Ahmed Moselhy worked on a project from October 2015 to November 2016 involving the rehabilitation of boiler units 3 and 4 at the Ataka Power Plant in Suez, Egypt. He was engaged by Mont R through Techno Steel Co. to work on site and demonstrated knowledge, dedication, and commitment in his role of providing workforce, materials, tools, rental cars, industrial gases, and safety equipment. The reference letter writer has no hesitation in providing a reference for Ahmed Moselhy and states he performed his job loyally and with the best performance.
Ahmed Moselhy worked on a project from October 2015 to November 2016 involving the rehabilitation of boiler units 3 and 4 at the Ataka Power Plant in Suez, Egypt. He was engaged by Mont R through Techno Steel Co. to work on site and demonstrated knowledge, dedication, and commitment in his role of providing workforce, materials, tools, rental cars, industrial gases, and safety equipment. The reference letter writer has no hesitation in providing a reference for Ahmed Moselhy and states he performed his job loyally and with the best performance.