xpress - pe...
 

Similar to Dit yvol4iss18

Effective Change Management
Effective Change ManagementEffective Change Management
Effective Change Management
Invensis Learning
 
Itil v3 foundation study guide service transition
Itil v3 foundation study guide   service transitionItil v3 foundation study guide   service transition
Itil v3 foundation study guide service transition
Muhammad Zamzani
 
Dit yvol5iss35
Dit yvol5iss35Dit yvol5iss35
Dit yvol5iss35
Rick Lemieux
 
Itil & Process Concepts Awareness Tadawul 5 Of March 2007
Itil & Process Concepts Awareness Tadawul 5 Of March 2007Itil & Process Concepts Awareness Tadawul 5 Of March 2007
Itil & Process Concepts Awareness Tadawul 5 Of March 2007
Abdulaziz AlFaify
 
Numara change & approval mgmt
Numara change & approval mgmtNumara change & approval mgmt
Numara change & approval mgmt
San Francisco Bay Area
 
SFHDI presents: Numara Software - Change & Approval Management
SFHDI presents: Numara  Software - Change & Approval ManagementSFHDI presents: Numara  Software - Change & Approval Management
SFHDI presents: Numara Software - Change & Approval Management
San Francisco Bay Area
 
Dit yvol4iss25
Dit yvol4iss25Dit yvol4iss25
Dit yvol4iss25
Rick Lemieux
 
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-lastThe DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
Peter Shirley-Quirk
 
ITIL V3 Overview
ITIL V3 OverviewITIL V3 Overview
ITIL V3 Overview
Allwyn George
 
(ONLINE) ITIL Indonesia Community - An Introduction to IT Change Management
(ONLINE) ITIL Indonesia Community - An Introduction to IT Change Management(ONLINE) ITIL Indonesia Community - An Introduction to IT Change Management
(ONLINE) ITIL Indonesia Community - An Introduction to IT Change Management
ITIL Indonesia
 
ChangeManagementTraining
ChangeManagementTrainingChangeManagementTraining
ChangeManagementTraining
Michael Perry
 
Engineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best PracticesEngineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best Practices
Shobhit Singhal
 
Dit yvol5iss4
Dit yvol5iss4Dit yvol5iss4
Dit yvol5iss4
Rick Lemieux
 
Itil v3 foundation study guide continual service improvement
Itil v3 foundation study guide   continual service improvementItil v3 foundation study guide   continual service improvement
Itil v3 foundation study guide continual service improvement
Muhammad Zamzani
 
Using DevOps' Intelligent Insights to Deliver Greater Business Value
Using DevOps' Intelligent Insights to Deliver Greater Business ValueUsing DevOps' Intelligent Insights to Deliver Greater Business Value
Using DevOps' Intelligent Insights to Deliver Greater Business Value
Cognizant
 
Dit yvol3iss36
Dit yvol3iss36Dit yvol3iss36
Dit yvol3iss36
Rick Lemieux
 
Six sigma it_service_delivery
Six sigma it_service_deliverySix sigma it_service_delivery
Six sigma it_service_delivery
Stephen Hightower
 
Service Transition Overview
Service Transition  OverviewService Transition  Overview
Service Transition Overview
sivashankar Balasubramanian
 
Dit yvol4iss08
Dit yvol4iss08Dit yvol4iss08
Dit yvol4iss08
Rick Lemieux
 
EEM Operations high level slide 2018_v1.pptx
EEM Operations high level slide 2018_v1.pptxEEM Operations high level slide 2018_v1.pptx
EEM Operations high level slide 2018_v1.pptx
Boris Berovic
 

Similar to Dit yvol4iss18 (20)

Effective Change Management
Effective Change ManagementEffective Change Management
Effective Change Management
 
Itil v3 foundation study guide service transition
Itil v3 foundation study guide   service transitionItil v3 foundation study guide   service transition
Itil v3 foundation study guide service transition
 
Dit yvol5iss35
Dit yvol5iss35Dit yvol5iss35
Dit yvol5iss35
 
Itil & Process Concepts Awareness Tadawul 5 Of March 2007
Itil & Process Concepts Awareness Tadawul 5 Of March 2007Itil & Process Concepts Awareness Tadawul 5 Of March 2007
Itil & Process Concepts Awareness Tadawul 5 Of March 2007
 
Numara change & approval mgmt
Numara change & approval mgmtNumara change & approval mgmt
Numara change & approval mgmt
 
SFHDI presents: Numara Software - Change & Approval Management
SFHDI presents: Numara  Software - Change & Approval ManagementSFHDI presents: Numara  Software - Change & Approval Management
SFHDI presents: Numara Software - Change & Approval Management
 
Dit yvol4iss25
Dit yvol4iss25Dit yvol4iss25
Dit yvol4iss25
 
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-lastThe DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
 
ITIL V3 Overview
ITIL V3 OverviewITIL V3 Overview
ITIL V3 Overview
 
(ONLINE) ITIL Indonesia Community - An Introduction to IT Change Management
(ONLINE) ITIL Indonesia Community - An Introduction to IT Change Management(ONLINE) ITIL Indonesia Community - An Introduction to IT Change Management
(ONLINE) ITIL Indonesia Community - An Introduction to IT Change Management
 
ChangeManagementTraining
ChangeManagementTrainingChangeManagementTraining
ChangeManagementTraining
 
Engineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best PracticesEngineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best Practices
 
Dit yvol5iss4
Dit yvol5iss4Dit yvol5iss4
Dit yvol5iss4
 
Itil v3 foundation study guide continual service improvement
Itil v3 foundation study guide   continual service improvementItil v3 foundation study guide   continual service improvement
Itil v3 foundation study guide continual service improvement
 
Using DevOps' Intelligent Insights to Deliver Greater Business Value
Using DevOps' Intelligent Insights to Deliver Greater Business ValueUsing DevOps' Intelligent Insights to Deliver Greater Business Value
Using DevOps' Intelligent Insights to Deliver Greater Business Value
 
Dit yvol3iss36
Dit yvol3iss36Dit yvol3iss36
Dit yvol3iss36
 
Six sigma it_service_delivery
Six sigma it_service_deliverySix sigma it_service_delivery
Six sigma it_service_delivery
 
Service Transition Overview
Service Transition  OverviewService Transition  Overview
Service Transition Overview
 
Dit yvol4iss08
Dit yvol4iss08Dit yvol4iss08
Dit yvol4iss08
 
EEM Operations high level slide 2018_v1.pptx
EEM Operations high level slide 2018_v1.pptxEEM Operations high level slide 2018_v1.pptx
EEM Operations high level slide 2018_v1.pptx
 

More from Rick Lemieux

IT Service Management (ITSM) Model for Business & IT Alignement
IT Service Management (ITSM) Model for Business & IT AlignementIT Service Management (ITSM) Model for Business & IT Alignement
IT Service Management (ITSM) Model for Business & IT Alignement
Rick Lemieux
 
Dit yvol5iss41
Dit yvol5iss41Dit yvol5iss41
Dit yvol5iss41
Rick Lemieux
 
Dit yvol5iss40
Dit yvol5iss40Dit yvol5iss40
Dit yvol5iss40
Rick Lemieux
 
Dit yvol5iss38
Dit yvol5iss38Dit yvol5iss38
Dit yvol5iss38
Rick Lemieux
 
Dit yvol5iss37
Dit yvol5iss37Dit yvol5iss37
Dit yvol5iss37
Rick Lemieux
 
Dit yvol5iss36
Dit yvol5iss36Dit yvol5iss36
Dit yvol5iss36
Rick Lemieux
 
Dit yvol5iss34
Dit yvol5iss34Dit yvol5iss34
Dit yvol5iss34
Rick Lemieux
 
Dit yvol5iss31
Dit yvol5iss31Dit yvol5iss31
Dit yvol5iss31
Rick Lemieux
 
Dit yvol5iss33
Dit yvol5iss33Dit yvol5iss33
Dit yvol5iss33
Rick Lemieux
 
Dit yvol5iss32
Dit yvol5iss32Dit yvol5iss32
Dit yvol5iss32
Rick Lemieux
 
Dit yvol5iss30
Dit yvol5iss30Dit yvol5iss30
Dit yvol5iss30
Rick Lemieux
 
Dit yvol5iss29
Dit yvol5iss29Dit yvol5iss29
Dit yvol5iss29
Rick Lemieux
 
Dit yvol5iss28
Dit yvol5iss28Dit yvol5iss28
Dit yvol5iss28
Rick Lemieux
 
Dit yvol5iss26
Dit yvol5iss26Dit yvol5iss26
Dit yvol5iss26
Rick Lemieux
 
Dit yvol5iss25
Dit yvol5iss25Dit yvol5iss25
Dit yvol5iss25
Rick Lemieux
 
Dit yvol5iss24
Dit yvol5iss24Dit yvol5iss24
Dit yvol5iss24
Rick Lemieux
 
Dit yvol5iss23
Dit yvol5iss23Dit yvol5iss23
Dit yvol5iss23
Rick Lemieux
 
Dit yvol5iss22
Dit yvol5iss22Dit yvol5iss22
Dit yvol5iss22
Rick Lemieux
 
Dit yvol5iss21
Dit yvol5iss21Dit yvol5iss21
Dit yvol5iss21
Rick Lemieux
 
Dit yvol5iss20
Dit yvol5iss20Dit yvol5iss20
Dit yvol5iss20
Rick Lemieux
 

More from Rick Lemieux (20)

IT Service Management (ITSM) Model for Business & IT Alignement
IT Service Management (ITSM) Model for Business & IT AlignementIT Service Management (ITSM) Model for Business & IT Alignement
IT Service Management (ITSM) Model for Business & IT Alignement
 
Dit yvol5iss41
Dit yvol5iss41Dit yvol5iss41
Dit yvol5iss41
 
Dit yvol5iss40
Dit yvol5iss40Dit yvol5iss40
Dit yvol5iss40
 
Dit yvol5iss38
Dit yvol5iss38Dit yvol5iss38
Dit yvol5iss38
 
Dit yvol5iss37
Dit yvol5iss37Dit yvol5iss37
Dit yvol5iss37
 
Dit yvol5iss36
Dit yvol5iss36Dit yvol5iss36
Dit yvol5iss36
 
Dit yvol5iss34
Dit yvol5iss34Dit yvol5iss34
Dit yvol5iss34
 
Dit yvol5iss31
Dit yvol5iss31Dit yvol5iss31
Dit yvol5iss31
 
Dit yvol5iss33
Dit yvol5iss33Dit yvol5iss33
Dit yvol5iss33
 
Dit yvol5iss32
Dit yvol5iss32Dit yvol5iss32
Dit yvol5iss32
 
Dit yvol5iss30
Dit yvol5iss30Dit yvol5iss30
Dit yvol5iss30
 
Dit yvol5iss29
Dit yvol5iss29Dit yvol5iss29
Dit yvol5iss29
 
Dit yvol5iss28
Dit yvol5iss28Dit yvol5iss28
Dit yvol5iss28
 
Dit yvol5iss26
Dit yvol5iss26Dit yvol5iss26
Dit yvol5iss26
 
Dit yvol5iss25
Dit yvol5iss25Dit yvol5iss25
Dit yvol5iss25
 
Dit yvol5iss24
Dit yvol5iss24Dit yvol5iss24
Dit yvol5iss24
 
Dit yvol5iss23
Dit yvol5iss23Dit yvol5iss23
Dit yvol5iss23
 
Dit yvol5iss22
Dit yvol5iss22Dit yvol5iss22
Dit yvol5iss22
 
Dit yvol5iss21
Dit yvol5iss21Dit yvol5iss21
Dit yvol5iss21
 
Dit yvol5iss20
Dit yvol5iss20Dit yvol5iss20
Dit yvol5iss20
 

Dit yvol4iss18

  • 1. The workable, practical guide to Do IT Yourself Vol. 4.18 • April 29, 2008 Are We There Yet? Wrapped Around the (E)Valuation Axle By Janet Kuhn A re we there yet? And, if we are not there, where are we? It may sound like a line from any of a number of comedy films, but woe be unto the IT department that goes full speed ahead to implement a service change, only to find it does not deliver value to the business. Get back on track with the Evaluation Process, introduced in ITIL V3's Service Transition phase. Charged with the nominal responsibility for ensuring that a service change is acceptable, Evaluation extends far beyond a single process performed during a service implementation and checked off on a task-completed list. In fact, it is performed several times, and unlike a checked-off task, it never goes away. This DITY explores what the Evaluation process is, when to use it, and – most importantly – what to do with the evaluation results. Evaluation and the Service Transition Phase. Evaluation is a natural fit with Service Transition. Even ITIL V2 addressed Evaluation – only it did not call it that, preferring the more benign term 'Assessment' within Change Management. Evaluation wraps around the entire Service Transition phase, but it plays an especially critical role at three points within Service Transition: Service Design Evaluation – ITIL recommends that the Service Design phase 'borrow' a bit of Service Transition’s evaluation expertise to ensure the effectiveness of the Service Design Package's (SDP) Acceptance criteria. Release and Deployment – This step evaluates the release and deployment processes prior to release of a service change. In essence, it ensures that these processes will foster an effective deployment. Acceptance – This is the final step in the Change Management process. Previously known as the Post Implementation Review, this step evaluates the service change against the Service Acceptance Criteria (SAC) prior to closing out the Change Request. What Goes into an Evaluation? It is always easy to specify an event that will trigger an evaluation, but by following these rules you can also ensure that it is an effective evaluation: Start early. This is not really a 'what' rule, but a 'when' rule. Build the evaluation into the Service Design or Change as early as possible. Different points within the evaluation require different evaluations. One size does not fit all. Change Management's evaluation to decide whether to proceed with a change is far different than Release and Deployment’s evaluation of whether its processes are appropriate for a particular change. As always, do evaluations in the context of the customer by defining interactions, responsibilities and deliverables.
  • 2. Define the scope of the evaluation. Be setting boundaries, you can more easily see what other processes and services interact with these boundaries and better understand the scope of both intended and unintended consequences of the change. Do a risk profile to understand what risks the business must accept as part of the change. Do a deviation analysis of the differences between the change’s predicted performance and its actual performance. Qualify the environment and IT infrastructure. Are required elements in place? Use the Service Validation and Testing Process to validate that changed application or service can go into production. Recommend the action to take based on the evaluation. Update the Knowledge Management Database with the results and recommendation. That makes it easier to travel this route in the future. Now That You're Here, What Do You Do? As simplistic as it may seem, the Evaluation process can only lead to three possible courses of action, but only the customer can best define how the change's Utility and Warranty levels will lead to the creation of Value to the business. The possible outcomes are: Accept the change; Reject the change; Require a new change with revised predicted performance Summary The objective of the Evaluation process is to build an environment that enables the Customer and IT to make informed decisions about the merit of a service change in the context of its actual vs. projected performance in the IT Service Portfolio. Entire Contents © 2008 itSM Solutions® LLC. All Rights Reserved. ITIL ® and IT Infrastructure Library ® are Registered Trade Marks of the Office of Government Commerce and is used here by itSM Solutions LLC under license from and with the permission of OGC (Trade Mark License No. 0002).