3 studies to move forward
1 – Accidentology (summer-fall 2011)
2 –Danger and number of crossings (summer
2011)
3 – Technical solutions (2010-2011)
july 2010 August
2011
Study n° 1 :
Accidentology
Rescues’ study on the Gouter
route, between Tete Rousse
refuge and Gouter refuge, from
1990 to 2011.
Made with the help of PGHM,
Rescue team from french
mounted police.
February 2012.
Goûter route
Two kinds of accidents
Objective danger, falling rocks during crossing the couloir
Subjective danger, human related
Glacier of Tête Rousse
Old refuge
Couloir
New refuge
Payot ridge
Accidentologie-Goûter 3
Accidentologie-Goûter 4
Couloir ± 100 m
Ridge ± 550
m
Nid d’aigle to
glacier of Tête
Rousse ± 2 400 m
Nid d’aigle to
refuge du Goûter ±
3 400 m
Ridge : 20 % of the route, 34 % of accidents
Couloir : 3 % of the route, 47% of accidents
3270 m
3132 m
3817 m
Alt. 2372 m
Altitude
Distance
Accidentologie-Goûter 5
Deaths
25%
Injuries
62%
unscathed
13%
74 deaths and
180 injuries
between
1990 and 2011
0
2
4
6
8
10
12
14
16
long term consistency
Décédées
Blessées
Indemnes
Linear (Décédées)
Linear (Blessées)
Accidentologie-Goûter 6
0.000%
0.050%
0.100%
0.150%
0.200%
0.250%
0.300%
Nbd'événementsparnuitéeauGoûter
One death for 2400 nights in Goûter refuge
Increase of injury rate over the last decade
Décès
Blessés
Victimes
Linear (Victimes)
Accidentologie-Goûter 7
Accidentologie-Goûter 8
Couloir
3% of the route
38% of accidents
Ridge
28%
Payot ridge
3%
Before Couloir
5%
other
8%
Unknow
18%
Localisation
of the accidents
1990 to 2011
Couloir
47%
Ridge 34%
Payot
4%
Beforel
Couloir
6% Other
9%
After proportional repartition
France
30%
Espagne
13%
RU
8%
Pologne
7%
Allemagne
6%Italie
5%
Belgique
5%
Tchéquie
3%
Croatie
2%
Pays-Bas
2%
Slovaquie
2%
Danemark
2%
Autriche
1%
Finlande
1%
Hongrie
1%
Slovénie
1%
Suisse
1%
Grèce
1%
Lituanie
1%
Serbie
1%
Suède
1%
Japon
2% Corée
2%
Canada
1%
EUA
1%
Israël
1%
Argentine
1% Injuries
from 27
countries
Accidentologie-Goûter 9
France
15%
Allemagne
12%
Espagne
11%
Tchéquie
11%
Pologne
9%
Italie
8%
Lituanie
5%
Belgique
4%
RU
4%
Autriche
3%
Hongrie
3%
Pays-Bas
3%
Ukraine
3% Danemark
1%
Irlande
1%
Macédoine
1%Slovénie
1% Suisse
1%
Slovaquie
1%
Japon
1%
Deaths from 20 countries
Accidentologie-Goûter 10
Accidentologie-Goûter 11
Study n°2 :
Analysis of falling rocks and numbers of ascents
during summer 2011
Accidentologie-Goûter 12
Study made by engineers in geotechnics
Observation : from 20th june to 18th september 2011
Observations made by Heïdi SEVESTRE, alpinist and doctorate in glaciology
• 11 sessions from 2 to 4 days in duration
• 42 days total of observation
METHODOLOGY
Accidentologie-Goûter 13
Observations :
Weather forecast datas :
 Temperature
 Humidity
 Speed and direction of the wind
 Rain
 Solar radiation
Zone 1 2 3 4 5 6 7
% 30 % 21 % 12 % 21 % 6 % 1 % 9 %
Falling rocks analysis
Departure zone :
Third of the rocks fall from the summit
02/07/11 08/07/11 19/07/11 21/07/1120/07/11
Significant reduction in falling rocks with temperature
below O°C
Significant increase falling rocks with sunny
weather
Air humidity :
30/06/11 01/07/11 28/07/11
12/08/11
29/07/11
11/08/11
CONCLUSIONS
Event : 75 % falling rocks between 10 am and 4 pm.
Most critical period : one event of rock fall every 17 minutes between 11 am and
12 am
No change with or without snow.
Frequency : 17 000 to 17 500 passages during summertime.
One person every 105 second between 12 am and 1pm
Almost 1000 persons are subjected to rock fall during the season.
Most dangerous period : during sunny weather combine with the middle of the
day => during the most important crossings.
.
Accidentologie-Goûter 18
Study n°3 :
Feasibility study and
preliminary draft of
security measures
proposed
Accidentologie-Goûter 19
Accidentologie-Goûter 20
Accidentologie-Goûter 21
Rejected solutions of security
> Limitation of crossings : illusory
> information, cable :
Necessary but not sufficient.
> Purgings and anchorings: difficult, dangerous,
unsuited.
> Protection by nets: landscape impact, heavy and
dangerous maintenance.
> Protection by reinforced concrete work: problem of
solidity and integration in the environment.
> Himalayan bridge:
First idea, but blocks bouncing too high (35 m), fast risk
of destruction, to 25 m, too heavy landscape impact
with 35m
Accidentologie-Goûter 22
One solution to think about : a small tunnel
Accidentologie-Goûter 23
Estimate cost :
821 K€ TTC for a 107 m tunnel
1 084 K€ TTC for a 168 m tunnel
Accidentologie-Goûter 24
Foundation goals
To bring objective elements to nourish the reflexions.
To awake.
To defend the beautiful risk, not the Russian roulette.
To promote the reduction of the objective risk, without denaturing the mountain.
To reflect on the basis of concrete solution, not only of the intentions.