12 Important
Questions When
Starting BPM
Projects
http://linkedin.com/in/janneohtonen
Starting a Business Process Management
(BPM) project and choosing the right
BPMS system can be a quite tricky thing
to do, especially if your organization
does not have experience on it.
There are several ways to start BPM
projects and there are many methods
available to choose from. Here are
some questions that you can ask when
thinking about starting a BPM project.
http://linkedin.com/in/janneohtonen
1. What process is at hand
and what does it achieve?
You should first get an idea what that process is
about. Asking what it achieves will help you get the
reason why this process exists. It will also help you
understand how critical is this process for
organization’s customers. The process should be
clearly some part of producing successful customer
outcomes. But do not restrict yourself into one process
only, every process in your organization needs to have
some clear function in fulfilling customer needs
(otherwise that process is redundant and needs to be
get rid of). So do process significance analysis to find
most important ones.
http://linkedin.com/in/janneohtonen
2. How does the process
currently work?
To choose what is going on in the process, you should
get some kind of idea how that process works today.
There are many ways to do that, for example
flowchart and CEI Method. If your organization does
not have process maps, this is a good time to pick up
a pen and start drawing. But remember that the point
is not to get that process map, but to understand how
that process works today. Therefore, it is important to
have all relevant parties participating process
mapping. I say it once again: the goal is not to model
the processes just for the sake of modeling them, but
to understand how those processes work.
http://linkedin.com/in/janneohtonen
3. Who are the
participants in the process
and what are their roles?
This will get you the roles and responsibilities of the
people involved with process. This will also help you to
find right performers to various tasks. Right people
should be doing the right work. This is why it is
important to have people from all parts of processes
participating the modeling, because they do tasks
that others do not know of and thus, could not model
them into process map.
http://linkedin.com/in/janneohtonen
4. Which business units
participate in the process?
This will help you understand who are the stakeholders
and how complex it will be to design the process. The
general rule is that if there are more units, the more
complex the process will be and the more effort you
(and client project team) will spend bringing everyone
to a common accepted stage. The more you have
functional silos in your organization, the more
complicated it will be. Process optimization goal is to
get rid of those useless functional silos and design the
organization’s hierarchy around fulfilling the customer
needs.
http://linkedin.com/in/janneohtonen
5. What will be the value
of the process to
customers in future?
Now you start asking questions about what needs to
be built. Find out what business you are in, what are
the customer needs and how to provide that with
minimal customer interaction. Such processes that are
not directly contributing to fulfilling customer needs
are the be get rid of. Also tasks in processes that are
not clearly contributing to that goal, should be either
removed or at least improved.
http://linkedin.com/in/janneohtonen
6. Where does the process
start and end?
This is very important, maybe even the most important
question besides what business are you in. Sometimes
you will realize that employees do not understand
where process starts and where it ends for your
customers. They know just their part of the process.
Make sure that everyone involved in that process
knows both their part and the whole purpose of the
process. This helps people to be more proactive in
process improvement and it will also make the work
more meaningful because they will know how their
contribution is used in the big picture. This will also help
to avoid building those functional silos that do not
work well.
http://linkedin.com/in/janneohtonen
7. What information flows
from one person to
another?
It will help you to model and minimize internal hand-
overs. If you are going to use BPM System, this will help
you determine what the screen and data fields should
be. Sometimes you could be dealing with complex
sets of data. Do ask questions why these information
flows happen and whether they are really useful.
http://linkedin.com/in/janneohtonen
8. Which internal and
external systems will this
process interact with?
Find out what level of integrations are you looking for.
Most of the business processes will be integrated with
some other systems. Sometimes integrations could
lead to complex processes, screens and routing.
Remember that integration is a tool for providing
successful customer outcomes easier. Use technology
to help you, not to slave you. Nowadays there are
many good BPMS system available to do that.
http://linkedin.com/in/janneohtonen
9. What business rules are
associated with the
process?
Ask what business rules are there. Also ask how often
do they change. And most importantly, ask whether
they are still relevant. If you are going to use rule
engine as part of the BPMS, this will help you
determine if rules should be embedded into the
process or put in as a separate component.
http://linkedin.com/in/janneohtonen
10. What are your
reporting requirements?
Your data layouts, your process routing could depend
upon what reporting requirements are there. If user
needs reports business unit wise or region wise, you will
need to incorporate those fields into your work-flow.
When you measure, remember that you get what you
measure. It is crucial that your KPIs are aligned with
successful customer outcomes, otherwise you will not
get the results that you are looking for in business
sense. You can use Business Intelligence tools joined
with BPM tools to get that information.
http://linkedin.com/in/janneohtonen
11. What are your
implementation time lines
and constraints?
Determine what are the time lines and constraints. It is
possible that people will ask you the question “when
can I have this?”. Be sure you keep it open or at least
realistic. Unless your implementation team has
analyzed everything, do not give an estimate.
Determine what constraints organization has and
figure out how the project can still go through.
http://linkedin.com/in/janneohtonen
12. Who will sign off the
requirements and final
production for this
process?
Finding out the right people is important. If one person
is going to sign-off the requirements and the other is
going to do user approval tests, you are in trouble.
Make sure the right stakeholders are in your list and
you spend enough time talking to them over the
course of project implementation. It is very important
to make sure that top management is committed to
process improvement and give their full support for
the project.
http://linkedin.com/in/janneohtonen
THANK YOU FOR
WATCHING THIS
PRESENTATION!
CONNECT WITH ME IN LINKEDIN:
http://linkedin.com/in/janneohtonen

More Related Content

Similar to 12 important questions when starting bpm projects

White Paper - Checklist for Business Process Improvement
White Paper - Checklist for Business Process ImprovementWhite Paper - Checklist for Business Process Improvement
White Paper - Checklist for Business Process Improvement
Craig Maye
 

Similar to 12 important questions when starting bpm projects (20)

BPM - The Promise And Challenges
BPM  - The Promise And ChallengesBPM  - The Promise And Challenges
BPM - The Promise And Challenges
 
7 Steps to Choosing an Enterprise BPM solution
7 Steps to Choosing an Enterprise BPM solution7 Steps to Choosing an Enterprise BPM solution
7 Steps to Choosing an Enterprise BPM solution
 
Think You Don't Need to Diagram Your Business Processes? Think Again.
Think You Don't Need to Diagram Your Business Processes? Think Again.Think You Don't Need to Diagram Your Business Processes? Think Again.
Think You Don't Need to Diagram Your Business Processes? Think Again.
 
Definition of Process Management What It Is and Why You Need It
Definition of Process Management What It Is and Why You Need It Definition of Process Management What It Is and Why You Need It
Definition of Process Management What It Is and Why You Need It
 
Dev biz process management strategy
Dev biz process management strategyDev biz process management strategy
Dev biz process management strategy
 
Using the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO ProjectsUsing the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO Projects
 
Using the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO ProjectsUsing the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO Projects
 
Business Analyst Interview Questions with Answers
Business Analyst Interview Questions with AnswersBusiness Analyst Interview Questions with Answers
Business Analyst Interview Questions with Answers
 
Business process mapping
Business process mappingBusiness process mapping
Business process mapping
 
Is Your Process Management System Killing Your Innovation?
Is Your Process Management System Killing Your Innovation?Is Your Process Management System Killing Your Innovation?
Is Your Process Management System Killing Your Innovation?
 
The Top Process Management Software That Will Make Your 2023 Great
The Top Process Management Software That Will Make Your 2023 GreatThe Top Process Management Software That Will Make Your 2023 Great
The Top Process Management Software That Will Make Your 2023 Great
 
BPM - The Soft Science of Change | Torry Harris Whitepaper
BPM - The Soft Science of Change | Torry Harris WhitepaperBPM - The Soft Science of Change | Torry Harris Whitepaper
BPM - The Soft Science of Change | Torry Harris Whitepaper
 
White Paper - Checklist for Business Process Improvement
White Paper - Checklist for Business Process ImprovementWhite Paper - Checklist for Business Process Improvement
White Paper - Checklist for Business Process Improvement
 
CRMT- A Roadmap for Marketing Automation Success
CRMT- A Roadmap for Marketing Automation Success  CRMT- A Roadmap for Marketing Automation Success
CRMT- A Roadmap for Marketing Automation Success
 
Implementing BPM Enterprise Wide
Implementing BPM Enterprise WideImplementing BPM Enterprise Wide
Implementing BPM Enterprise Wide
 
Business analyst
Business analystBusiness analyst
Business analyst
 
Your Business Process Automation Cheat Sheet
Your Business Process Automation Cheat SheetYour Business Process Automation Cheat Sheet
Your Business Process Automation Cheat Sheet
 
Supplement For Secrets Of Successful Portals Presentation
Supplement For Secrets Of Successful Portals PresentationSupplement For Secrets Of Successful Portals Presentation
Supplement For Secrets Of Successful Portals Presentation
 
Marketing automation implementation
Marketing automation implementationMarketing automation implementation
Marketing automation implementation
 
7 Workflow Solution Questions Workbook
7 Workflow Solution Questions Workbook7 Workflow Solution Questions Workbook
7 Workflow Solution Questions Workbook
 

More from Dr. Janne Ohtonen

More from Dr. Janne Ohtonen (7)

Ae-6_2015
Ae-6_2015Ae-6_2015
Ae-6_2015
 
Operational-Excellence
Operational-ExcellenceOperational-Excellence
Operational-Excellence
 
Employee Engagement and Customer Experiences - How are they related?
Employee Engagement and Customer Experiences - How are they related?Employee Engagement and Customer Experiences - How are they related?
Employee Engagement and Customer Experiences - How are they related?
 
3 essential tips for change management
3 essential tips for change management3 essential tips for change management
3 essential tips for change management
 
The customer of the future is here!
The customer of the future is here!The customer of the future is here!
The customer of the future is here!
 
Customer centric stakeholder management
Customer centric stakeholder managementCustomer centric stakeholder management
Customer centric stakeholder management
 
Creating customer centric culture for your organisation
Creating customer centric culture for your organisationCreating customer centric culture for your organisation
Creating customer centric culture for your organisation
 

Recently uploaded

CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)
Wonjun Hwang
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
panagenda
 

Recently uploaded (20)

Generative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdfGenerative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdf
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
الأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهلهالأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهله
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate Guide
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
Top 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development CompaniesTop 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development Companies
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 

12 important questions when starting bpm projects

  • 1. 12 Important Questions When Starting BPM Projects http://linkedin.com/in/janneohtonen
  • 2. Starting a Business Process Management (BPM) project and choosing the right BPMS system can be a quite tricky thing to do, especially if your organization does not have experience on it. There are several ways to start BPM projects and there are many methods available to choose from. Here are some questions that you can ask when thinking about starting a BPM project. http://linkedin.com/in/janneohtonen
  • 3. 1. What process is at hand and what does it achieve? You should first get an idea what that process is about. Asking what it achieves will help you get the reason why this process exists. It will also help you understand how critical is this process for organization’s customers. The process should be clearly some part of producing successful customer outcomes. But do not restrict yourself into one process only, every process in your organization needs to have some clear function in fulfilling customer needs (otherwise that process is redundant and needs to be get rid of). So do process significance analysis to find most important ones. http://linkedin.com/in/janneohtonen
  • 4. 2. How does the process currently work? To choose what is going on in the process, you should get some kind of idea how that process works today. There are many ways to do that, for example flowchart and CEI Method. If your organization does not have process maps, this is a good time to pick up a pen and start drawing. But remember that the point is not to get that process map, but to understand how that process works today. Therefore, it is important to have all relevant parties participating process mapping. I say it once again: the goal is not to model the processes just for the sake of modeling them, but to understand how those processes work. http://linkedin.com/in/janneohtonen
  • 5. 3. Who are the participants in the process and what are their roles? This will get you the roles and responsibilities of the people involved with process. This will also help you to find right performers to various tasks. Right people should be doing the right work. This is why it is important to have people from all parts of processes participating the modeling, because they do tasks that others do not know of and thus, could not model them into process map. http://linkedin.com/in/janneohtonen
  • 6. 4. Which business units participate in the process? This will help you understand who are the stakeholders and how complex it will be to design the process. The general rule is that if there are more units, the more complex the process will be and the more effort you (and client project team) will spend bringing everyone to a common accepted stage. The more you have functional silos in your organization, the more complicated it will be. Process optimization goal is to get rid of those useless functional silos and design the organization’s hierarchy around fulfilling the customer needs. http://linkedin.com/in/janneohtonen
  • 7. 5. What will be the value of the process to customers in future? Now you start asking questions about what needs to be built. Find out what business you are in, what are the customer needs and how to provide that with minimal customer interaction. Such processes that are not directly contributing to fulfilling customer needs are the be get rid of. Also tasks in processes that are not clearly contributing to that goal, should be either removed or at least improved. http://linkedin.com/in/janneohtonen
  • 8. 6. Where does the process start and end? This is very important, maybe even the most important question besides what business are you in. Sometimes you will realize that employees do not understand where process starts and where it ends for your customers. They know just their part of the process. Make sure that everyone involved in that process knows both their part and the whole purpose of the process. This helps people to be more proactive in process improvement and it will also make the work more meaningful because they will know how their contribution is used in the big picture. This will also help to avoid building those functional silos that do not work well. http://linkedin.com/in/janneohtonen
  • 9. 7. What information flows from one person to another? It will help you to model and minimize internal hand- overs. If you are going to use BPM System, this will help you determine what the screen and data fields should be. Sometimes you could be dealing with complex sets of data. Do ask questions why these information flows happen and whether they are really useful. http://linkedin.com/in/janneohtonen
  • 10. 8. Which internal and external systems will this process interact with? Find out what level of integrations are you looking for. Most of the business processes will be integrated with some other systems. Sometimes integrations could lead to complex processes, screens and routing. Remember that integration is a tool for providing successful customer outcomes easier. Use technology to help you, not to slave you. Nowadays there are many good BPMS system available to do that. http://linkedin.com/in/janneohtonen
  • 11. 9. What business rules are associated with the process? Ask what business rules are there. Also ask how often do they change. And most importantly, ask whether they are still relevant. If you are going to use rule engine as part of the BPMS, this will help you determine if rules should be embedded into the process or put in as a separate component. http://linkedin.com/in/janneohtonen
  • 12. 10. What are your reporting requirements? Your data layouts, your process routing could depend upon what reporting requirements are there. If user needs reports business unit wise or region wise, you will need to incorporate those fields into your work-flow. When you measure, remember that you get what you measure. It is crucial that your KPIs are aligned with successful customer outcomes, otherwise you will not get the results that you are looking for in business sense. You can use Business Intelligence tools joined with BPM tools to get that information. http://linkedin.com/in/janneohtonen
  • 13. 11. What are your implementation time lines and constraints? Determine what are the time lines and constraints. It is possible that people will ask you the question “when can I have this?”. Be sure you keep it open or at least realistic. Unless your implementation team has analyzed everything, do not give an estimate. Determine what constraints organization has and figure out how the project can still go through. http://linkedin.com/in/janneohtonen
  • 14. 12. Who will sign off the requirements and final production for this process? Finding out the right people is important. If one person is going to sign-off the requirements and the other is going to do user approval tests, you are in trouble. Make sure the right stakeholders are in your list and you spend enough time talking to them over the course of project implementation. It is very important to make sure that top management is committed to process improvement and give their full support for the project. http://linkedin.com/in/janneohtonen
  • 15. THANK YOU FOR WATCHING THIS PRESENTATION! CONNECT WITH ME IN LINKEDIN: http://linkedin.com/in/janneohtonen