What’s wrong with
CHAT?
Clay Spinuzzi
University of Texas at Austin
What’s wrong with
“What’s Wrong with
CHAT?”?
Clay Spinuzzi
University of Texas at Austin
A quick word about
what I’ve been up to
for the last 20 years
Field studies of workplaces
Field studies of...
Software developers
Traffic safety workers
Telecommunications workers
Office workers
Freelancers
Search engine optimization
specialists
Coworkers (in coworking spaces)
Innovators learning to be
entrepreneurs
Common threads
in these studies
Multiple, often quotidian texts
Composed and assembled
innovatively, sometimes
idiosyncratically
Yielding solutions that balance
stability and flexibility
(centripetal/centrifugal)
Within bounded cases (bounded by a
relatively stable, mutually defined
activity)
Activity theory
Activity theory...
… and Bakhtinian genre theory (Tracing Genres, 2003)
… and actor-network theory (Network, 2008)
… and organizational networks (All Edge, 2015)
AT is overly complicated. We can talk about it if you want...
Choose your own adventure!
“Your conceptual
framework”: Basics of AT?
“Your methodology and
methods”: AT and
methodology?
“The conclusions you are
drawing”: Rhetorically
pivoting AT?
“[How] your work could
speak to or be used by
scholars from a different
discipline”
“Your conceptual
framework”
Stimulus-response (this is how animals live!)
S R
Mediation through physical or psychological tools (ex: egocentric speech)
S r
m
Mediation at the social level (cyclically repeated labor)
(also handy for bounding case studies of work)
Subject (actor/s) object(ive)
(material,
projective)
Mediating artifact(s)
Community
(stakeholders)
outcome
Rules Division of labor
Levels of activity: To explain learning and development in collective activities
Level of activity Characteristics
Activity (Macro level)
Culture, history; objectives and outcomes; usually
unconscious
Action (Meso level) Actions and goals; conscious
Operations (Micro
level) Habits and reactions; unconscious
“Your methodology
and methods”
Field research in case studies
(not ethnographies)
Observations
Interviews
Artifact analysis (including textual analysis)
Others as they might be useful
Cf. Topsight (2013)
“The conclusions
you are drawing”
“I’m using a Soviet theory
to study entrepreneurship.”
— me, 2014
“Generations” of AT, with historical accretions of concepts*
* An ANT-based translation analysis
1GAT
2GAT
3GAT
mediation, internalization, proximal development
activity system, structure of activity
activity networks, contradictions, rules
3GAT was
applied to design
research
And consequently changed in
fundamental ways
From research subjects to
participants
From individual to collective
subjects
From prediction to description (and
deliberation)
From individual activities to
networked activities
1GAT
2GAT
3GAT
4GATRhetorical pivots—as assumptions and
justifications reach their shelf life
The next pivot?
A “rough draft”
Application: Apply AT to
sociocognitive, not just social,
research into writing
Theory: Rebuild activity theory
around dialogism
Phenomenon: Understand the
object(ive) as multiple
Development: Theorize interfering
cycles of development
“[How] your work
could speak to or be
used by scholars
from a different
discipline”
Applications in...
Professional writing
Technology studies
Human dimensions of organizations
Studies of work
HCI/CSCW
wherever AT has spread.

Dartmouth discussion: What's wrong with "What's wrong with CHAT?"?

  • 1.
    What’s wrong with CHAT? ClaySpinuzzi University of Texas at Austin
  • 2.
    What’s wrong with “What’sWrong with CHAT?”? Clay Spinuzzi University of Texas at Austin
  • 3.
    A quick wordabout what I’ve been up to for the last 20 years
  • 4.
    Field studies ofworkplaces
  • 5.
    Field studies of... Softwaredevelopers Traffic safety workers Telecommunications workers Office workers Freelancers Search engine optimization specialists Coworkers (in coworking spaces) Innovators learning to be entrepreneurs
  • 6.
    Common threads in thesestudies Multiple, often quotidian texts Composed and assembled innovatively, sometimes idiosyncratically Yielding solutions that balance stability and flexibility (centripetal/centrifugal) Within bounded cases (bounded by a relatively stable, mutually defined activity)
  • 7.
  • 8.
    Activity theory... … andBakhtinian genre theory (Tracing Genres, 2003) … and actor-network theory (Network, 2008) … and organizational networks (All Edge, 2015) AT is overly complicated. We can talk about it if you want...
  • 9.
    Choose your ownadventure! “Your conceptual framework”: Basics of AT? “Your methodology and methods”: AT and methodology? “The conclusions you are drawing”: Rhetorically pivoting AT? “[How] your work could speak to or be used by scholars from a different discipline”
  • 10.
  • 11.
    Stimulus-response (this ishow animals live!) S R
  • 12.
    Mediation through physicalor psychological tools (ex: egocentric speech) S r m
  • 13.
    Mediation at thesocial level (cyclically repeated labor) (also handy for bounding case studies of work) Subject (actor/s) object(ive) (material, projective) Mediating artifact(s) Community (stakeholders) outcome Rules Division of labor
  • 14.
    Levels of activity:To explain learning and development in collective activities Level of activity Characteristics Activity (Macro level) Culture, history; objectives and outcomes; usually unconscious Action (Meso level) Actions and goals; conscious Operations (Micro level) Habits and reactions; unconscious
  • 15.
  • 16.
    Field research incase studies (not ethnographies) Observations Interviews Artifact analysis (including textual analysis) Others as they might be useful Cf. Topsight (2013)
  • 17.
  • 18.
    “I’m using aSoviet theory to study entrepreneurship.” — me, 2014
  • 19.
    “Generations” of AT,with historical accretions of concepts* * An ANT-based translation analysis 1GAT 2GAT 3GAT mediation, internalization, proximal development activity system, structure of activity activity networks, contradictions, rules
  • 20.
    3GAT was applied todesign research And consequently changed in fundamental ways From research subjects to participants From individual to collective subjects From prediction to description (and deliberation) From individual activities to networked activities
  • 21.
    1GAT 2GAT 3GAT 4GATRhetorical pivots—as assumptionsand justifications reach their shelf life
  • 22.
    The next pivot? A“rough draft” Application: Apply AT to sociocognitive, not just social, research into writing Theory: Rebuild activity theory around dialogism Phenomenon: Understand the object(ive) as multiple Development: Theorize interfering cycles of development
  • 23.
    “[How] your work couldspeak to or be used by scholars from a different discipline”
  • 24.
    Applications in... Professional writing Technologystudies Human dimensions of organizations Studies of work HCI/CSCW wherever AT has spread.