Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunications Service Companies - An Product/Service/Solution Innovation Example Alan McSweeney
As Its Simplest, Innovation Is … A good idea successfully implemented and operated This implies the need for effective processes for generating and identifying good ideas and for bringing them to fruition
Successful Innovation Means … Having a function and associated processes for Product, Solution and Service Lifecycle Management (PSSLM)  Structured approach to the introduction of innovations within product/service/solution offerings from concept to delivery and operation There is no easy way to creating a new product/solution/service designed for large-scale sale and use
Move To Service Management Trends in information technology such as cloud and XaaS are moving companies from product to service and utility suppliers Evolution of telecoms companies mirrors the path many companies want to follow Move from provision of telecoms links to services (voice, data, television, gaming, wireless) Telecoms industry can provide a model for business processes and best practices for other industries looking to move to greater service orientation Move to services can be challenging for companies A structured approach to innovation in important in such a move
Spectrum Of Product/Solution/Service Product Collection Of Products Provided As A Package Solution Limited Services Extended Services Such As Warranty And Support, Warranty Renewal Utility Services Ongoing Services Services Supplied As Part Of Solution Solution As A Service (Cloud, XaaS, Utility Services, etc.)
Migration From Products to Services Product Solution Limited Services Utility Services Ongoing Services Where Many Companies Are Now Where Many Companies Want To Be Need A Structured Process For Innovation To Achieve Services Vision
Spectrum Of Product/Solution/Service Sell Me Products That I Will Use To Solve A Problem   Sell Me A Solution To A Problem Take Responsibility For Operating The Solution To The Problem
Innovation Means … Acceptance of change – innovation implies and requires change Innovation exposes an organisation to change A secondary affect of successful innovation is the willingness of an organisation to change To be good at innovation means to be good at change Innovation means welcoming change and being able to successfully deliver change Innovation means  continuously challenging accepted conventions If you cannot change, you cannot innovate
Changes Implied By And Required For Move To Utility Services Changes The Nature Of The Business Relationship With The Customer Implementing and Sustaining Underlying Organisation Change Changes  The Nature Of Financial Relationship With The Customer Changes To The Organisation Cost Model Changes The Services Provided Changes The Information You Have On The Customer
Changes Implied By And Required For Move To Utility Services Changes The Nature Of The Business Relationship With The Customer:  organisation becomes responsible for service management (availability, continuity, capacity, change, release, risk, security, access, facilities, compliance and many others) Changes The Nature Of Financial Relationship With The Customer:  from initial payments and with smaller recurring component to near continuous payment for service Changes To The Organisation Cost Model:  shift costs to organisation from customer as initial and ongoing investment required to generate recurring service revenue with consequences for cashflow and growth Changes The Services Provided:  from initial supply with some packaged services and ongoing support/warranty to service management-oriented services Changes The Information You Have On The Customer:  you know their pattern of usage of your service (product) and can obtain and exploit such insights
eTOM (enhanced Telecom Operations Map)  Provides a detailed process framework for a telecoms utility companies that can be adopted by non-telecoms organisations moving to solutions as a service operating model Developed by TM Forum -  www.tmforum.org eTOM -  http://www.tmforum.org/BusinessProcessFramework/1647/home.html   Reference framework that classifies and defines the business activities used by a company involved in delivering (online) services – three major process areas: Strategy, Infrastructure and Product  – concerned with planning and lifecycle management Operations  – concerned the core of operational management Enterprise Management  – concerned corporate or business support management Offers the potential for non-telecoms companies to learn from an effective operational framework
eTOM Business Process Framework Overview Strategy, Infrastructure and Product Operations Enterprise Management Customer Strategy, New Ideas, Products And Associated Supporting Infrastructure Moved to Production and Steady-State Operations Fundamental Supporting Business Processes Needed To Run Any Business Operational Processes – Sales, Fulfillment, Assurance, Billing and Support
eTOM Business Process Framework - Detail Strategy, Infrastructure and Product Operations Strategy and Commit Infrastructure Lifecycle Management Product Lifecycle Management  Operations Support and Readiness Fulfilment Assurance Billing and Revenue Management Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Customer Relationship Management Service Management and Operations Resource Management and Operations Supplier/Partner Relationship Management
eTOM Enterprise Business Process Model – Common Structure eSample business process model has a three pillar structure that is common to other business process models Generic structure that forms a template for specific actualisations eTOM provides a detailed template for communications service providers that can be applied to other similar service companies Vision, Strategy, Leadership, Business Management Operational Processes With Cross Functional Linkages Management and Support Processes
Sample Enterprise Business Process Models - 1 Business Controlling Process Processes That Direct and Tune Other Processes Core Processes Processes That Create Value for the Customer Customer Acquisition Product Delivery Order Fulfilment Customer Support Enabling Processes Processes That Supply Resources to Other Processes Channel Management Supply Management Human Resources Information Technology Business Acquisition Business Measurement Process Processes That Monitor and Report the Results of Other Processes Customer’s Process Needs Supplier’s Processes Business Environment Competitors, Governments Regulations and Requirements, Standards, Economics
Sample Enterprise Business Process Models - 2 Supply Chain Customers Innovate Sell Align Plan Make Source Fulfil Build Finance People Information Environment Governance
Sample Enterprise Business Process Models – Common Structure Vision, Strategy, Business Management Operational Processes With Cross Functional Linkages Management and Support Processes Develop and Manage Products and Services Market and Sell Products and Services Deliver Products and Services Manage Customer Service Human Resource Management Information Technology Management Financial Management Facilities Management Legal, Regulatory, Environment, Health and Safety Management External Relationship Management Knowledge, Improvement and Change Management Vision and Strategy Business Planning, Merger, Acquisition Governance and Compliance
Achieving the Potential – New Product/Service/Solution Innovation Industrialisation and Productisation Productisation is a pre-requisite for and an enabler of industrialisation Industrialisation Common Implementation and Operation Approaches Productisation Defined Set of Products/Solutions/ Services and Packaging/Delivery Options
Innovation and eTOM Innovation is about managing the value from new ideas New and enhanced existing products, solutions and services are just one aspect of innovation Product, Solution and Service Lifecycle Management (PSSLM) is a generalised view of completing the innovation process and achieving actualisation of ideas
Migration From Products to Services Product Solution Limited Services Utility Services Ongoing Services Where Many Companies Are Now Where Many Companies Want To Be Use Appropriate Elements Of eTOM Process Framework To Achieve Services Innovation And Transformation
Innovation Extends Creativity To Implementation And Generation Of Value Discern Creativity Develop Clarify Verify Implement Market Sell Innovation Value Using a Structured Approach to Industrialising Innovation Maximises Value } Manage
Where Organisations Look For Innovation Product/solution/service innovation is just one aspect of a wider view of innovation
Where Organisations Can Look For Innovation How Do Customers Feel When They Interact With Your Organisation And Your Products And Services? Customer Experience How Do You Communicate Your Core Products And Services? Brand How Do You Get Core Products And Services to Market? Channel Provision and Delivery How Do You Provide Value To Your Customers Beyond Your Core Products And Services? Service How Do You Connect Or Provide A Common Platform For Your Products And Services? Product System How Do You Design Your Core Products And Services? Product Performance Products and Services How Are Core Processes Supported And Enabled? Enabling Processes How Do You Create and Add Value To Your Products And Services? Core Processes Processes How Do You Work With Other Organisations For Mutual Benefit? Networking and Alliances How Do You Make Money? Business Model Finance
Product, Solution and Service Lifecycle Management (PSSLM) PSSLM is concerned with the functions and processes need to define, plan, design, build, deliver, maintenance, manage revise and retirement of all products, solutions and services in the organisation’s portfolio Enable the organisation strategic and business product/solution/service vision Drive internal and customer-oriented processes to meet market demand and customer expectations
Product, Solution and Service Lifecycle Management (PSSLM)  PSSLM belongs within Strategy, Infrastructure and Product/Solution/Service (SIPSS) function Responsibilities of SIPSS function Develop strategy Commit to the organisation Build and resources infrastructure - supports the delivery products, solutions and services themselves and their associated functional processes Develop and manage products, solutions and services Develop and manage the supply chain
Strategy, Infrastructure and Product/Solution/Service (SIPSS) Function Innovation – development of new products/services/solutions lie in SIPSS function SIPSS divided into  Horizontal functional groups  Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Vertical process views Strategy and Commit Infrastructure Lifecycle Management Product, Solution and Service Lifecycle Management
Strategy, Infrastructure and Product/Solution/Service (SIPSS) - Horizontal Process Functions and Vertical Process Views Strategy, Infrastructure and Product/Solution/Service (SIPSS)  Strategy and Commit Infrastructure Lifecycle Management Product, Solution and Service Lifecycle Management  Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management
Strategy, Infrastructure and Product/Solution/Service (SIPSS) - Horizontal Process Function Details Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Market Strategy and Policy Product and Offer Portfolio Planning Product and Offer Capability Delivery Marketing Capability Delivery Product and Offer Development and Retirement Sales Development Product Marketing Communications and Promotion Service Strategy and Planning Service Capability Delivery Service Development and Retirement Resource Strategy and Planning Resource Capability Delivery Resource Development and Retirement Supply Chain Strategy and Planning Supply Chain Capability Delivery Supply Chain Development and Change Management
SIPSS – Vertical Process Views Strategy and Commit Strategy, Infrastructure and Product/Solution/Service (SIPSS)  Responsible for the generation of strategies and establishment of business commitment in support of the Infrastructure and Product/Solution/Service Lifecycle processes involving all levels of operation from market, customer and products/solutions/services, through the services and the resources on which these depend to the involvement of suppliers and partners in meeting these needs Infrastructure Lifecycle Management Product, Solution and Service Lifecycle Management  Responsible for the definition, planning and implementation of all necessary infrastructures (application, IT and network), as well as all other support infrastructures and business capabilities (operations centers, architectures, etc.) Responsible for the definition, planning, design and implementation of all products/solutions/services in the organisation’s portfolio to required profit margins customer satisfaction and quality commitments, delivering new and retiring existing products/solutions/services to the market
SIPSS - Horizontal Process Functional Groups  Strategy, Infrastructure and Product/Solution/Service (SIPSS)  Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Defines strategies, develops new products/solutions/services, manages existing products/solutions/services including retirement, manages pricing, sales and channels and implements marketing communications and promotion and offering strategies Plans, develops and delivers services to operations domain for product/solution/service creation and design, managing and assessing the performance of existing products/solutions/services and ensuring that capabilities are in place to meet future product/solution/service demand Plans, develops and delivers the resources - physical and non-physical - needed by operations to support products/solutions/services, manages and assesses the performance of existing resources and ensures that capabilities are in place to meet future products/solutions/services needs Focuses on the interactions required by the organisation with suppliers and partners who are involved in maintaining the supply chain network of relationships that a service provider manages to source and deliver products, supports sourcing decisions, suppliers and partners selection
Horizontal Process Functional Structure Four levels of process detail within horizontal structure Level 1 Level 2 Level 3 Level 4
Product, Solution and Service Lifecycle Management – Functional Structure – Levels 1, 2 and 3 Level 1 Level 2 Level 3 Product, Solution and Service Lifecycle Management  Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development and Management Market Strategy and Policy Product and Offer Portfolio Planning Product and Offer Capability Delivery Marketing Capability Delivery Product and Offer Development and Retirement Sales Development Service Strategy and Planning Service Capability Delivery Service Development and Retirement Resource Strategy and Planning Supply Chain Strategy and Planning Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management Product Marketing Communications and Promotion
Product, Solution and Service Lifecycle Management – Functional Structure Functional view of what is needed to productise the results of innovation Not prescriptive of the approach
Marketing and Offer Management – Levels 2, 3 and 4 Level 2 Level 3 Level 4 Marketing and Offer Management Market Strategy and Policy Product and Offer Portfolio Planning Product and Offer Capability Delivery Marketing Capability Delivery Product and Offer Development and Retirement Sales Development Product Marketing Communications and Promotion Gather and Analyse Market Information Establish Market Strategy Establish Market Segments Link Market Segments and Products Gain Commitment to Marketing Strategy Gather and Analyse Product Information Establish Product Portfolio Strategy Produce Product Portfolio Business Plans Gain Commitment to Product Business Plans Define Product Capability Requirements Capture Product Capability Shortfalls Approve Product Business Case Deliver Product Capability Manage Handover to Product Operations Manage Product Capability Delivery Methodology Define Marketing Capability Requirements Gain Marketing Capability Approval Deliver Marketing Infrastructure Manage Handover to Marketing Operations Manage Marketing Capability Delivery Methodology Gather and Analyse New Product Ideas Assess Performance of Existing Products Develop New Product Business Proposal Develop Product Commercialisation Strategy Develop Detailed Product Specifications Manage Product Development Launch New Products Manage Product Exit Monitor Sales and Channel Best Practice Develop Sales and Channel Proposals Develop New Sales Channels and Processes Define Product Marketing Promotion Strategy Develop Product and Campaign Message Select Message and Campaign Channels Develop Promotional Collateral Manage Message and Campaign Delivery Monitor Message and Campaign Effectiveness
Service Development and Management – Levels 2, 3 and 4 Service Development and Management Service Strategy and Planning Service Capability Delivery Service Development and Retirement Gather and Analyse Service Information Manage Service Research Establish Service Strategy and Goals Define Service Support Strategies Produce Service Business Plans Map and Analyse Service Requirements Capture Service Capability Shortfalls Gain Service Capability Investment Approval Design Service Capabilities Gather and Analyse New Service Ideas Assess Performance of Existing Services Develop New Service Business Proposal Develop Detailed Service Specifications Manage Service Development Manage Service Deployment Develop Service Partnership Requirements Gain Enterprise Commitment to Service Strategies# Enable Service Support and Operations Manage Service Capability Delivery Manage Handover to Service Operations Manage Service Exit
Resource Development and Management – Levels 2, 3 and 4 Marketing and Offer Management Resource Strategy and Planning Resource Capability Delivery Resource Development and Retirement Gather and Analyse Resource Information   Manage Resource Research   Establish Resource Strategy and Architecture   Define Resource Support Strategies   Produce Resource Business Plans   Map and Analyse Resource Requirements   Capture Resource Capability Shortfalls   Gain Resource Capability Investment Approval   Design Resource Capabilities   Gather and Analyse New Resource Ideas   Assess Performance of Existing Resources   Develop New Resource Business Proposal   Develop Detailed Resource Specifications   Manage Resource Development   Manage Resource Deployment   Develop Resource Partnership Requirements   Gain Enterprise Commitment to Resource Plans   Enable Resource Support and Operations   Manage Resource Capability Delivery   Manage Handover to Resource Operations   Manage Resource Exit
Supply Chain Development and Management  – Levels 2, 3 and 4 Supply Chain Development and Management   Supply Chain Strategy and Planning   Supply Chain Capability Delivery   Supply Chain Development and Change Management   Gather and Analyse Supply Chain Information   Establish Supply Chain Strategy and Goals   Define Supply Chain Support Strategies   Produce Supply Chain Business Plans   Gain Enterprise Commitment to Supply Chain Plans   Determine the Sourcing Requirements   Determine Potential Suppliers/Partners   Manage the Tender Process   Gain Tender Decision Approval   Manage Supplier/Partner Engagement   Manage Supply Chain Contract Variation   Manage Supplier/Partner Termination   Gain Approval for Commercial Arrangements   Negotiate Commercial Arrangements
Product And Offer Development And Retirement – Levels 3 and 4 Process Details Product And Offer Development And Retirement Gather and Analyse New Product Ideas Research and analyse demographic, customer, technology and marketing information to identify new product and offer potential opportunities, compare current capabilities with the identified opportunities and develop new opportunity concepts Assess Performance of Existing Products Develop New Product Business Proposal Develop Product Commercialisation Strategy Develop Detailed Product Specifications Manage Product Development Launch New Products Manage Product Exit Analyse the performance of existing products to identify inadequacies and required improvements using information from customers and from operational activities  Develop and document business proposals for the identified new product concept, including a business case, identifying the new product requirements,  service components,  development costs and anticipated benefits, risks and the competitive positioning Ensure that product specific pricing, sales channel support and regulatory approvals are identified and agreed and  developed  ensuring that all commercialisation aspects of the product development process associated with selling the product are covered Develop and document the detailed product-related technical, performance and operational specification including required product features, the specific service and resource requirements and selections, the specific performance and operational requirements and support activities Ensure the co-coordinated delivery in line with the approved business case of all required product capabilities for that business case across the organisation Manage the initial introduction of new and enhanced products into the market and handover to operations for ongoing rollout Identify existing products which are unviable and manage the processes to exit the product from the market, identify customers impacted by the exit, develop customer specific or market segment exit or migration strategies, develop infrastructure transition and/or replacement strategies
Sample Cross-Functional Scenario -  Get Approval For The Development Of A New Product/Solution/Service Product/solution/service consists of components that can be reused to further define and build new products/solutions/services New product/solution/service proposal is then submitted for approval  Processes involved in this scenario are: Product and Offer Portfolio Planning Product Marketing Communications and Promotion Product and Offer Development and Retirement Service Strategy and Planning Service Development and Retirement Resource Development and Retirement Product and Offer Capability Delivery Service Capability Delivery  Resource Capability Delivery Outputs from scenario New product/solution/service with its associated services and resources developed, tested and accepted Configuration information including pricing rules and promotions  Steps can be iterated for rapid  product/solution/service concept exploration and examination
Process Interactions – Get Approval For The Development Of A New Product/Solution/Service Product and Offer Capability Delivery Product and Offer Development and Retirement Service Capability Delivery Service Development and Retirement Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management Product and Offer Capability Delivery Product and Offer Development and Retirement Service Capability Delivery Service Development and Retirement Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management 1 2 3 4 5 6 8 7 9 10 11 12 13 14 15
Process Interactions – Get Approval For The Development Of A New Product/Solution/Service Provide Product/Solution/Service Development Plan Provide Product/Solution/Service Development Plan Provide Resource Infrastructure Requirements Provide Product/Solution/Service Deployment Plan Provide Service Infrastructure Requirements Provide Supplier/Partner Capability Requirements Provide Supplier/Partner Infrastructure Requirements Provide Resource Infrastructure Requirements Provide Supplier/Partner Required Capabilities Provide Resource Infrastructure Plan Provide Supplier/Partner Integration Plan Seek Approval For Supplier/Partner Infrastructure and Integration Plan Seek Approval For Resource Infrastructure Plan Seek Approval For Service Infrastructure Plan Seek Approval For Product Infrastructure Plan
Repeat Process Cycle At Greater Levels Of Detail For Refinement and Iterative Delivery And Identification of Appropriate Innovations Product and Offer Capability Delivery Product and Offer Development and Retirement Service Capability Delivery Service Development and Retirement Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management Product and Offer Capability Delivery Product and Offer Development and Retirement Service Capability Delivery Service Development and Retirement Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management
Use The Framework As A Checklist For Product/Solution/Service Development
Summary eTOM (enhanced Telecom Operations Map) business process framework  can provide a workable model for transition to services for non-telecommunications service providers Proven framework for area of services provision Organisations offering cloud and XaaS services moving from products to communications-like utility services eTOM can be extended outside its core telecommunications focus to these organisations
More Information Alan McSweeney [email_address]

Applying eTOM (enhanced Telecom Operations Map) Framework to Non-Telecommunications Service Companies - An Product/Service/Solution Innovation Example

  • 1.
    Applying eTOM (enhancedTelecom Operations Map) Framework to Non-Telecommunications Service Companies - An Product/Service/Solution Innovation Example Alan McSweeney
  • 2.
    As Its Simplest,Innovation Is … A good idea successfully implemented and operated This implies the need for effective processes for generating and identifying good ideas and for bringing them to fruition
  • 3.
    Successful Innovation Means… Having a function and associated processes for Product, Solution and Service Lifecycle Management (PSSLM) Structured approach to the introduction of innovations within product/service/solution offerings from concept to delivery and operation There is no easy way to creating a new product/solution/service designed for large-scale sale and use
  • 4.
    Move To ServiceManagement Trends in information technology such as cloud and XaaS are moving companies from product to service and utility suppliers Evolution of telecoms companies mirrors the path many companies want to follow Move from provision of telecoms links to services (voice, data, television, gaming, wireless) Telecoms industry can provide a model for business processes and best practices for other industries looking to move to greater service orientation Move to services can be challenging for companies A structured approach to innovation in important in such a move
  • 5.
    Spectrum Of Product/Solution/ServiceProduct Collection Of Products Provided As A Package Solution Limited Services Extended Services Such As Warranty And Support, Warranty Renewal Utility Services Ongoing Services Services Supplied As Part Of Solution Solution As A Service (Cloud, XaaS, Utility Services, etc.)
  • 6.
    Migration From Productsto Services Product Solution Limited Services Utility Services Ongoing Services Where Many Companies Are Now Where Many Companies Want To Be Need A Structured Process For Innovation To Achieve Services Vision
  • 7.
    Spectrum Of Product/Solution/ServiceSell Me Products That I Will Use To Solve A Problem Sell Me A Solution To A Problem Take Responsibility For Operating The Solution To The Problem
  • 8.
    Innovation Means …Acceptance of change – innovation implies and requires change Innovation exposes an organisation to change A secondary affect of successful innovation is the willingness of an organisation to change To be good at innovation means to be good at change Innovation means welcoming change and being able to successfully deliver change Innovation means continuously challenging accepted conventions If you cannot change, you cannot innovate
  • 9.
    Changes Implied ByAnd Required For Move To Utility Services Changes The Nature Of The Business Relationship With The Customer Implementing and Sustaining Underlying Organisation Change Changes The Nature Of Financial Relationship With The Customer Changes To The Organisation Cost Model Changes The Services Provided Changes The Information You Have On The Customer
  • 10.
    Changes Implied ByAnd Required For Move To Utility Services Changes The Nature Of The Business Relationship With The Customer: organisation becomes responsible for service management (availability, continuity, capacity, change, release, risk, security, access, facilities, compliance and many others) Changes The Nature Of Financial Relationship With The Customer: from initial payments and with smaller recurring component to near continuous payment for service Changes To The Organisation Cost Model: shift costs to organisation from customer as initial and ongoing investment required to generate recurring service revenue with consequences for cashflow and growth Changes The Services Provided: from initial supply with some packaged services and ongoing support/warranty to service management-oriented services Changes The Information You Have On The Customer: you know their pattern of usage of your service (product) and can obtain and exploit such insights
  • 11.
    eTOM (enhanced TelecomOperations Map) Provides a detailed process framework for a telecoms utility companies that can be adopted by non-telecoms organisations moving to solutions as a service operating model Developed by TM Forum - www.tmforum.org eTOM - http://www.tmforum.org/BusinessProcessFramework/1647/home.html Reference framework that classifies and defines the business activities used by a company involved in delivering (online) services – three major process areas: Strategy, Infrastructure and Product – concerned with planning and lifecycle management Operations – concerned the core of operational management Enterprise Management – concerned corporate or business support management Offers the potential for non-telecoms companies to learn from an effective operational framework
  • 12.
    eTOM Business ProcessFramework Overview Strategy, Infrastructure and Product Operations Enterprise Management Customer Strategy, New Ideas, Products And Associated Supporting Infrastructure Moved to Production and Steady-State Operations Fundamental Supporting Business Processes Needed To Run Any Business Operational Processes – Sales, Fulfillment, Assurance, Billing and Support
  • 13.
    eTOM Business ProcessFramework - Detail Strategy, Infrastructure and Product Operations Strategy and Commit Infrastructure Lifecycle Management Product Lifecycle Management Operations Support and Readiness Fulfilment Assurance Billing and Revenue Management Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Customer Relationship Management Service Management and Operations Resource Management and Operations Supplier/Partner Relationship Management
  • 14.
    eTOM Enterprise BusinessProcess Model – Common Structure eSample business process model has a three pillar structure that is common to other business process models Generic structure that forms a template for specific actualisations eTOM provides a detailed template for communications service providers that can be applied to other similar service companies Vision, Strategy, Leadership, Business Management Operational Processes With Cross Functional Linkages Management and Support Processes
  • 15.
    Sample Enterprise BusinessProcess Models - 1 Business Controlling Process Processes That Direct and Tune Other Processes Core Processes Processes That Create Value for the Customer Customer Acquisition Product Delivery Order Fulfilment Customer Support Enabling Processes Processes That Supply Resources to Other Processes Channel Management Supply Management Human Resources Information Technology Business Acquisition Business Measurement Process Processes That Monitor and Report the Results of Other Processes Customer’s Process Needs Supplier’s Processes Business Environment Competitors, Governments Regulations and Requirements, Standards, Economics
  • 16.
    Sample Enterprise BusinessProcess Models - 2 Supply Chain Customers Innovate Sell Align Plan Make Source Fulfil Build Finance People Information Environment Governance
  • 17.
    Sample Enterprise BusinessProcess Models – Common Structure Vision, Strategy, Business Management Operational Processes With Cross Functional Linkages Management and Support Processes Develop and Manage Products and Services Market and Sell Products and Services Deliver Products and Services Manage Customer Service Human Resource Management Information Technology Management Financial Management Facilities Management Legal, Regulatory, Environment, Health and Safety Management External Relationship Management Knowledge, Improvement and Change Management Vision and Strategy Business Planning, Merger, Acquisition Governance and Compliance
  • 18.
    Achieving the Potential– New Product/Service/Solution Innovation Industrialisation and Productisation Productisation is a pre-requisite for and an enabler of industrialisation Industrialisation Common Implementation and Operation Approaches Productisation Defined Set of Products/Solutions/ Services and Packaging/Delivery Options
  • 19.
    Innovation and eTOMInnovation is about managing the value from new ideas New and enhanced existing products, solutions and services are just one aspect of innovation Product, Solution and Service Lifecycle Management (PSSLM) is a generalised view of completing the innovation process and achieving actualisation of ideas
  • 20.
    Migration From Productsto Services Product Solution Limited Services Utility Services Ongoing Services Where Many Companies Are Now Where Many Companies Want To Be Use Appropriate Elements Of eTOM Process Framework To Achieve Services Innovation And Transformation
  • 21.
    Innovation Extends CreativityTo Implementation And Generation Of Value Discern Creativity Develop Clarify Verify Implement Market Sell Innovation Value Using a Structured Approach to Industrialising Innovation Maximises Value } Manage
  • 22.
    Where Organisations LookFor Innovation Product/solution/service innovation is just one aspect of a wider view of innovation
  • 23.
    Where Organisations CanLook For Innovation How Do Customers Feel When They Interact With Your Organisation And Your Products And Services? Customer Experience How Do You Communicate Your Core Products And Services? Brand How Do You Get Core Products And Services to Market? Channel Provision and Delivery How Do You Provide Value To Your Customers Beyond Your Core Products And Services? Service How Do You Connect Or Provide A Common Platform For Your Products And Services? Product System How Do You Design Your Core Products And Services? Product Performance Products and Services How Are Core Processes Supported And Enabled? Enabling Processes How Do You Create and Add Value To Your Products And Services? Core Processes Processes How Do You Work With Other Organisations For Mutual Benefit? Networking and Alliances How Do You Make Money? Business Model Finance
  • 24.
    Product, Solution andService Lifecycle Management (PSSLM) PSSLM is concerned with the functions and processes need to define, plan, design, build, deliver, maintenance, manage revise and retirement of all products, solutions and services in the organisation’s portfolio Enable the organisation strategic and business product/solution/service vision Drive internal and customer-oriented processes to meet market demand and customer expectations
  • 25.
    Product, Solution andService Lifecycle Management (PSSLM) PSSLM belongs within Strategy, Infrastructure and Product/Solution/Service (SIPSS) function Responsibilities of SIPSS function Develop strategy Commit to the organisation Build and resources infrastructure - supports the delivery products, solutions and services themselves and their associated functional processes Develop and manage products, solutions and services Develop and manage the supply chain
  • 26.
    Strategy, Infrastructure andProduct/Solution/Service (SIPSS) Function Innovation – development of new products/services/solutions lie in SIPSS function SIPSS divided into Horizontal functional groups Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Vertical process views Strategy and Commit Infrastructure Lifecycle Management Product, Solution and Service Lifecycle Management
  • 27.
    Strategy, Infrastructure andProduct/Solution/Service (SIPSS) - Horizontal Process Functions and Vertical Process Views Strategy, Infrastructure and Product/Solution/Service (SIPSS) Strategy and Commit Infrastructure Lifecycle Management Product, Solution and Service Lifecycle Management Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management
  • 28.
    Strategy, Infrastructure andProduct/Solution/Service (SIPSS) - Horizontal Process Function Details Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Market Strategy and Policy Product and Offer Portfolio Planning Product and Offer Capability Delivery Marketing Capability Delivery Product and Offer Development and Retirement Sales Development Product Marketing Communications and Promotion Service Strategy and Planning Service Capability Delivery Service Development and Retirement Resource Strategy and Planning Resource Capability Delivery Resource Development and Retirement Supply Chain Strategy and Planning Supply Chain Capability Delivery Supply Chain Development and Change Management
  • 29.
    SIPSS – VerticalProcess Views Strategy and Commit Strategy, Infrastructure and Product/Solution/Service (SIPSS) Responsible for the generation of strategies and establishment of business commitment in support of the Infrastructure and Product/Solution/Service Lifecycle processes involving all levels of operation from market, customer and products/solutions/services, through the services and the resources on which these depend to the involvement of suppliers and partners in meeting these needs Infrastructure Lifecycle Management Product, Solution and Service Lifecycle Management Responsible for the definition, planning and implementation of all necessary infrastructures (application, IT and network), as well as all other support infrastructures and business capabilities (operations centers, architectures, etc.) Responsible for the definition, planning, design and implementation of all products/solutions/services in the organisation’s portfolio to required profit margins customer satisfaction and quality commitments, delivering new and retiring existing products/solutions/services to the market
  • 30.
    SIPSS - HorizontalProcess Functional Groups Strategy, Infrastructure and Product/Solution/Service (SIPSS) Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Defines strategies, develops new products/solutions/services, manages existing products/solutions/services including retirement, manages pricing, sales and channels and implements marketing communications and promotion and offering strategies Plans, develops and delivers services to operations domain for product/solution/service creation and design, managing and assessing the performance of existing products/solutions/services and ensuring that capabilities are in place to meet future product/solution/service demand Plans, develops and delivers the resources - physical and non-physical - needed by operations to support products/solutions/services, manages and assesses the performance of existing resources and ensures that capabilities are in place to meet future products/solutions/services needs Focuses on the interactions required by the organisation with suppliers and partners who are involved in maintaining the supply chain network of relationships that a service provider manages to source and deliver products, supports sourcing decisions, suppliers and partners selection
  • 31.
    Horizontal Process FunctionalStructure Four levels of process detail within horizontal structure Level 1 Level 2 Level 3 Level 4
  • 32.
    Product, Solution andService Lifecycle Management – Functional Structure – Levels 1, 2 and 3 Level 1 Level 2 Level 3 Product, Solution and Service Lifecycle Management Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development and Management Market Strategy and Policy Product and Offer Portfolio Planning Product and Offer Capability Delivery Marketing Capability Delivery Product and Offer Development and Retirement Sales Development Service Strategy and Planning Service Capability Delivery Service Development and Retirement Resource Strategy and Planning Supply Chain Strategy and Planning Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management Product Marketing Communications and Promotion
  • 33.
    Product, Solution andService Lifecycle Management – Functional Structure Functional view of what is needed to productise the results of innovation Not prescriptive of the approach
  • 34.
    Marketing and OfferManagement – Levels 2, 3 and 4 Level 2 Level 3 Level 4 Marketing and Offer Management Market Strategy and Policy Product and Offer Portfolio Planning Product and Offer Capability Delivery Marketing Capability Delivery Product and Offer Development and Retirement Sales Development Product Marketing Communications and Promotion Gather and Analyse Market Information Establish Market Strategy Establish Market Segments Link Market Segments and Products Gain Commitment to Marketing Strategy Gather and Analyse Product Information Establish Product Portfolio Strategy Produce Product Portfolio Business Plans Gain Commitment to Product Business Plans Define Product Capability Requirements Capture Product Capability Shortfalls Approve Product Business Case Deliver Product Capability Manage Handover to Product Operations Manage Product Capability Delivery Methodology Define Marketing Capability Requirements Gain Marketing Capability Approval Deliver Marketing Infrastructure Manage Handover to Marketing Operations Manage Marketing Capability Delivery Methodology Gather and Analyse New Product Ideas Assess Performance of Existing Products Develop New Product Business Proposal Develop Product Commercialisation Strategy Develop Detailed Product Specifications Manage Product Development Launch New Products Manage Product Exit Monitor Sales and Channel Best Practice Develop Sales and Channel Proposals Develop New Sales Channels and Processes Define Product Marketing Promotion Strategy Develop Product and Campaign Message Select Message and Campaign Channels Develop Promotional Collateral Manage Message and Campaign Delivery Monitor Message and Campaign Effectiveness
  • 35.
    Service Development andManagement – Levels 2, 3 and 4 Service Development and Management Service Strategy and Planning Service Capability Delivery Service Development and Retirement Gather and Analyse Service Information Manage Service Research Establish Service Strategy and Goals Define Service Support Strategies Produce Service Business Plans Map and Analyse Service Requirements Capture Service Capability Shortfalls Gain Service Capability Investment Approval Design Service Capabilities Gather and Analyse New Service Ideas Assess Performance of Existing Services Develop New Service Business Proposal Develop Detailed Service Specifications Manage Service Development Manage Service Deployment Develop Service Partnership Requirements Gain Enterprise Commitment to Service Strategies# Enable Service Support and Operations Manage Service Capability Delivery Manage Handover to Service Operations Manage Service Exit
  • 36.
    Resource Development andManagement – Levels 2, 3 and 4 Marketing and Offer Management Resource Strategy and Planning Resource Capability Delivery Resource Development and Retirement Gather and Analyse Resource Information Manage Resource Research Establish Resource Strategy and Architecture Define Resource Support Strategies Produce Resource Business Plans Map and Analyse Resource Requirements Capture Resource Capability Shortfalls Gain Resource Capability Investment Approval Design Resource Capabilities Gather and Analyse New Resource Ideas Assess Performance of Existing Resources Develop New Resource Business Proposal Develop Detailed Resource Specifications Manage Resource Development Manage Resource Deployment Develop Resource Partnership Requirements Gain Enterprise Commitment to Resource Plans Enable Resource Support and Operations Manage Resource Capability Delivery Manage Handover to Resource Operations Manage Resource Exit
  • 37.
    Supply Chain Developmentand Management – Levels 2, 3 and 4 Supply Chain Development and Management Supply Chain Strategy and Planning Supply Chain Capability Delivery Supply Chain Development and Change Management Gather and Analyse Supply Chain Information Establish Supply Chain Strategy and Goals Define Supply Chain Support Strategies Produce Supply Chain Business Plans Gain Enterprise Commitment to Supply Chain Plans Determine the Sourcing Requirements Determine Potential Suppliers/Partners Manage the Tender Process Gain Tender Decision Approval Manage Supplier/Partner Engagement Manage Supply Chain Contract Variation Manage Supplier/Partner Termination Gain Approval for Commercial Arrangements Negotiate Commercial Arrangements
  • 38.
    Product And OfferDevelopment And Retirement – Levels 3 and 4 Process Details Product And Offer Development And Retirement Gather and Analyse New Product Ideas Research and analyse demographic, customer, technology and marketing information to identify new product and offer potential opportunities, compare current capabilities with the identified opportunities and develop new opportunity concepts Assess Performance of Existing Products Develop New Product Business Proposal Develop Product Commercialisation Strategy Develop Detailed Product Specifications Manage Product Development Launch New Products Manage Product Exit Analyse the performance of existing products to identify inadequacies and required improvements using information from customers and from operational activities Develop and document business proposals for the identified new product concept, including a business case, identifying the new product requirements, service components, development costs and anticipated benefits, risks and the competitive positioning Ensure that product specific pricing, sales channel support and regulatory approvals are identified and agreed and developed ensuring that all commercialisation aspects of the product development process associated with selling the product are covered Develop and document the detailed product-related technical, performance and operational specification including required product features, the specific service and resource requirements and selections, the specific performance and operational requirements and support activities Ensure the co-coordinated delivery in line with the approved business case of all required product capabilities for that business case across the organisation Manage the initial introduction of new and enhanced products into the market and handover to operations for ongoing rollout Identify existing products which are unviable and manage the processes to exit the product from the market, identify customers impacted by the exit, develop customer specific or market segment exit or migration strategies, develop infrastructure transition and/or replacement strategies
  • 39.
    Sample Cross-Functional Scenario- Get Approval For The Development Of A New Product/Solution/Service Product/solution/service consists of components that can be reused to further define and build new products/solutions/services New product/solution/service proposal is then submitted for approval Processes involved in this scenario are: Product and Offer Portfolio Planning Product Marketing Communications and Promotion Product and Offer Development and Retirement Service Strategy and Planning Service Development and Retirement Resource Development and Retirement Product and Offer Capability Delivery Service Capability Delivery Resource Capability Delivery Outputs from scenario New product/solution/service with its associated services and resources developed, tested and accepted Configuration information including pricing rules and promotions Steps can be iterated for rapid product/solution/service concept exploration and examination
  • 40.
    Process Interactions –Get Approval For The Development Of A New Product/Solution/Service Product and Offer Capability Delivery Product and Offer Development and Retirement Service Capability Delivery Service Development and Retirement Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management Product and Offer Capability Delivery Product and Offer Development and Retirement Service Capability Delivery Service Development and Retirement Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management 1 2 3 4 5 6 8 7 9 10 11 12 13 14 15
  • 41.
    Process Interactions –Get Approval For The Development Of A New Product/Solution/Service Provide Product/Solution/Service Development Plan Provide Product/Solution/Service Development Plan Provide Resource Infrastructure Requirements Provide Product/Solution/Service Deployment Plan Provide Service Infrastructure Requirements Provide Supplier/Partner Capability Requirements Provide Supplier/Partner Infrastructure Requirements Provide Resource Infrastructure Requirements Provide Supplier/Partner Required Capabilities Provide Resource Infrastructure Plan Provide Supplier/Partner Integration Plan Seek Approval For Supplier/Partner Infrastructure and Integration Plan Seek Approval For Resource Infrastructure Plan Seek Approval For Service Infrastructure Plan Seek Approval For Product Infrastructure Plan
  • 42.
    Repeat Process CycleAt Greater Levels Of Detail For Refinement and Iterative Delivery And Identification of Appropriate Innovations Product and Offer Capability Delivery Product and Offer Development and Retirement Service Capability Delivery Service Development and Retirement Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management Product and Offer Capability Delivery Product and Offer Development and Retirement Service Capability Delivery Service Development and Retirement Resource Capability Delivery Resource Development and Retirement Supply Chain Capability Delivery Supply Chain Development and Change Management
  • 43.
    Use The FrameworkAs A Checklist For Product/Solution/Service Development
  • 44.
    Summary eTOM (enhancedTelecom Operations Map) business process framework can provide a workable model for transition to services for non-telecommunications service providers Proven framework for area of services provision Organisations offering cloud and XaaS services moving from products to communications-like utility services eTOM can be extended outside its core telecommunications focus to these organisations
  • 45.
    More Information AlanMcSweeney [email_address]