CE3701-ECVE - Prof. AK
CE3701 - Estimation, Costing And Valuation Engineering
Prepared By: Dr. A. Ananthakumar, M.E (STRUCT)., Ph.D.,
COURSE OBJECTIVE:
The students will acquire knowledge in estimation, tender practices, contract
procedures, and valuation and will be able to prepare estimates, call for tenders
and execute works.
Credit 3
August 7, 2026
CE3701-ECVE - Prof. AK
SYLLABUS
 UNIT II RATE ANALYSIS AND COSTING 9
Standard Data – Observed Data – Schedule of rates – Market rates –
Materials and Labour – Standard Data for Man Hours and
Machineries for common civil works – Rate Analysis for all Building
works, canals, and Roads – Cost Estimates (additional practice in
class room using Computer softwares) – (Analysis of rates for the
item of work asked, the data regarding labour, rates of material and
rates of labour to be given in the Examination Question Paper)
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Unit 2 – RATE ANALYSIS AND COSTING
INTRODUCTION
Rate analysis and costing are crucial aspects of civil engineering that
involve the determination of the costs associated with construction projects.
This includes assessing the expenses for materials, labor, and machinery
required for various construction activities. Understanding standard data,
observed data, and market rates helps in accurate estimation and budgeting.
Rate analysis provides detailed insights into the cost of individual components
of building works, canals, and roads. By utilizing standard data for man-hours
and machinery, engineers can perform precise rate analysis, ensuring effective
project planning and cost control.
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Standard Data
It refers to the pre-determined data for construction activities, includes standard rates for
materials, labor, and machinery usage.
Short note:
Standard data serves as a crucial benchmark in construction planning and management. It
encompasses predefined values for labor productivity, material usage, and equipment
performance, derived from extensive observations and industry practices. By using
standard data, engineers and project managers can make accurate predictions about the
resources needed for specific construction activities, ensuring consistency and efficiency in
project execution. This data helps in formulating schedules, preparing cost estimates, and
conducting rate analysis for various building works, canals, and roads. Ultimately, standard
data enhances the reliability of project planning and aids in maintaining budgetary control.
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Observed Data
Data observed from the actual construction sites. It Includes real time information on the
performance, productivity, and costs associated with specific tasks.
Short Note:
Observed data plays a pivotal role in refining construction planning and cost estimation. Unlike
standard data, which is based on established norms, observed data provides real-world insights
by capturing the actual performance of labor, materials, and machinery during project execution.
This data is invaluable for validating and adjusting standard data, leading to more accurate and
realistic rate analyses and cost estimates. By continuously monitoring and recording observed
data, project managers can identify discrepancies, optimize resource allocation, and improve
overall project efficiency. The integration of observed data with standard data ensures a dynamic
and responsive approach to construction management, enhancing the accuracy of project
planning and budgeting.
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Schedule of rates
A schedule of rates is a comprehensive list detailing the costs of various materials, labor, and
construction activities used in civil engineering projects. It serves as a standardized reference
for pricing construction works, aiding in the preparation of cost estimates and contracts.
Purpose:
The primary purpose of a schedule of rates is to provide a standardized and consistent
reference for pricing construction works. It serves as a benchmark for estimating the
costs of materials, labor, and equipment, facilitating accurate budgeting and financial
planning for construction projects. The schedule of rates also aids in the preparation of
cost estimates, tendering, and contract management, ensuring fair and
transparent pricing practices.
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Schedule of rates
Importance:
Standardization
Accuracy in Cost Estimation
TransparencyBudgeting and Financial Planning
Benchmarking and Performance Evaluation
Tendering and Contract Management
Regulatory Compliance
Project Planning and Management
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Schedule of rates
Components:
Mat
erial
Rate
s
Lab
or
Rate
s
Mac
hina
ry
Rate
s
Ove
rhea
ds
and
Profi
t
Mar
gin
Misc
ella
niou
s
Char
ges
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Schedule of rates
Preparation of Schedule of Rates:
Data Collection
Market Analysis
Standardization
Publication
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Schedule of rates
Usage:
Public Sector Projects
Private Sector Projects
Consultants and Engineers
Contracts
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Schedule of rates
Benefits:
Accuracy
Efficiency
Transparency
Benchmarking
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Example of Schedule of Rates
Materials Rates
•Cement : Rs. 350 per bag
•Steel: Rs. 45 per kg
•Bricks : Rs 6000 per 1000nos.
•Sand : Rs. 1000 per cubic meter
•Store ballast: Rs. 1000 per cubic meter
Labor Rates
•Mason : Rs. 600 per day
•Carpenter : Rs. 500 per day
•Plumber :Rs. 700 per day
•Electrician: Rs. 700 per day
•Unskilled labor: Rs. 400 per day
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Example of Schedule of Rates
Machinery Rates
•Excavator : Rs. 1500 per hour
•Concrete mixer: Rs. 2000 per day
•Crane : Rs. 3000 per hour
•Vibator: Rs. 1000 per day
Overheads and Profits •Overhead charges : 15% of the total cost
•Contractors profit : 10% of the total cost
Miscellaneous Charges
•Transportatioon of materials : Rs. 2000 per trip
•Insurance : 1% of the total project cost
•Taxes: 18% GST on total cost
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Market Rates
Market rate refers to the current price at which goods and services can be
bought and sold in an open market. It reflects the prevailing conditions of supply and
demand for the item in question at any given time.
Material:
All physical items required for construction. Such as cement, steel, bricks, sand,
aggregates, etc.,
Labor:
Workforce required for carrying out various construction activites, including skilled
and unskilled labor.
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Standard Data
Man Hours:
The total hours required by workers to complete a specific task. It helps in
estimating labor costs accurately.
Machineries:
Equipment used in construction work, such as excavators, concrete mixers,
cranes, etc., Standard data includes usage rates consumption and maintenance
costs.
Unit 2 – Rate Analysis and Costing
August 7, 2026
CE3701-ECVE - Prof. AK
Unit 2 – Rate Analysis and Costing
THANK YOU…