Cloud Technologies Limited 1
Online Shopping Portal
For
MyCompany.com
Project Code: PRJ-2014/101
Cloud Technologies Limited 2
Project overview
Execution
Planning
Closing
Controlling
Initiating
Cloud Technologies Limited 3
Initiating Planning Executing Controlling Closing
Team Setup
Cloud Technologies Limited 4
Initiating Planning Executing Controlling Closing
Initiating Phase

Defined business case

...
Cloud Technologies Limited 5
PlanningInitiating Executing Controlling Closing
Scope
CostTime
Quality
Scope

Requirement d...
Cloud Technologies Limited 6
Initiating Planning Executing Controlling Closing
Scope
CostTime
Quality
Quality

Configurat...
Cloud Technologies Limited 7
Initiating Planning Executing Controlling Closing
Scope
CostTime
Quality
Time

Defined phase...
Cloud Technologies Limited 8
Initiating Planning Executing Controlling Closing
Scope
CostTime
Quality
PlanningInitiating
F...
Cloud Technologies Limited 9
PlanningInitiating Executing Controlling Closing
https://docs.google.com/file/d/0B1bWsZvmMNDN...
Cloud Technologies Limited 10
Work distribution
ExecutingPlanningInitiating Controlling Closing
Cloud Technologies Limited 11
Collaboration for development
ExecutingPlanningInitiating Controlling Closing
Cloud Technologies Limited 12
Development Progress

Infrastructure setup

Database design and implementation

UI layout...
Cloud Technologies Limited 13

Quality Control
− CM (Configuration Management) audit
At the beginning of Iteration 3
− Se...
Cloud Technologies Limited 14
Milestones (for controlled progress)
− Milestone 1 – Complete design document
− Milestone 2 ...
Cloud Technologies Limited 15
Burndown chart
ControllingPlanningInitiating Executing Closing
Cloud Technologies Limited 16
Closing
− Release management
− Production release
− Post-production training
ClosingPlanning...
Cloud Technologies Limited 17
A line of wisdom...
“Highest first”
Proper initial planning of the project leads to quality ...
Cloud Technologies Limited 18
Thank you!
Q&A
Upcoming SlideShare
Loading in …5
×

Prj 2014-101 progress-presentation-0.2.0

341 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
341
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Prj 2014-101 progress-presentation-0.2.0

  1. 1. Cloud Technologies Limited 1 Online Shopping Portal For MyCompany.com Project Code: PRJ-2014/101
  2. 2. Cloud Technologies Limited 2 Project overview Execution Planning Closing Controlling Initiating
  3. 3. Cloud Technologies Limited 3 Initiating Planning Executing Controlling Closing Team Setup
  4. 4. Cloud Technologies Limited 4 Initiating Planning Executing Controlling Closing Initiating Phase  Defined business case  Feasibility study  Developed project charter  Assigned project management team.
  5. 5. Cloud Technologies Limited 5 PlanningInitiating Executing Controlling Closing Scope CostTime Quality Scope  Requirement doc  Functional spec  Define change request
  6. 6. Cloud Technologies Limited 6 Initiating Planning Executing Controlling Closing Scope CostTime Quality Quality  Configuration Management (PRJ-2014-101_Configuration_Management_0.0.1)  Status review after every iteration  Quality audit (at the beginning of 3rd iteration)  Security audit (At the beginning of 4th iteration) Initiating PlanningPlanningInitiating
  7. 7. Cloud Technologies Limited 7 Initiating Planning Executing Controlling Closing Scope CostTime Quality Time  Defined phases, iterations and milestones.  Prepared a schedule Iteration 1 Iteration 2 Iteration 3 Iteration 4 Project period First phase Second phase PlanningInitiating
  8. 8. Cloud Technologies Limited 8 Initiating Planning Executing Controlling Closing Scope CostTime Quality PlanningInitiating First Iteration: July 7th – July 9th Second Iteration: July 10th – July 12th Third Iteration: July 13th – July 14th Fourth Iteration: July 15th – July 16th
  9. 9. Cloud Technologies Limited 9 PlanningInitiating Executing Controlling Closing https://docs.google.com/file/d/0B1bWsZvmMNDNWGozUXRfMVZKaFE/edit
  10. 10. Cloud Technologies Limited 10 Work distribution ExecutingPlanningInitiating Controlling Closing
  11. 11. Cloud Technologies Limited 11 Collaboration for development ExecutingPlanningInitiating Controlling Closing
  12. 12. Cloud Technologies Limited 12 Development Progress  Infrastructure setup  Database design and implementation  UI layout design  Development status − Registration and Login (for vendor and buyer) − Payment Gateway:Credit card for newly registered user. − Vendor: Add and list products − Buyer: Browse products, view product detail − Shopping cart (Remaining) − Order: Enter billing and shopping address ExecutingPlanningInitiating Controlling Closing
  13. 13. Cloud Technologies Limited 13  Quality Control − CM (Configuration Management) audit At the beginning of Iteration 3 − Security Audit At the beginning of Iteration 4 − Status review at the end of every iteration. ControllingPlanningInitiating Executing Closing
  14. 14. Cloud Technologies Limited 14 Milestones (for controlled progress) − Milestone 1 – Complete design document − Milestone 2 – 35% development completion − Milestone 3 – 85% development completion − Milestone 4 – 100% development completion ControllingPlanningInitiating Executing Closing
  15. 15. Cloud Technologies Limited 15 Burndown chart ControllingPlanningInitiating Executing Closing
  16. 16. Cloud Technologies Limited 16 Closing − Release management − Production release − Post-production training ClosingPlanningInitiating Executing Controlling
  17. 17. Cloud Technologies Limited 17 A line of wisdom... “Highest first” Proper initial planning of the project leads to quality product and overall success of the project.
  18. 18. Cloud Technologies Limited 18 Thank you! Q&A

×