A Successful WebCenter Upgrade: 
What You Need to Know 
Paul Heupel 
Senior WebCenter Consultant 
Fishbowl Solutions
Topics To Be Covered 
+ Fishbowl overview 
+ 11g architecture 
+ New features 
+ Upgrading WebCenter Content 
– Migration process options 
– Components 
– Tips and tricks 
– Project timeline 
– Licensing 
+ Upgrading WebCenter Imaging 
– Migration process and tools 
– Timeline 
+ WebCenter Portal will not be covered. Come see us in 
our booth for info on Portal upgrades! 
2 
www.fishbowlsolutions.com
About Fishbowl Solutions 
Experience 
+ Over 700 projects since founding in 1999 
+ Oracle “Gold” Partner 
+ Oracle “Public Sector Pillar Partner” 
Expertise 
+ Portals and content management 
+ Enterprise information management 
+ Business process automation 
Customer Successes 
+ Across verticals 
Award Winning 
+ Forrester Groundswell Award - Mobile App 
+ Oracle Excellence Award 
+ Enterprise 2.0 Blazer 
+ ECM Architect of the Year 
+ Best Places to Work 
www.fishbowlsolutions.com
Leading Innovations 
WebCenter Mobile WebCenter Portals & Intranets 
SharePoint Integration Google Search Integration 
www.fishbowlsolutions.com
Fishbowl Consulting Services 
+ WebCenter Content 
- Document Mgmt - Records Mgmt 
- Digital Asset Mgmt - Web Content Mgmt 
- Image & Process Mgmt - Document Capture 
- Forms Recognition - Content Consolidation 
+ WebCenter Portal 
- Employee Intranets 
- Vendor or Partner Extranets 
- Customer Portals 
+ BPM (business process management) 
+ ERP Integrations 
+ Upgrades, installations, configuration, performance tuning, 
solution design, development, implementation 
www.fishbowlsolutions.com
WebCenter Content 11g 
Architecture and Features 
www.fishbowlsolutions.com
10g & 11g Architecture Differences 
www.fishbowlsolutions.com 
WebCenter Content 11g 
Content Server running in container 
(WebLogic Server) 
UCM 10g 
Closely tied to web server
WebCenter Content: New Web UI 
www.fishbowlsolutions.com 
+ Simple, fast 
– Immediate response to actions 
– Single page app 
– Easy content-centric views 
+ Compelling 
– Provide the best capabilities in 
the industry 
– Modeled after consumer web 
– Zero training 
+ Architecture & features 
– Detached UI app in front 
of content server services 
– Libraries, filtering, 
scanning, & integrated 
viewer
WebCenter Content – Mobile Apps 
www.fishbowlsolutions.com 
+ Mobile Access 
– Optimized app for 
smartphone and tablet 
– Support iOS and 
Android 
– Search, browse, view, 
download 
– Take important 
documents offline 
+ Benefits 
– Ability for “on the go” 
users to access 
business documents 
– Allows enterprises to 
support emerging 
BYOD culture
WebCenter Content: Desktop Integration Suite 
+ DIS enhanced to 
have same look and 
feel as new web UI 
+ Windows Explorer 
integration 
enhancements 
+ Microsoft Outlook 
integration 
enhancements 
www.fishbowlsolutions.com
Planning for Success: Tips and 
Tricks for Upgrading WebCenter 
Content 
www.fishbowlsolutions.com
Step 1 – Have a Plan! 
- How much content do you have and what is the 
total size? 
- How long can production be down during 
transition? 
- Do you need to maintain audit history? 
- Document History and Workflow History 
- Is it time for new hardware? Or time to move to 
VM? 
- Does your database need to be upgraded? 
- Standard and custom components 
- Consider your storage! 
- File store provider 
www.fishbowlsolutions.com
Content Upgrade Options 
www.fishbowlsolutions.com
Upgrade In Place 
+ Use of the Oracle Upgrade Assistant allows for ‘in 
place’ upgrades 
+ The high level process involves: 
– Shut down current 10gR3 server 
– Install WebLogic Server (or the supported container of 
your choice) 
– Install the WebCenter Content installation files 
– Run the Upgrade Assistant pointing to the existing 
instance of Content Server 
www.fishbowlsolutions.com
Advantages / Disadvantages 
+ Advantages 
– No need to spend time migrating content 
– Items stay in workflow 
– Audit history stays intact 
– Upgrade can be completed in a few hours or less 
+ Disadvantages 
– Production must be down during upgrade 
– Have to keep the same hardware 
– More difficult to roll back if something goes wrong. 
– Can run into unforeseen issues, even if dev and/or 
staging servers are upgraded first. 
www.fishbowlsolutions.com
Upgrade In Place – Decision Criteria 
+ Already on 64-bit OS 
+ 12+ GB of RAM available 
+ Lots of workflow items 
+ Need to maintain workflow history 
+ Very short upgrade schedule 
+ Very large content size 
+ Few customizations, or enough time to test 
upgraded customizations in dev and stage 
www.fishbowlsolutions.com
Migrating to New Instances 
+ Isn’t really an upgrade, but it is very common. 
+ Wholly new instances of Content Server are 
installed and all configuration, status 
information, and content is migrated to the new 
instances. 
+ Configuration Migration Utility (CMU) is used to 
migrate the bulk of the configuration. 
+ Archiver is used to migrate custom 
table data. 
+ The migration of content is typically 
performed with the Archiver applet. 
www.fishbowlsolutions.com
Advantages / Disadvantages 
+ Advantages 
– Can use new hardware 
– Can use new database software/hardware 
– Can fully test new production before go-live 
– Go-live is simply a DNS change 
– Easy to roll back to the old system 
+ Disadvantages 
– Content migration can take a long time 
– No easy way to migrate workflow content 
– Care has to be taken to migrate audit history 
www.fishbowlsolutions.com
Migrating to New Instance – Decision Criteria 
+ Currently on 32-bit OS 
+ Current hardware is old 
+ Need to upgrade database software 
+ Not a lot of workflow content, or plan in place to 
handle workflow items 
+ Not a lot of content, or plenty of time in schedule 
for migration 
+ Lots of customizations 
+ Need short downtime at go-live 
+ Need to be able to roll back quickly 
www.fishbowlsolutions.com
Hybrid Approach - Copy and Upgrade In Place 
+ Schedule a time to shut down production 
+ Copy 10g file system to new hardware 
+ Copy vault and weblayout to new storage 
location 
+ Copy the database 
+ Modify config settings 
– Database connection string 
– Vault and Weblayout directory locations 
– Server ID (IDC_Name) 
+ Start the copied 10g server to verify it starts 
correctly 
+ Run Upgrade Assistant 
www.fishbowlsolutions.com
Advantages / Disadvantages 
+ Advantages 
– Can use new hardware 
– Much faster to copy files over network file shares 
instead of using Archiver. Good for large repositories. 
– Can fully test new production server before go-live. 
– Go-live is just switching a DNS entry. 
– Can maintain workflow items. 
– Easy to roll back in case of issues. 
+ Disadvantages 
– Content must be reconciled from the “snapshot” date 
to the go-live date, including workflow items. 
– Not a fully documented method, requires config 
changes. 
www.fishbowlsolutions.com
Hybrid Approach – Decision Criteria 
+ Currently on 32-bit OS or on old hardware 
+ A lot of content in the system 
+ A lot of workflow content in the system 
+ A lot of customizations 
+ Want to keep same database software 
+ Need short downtime at go-live 
+ Need to be able to roll back quickly 
www.fishbowlsolutions.com
What About Standard 
Components? 
www.fishbowlsolutions.com 25
Standard Component Considerations 
+ WebCenter Content 11g comes with the standard components 
already pre-packaged 
+ After upgrade with UA, all old components will be disabled 
+ Checkboxes in Admin Server page to enable standard 
components 
+ Standard components are upgraded with patches to the 
system, not installed manually 
www.fishbowlsolutions.com
Folders 
+ New folders component called Framework Folders 
+ New functionality in Framework Folders 
– Query folders 
– Enterprise Library folders 
– No more 1000 sub-folders or 1000 pieces of content limits 
+ Folders_g still exists, but the future is Framework 
Folders 
+ Upgrade tool to move from folders_g to Framework 
Folders 
+ New DIS client 
+ WebDAV URL changed 
– Old URL – 
http://showme.fishbowlsolutions.com/cs/idcplg/webdav/ 
– New URL - 
http://showme.fishbowlsolutions.com/_dav/cs/idcplg/webdav/ 
www.fishbowlsolutions.com
Site Studio 
+ Updated version of 
Designer and Contributor 
+ 11g Site Studio almost the 
same as 10gR4 
+ Sites don’t require much, 
if any, changes to upgrade 
+ 10gR3 sites will continue 
to function, but can’t use latest 
features 
+ Site Studio is not Oracle’s strategic WCM offering 
going forward; this has been taken up by 
WebCenter Sites 
www.fishbowlsolutions.com
What About Custom 
Components? 
www.fishbowlsolutions.com 29
Custom Component Considerations 
+ All custom components should be upgraded and 
tested in development before upgrading production 
+ Back-end customizations like custom services will 
most likely work after upgrade 
+ Front-end customizations may need work 
– Menuing 
– Results tables 
– CSS changes 
– Skins / Layouts 
– JavaScript 
+ If using Upgrade Assistant, make sure custom 
workflow components are enabled before starting 11g 
server! 
+ IdcToken 
– Standard include 
www.fishbowlsolutions.com
Additional Considerations 
www.fishbowlsolutions.com 31
Web Server 
+ WebCenter Content is available on port 16200; 
install a web server so users aren’t required to 
enter a port 
– IIS 
– OHS 
– Apache 
+ Web server proxies requests to application 
server; Weblogic Proxy Plugin available from 
Oracle 
+ Make sure to configure SSL in web server 
+ SSL can also be configured between application 
server and web server 
www.fishbowlsolutions.com
Refinery 
+ Deployed as a managed server in WebLogic 
+ Still recommended to install on a separate 
server 
+ Oracle does not recommend upgrading in place. 
Install fresh for 11g 
+ New direct PDF export engine 
+ Still recommend using Office to convert Office 
documents 
www.fishbowlsolutions.com
File Store Provider 
+ File Store Provider defines the location of files 
and how to disperse the files 
+ Existed in 10g; functionality had to be enabled 
+ 11g has dispersion enabled automatically 
– Files are dispersed to limit files in folders 
– Web URL changes for documents 
– Important to note that web links to documents may 
break, particularly for Site Studio 
– Can be changed back to not use dispersion 
– Typically recommend setting up storage rule for any 
docs that should use the old paths 
www.fishbowlsolutions.com
Upgrade Timeline 
www.fishbowlsolutions.com 35
Project Timeline 
+ Depends heavily on the level of customization 
and amount of content 
+ Typical upgrades range from 6 weeks to 3 
months 
+ If migrating to a new server, test the transfer rate 
early! 
+ Allow enough time for user acceptance testing 
and sign-off from the business 
+ Plan time for resolution of some (hopefully) small 
issues post go-live 
www.fishbowlsolutions.com
Planning for Success: Tips and 
Tricks for Upgrading WebCenter 
Imaging 
Paul Heupel 
Senior Software Consultant 
– Team Lead 
Fishbowl Solutions 
www.fishbowlsolutions.com
Changes in Imaging 11g 
+ Java application deployed as a managed server 
in WebLogic 
+ All content stored in WebCenter Content 
+ Web application - no more client installation. 
+ Process workflow separated out to use BPM 
+ Scalability and 
redundancy now 
handled with 
WebLogic clustering 
www.fishbowlsolutions.com
Items to Note About 11g 
+ Two viewers built into the product 
– Basic 
– Advanced 
+ Administrator can set default viewer, user can change it 
in Preferences. 
+ Advanced viewer required to create/modify annotations. 
+ Advanced viewer requires Java on client machine. 
+ Users will get Java prompts if Java is out of date. 
+ Most preference defaults can be set in Enterprise 
Manager. 
+ E-mailing in the system now sends a link instead of an 
attachment. 
www.fishbowlsolutions.com
Migration Considerations 
+ No in-place upgrade - must install 11g from scratch 
+ No tool to migrate applications, security, workflow, or 
searches from 10g to 11g; all settings must be 
configured manually in 11g 
+ Can migrate settings between 11g servers (Dev to 
Stage to Prod) 
+ Oracle supported migration tool for migrating 
content 
+ Migration tool only 
works with latest 
patchset of IBPM 10gR3 
10.1.3.6 (7.7 PR4) 
www.fishbowlsolutions.com
Migration Overview 
+ Patch IBPM 10gR3 system to 10.1.3.6. 
+ Install WebLogic and IPM 11g on new hardware. 
+ Install BPM / SOA 11g on new hardware if using 
workflow. 
+ Configure applications, security, and searches in 
IPM 11g. 
+ Configure workflows in BPM. 
+ Create Input definitions in IPM 11g. 
+ Use Oracle Migration Tool to export content to 11g 
input location. 
+ Cut over to new production system. 
www.fishbowlsolutions.com
Notes on Oracle Migration Tool 
+ Tool can be installed and run from a server 
separate from IBPM. 
+ Migration tool can be optimized. 
– Run multiple migration tool instances at once. 
– Adjust the number of migration threads per instance. 
+ Tool stores migration info in the database so it 
can be stopped and started throughout the 
process. 
+ Failures can be reset and tried again. 
+ Tool will start with latest documents first and 
work its way backwards. It’s possible to go-live 
before migration has finished. 
www.fishbowlsolutions.com
Migration Tool Limitations 
+ Does not export 10g Stamps or Bitmap annotations. 
+ All rich text formatting for Sticky Notes is removed 
during export. 
+ Any annotation that falls outside the bounds of the 
original image is placed at the top left to top right 
corner of the image 
+ Only exports documents and their annotations. 
+ Will recombine multi-page tiff files. Will export other 
compound document types as separate files. 
+ If configured to burn in annotations, tool will export 
all files as tiffs. 
+ Tool can affect the performance of IBPM. 
www.fishbowlsolutions.com
Time to Complete the Migration 
+ Migration speed can vary 
widely based on CPU, 
RAM, network latency, 
IBPM system load, etc. 
+ Expect to realize about 
150 - 200 documents 
migrated per minute with 
a single migration node. 
+ Performance of the tool can be improved by 
running during offline hours. 
www.fishbowlsolutions.com
New Licensing 
www.fishbowlsolutions.com
Oracle License Migration 
+ Stellent licensing model was based on instance 
and based on module. 
+ Oracle licensing model is based on CPU. 
+ May need to go through license migration during 
upgrade. 
+ Licensing varies if using VMWare vs. Oracle VM 
vs physical hardware. 
www.fishbowlsolutions.com
Summary & Questions 
www.fishbowlsolutions.com
Additional Resources 
+ Booth: #2036 Moscone South 
+ Web: www.fishbowlsolutions.com 
+ Email: info@fishbowlsolutions.com 
+ Twitter: @fishbowlE20 
+ Facebook: facebook.com/fishbowlsolutions 
Learn more about WebCenter Content 
Mobile, SharePoint Integration, Google 
Search, Portal Solution Accelerator, and 
www.fishbowlsolutions.com 
more. 
Enter to 
win an 
iPad!
Fishbowl Presentations at OpenWorld 
Wednesday, October 1st 
• Automate Financial Processes for PeopleSoft and Oracle E-Business Suite 
• 12:45 PM to 1:30 PM 
• Moscone West, 3018 
• Oracle WebCenter for Education and Research 
• 2:00 to 2:45 PM 
• Marriott Marquis, Golden Gate C3 
www.fishbowlsolutions.com
Contact Us to Learn More 
web: fishbowlsolutions.com email: info@fishbowlsolutions.com 
phone: +1.952.465.3400 blog: cfour.fishbowlsolutions.com 
twitter: @FishbowlE20 
facebook: facebook.com/fishbowlsolutions 
linkedIn: join our groups 
webcenter content & webcenter portal 
www.fishbowlsolutions.com

A Succesful WebCenter Upgrade: What You Need to Know

  • 1.
    A Successful WebCenterUpgrade: What You Need to Know Paul Heupel Senior WebCenter Consultant Fishbowl Solutions
  • 2.
    Topics To BeCovered + Fishbowl overview + 11g architecture + New features + Upgrading WebCenter Content – Migration process options – Components – Tips and tricks – Project timeline – Licensing + Upgrading WebCenter Imaging – Migration process and tools – Timeline + WebCenter Portal will not be covered. Come see us in our booth for info on Portal upgrades! 2 www.fishbowlsolutions.com
  • 3.
    About Fishbowl Solutions Experience + Over 700 projects since founding in 1999 + Oracle “Gold” Partner + Oracle “Public Sector Pillar Partner” Expertise + Portals and content management + Enterprise information management + Business process automation Customer Successes + Across verticals Award Winning + Forrester Groundswell Award - Mobile App + Oracle Excellence Award + Enterprise 2.0 Blazer + ECM Architect of the Year + Best Places to Work www.fishbowlsolutions.com
  • 4.
    Leading Innovations WebCenterMobile WebCenter Portals & Intranets SharePoint Integration Google Search Integration www.fishbowlsolutions.com
  • 5.
    Fishbowl Consulting Services + WebCenter Content - Document Mgmt - Records Mgmt - Digital Asset Mgmt - Web Content Mgmt - Image & Process Mgmt - Document Capture - Forms Recognition - Content Consolidation + WebCenter Portal - Employee Intranets - Vendor or Partner Extranets - Customer Portals + BPM (business process management) + ERP Integrations + Upgrades, installations, configuration, performance tuning, solution design, development, implementation www.fishbowlsolutions.com
  • 6.
    WebCenter Content 11g Architecture and Features www.fishbowlsolutions.com
  • 7.
    10g & 11gArchitecture Differences www.fishbowlsolutions.com WebCenter Content 11g Content Server running in container (WebLogic Server) UCM 10g Closely tied to web server
  • 8.
    WebCenter Content: NewWeb UI www.fishbowlsolutions.com + Simple, fast – Immediate response to actions – Single page app – Easy content-centric views + Compelling – Provide the best capabilities in the industry – Modeled after consumer web – Zero training + Architecture & features – Detached UI app in front of content server services – Libraries, filtering, scanning, & integrated viewer
  • 9.
    WebCenter Content –Mobile Apps www.fishbowlsolutions.com + Mobile Access – Optimized app for smartphone and tablet – Support iOS and Android – Search, browse, view, download – Take important documents offline + Benefits – Ability for “on the go” users to access business documents – Allows enterprises to support emerging BYOD culture
  • 10.
    WebCenter Content: DesktopIntegration Suite + DIS enhanced to have same look and feel as new web UI + Windows Explorer integration enhancements + Microsoft Outlook integration enhancements www.fishbowlsolutions.com
  • 11.
    Planning for Success:Tips and Tricks for Upgrading WebCenter Content www.fishbowlsolutions.com
  • 12.
    Step 1 –Have a Plan! - How much content do you have and what is the total size? - How long can production be down during transition? - Do you need to maintain audit history? - Document History and Workflow History - Is it time for new hardware? Or time to move to VM? - Does your database need to be upgraded? - Standard and custom components - Consider your storage! - File store provider www.fishbowlsolutions.com
  • 13.
    Content Upgrade Options www.fishbowlsolutions.com
  • 14.
    Upgrade In Place + Use of the Oracle Upgrade Assistant allows for ‘in place’ upgrades + The high level process involves: – Shut down current 10gR3 server – Install WebLogic Server (or the supported container of your choice) – Install the WebCenter Content installation files – Run the Upgrade Assistant pointing to the existing instance of Content Server www.fishbowlsolutions.com
  • 15.
    Advantages / Disadvantages + Advantages – No need to spend time migrating content – Items stay in workflow – Audit history stays intact – Upgrade can be completed in a few hours or less + Disadvantages – Production must be down during upgrade – Have to keep the same hardware – More difficult to roll back if something goes wrong. – Can run into unforeseen issues, even if dev and/or staging servers are upgraded first. www.fishbowlsolutions.com
  • 16.
    Upgrade In Place– Decision Criteria + Already on 64-bit OS + 12+ GB of RAM available + Lots of workflow items + Need to maintain workflow history + Very short upgrade schedule + Very large content size + Few customizations, or enough time to test upgraded customizations in dev and stage www.fishbowlsolutions.com
  • 17.
    Migrating to NewInstances + Isn’t really an upgrade, but it is very common. + Wholly new instances of Content Server are installed and all configuration, status information, and content is migrated to the new instances. + Configuration Migration Utility (CMU) is used to migrate the bulk of the configuration. + Archiver is used to migrate custom table data. + The migration of content is typically performed with the Archiver applet. www.fishbowlsolutions.com
  • 18.
    Advantages / Disadvantages + Advantages – Can use new hardware – Can use new database software/hardware – Can fully test new production before go-live – Go-live is simply a DNS change – Easy to roll back to the old system + Disadvantages – Content migration can take a long time – No easy way to migrate workflow content – Care has to be taken to migrate audit history www.fishbowlsolutions.com
  • 19.
    Migrating to NewInstance – Decision Criteria + Currently on 32-bit OS + Current hardware is old + Need to upgrade database software + Not a lot of workflow content, or plan in place to handle workflow items + Not a lot of content, or plenty of time in schedule for migration + Lots of customizations + Need short downtime at go-live + Need to be able to roll back quickly www.fishbowlsolutions.com
  • 20.
    Hybrid Approach -Copy and Upgrade In Place + Schedule a time to shut down production + Copy 10g file system to new hardware + Copy vault and weblayout to new storage location + Copy the database + Modify config settings – Database connection string – Vault and Weblayout directory locations – Server ID (IDC_Name) + Start the copied 10g server to verify it starts correctly + Run Upgrade Assistant www.fishbowlsolutions.com
  • 21.
    Advantages / Disadvantages + Advantages – Can use new hardware – Much faster to copy files over network file shares instead of using Archiver. Good for large repositories. – Can fully test new production server before go-live. – Go-live is just switching a DNS entry. – Can maintain workflow items. – Easy to roll back in case of issues. + Disadvantages – Content must be reconciled from the “snapshot” date to the go-live date, including workflow items. – Not a fully documented method, requires config changes. www.fishbowlsolutions.com
  • 22.
    Hybrid Approach –Decision Criteria + Currently on 32-bit OS or on old hardware + A lot of content in the system + A lot of workflow content in the system + A lot of customizations + Want to keep same database software + Need short downtime at go-live + Need to be able to roll back quickly www.fishbowlsolutions.com
  • 23.
    What About Standard Components? www.fishbowlsolutions.com 25
  • 24.
    Standard Component Considerations + WebCenter Content 11g comes with the standard components already pre-packaged + After upgrade with UA, all old components will be disabled + Checkboxes in Admin Server page to enable standard components + Standard components are upgraded with patches to the system, not installed manually www.fishbowlsolutions.com
  • 25.
    Folders + Newfolders component called Framework Folders + New functionality in Framework Folders – Query folders – Enterprise Library folders – No more 1000 sub-folders or 1000 pieces of content limits + Folders_g still exists, but the future is Framework Folders + Upgrade tool to move from folders_g to Framework Folders + New DIS client + WebDAV URL changed – Old URL – http://showme.fishbowlsolutions.com/cs/idcplg/webdav/ – New URL - http://showme.fishbowlsolutions.com/_dav/cs/idcplg/webdav/ www.fishbowlsolutions.com
  • 26.
    Site Studio +Updated version of Designer and Contributor + 11g Site Studio almost the same as 10gR4 + Sites don’t require much, if any, changes to upgrade + 10gR3 sites will continue to function, but can’t use latest features + Site Studio is not Oracle’s strategic WCM offering going forward; this has been taken up by WebCenter Sites www.fishbowlsolutions.com
  • 27.
    What About Custom Components? www.fishbowlsolutions.com 29
  • 28.
    Custom Component Considerations + All custom components should be upgraded and tested in development before upgrading production + Back-end customizations like custom services will most likely work after upgrade + Front-end customizations may need work – Menuing – Results tables – CSS changes – Skins / Layouts – JavaScript + If using Upgrade Assistant, make sure custom workflow components are enabled before starting 11g server! + IdcToken – Standard include www.fishbowlsolutions.com
  • 29.
  • 30.
    Web Server +WebCenter Content is available on port 16200; install a web server so users aren’t required to enter a port – IIS – OHS – Apache + Web server proxies requests to application server; Weblogic Proxy Plugin available from Oracle + Make sure to configure SSL in web server + SSL can also be configured between application server and web server www.fishbowlsolutions.com
  • 31.
    Refinery + Deployedas a managed server in WebLogic + Still recommended to install on a separate server + Oracle does not recommend upgrading in place. Install fresh for 11g + New direct PDF export engine + Still recommend using Office to convert Office documents www.fishbowlsolutions.com
  • 32.
    File Store Provider + File Store Provider defines the location of files and how to disperse the files + Existed in 10g; functionality had to be enabled + 11g has dispersion enabled automatically – Files are dispersed to limit files in folders – Web URL changes for documents – Important to note that web links to documents may break, particularly for Site Studio – Can be changed back to not use dispersion – Typically recommend setting up storage rule for any docs that should use the old paths www.fishbowlsolutions.com
  • 33.
  • 34.
    Project Timeline +Depends heavily on the level of customization and amount of content + Typical upgrades range from 6 weeks to 3 months + If migrating to a new server, test the transfer rate early! + Allow enough time for user acceptance testing and sign-off from the business + Plan time for resolution of some (hopefully) small issues post go-live www.fishbowlsolutions.com
  • 35.
    Planning for Success:Tips and Tricks for Upgrading WebCenter Imaging Paul Heupel Senior Software Consultant – Team Lead Fishbowl Solutions www.fishbowlsolutions.com
  • 36.
    Changes in Imaging11g + Java application deployed as a managed server in WebLogic + All content stored in WebCenter Content + Web application - no more client installation. + Process workflow separated out to use BPM + Scalability and redundancy now handled with WebLogic clustering www.fishbowlsolutions.com
  • 37.
    Items to NoteAbout 11g + Two viewers built into the product – Basic – Advanced + Administrator can set default viewer, user can change it in Preferences. + Advanced viewer required to create/modify annotations. + Advanced viewer requires Java on client machine. + Users will get Java prompts if Java is out of date. + Most preference defaults can be set in Enterprise Manager. + E-mailing in the system now sends a link instead of an attachment. www.fishbowlsolutions.com
  • 38.
    Migration Considerations +No in-place upgrade - must install 11g from scratch + No tool to migrate applications, security, workflow, or searches from 10g to 11g; all settings must be configured manually in 11g + Can migrate settings between 11g servers (Dev to Stage to Prod) + Oracle supported migration tool for migrating content + Migration tool only works with latest patchset of IBPM 10gR3 10.1.3.6 (7.7 PR4) www.fishbowlsolutions.com
  • 39.
    Migration Overview +Patch IBPM 10gR3 system to 10.1.3.6. + Install WebLogic and IPM 11g on new hardware. + Install BPM / SOA 11g on new hardware if using workflow. + Configure applications, security, and searches in IPM 11g. + Configure workflows in BPM. + Create Input definitions in IPM 11g. + Use Oracle Migration Tool to export content to 11g input location. + Cut over to new production system. www.fishbowlsolutions.com
  • 40.
    Notes on OracleMigration Tool + Tool can be installed and run from a server separate from IBPM. + Migration tool can be optimized. – Run multiple migration tool instances at once. – Adjust the number of migration threads per instance. + Tool stores migration info in the database so it can be stopped and started throughout the process. + Failures can be reset and tried again. + Tool will start with latest documents first and work its way backwards. It’s possible to go-live before migration has finished. www.fishbowlsolutions.com
  • 41.
    Migration Tool Limitations + Does not export 10g Stamps or Bitmap annotations. + All rich text formatting for Sticky Notes is removed during export. + Any annotation that falls outside the bounds of the original image is placed at the top left to top right corner of the image + Only exports documents and their annotations. + Will recombine multi-page tiff files. Will export other compound document types as separate files. + If configured to burn in annotations, tool will export all files as tiffs. + Tool can affect the performance of IBPM. www.fishbowlsolutions.com
  • 42.
    Time to Completethe Migration + Migration speed can vary widely based on CPU, RAM, network latency, IBPM system load, etc. + Expect to realize about 150 - 200 documents migrated per minute with a single migration node. + Performance of the tool can be improved by running during offline hours. www.fishbowlsolutions.com
  • 43.
  • 44.
    Oracle License Migration + Stellent licensing model was based on instance and based on module. + Oracle licensing model is based on CPU. + May need to go through license migration during upgrade. + Licensing varies if using VMWare vs. Oracle VM vs physical hardware. www.fishbowlsolutions.com
  • 45.
    Summary & Questions www.fishbowlsolutions.com
  • 46.
    Additional Resources +Booth: #2036 Moscone South + Web: www.fishbowlsolutions.com + Email: info@fishbowlsolutions.com + Twitter: @fishbowlE20 + Facebook: facebook.com/fishbowlsolutions Learn more about WebCenter Content Mobile, SharePoint Integration, Google Search, Portal Solution Accelerator, and www.fishbowlsolutions.com more. Enter to win an iPad!
  • 47.
    Fishbowl Presentations atOpenWorld Wednesday, October 1st • Automate Financial Processes for PeopleSoft and Oracle E-Business Suite • 12:45 PM to 1:30 PM • Moscone West, 3018 • Oracle WebCenter for Education and Research • 2:00 to 2:45 PM • Marriott Marquis, Golden Gate C3 www.fishbowlsolutions.com
  • 48.
    Contact Us toLearn More web: fishbowlsolutions.com email: info@fishbowlsolutions.com phone: +1.952.465.3400 blog: cfour.fishbowlsolutions.com twitter: @FishbowlE20 facebook: facebook.com/fishbowlsolutions linkedIn: join our groups webcenter content & webcenter portal www.fishbowlsolutions.com

Editor's Notes

  • #4 1 minutes What do you know about Fishbowl Solutions? Who are the other Oracle partners you have used in the past? Have you used OCS? What has your experiences been with these other partners?
  • #5 Our current software and services initiatives for Oracle WebCenter are shown here. We have recently been focused on developing products that provide Oracle WebCenter customers with new ways to interact and consume content. This includes solutions for Mobile ECM, extending Oracle WebCenter capabilities to iPhone, iPad and Android devices. Additionally, we have packaged software and services offerings to build out next generation intranets and self-service portals. And our SharePoint connector provides users of both SharePoint and Oracle WebCenter Content with that desired SharePoint front-end collaboration and content contribution backed by the power of Oracle. We also have a Google Search connector that enables WebCenter customers to harness the power of Google Search within their WebCenter-based Internets and Intranets.
  • #6 As mentioned, Fishbowl is specialized in WebCenter Content and Portal Solutions, and we are a full-service WebCenter consulting organization for the WebCenter Content components listed here. Our goal is to really help you extend the functionality of each of these components while maximizing your investment. We also have experience helping organizations implement and build out their enterprise portals. We have worked with customers to build employee intranets, vendor or partner extranets, and and customer self-service portals. To support these efforts, we have also expanded our knowledgebase to include such technologies as Oracle Business Process Mangement (Oracle BPM) to help organization build out and utilize powerful workflows to automate content-based business processes like accounts payable, while also helping those customers integrate WebCenter with ERP systems like E-Business Suite and PeopleSoft. Fishbowl has a vast range of consulting services, and we invite you to chat more about these after today’s session or at our booth. I will provide more information about Fishbowl’s activities at the end of today’s session.
  • #7 Let’s now dive in and discuss the major reason we hope you are joining us today. And that reason is to get you and your organization to 11g.
  • #8 And there are a lot of misconceptions about upgrades. One is just waiting until the next version. The misconception here is that you can “skip” versions and just upgrade to the latest and greatest version of the software. However, many applications require consecutive version upgrades. This can lead to longer upgrade times, compatibility issues, and downtime for your business. Even when there is no consecutive version upgrade requirement, the process will take longer, require more testing and validation, and inevitably result in more complications. Another misconception is “I’ll just renew my cancelled maintenance and support plan when I need to upgrade.” This can be a costly mistake. Software companies use those fees to add new features and make any necessary fixes to the software. They are not about to let you renew your maintenance and support agreement without paying back maintenance and support fees and even penalties for the time period you were not on the plan. Another one is “I don’t have any bugs that need to be fixed and there’s nothing special in these updates. It’s not worth the time for our IT department to upgrade.” Read the software update documentation in detail. Items like IRS 1099 forms and fixed asset tax depreciation rules and regulations change annually. In addition, think in terms of how much time the update would save the people using the software, not how much time it will take your IT department to upgrade. You’d be surprised how many perceived “insignificant” changes can lead to improved efficiencies and time saved for the people who use the software. Lastly, another one is “Let’s cut this expense out of the budget. It’s a waste of money.” Besides the aforementioned software updates, maintenance is often bundled with support, allowing you to contact the software company if and when you need to. In addition, these fees often entitle you to exclusive access to training sessions at reduced rates, sponsored events, community forums, user groups, knowledgebases, newsletters and other valuable resources.
  • #9 Let’s now briefly review some of the features of WebCenter 11g.
  • #10 And the first thing is that WebCenter now runs within the Weblogic Server container. This means you will be able to leverage one application service for your enterprise system and services. Application server for enterprise systems and services. Along with Oracle Enterprise Manager, it provides a dashboard for centralized installation, configuration, monitoring, logging, performance metrics and diagnostics. You will also be able to stop and start multiple refineries. Weblogic Server is multi-threaded to handle greater in out loads, which I highlighted earlier. And from WebLogic Server you will be able to handle and manage all data sources and user directories.
  • #11 As far as the new UI is concerned, as you all know it replaced a very outdated web UI. It was built from ground up. Simple, fast, intuitive, consumer-grade. Zero-training needed. Helps with user adoption. Makes it easier to users to be productive, collaborate on content. Enjoy interacting with WebCenter Content. The new UI is optional. If you want, you can continue to use the existing web UI (now renamed to ‘native 11g UI’). It also only supports document management capabilities (but not advanced functionality like workflow, folios, video storyboarding, and records management. That’s why we are still supporting the native 11g UI). There is also no UI for admin functionality. The new UI uses ADF in the front end with Content Server services in the back end. FAQ: As an existing customer, will I have to use this new web UI when we upgrade to the new release? No. It will be optional. If you want, you can continue to use the existing web UI (now renamed to ‘native 11g UI’) Will the new web UI support all business user functionality? Not in the first release. The first release will support document management capabilities (but not advanced functionality like workflow, folios, video storyboarding, and records management. That’s why we are still supporting the native 11g UI). Will the new web UI also be available for the administrative functionality? Not in the first release, but we will eventually update the admin UI once we’re done updating the end-user UI. Will the new web UI be section 508 compliant (meet accessibility requirements)? Yes. The plan is to have the UI be accessible according to Oracle standards, which is above and beyond section 508. Can the new web UI be customized? In this first release, we support the ability change the logo and skin the UI to give it a new look and feel. Further customization (like moving components around on the page) will be supported in upcoming releases. Will the new web UI support any existing customizations I have in the old UI? UI-level customizations in the current IDOC UI will have to be re-implemented in the new web UI. Server-side customizations that extend existing Content Server services or add new services will usually work. Of course, you will have to test them after upgrading to make sure there are no issues. Will end users be able to switch between the current and new interface or will the switch be global for all users? The new web UI is a separate app. You could have your admin restrict access to the app. But otherwise identity access is provided and control is in the users hands. You can allow users to use the new UI for Doc Man functionality and the native UI for extended functionality that is currently not ported to the new web UI. What technology are you using for this new web UI? The new UI uses ADF in the front end with Content Server services in the back end. Will the Idoc script be supported going forward in WebCenter Content with the advent of the ADF UI? We will continue to support Idoc for the near future. However, once we have the ADF UI reach feature parity with the Idoc UI (maybe CY2015), we will put it on the deprecation path and actively encourage customers to switch, but we will give adequate time for customers to switch over. What new search capabilities will be supported? The new UI includes instant search suggestions, faceted search results, advanced searches and saved searches.
  • #12 As far as mobile apps in WebCenter Content, the tasks supported by mobile app will include - the ability to access documents stored on an Oracle WebCenter Content server. - Search for documents on the server and filter the results to find exactly what you need. - View a document on your device. - View information about a document or folder. - Download a copy of a document and store it on your device so you can view it even when offline. - Create a link to a document which can then be shared with others. - Email a copy of a document as an attachment. The Oracle WebCenter Content app uses enterprise-level authentication to access the content server, and you can set a passcode on the setting page to lock the app after a specified time to keep others from accessing your files should you walk away from your phone or tablet. Any files downloaded to your device are encrypted and you cannot access them outside of the Oracle WebCenter Content app.
  • #13 As far as desktop integration, there have been improvements made in: Look and Feel: UI shows top level Libraries similar to web UI/mobile apps. Other changes: Common Dialog Check-In, WEI Content & Document Information pages, Propagate Metadata, Check Out & Open Windows Explorer: Enhancements around Automatic Configuration: The Desktop client software adds a hierarchical folder structure called WebCenter Content Servers to the navigation pane in Windows Explorer. Outlook: Enhancements include Automatic Check-in After Sending, Option To Show/Hide Check-In Distribution List, Link the Content Items for Email and its attachments, Uses related content component
  • #14 Our next speaker is Paul Heupel of Fishbowl Solutions. Paul brings over seven years as a senior consultant, developer, analyst, and pre-sales specialist for Oracle WebCenter. He is particularly interested in identifying innovative ways to solve complex information management problems using technical solutions. Paul has recently expanded Fishbowl’s operations to the west coast, and his heading up Fishbowl’s sales consulting efforts from San Jose, California. Let’s welcome Paul to the stage.
  • #38 So at this point, I would like to welcome Paul Heupel back to the stage to talk about the Tips and Tricks for Upgrading WebCenter Imaging.
  • #49 So we covered a lot of information today, and I want to point you to some additional resources where you can further explore our product and service offerings.