TOTAL QUALITY
MANAGEMENTI T S A P P L I C A T I O N S A N D F A I L U R E S
Quality Management v/s Total Quality Management
Quality Management is just to manage the quality of finished product or
service i.e, the end result.
TQM is managing quality throughout the whole process of production
including management and other departments.
Total = Large no. of people involved in
Quality = The product meets @ exceeds the standards
Management = Related to the level of management hierarchy
2
Quality From the eye of TQM
• Quality is everything that an organisation
does, in the eyes of its customers
• That encourage them to regard the
organisation as one of the best in its
particular field of operation.
3
ELEMENTS OF TQM
4
BENEFITS
TANGIBLE GAINS INTANGIBLE GAINS
 Better product quality
 Productivity improvement
 Reduced quality cost
 Increased market
 Increased profitability
 Reduced employee grievances
 Effective team work
 Improvement in human relations and
work area morale
 Customer satisfaction
 Better company image
 Enhanced problem solving capacity
5
APPLICATIONS
OF TQM
CASE 1
• ABC Bank is one of the biggest bank in Asia. Establish around 85 years back.
• Facing Problem: Increase in customer complains results in reduced profit margins &
significant drop in customers.
• As a result a group composed of People from all levels and no status titles were assigned
to manage customer services to focus on trouble shooting, customer service improvement
and improving management and staff relation.
• The workshop were arranged for the group focusing on superseded goal to put the
“Customer First” as a philosophy. The workshop program emphasized on creative problem
solving approach to permit innovation and challenging the existing cultural norms.
• During the workshop the cultural, work environment and attitude towards the customer in
the banking section were discussed openly, results in developing a sense of trust and
commitment among participants.
7
• The workshop were arranged for the group focusing on superseded goal to put the
“Customer First” as a philosophy.
• The workshop program emphasized on creative problem solving approach to permit
innovation and challenging the existing cultural norms.
• During the workshop the cultural, work environment and attitude towards the customer in
the banking section were discussed openly, results in developing a sense of trust and
commitment among participants. Through these workshop network of committed people
were established across the branches.
• Thus, By stepping outside the system and focusing on motivation and reward, the
organization bought about a necessary cultural change to keep the satisfaction of
the customer as a primary goal of all the employees.
8
CASE 2
• Photo frame is a company engaged in producing photographic and projection
equipment.
• The company was the first to gain the ISO registration among all the competitors and
had good record of profitability.
• To retain the competitive edge and continue to succeed in International market, the
company decided to make use of external resources to facilitate total quality
improvement effect.
• Selection of consultants was based of factors such as
Over all philosophy and approach to TQM
Suitability to company requirements
Practical experience in implementing TQM
Evidence of consultant actually practicing TQM
9
• The consultant, along with senior managers, developed the mission and policy
statements.In doing this, consideration was given to the factors which contributed to the
company’s success and the future goals.
• Ideas were collected through BRAINSTROMING
• This process resulted in better interaction between the managers in building up trust and
bridging the communication gap.
• The TQM process developed a form working teams to:
Achieve continuous improvement
Supply products and services to meet customer expectations
Develop the potential of people to maximum
• The next task undertaken was the training of people to develop excellence.
• The core areas were selected, Primarily focusing on team building activity, total quality
concept, quality delivery process and total quality maintenance process.
10
• Sufficient time was allocated for training so as to initiate creative participation in TQM
efforts.
• The work groups were formed to execute special projects.
• At the end of 3 and half months it was observed that the participants changed their
opinion and attitude towards work and had a positive approach.
• Through the exercise of execution of project it was found that functional
boundaries were successfully bridged and multi disciplinary quality improvement
teams were set. The company thus achieved the target objectives by recognizing
the strength of the people.
11
FAILURES
OF TQM
13
14
.
15
.
16
.
17
• Strong debate in the late 70’s about
safety of nuclear power
• Worst nuclear disaster in U.S.
history – March 1979
• Proper controls not in place
• Human error attributed to lack of
proper training
• Only new nuclear power stations
built since were those already
under construction
CASE1 - MILEISLAND
18
• Only months after completion, dam
collapsed - June 1976
• 6 miles of Teton River canyon
• were flooded
• Improper materials used
• Maintenance was done during
spring when likely reservoir would
fill to capacity
CASE 2- TETONDAM
19
• Apple was on verge of losing dominance in device
market
• Difficult to make calls with iPhone 4
• Dropped calls
• Widespread dissatisfaction with early adopter
loyal customers
• Denial/minimization of problem byApple
• Independent tests identified issue
•“Voluntary” recall was conducted to correct the problem.
CASE3- IPHONE4
20
THANK YOU
21

More Related Content

What's hot (20)

Kano Model
Kano ModelKano Model
Kano Model
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function Deployment
 
Six Sigma Case Study
Six Sigma Case StudySix Sigma Case Study
Six Sigma Case Study
 
Organizing For Total Quality Management
Organizing For Total Quality ManagementOrganizing For Total Quality Management
Organizing For Total Quality Management
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TQM - DEMING CONTRIBUTION
TQM - DEMING CONTRIBUTIONTQM - DEMING CONTRIBUTION
TQM - DEMING CONTRIBUTION
 
Tqm ch 07
Tqm ch 07Tqm ch 07
Tqm ch 07
 
Tqm ch 03
Tqm ch 03Tqm ch 03
Tqm ch 03
 
The DMAIC process
The DMAIC processThe DMAIC process
The DMAIC process
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Mba ii pmom_unit-1.1 introduction to production & operation management a - copy
Mba ii pmom_unit-1.1 introduction to production & operation management a - copyMba ii pmom_unit-1.1 introduction to production & operation management a - copy
Mba ii pmom_unit-1.1 introduction to production & operation management a - copy
 
What Is Dfss
What Is DfssWhat Is Dfss
What Is Dfss
 
Quality (Q), Cost (C), Delivery (D)---Q-C-D
Quality (Q), Cost (C), Delivery (D)---Q-C-DQuality (Q), Cost (C), Delivery (D)---Q-C-D
Quality (Q), Cost (C), Delivery (D)---Q-C-D
 
WCM (World Class Manufacturing)
WCM (World Class Manufacturing)WCM (World Class Manufacturing)
WCM (World Class Manufacturing)
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Quality principles and concepts
Quality principles and conceptsQuality principles and concepts
Quality principles and concepts
 
Value Stream Mapping (VSM)
Value Stream Mapping (VSM)Value Stream Mapping (VSM)
Value Stream Mapping (VSM)
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Quality awards
Quality awardsQuality awards
Quality awards
 
scheduling
schedulingscheduling
scheduling
 

Similar to Total Quality Management: Applications and Failures

Similar to Total Quality Management: Applications and Failures (20)

Tqm
TqmTqm
Tqm
 
TQM- Unit 1-Lecture 1.pptx
TQM- Unit 1-Lecture 1.pptxTQM- Unit 1-Lecture 1.pptx
TQM- Unit 1-Lecture 1.pptx
 
TQM
TQMTQM
TQM
 
total quality management
total quality managementtotal quality management
total quality management
 
TQM and Survey Data Feedback Process
TQM and Survey Data Feedback ProcessTQM and Survey Data Feedback Process
TQM and Survey Data Feedback Process
 
Tqm
TqmTqm
Tqm
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Total Quality Management
Total Quality Management Total Quality Management
Total Quality Management
 
total quality management
total quality management total quality management
total quality management
 
Total Quality & Organizational Change
Total Quality & Organizational ChangeTotal Quality & Organizational Change
Total Quality & Organizational Change
 
Concepts of tqm
Concepts of tqmConcepts of tqm
Concepts of tqm
 
Mgt15ppt
Mgt15pptMgt15ppt
Mgt15ppt
 
TQM-notess (1).pptx
TQM-notess (1).pptxTQM-notess (1).pptx
TQM-notess (1).pptx
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality Management
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality Management
 
ResumeHoJY 290316
ResumeHoJY 290316ResumeHoJY 290316
ResumeHoJY 290316
 
Quality management in hospitality industry
Quality management in hospitality industryQuality management in hospitality industry
Quality management in hospitality industry
 
Quality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singhQuality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singh
 
Innovator of tqm.pptx
Innovator of tqm.pptxInnovator of tqm.pptx
Innovator of tqm.pptx
 

More from SIBENDU SURAJEET JENA

Study on quality control & quality management systems
Study on quality control & quality management systemsStudy on quality control & quality management systems
Study on quality control & quality management systemsSIBENDU SURAJEET JENA
 
Quality assurance vs quality control
Quality assurance vs quality controlQuality assurance vs quality control
Quality assurance vs quality controlSIBENDU SURAJEET JENA
 
Project quality assurance management
Project quality assurance managementProject quality assurance management
Project quality assurance managementSIBENDU SURAJEET JENA
 
Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...SIBENDU SURAJEET JENA
 
Construction practices and quality control
Construction practices and quality controlConstruction practices and quality control
Construction practices and quality controlSIBENDU SURAJEET JENA
 

More from SIBENDU SURAJEET JENA (11)

Study on quality control & quality management systems
Study on quality control & quality management systemsStudy on quality control & quality management systems
Study on quality control & quality management systems
 
Statistical quality control
Statistical  quality  controlStatistical  quality  control
Statistical quality control
 
Six sigma method of quality control
Six sigma method of quality controlSix sigma method of quality control
Six sigma method of quality control
 
Quality assurance vs quality control
Quality assurance vs quality controlQuality assurance vs quality control
Quality assurance vs quality control
 
Quality standards as per iso
Quality  standards  as  per  isoQuality  standards  as  per  iso
Quality standards as per iso
 
Project quality assurance management
Project quality assurance managementProject quality assurance management
Project quality assurance management
 
Methods for quality management
Methods for quality managementMethods for quality management
Methods for quality management
 
Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...
 
Construction practices and quality control
Construction practices and quality controlConstruction practices and quality control
Construction practices and quality control
 
Bim its applications
Bim   its applicationsBim   its applications
Bim its applications
 
Acceptance sampling
Acceptance samplingAcceptance sampling
Acceptance sampling
 

Recently uploaded

System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Malware Detection By Machine Learning Presentation.pptx
Malware Detection By Machine Learning  Presentation.pptxMalware Detection By Machine Learning  Presentation.pptx
Malware Detection By Machine Learning Presentation.pptxalishapatidar2021
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMchpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMNanaAgyeman13
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 

Recently uploaded (20)

System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Malware Detection By Machine Learning Presentation.pptx
Malware Detection By Machine Learning  Presentation.pptxMalware Detection By Machine Learning  Presentation.pptx
Malware Detection By Machine Learning Presentation.pptx
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMchpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 

Total Quality Management: Applications and Failures

  • 1. TOTAL QUALITY MANAGEMENTI T S A P P L I C A T I O N S A N D F A I L U R E S
  • 2. Quality Management v/s Total Quality Management Quality Management is just to manage the quality of finished product or service i.e, the end result. TQM is managing quality throughout the whole process of production including management and other departments. Total = Large no. of people involved in Quality = The product meets @ exceeds the standards Management = Related to the level of management hierarchy 2
  • 3. Quality From the eye of TQM • Quality is everything that an organisation does, in the eyes of its customers • That encourage them to regard the organisation as one of the best in its particular field of operation. 3
  • 5. BENEFITS TANGIBLE GAINS INTANGIBLE GAINS  Better product quality  Productivity improvement  Reduced quality cost  Increased market  Increased profitability  Reduced employee grievances  Effective team work  Improvement in human relations and work area morale  Customer satisfaction  Better company image  Enhanced problem solving capacity 5
  • 7. CASE 1 • ABC Bank is one of the biggest bank in Asia. Establish around 85 years back. • Facing Problem: Increase in customer complains results in reduced profit margins & significant drop in customers. • As a result a group composed of People from all levels and no status titles were assigned to manage customer services to focus on trouble shooting, customer service improvement and improving management and staff relation. • The workshop were arranged for the group focusing on superseded goal to put the “Customer First” as a philosophy. The workshop program emphasized on creative problem solving approach to permit innovation and challenging the existing cultural norms. • During the workshop the cultural, work environment and attitude towards the customer in the banking section were discussed openly, results in developing a sense of trust and commitment among participants. 7
  • 8. • The workshop were arranged for the group focusing on superseded goal to put the “Customer First” as a philosophy. • The workshop program emphasized on creative problem solving approach to permit innovation and challenging the existing cultural norms. • During the workshop the cultural, work environment and attitude towards the customer in the banking section were discussed openly, results in developing a sense of trust and commitment among participants. Through these workshop network of committed people were established across the branches. • Thus, By stepping outside the system and focusing on motivation and reward, the organization bought about a necessary cultural change to keep the satisfaction of the customer as a primary goal of all the employees. 8
  • 9. CASE 2 • Photo frame is a company engaged in producing photographic and projection equipment. • The company was the first to gain the ISO registration among all the competitors and had good record of profitability. • To retain the competitive edge and continue to succeed in International market, the company decided to make use of external resources to facilitate total quality improvement effect. • Selection of consultants was based of factors such as Over all philosophy and approach to TQM Suitability to company requirements Practical experience in implementing TQM Evidence of consultant actually practicing TQM 9
  • 10. • The consultant, along with senior managers, developed the mission and policy statements.In doing this, consideration was given to the factors which contributed to the company’s success and the future goals. • Ideas were collected through BRAINSTROMING • This process resulted in better interaction between the managers in building up trust and bridging the communication gap. • The TQM process developed a form working teams to: Achieve continuous improvement Supply products and services to meet customer expectations Develop the potential of people to maximum • The next task undertaken was the training of people to develop excellence. • The core areas were selected, Primarily focusing on team building activity, total quality concept, quality delivery process and total quality maintenance process. 10
  • 11. • Sufficient time was allocated for training so as to initiate creative participation in TQM efforts. • The work groups were formed to execute special projects. • At the end of 3 and half months it was observed that the participants changed their opinion and attitude towards work and had a positive approach. • Through the exercise of execution of project it was found that functional boundaries were successfully bridged and multi disciplinary quality improvement teams were set. The company thus achieved the target objectives by recognizing the strength of the people. 11
  • 13. 13
  • 14. 14
  • 15. . 15
  • 16. . 16
  • 17. . 17
  • 18. • Strong debate in the late 70’s about safety of nuclear power • Worst nuclear disaster in U.S. history – March 1979 • Proper controls not in place • Human error attributed to lack of proper training • Only new nuclear power stations built since were those already under construction CASE1 - MILEISLAND 18
  • 19. • Only months after completion, dam collapsed - June 1976 • 6 miles of Teton River canyon • were flooded • Improper materials used • Maintenance was done during spring when likely reservoir would fill to capacity CASE 2- TETONDAM 19
  • 20. • Apple was on verge of losing dominance in device market • Difficult to make calls with iPhone 4 • Dropped calls • Widespread dissatisfaction with early adopter loyal customers • Denial/minimization of problem byApple • Independent tests identified issue •“Voluntary” recall was conducted to correct the problem. CASE3- IPHONE4 20