Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
SHARON
KRISANOVSKI
CUBE HOUSE PROJECT
01 maximiZing interior small spaces
project chaLlenge
the scope was to be able to
fit a coMfortable liv...
1
c) Sezione che mostra l’armadio, l’interno
del bagno e la retrostante zona letto.
d) Sezione che mostra la zona cottura,...
CUBE HOUSE PROJECT
01 maximizing interior small spaces
18
a) Sezione che mostra la zona studio, la
sovrastante zona letto ...
AN INTELLECTUAL SPACE IN TRIESTE
02
BOOK CAFE INTERIORS
project chalLenge
GIVEN A BUILDING, AS A TEAM WE
HAD TO DESIGN A S...
BOOK CAFE INTERIORS
02 AN INTELLECTUAL SPACE IN TRIESTE
a
b d
98
b
c
c
e
b d
e
research & model
the last room on the top
f...
a
100
b
MODELLO
AN INTELLECTUAL SPACE IN TRIESTE
02
BOOK CAFE INTERIORS
the book
a building that unfolds a
story and a new...
philadelphia project
03 research & mood board
f
a
a
94
a
b
b
c
03
philadelphia project
f
i
a
a
a
b
b
95
i
MODELLI
elevations & model
a) Prospetti.
b) Sezione in dettaglio...
perth children’s hospital
04 with cox architects and baIley woodland
PROFESSIONAL PORTFOLIO
SHARON KRISANOVSKI 2012-201
pr...
perth children’s hospital
04offices and healthcare
offices presentation extract
for user group review
perth children’s hospital
04 offices and healthcare
colourpalette
perth children’s hospital
04offices and healthcare
interior snapshot
revit
in design
DRAWING No.
REVISION:
SCALE AT A3:
DRAWING TITLE
DRAWN:
CHECKED:
DATE:
FIRST ISSUE:
CLIENT:
PROJECT:
IMPORTANT NOTE:
A ful...
05acrd - retail & hospitality
lenard’s chiCken shop
FFL
0
BULKHEAD
4000
CEILING
3000
NEW BULKHEAD
2400
1.27
1.04
2.02
1.20...
05 acrd - retail & hospitality
lenard’s chiCken shop
P1
P1
P1
D2D2
D2
D2 D2
D1
D1
D1
D1
D1
D1
D1
D2D2
NOMINATED CEILING HE...
SCALE @
REVISION
DRAWING
CHECKED:
DRAWN:
FIRST ISSUE:
DATE:
PROJECT:
CLIENT:
IMPORTANT NOTE:
A full site measure is to be ...
06
seed clothing shop
acrd - retail
2
A-200
2
A-300
3
A-300
1
A-301
2
A-301
1
A-300
7576
7757
6.17 m²
B.O.H.
47.51 m²
STOR...
18
07STUDENT HOUSING - VENICE
FRANCIS KERE WORKSHOP
project CHALLENGE
ARCHICAD
FITTING A MODERN DESIGN INTO THE VENETIAN
H...
07 STUDENT HOUSING - VENICE
FRANCIS KERE WORKSHOP
120
a
122
a
MODELLI
c
123
o del edificio.
li.
c
d
c
d
CONCEPT & MODELS
F...
fe
2
c) Pianta piano terra.
d) Pianta Primo piano.
e) Pianta secondo piano.
f) Pianta tipo.
b
c
d
07STUDENT HOUSING - VENI...
puma energy canopy
08 with acrd - retail
project chalLenge
Designing a concept for a
growing energy company.
graphic desig...
puma energy canopy
08with acrd - retail
Rebranding & Canopy Concept
for client presentation
puma energy canopy
08 with acrd - retail
Detail elements
Concept development for sig-
nage, podium with storage and
a Serv...
Apartment renovation
09with acrd
project chalLenge
Renovating an apartment
situated in brighton (vic)
PROGRAMS
Revit
Lumion
apartment renovation
09 with acrd
DDDDESKKKKKKKK
CCCCCCCCCCCUUUUUPPPPPPBBBOOOOOOAAAAAAAARRRRRRDDDDDDDD
CCCCCCEEEENNNNNNTTT...
Apartment renovation
09with acrd
bathroom renders
research & documentation
THANK YOU
Upcoming SlideShare
Loading in …5
×

Portfolio

309 views

Published on

Student and professional samples

Published in: Design
  • Be the first to comment

  • Be the first to like this

Portfolio

  1. 1. SHARON KRISANOVSKI
  2. 2. CUBE HOUSE PROJECT 01 maximiZing interior small spaces project chaLlenge the scope was to be able to fit a coMfortable living space in a 3 sqm cube. TecHnique hand drawing ink and watercolour a) Prospetti laterali. b) copertura verde. c) pianta pianto terra. b c
  3. 3. 1 c) Sezione che mostra l’armadio, l’interno del bagno e la retrostante zona letto. d) Sezione che mostra la zona cottura, e loscorrimento dell’armadio. c d CUBE HOUSE PROJECT 01maximizing interior small spaces 6 a) Progetto casa 3x3 all’interno del giardino delle volpi b) Prospetto del fronte della casa 3x3. b VIEWS hand drawing ink and watercolour 19 c) Sezione che mostra l’armadio, l’interno del bagno e la retrostante zona letto. d) Sezione che mostra la zona cottura, e loscorrimento dell’armadio. c d
  4. 4. CUBE HOUSE PROJECT 01 maximizing interior small spaces 18 a) Sezione che mostra la zona studio, la sovrastante zona letto e la zona cottura. b) Sezione che mostra l’entrata del bagno, la zona studio e la sovrastante zona letto. aa sections hand drawing ink and watercolour 20 a) Schizzi di progetto che raffigurano l’interno della casa 3x3m . b) raffigurazione di come funzionano i vari servizi del bagno incastrati nella parete. sectionsa 18 a) Sezione che mostra la zona studio, la sovrastante zona letto e la zona cottura. b) Sezione che mostra l’entrata del bagno, la zona studio e la sovrastante zona letto. a
  5. 5. AN INTELLECTUAL SPACE IN TRIESTE 02 BOOK CAFE INTERIORS project chalLenge GIVEN A BUILDING, AS A TEAM WE HAD TO DESIGN A SPACE CHANGING THE EXISTING MINIMALLY. PROGRAMS IN DESIGN ARCHICAD 97 orica che rdanti la ella luce per poter quì e ho maniera are uno ometrica del 10%. o deciso e a falda state: la sarebbe nato. Ho tuale; un vigare in rieste, in dificio si stello di nevo che moderno, gli artisti luogo è arsi in un mina ogni avanti ad odere del bro, una percorso o ad un r godere ere con o bar. Si si viene he dirige ttivo che so i suoi funzioni i si trova da sulla ma della mpre più lettura è terrazza. o spazio zzare un percorso n piccolo ffitto che un luogo orità. Gli orso. La o evoca tante di a pagina facendo a b c d 97 2 Il corso era costituito da una parte teorica che ha trattato svariati argomenti riguardanti la luce e lo spazio interno. L’uso della luce naturale è un aspetto fondamentale per poter progettare in maniera sostenibile, e quì e ho avuto modo di approfondire in maniera interessante l’argomento. L’esercitazione consisteva nel pensare uno spazio interno per una forma geometrica prestabilita, con eventuali modifiche del 10%. Si doveva scegliere tra 4 possibilità. Ho deciso per una pianta rettangolare e sezione a falda inclinata. Le scelte successive sono state: la tipologia di edificio, il luogo in cui si sarebbe trovato e a chi sarebbe stato destinato. Ho deciso di progettare un Caffè intellettuale; un bar dove poter leggere, rilassarsi, navigare in rete e meditare. L’ho collocato a Trieste, in collina, disposto in modo che dall’edificio si potesse vedere il mare ed il castello di Miramare. Ho scelto Trieste perchè ritenevo che fosse adatta ad uno spazio seppur moderno, simile ai bar dove si incontravano gli artisti intellettuali dell’inizio del XX secolo. Il luogo è destinato a chiunque volesse adentrarsi in un mondo parallelo dove la mente domina ogni cosa, per discutere piacevolmente davanti ad una tazza di tè, per informarsi, per godere del magnifico panorama, leggere un libro, una rivista o guardare un film. Il bar è un percorso che fà la mente. Si passa dall’esterno ad un ambiente filtro, protetto, dove poter godere dell’aria aperta e poter discorrere con tranquillità, disponendo del servizio bar. Si passa poi veramente all’interno e si viene catapultati in un imbuto prospettico che dirige verso la scala (uno strumento percettivo che permette alla luce di filtrare attraverso i suoi gradini). Questo spazio più protetto ha funzioni simili a quelle esterne. Salita la scala ci si trova davanti ad una grande finestra che da sulla costa, un luogo dove poter sostare prima della sala lettura. comnciamo ad entrare sempre più nell’intimità del nostro essere. La sala lettura è una stanza silenziosa e luminosa con terrazza. Spostando una tenda, rialzato, cè uno spazio più buio ed intimo, dove poter apprezzare un bel film. Poi vi è l’ultimo passo del percorso mentale, luogo per la meditazione, un piccolo spazio chiuso con un apertura sul soffitto che permette la vista della volta celeste, un luogo dove ci si perde nella propria interiorità. Gli spazi sono l’esito di questo percorso. La disposizione delle pareti a libro evoca l’immagine dell’oggetto più importante di questo luogo. Ogni spazio è come una pagina di un libro e racconta una storia pur facendo parte della stessa narrazione. a b c d c d PER CHI?
  6. 6. BOOK CAFE INTERIORS 02 AN INTELLECTUAL SPACE IN TRIESTE a b d 98 b c c e b d e research & model the last room on the top floor is a spiritual space inspired by james turrell
  7. 7. a 100 b MODELLO AN INTELLECTUAL SPACE IN TRIESTE 02 BOOK CAFE INTERIORS the book a building that unfolds a story and a new expeRIence in each space
  8. 8. philadelphia project 03 research & mood board f
  9. 9. a a 94 a b b c 03 philadelphia project f i a a a b b 95 i MODELLI elevations & model a) Prospetti. b) Sezione in dettaglio. c) Render del progetto. d) Copertura. b e modular houses a fusion of zen and nordic touch
  10. 10. perth children’s hospital 04 with cox architects and baIley woodland PROFESSIONAL PORTFOLIO SHARON KRISANOVSKI 2012-201 project chalLenge a LARGE anD complex project where comMunication between teams was the real challenge. PROGRAMS IN DESIGN revit
  11. 11. perth children’s hospital 04offices and healthcare offices presentation extract for user group review
  12. 12. perth children’s hospital 04 offices and healthcare colourpalette
  13. 13. perth children’s hospital 04offices and healthcare interior snapshot revit in design
  14. 14. DRAWING No. REVISION: SCALE AT A3: DRAWING TITLE DRAWN: CHECKED: DATE: FIRST ISSUE: CLIENT: PROJECT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencementon site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or inpart without the permission of ACRD Pty. Ltd. Use figure ddimensions in reference to scale ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 7/21/2016 2:50:24 PM INTERNAL FOH PERSPECTIVES WILLOWS SHOPPING TOWN LENARD'S CHICKEN SK DC A405 25/09/2015 PRE DRAWING No. REVISION: SCALE AT A3: DRAWING TITLE DRAWN: CHECKED: DATE: FIRST ISSUE: CLIENT: PROJECT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencementon site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or inpart without the permission of ACRD Pty. Ltd. Use figure ddimensions in reference to scale ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 7/21/2016 2:49:43 PM SHOPFRONT PERSPECTIVE WILLOWS SHOPPING TOWN LENARD'S CHICKEN SK DC A202 25/09/2015 PRE SHOPFRONT PERSPECTIVE 1 05 acrd - retail & hospitality lenard’s chiCken shop project chalLenge retail & Hospitality tecHnical equipment requirements programs revit
  15. 15. 05acrd - retail & hospitality lenard’s chiCken shop FFL 0 BULKHEAD 4000 CEILING 3000 NEW BULKHEAD 2400 1.27 1.04 2.02 1.20 1.23+1.24 1.25+1.26 1.23+1.24 2.03 2.40 2.09 2.13 2.12 T1 GBGB TRESPA FEATURE SHOPFRON T PORTAL (A1). REFER TO J106 FOR DETAILS TRESPA FEATURE SHOPFRON T PORTAL (A1) CONTINUED ON OUTER BULKHEAD COLD DISPLAY CABINET SHOPFRONT FEAUTURE LOW WALL (131mm W) REFER TO J001 FOR DETAILS. 50mm ALUMINIUM KICKER IN P1 FINISH POSTER FRAMES. REFER TO GRAPHICS SCHEDULE ILLUMINA TED SHOPFRO NT SIGN. REFER TO J002 VINYL GRAPHIC FULL HEIGHT TO WALL. BAT TRIM (MCA-8-3- BK) FOR TILES TO GRAPHIC TRANSITION INTERNAL PLASTERBOARD BULKHEAD WITH VINYL GRAPHIC TO FRONT FACE 150mm VINYL COVING 2.25 625 1562 600 STEEL DOUBLE SWING DOOR TO BOH, WITH SAFETY WINDOW, DIGITAL LOCK + 150mm STEEL KICKER VINYL GRAPHICS (G5) TBC BY CLIENT 1.28 1.50 SCALE @ A3: REVISION: DRAWING NO: CHECKED: DRAWN: FIRST ISSUE: DATE: PROJECT: CLIENT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencement on site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or in part without the permission of ACRD Pty. Ltd. Use figured dimensions in reference to scale. DRAWING TITLE: ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. PRELIM 14/04/2016 14/04/2016 DC DDR 13 HERVEY RANGE ROAD, THURINGOWA CENTRAL, QLD 4817 7/21/2016 2:49:45 PM 1 : 25 A403 LENARD'S CHICKEN WILLOWS SHOPPING TOWN INTERNAL FOH SECTION 1 : 25 Section 2 1 WIRELESS BELL TO BE PLUGGED IN TO ONE STANDARD GPO IN BOH. BUTTON FOR FOH TO RUN ON A BUTTON CELL BATTERY HOT AND PASTRY DISPLAY TO BE HARD WIRED BY SITE ELECTRICIAN. 7KW SINGLE PHASE 29AMP 240V 50HZ OR 3 PHASE 415V 50HZ NEUTRAL AND EARTH L1-8.1AMP L2-9.3AMP L3-9.3AMP COMMS. CABINET WITH 2x DOUBLE GPO'S. NOTE REQUIREMENTS FOR COMMS. CABINET DESCRIBED ON BOTTOM LEFT OF PAGE. DESK POWER AND DATA POS POWER AND DATA 300 300 700 15 700 1300 ON COLD DISPLAY 700 700 700 700 700 700 700 700 15 700700 300 300 15 1200 1200 300 700 20 700 10 100010001000100010001000 OVEN DATA CONNECTED TO COMMS BOX EDB POSITIONED NO LOWER THAN 1300 FFL 700 20 300 1300 ON COLD DISPLAY 300 POS POWER AND DATA 700 700 700 700 700 700 700 SHOPFITTER TO CHANGE EQUIPMENT PLUGS TO FLAT END PLUGS AS REQUIRED ON SITE. SHOPFITTER TO CHANGE EQUIPMENT PLUGS TO FLAT END PLUGS AS REQUIRED ON SITE. TYPICAL 1O AMP DOUBLE GPO INSTALLED AT NOMINATED HEIGHT POWER & DATA SCHEDULE 3 PHASE POWER POINT INSTALLED AT NOMINATED HEIGHT LOCATION OF CAT 6 WIRING DATA POINT (INSTALLED AT NOMINATED HEIGHT) INDICATIVE LOCATION OF EDB 4.5KG DRY CHEMICAL-FREE EXTINGUISHER LOCATED BETWEEN 2-20 METRES FROM MAIN SWITCHBOARD INDICATIVE LOCATION OF COMMUNICATIONS CABINET HEIGHT HEIGHT 10 HEIGHT TYPICAL 15 AMP DOUBLE GPO INSTALLED AT NOMINATED HEIGHT HEIGHT 15 TYPICAL 2O AMP DOUBLE GPO INSTALLED AT NOMINATED HEIGHT HEIGHT 20 DRA REV SCA DRAWING TITLE DRAWN: CHECKED: DATE: FIRST ISSUE: CLIENT: PROJECT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencementon site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or inpart without the permission of ACRD Pty. Ltd. Use figure ddimensions in reference to scale ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 7/21/2016 2:49:10 PM POWER & DATA PLAN WILLOWS SHOPPING TOWN LENARD'S CHICKEN SK DC 25/09/2015 1 : 50 A105 POWER & DATA PLAN 1 All GPO’s that are to accommodate ‘IT’ equipment must be on a dedicated circuit. These GPO's must be clearly labeled with the circuit number from the main switch board. All data cabling must be installed to a standard Category 6 classification or better. Each outlet to be installed with a Krone 45 shuttered flush mounted socket with the key at the bottom of the jack and the conductors at the top to prevent dust and moisture contaminating the conductors. Each outlet will be labelled with a unique identifier corresponding with Krone Patch Panel located at the back of house. Data cabling to be terminated in a ‘Communications Cabinet’ located in back of house, location to be confirmed on site with Client. Cabinet to be located not more than 1800mm from floor. Data cabling to be terminated in this cabinet on a Krone Patch Panel (Minimum 12 ports). Each termination to be clearly labelled with unique identifier corresponding to socket mounted in front counter. Phone line to be terminated on the same Krone Patch Panel (on the far right socket of possible) and clearly marked with the actual phone number. 2 x Double GPOs (10AMP) plugs to be located inside cabinet next to Krone Patch Panel. 1 x Double GPO (10AMP) to be located at desk height inside office cabinet (if present). 2 x Cat6 Data points to located at desk height inside office cabinet (if present). A report must be provided certifying the data cables are all performing at the required standard. This report, for each cable, must include cable length, Attenuation, Return Loss, NEXT (Near End Crosstalk), FEXT (Far End Crosstalk), PSNEXT (Power Sum Crosstalk), and AXT (ALien Crosstalk). Plug on equipment is part of shopfitters pricing. POWER TO SCALES INSTALLED ON COLD CABINET CABLE TRAY power-data plan & Section construction documentation extract
  16. 16. 05 acrd - retail & hospitality lenard’s chiCken shop P1 P1 P1 D2D2 D2 D2 D2 D1 D1 D1 D1 D1 D1 D1 D2D2 NOMINATED CEILING HEIGHT FROM FINISHED FLOOR LEVEL SELECTED CEILING FINISH. REFER TO FINISHES SCHEDULE. REFLECTED CEILING PLAN LEGEND RECESSED EMERGENCY LIGHT, CLASS C0/C90: D12.5 FIRE SPRINKLER CEILING ACCESS PANEL TO BE FLUSHED WITH ALLEN KEY LOCKS. ALL FIXINGS AND FITTINGS TO BE CONCEALED EM-1 EXIT EXIT LIGHT, 24M, SURFACE MOUNTED/SUSPENDED CLASS CO/C90:E1.6 XXX CH XX AIR CONDITIONING VENT. DIFFUSERS TO MATCH CEILING COLOUR LIGHTING SCHEDULE MODEL 4.02 EW-RSL-SA35SD4k 'MILL' 4.03 'KIT MINI' WITH SQUARE PLATE 4.01 WAREHOUSE PENDANT LIGHTS SYMBOL QTYWATTS SUB TOTAL TOTAL WATTS WATTS PER SQM DESCRIPTION ADJUSTABLE WALL WASHER RECCESSED DOWNLIGHT RED 420DIA LAMP SHADE 40W LED 14.2W LED 11W COMPACT FLURO 7 7 3 240 85.2 33 FOH LIGHTING BOH LIGHTING COOLROOM 358.2 X X EW-RSL-SA35SD4k 'MILL' 'KIT MINI' WITH SQUARE PLATE WAREHOUSE PENDANT LIGHTS LIGHT FITTING IMAGES D1 D2 P1 IN RED COLOR EXISTING LIGHTS TO REMAIN EXISTING LIGHTS starters and tubes replaced with triphospher Daylight tubes starters and tubes replaced with triphospher Daylight tubes NEW BUILD PLASTERBOARD CEILING UNDER BULKHEAD IN P2 FINISH PORTAL CEILING IN A1 TRESPA METEON FINISH. 3000 MALL BULKHEAD AND CEILING BY LESSOR T5 T5 T5 T5 T5 T5 INSULATED PANEL 75mm THK FOR COOLROOM WALLS AND CEILING EXIT T5 2400 3000 3000 3960 EM-1 EXIT 109119992190903630 5005007517351735 2630909901200 1300 3700 2750 1000 8750 907907907997109510951000996 EM-1 ACCESS PANEL TBC ON SITE 54654510001000600600 1148 1048 90 854 854 854 854 1837 1213 1042 1042 1042 1042 1042 1250 625 1094 1094 1094 1094 1094 1094 1094 1094 4375 4375 455455 AC AC 2239 1450 1450 669 669 1713 DRAWING No. REVISION: SCALE AT A3: DRAWING TITLE DRAWN: CHECKED: DATE: FIRST ISSUE: CLIENT: PROJECT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencementon site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or inpart without the permission of ACRD Pty. Ltd. Use figure ddimensions in reference to scale ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 1 : 50 7/21/2016 2:49:11 PM REFLECTED CEILING PLAN WILLOWS SHOPPING TOWN LENARD'S CHICKEN SK DC A106 25/09/2015 PRE NOTE: - ENSURE CONCEALED FIXINGS FOR SUSPENDED SIGNAGE 1 : 50 A106 REFLECTED CEILING PLAN 1 LOW 131mm WALL. REFER TO DRAWING J001 FOR DETAILS STEEL PLINTHS FOR DISPLAY CABINETS. SUPPLIED BY MANUFACTURER NEW STEEL DOUBLE SWING DOOR, INSTAL NEW DIGITAL LOCK. (REFER TO SOW FOR DOOR SPECS) NEW STEEL STUD WALL WITH D/S FULL HEIGHT PLASTER BOARD AND NOMINATED FINISH STEEL PLIN THS FO R DIS PLAY CABIN ETS. SUPPLIE D BY M ANUFACTURER STEEL PLINTHS FOR DISPLAY CABINETS. SUPPLIED BY MANUFACTURER FEATURE PORTAL REFER TO SEPARATE DRAWING FOR DETAILS INSULATED PANEL NOM.75mm THK FOR COOL ROOM WALLS AND CEILING. COOL ROOM SWING DOOR 43 m² FOH 150mmH CONCRETE PLINTHS UNDER POS COUNTER 150mmH CONCRETE PLINTHS UNDER POS COUNTER INSTALL OFFICE CABINET BEFORE FLOOR COVING FEATURE PORTAL REFER TO SEPARATE DRAWING FOR DETAILS LOW 131mm WALL. REFER TO DRAWING J001 FOR DETAILS C O L. C O L. GB T1 GB GB GB T1 T1 T1 24 m² BOH 3 10 m² COOL ROOM 2 100075347075903196963131 347044361094 120824219023652915 36309023652576339 9000 2196 90 4874 940 650 5700 75 2900 75 8750 100 555 400 1560 40 100 802 495 1460 2000 6500 2250 LEASE LINE NEW WINDOW (2000W x 400H) EXISTING SOLID TENANCY WALL. LINED WITH PLASTER BOARD. FINISH BY LESSEE. NEW FULL HEIGHT TIMBER STUD WALLS LINED WITH PLASTERBOARD ON BOTH SIDES. REFER TO ELEVATIONS AND FINISHES SCHEDULE FOR WALL FINISH DETAILS. NEW TIMBER STUD LOW HEIGHT WALL LINED WITH 6mm THK BORAL FIBRE CEMENT SHEET. CAPPED IN (A1) TO MATCH SHOPFRONT NIB WALL. NEW 131MM TIMBER STUD LOW HEIGHT ( )NIB WALL 627MM . REFER TO J001 FOR FURTHER DETAILS. SETOUT LEGEND DRAWING No. REVISION: SCALE AT A3: DRAWING TITLE DRAWN: CHECKED: DATE: FIRST ISSUE: CLIENT: PROJECT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencementon site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or inpart without the permission of ACRD Pty. Ltd. Use figure ddimensions in reference to scale ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 1 : 50 7/21/2016 2:49:06 PM SETOUT PLAN WILLOWS SHOPPING TOWN LENARD'S CHICKEN SK DC A103 25/09/2015 PRE 1 : 50 A103 SET OUT PLAN 1 - ALL WALL DIMENSION SHOWN ARE FINISH WALL SIZES. - REFER TO EXISTING PLAN, ELEVATIONS, DOOR, FINISHES AND GRPHICS SCHEDULE FOR FURTHER DETAILS. - REFER TO ENGINEER'S DRAWINGS FOR WALL STRUCTURE SPECIFICATIONS. - SITE MEASURE REQUIRED FOR EXACT FRIDGE DIMENSIONS PRIOR TO ORDERING - BUILDER TO MAKE GOOD ALL (REUSED) EXISTING SHOP ELEMENTS - BUILDER TO CONFIRM ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO WORKS COMMENCING ADDITIONAL NOTES: REFER TO STRUCTURAL DRAWINGS FOR SHOPFRONT CONSTRUCTION DETAILS. N CONSTRUCTION PROGRAM: - STEEL PLINTHS TO BE CONSTRUCTED AND INSTALLED - DISPLAY CABINETS TO BE INSTALLED - SHOPFRONT LOW WALL TO BE CONSTRUCTED - FLOORING AND COVING INSTALLED TO FACE OF PLINTHS SHOPFITTER TO CONTACT DISPLAY CABINET MANUFACTURER PRIOR TO CONSTRUCTION LOW 131mm WALL. REFER TO DRAWING J001 FOR DETAILS STEEL PLINTHS FOR DISPLAY CABINETS. SUPPLIED BY MANUFACTURER NEW STEEL DOUBLE SWING DOOR, INSTAL NEW DIGITAL LOCK. (REFER TO SOW FOR DOOR SPECS) NEW STEEL STUD WALL WITH D/S FULL HEIGHT PLASTER BOARD AND NOMINATED FINISH STEEL PLIN THS FO R DIS PLAY CABIN ETS. SUPPLIE D BY M ANUFACTURER STEEL PLINTHS FOR DISPLAY CABINETS. SUPPLIED BY MANUFACTURER FEATURE PORTAL REFER TO SEPARATE DRAWING FOR DETAILS INSULATED PANEL NOM.75mm THK FOR COOL ROOM WALLS AND CEILING. COOL ROOM SWING DOOR 43 m² FOH 150mmH CONCRETE PLINTHS UNDER POS COUNTER 150mmH CONCRETE PLINTHS UNDER POS COUNTER INSTALL OFFICE CABINET BEFORE FLOOR COVING FEATURE PORTAL REFER TO SEPARATE DRAWING FOR DETAILS LOW 131mm WALL. REFER TO DRAWING J001 FOR DETAILS C O L. C O L. GB T1 GB GB GB T1 T1 T1 24 m² BOH 3 10 m² COOL ROOM 2 100075347075903196963131 347044361094 120824219023652915 36309023652576339 9000 2196 90 4874 940 650 5700 75 2900 75 8750 100 555 400 1560 40 100 802 495 1460 2000 6500 2250 LEASE LINE NEW WINDOW (2000W x 400H) DRAWING No. REVISION: SCALE AT A3: DRAWING TITLE DRAWN: CHECKED: DATE: FIRST ISSUE: CLIENT: PROJECT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencementon site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or inpart without the permission of ACRD Pty. Ltd. Use figure ddimensions in reference to scale ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 1 : 50 7/21/2016 2:49:06 PM SETOUT PLAN WILLOWS SHOPPING TOWN LENARD'S CHICKEN SK DC A103 25/09/2015 PRE 1 : 50 A103 SET OUT PLAN 1 R FURTHER DETAILS. MENCING N setout & rCP construction documentation extract
  17. 17. SCALE @ REVISION DRAWING CHECKED: DRAWN: FIRST ISSUE: DATE: PROJECT: CLIENT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencement on site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or in part without the permission of ACRD Pty. Ltd. Use figured dimensions in reference to scale. DRAWING TITLE: ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 1 James Schofield Drive, Adelaide South Australia 5950 CD A-3 SK SK PUMA ENERGY AUSTRALIA ADELAIDE AIRPORT INTERNAL PROSPECTIVES 21/07/2016 30/06/2016 3D PERSPECTIVE 1 UTH PERSPECTIVE ST PERSPECTIVE REVISION SCHEDULE Description PRELIMINARY 06acrd - retail seed clothing shop project chalLenge retail is a fast paced industry the challenge for these kind of projects is time management PROGRAMS revit 3D WEST PERSPECTIVE 3 C D PROJECT: CLIENT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencement on site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or in part without the permission of ACRD Pty. Ltd. Use figured dimensions in reference to scale. D A1 James Schofield Drive, Adelaide South Australia 5950 PUMA ENERGY AUSTRALIA ADELAIDE AIRPORT 3D PERSPECTIVE 1 3D SOUTH PERSPECTIVE 2 3D WEST PERSPECTIVE 3 REVISION SCHEDULE Number Date Description 30/06/16 PRELIMINARY
  18. 18. 06 seed clothing shop acrd - retail 2 A-200 2 A-300 3 A-300 1 A-301 2 A-301 1 A-300 7576 7757 6.17 m² B.O.H. 47.51 m² STORE 1.33 m² B.M.S. 1 A-200 3 A-301 4 A-301 J-38 J-18 J-17J-17 J-38 J-01 WB-01 1200 WB-01 3000 J-38 J-38 H-ISLAND J-01 J-01 J-34 J-34J-10 J-07 J-09 WB-01 3600 J-08 J-30J-16 FULL HEIGHT LOCKABLE JOINERY PANEL DOORS SURFACE MOUNTED NEW LIGHT BOX XPO TEX 85 D 01 LOWERED CEILING AND CORRIDOR STARTS - NO FINISHES TO THIS AREA REQUIERD 1 A-303 J-14 J-12 SUNGLASSES NICHE NEW PLASTER WALL WALL TYPES EXISTING WALL PROJECT: CLIENT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencement on site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or in part without the permission of ACRD Pty. Ltd. Use figured dimensions in reference to scale. 1 James Schofiel Adelaide South A PUMA ENERGY AUST ADELAIDE AIRPO REVISION SCHEDULE Number Date Description A 30/06/16 PRELIMINARY B 04/07/16 CD-01 C 20/07/16 CD-02 D 20/07/16 CD-03 NOTE: • ALL J-38, J-01, J-18 AND J-17 FIXTURES TO BE ON CASTORS. • LINING BOARD TO ALL EXPOSED WALLS GROUND LEVEL 0 J-38 J-10H-ISLAND CEILING LEVEL 3000 WINDOW SILL IN (TM2) ILLUMINATED LOGO 6mm MATTE ACRYLIC LETTERS (P3) + 16mm OPAL ACRYLIC DIFFUSER BEHIND WITH EMBED LEDS. PINNED OFF WALL BY 10mm. 10312400 10002431 SHOPFRONT FINISH REMAINS AS IS P1L 3388.8 1067.9 GLASS J-01 J-38 J-18 J-38 J-17 NEW LIGHT BOX 10002431 ILLUMINATED LOGO 6mm MATTE ACRYLIC LETTERS (P3) + 16mm OPAL ACRYLIC DIFFUSER BEHIND WITH EMBED LEDS. PINNED OFF WALL BY 10mm. 2002231226.1300173.9300 SHOPFRONT FINISH REMAINS AS IS P1L 1067.9 2264.7 NEW ILLUMINATED SIGNAGE SCALE @ A3 REVISION: DRAWING NO CHECKED: DRAWN: FIRST ISSUE: DATE: PROJECT: CLIENT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencement on site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or in part without the permission of ACRD Pty. Ltd. Use figured dimensions in reference to scale. DRAWING TITLE: ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 1 : 501 James Schofield Drive, Adelaide South Australia 5950 CD-03 A-200 SK SK PUMA ENERGY AUSTRALIA ADELAIDE AIRPORT SHOPFRONT ELEVATIONS 21/07/2016 30/06/2016 1 : 50 FRONT ELEVATION 2 1 : 50 Elevation 1 - a 1 REVISION SCHEDULE Number Date Description A 30/06/16 PRELIMINARY D 20/07/16 CD-03 GROUND LEVEL 0 J-38 J-10H-ISLAND CEILING LEVEL 3000 WINDOW SILL IN (TM2) ILLUMINATED LOGO 6mm MATTE ACRYLIC LETTERS (P3) + 16mm OPAL ACRYLIC DIFFUSER BEHIND WITH EMBED LEDS. PINNED OFF WALL BY 10mm. 10312400 10002431 SHOPFRONT FINISH REMAINS AS IS P1L 3388.8 1067.9 GLASS ATED NAGE SCALE @ A3: REVISION: DRAWING NO: CHECKED: DRAWN: FIRST ISSUE: DATE: PROJECT: CLIENT: IMPORTANT NOTE: A full site measure is to be carried out prior to any construction commencing on site. All site measurements are to checked against drawings. Any changes are to be made by designer to drawings prior to commencement on site. All dimensions are to be checked on site before commencement of work or manufacturing of any items. These drawings are the property of ACRD Pty. Ltd. and must not be reproduced or copied wholly or in part without the permission of ACRD Pty. Ltd. Use figured dimensions in reference to scale. DRAWING TITLE: ALL DIMENSIONS ARE IN MILLIMETERS. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF WORKS. DO NOT SCALE OFF DRAWING. COPYRIGHT REMAINS THE PROPERTY OF THIS OFFICE. 1 : 501 James Schofield Drive, Adelaide South Australia 5950 CD-03 A-200 SK SK PUMA ENERGY AUSTRALIA ADELAIDE AIRPORT SHOPFRONT ELEVATIONS 21/07/2016 30/06/2016 1 : 50 FRONT ELEVATION 2 LAYOUT PLAN & SHOPFRONT construction documentation EXTRACT
  19. 19. 18 07STUDENT HOUSING - VENICE FRANCIS KERE WORKSHOP project CHALLENGE ARCHICAD FITTING A MODERN DESIGN INTO THE VENETIAN HISTORICAL LANDSCAPE programs 2 SPACIAL EXPERIENCETOWARDS FUTURE LIVING : On the recently filled up island Sacca Fisola in the lagoon of Venice, a new habitat for students will be established. The island has enormous building capacity and is in close proximity to the architecture faculty of the university. Sacca Fisola has the potential to be an example for contemporary Venice. Demographics, lifestyles, economies and resources are changing: the challenges of today are influencing our life and habits. We are asking the participants of this design engagement to think about a vision of their own living space for the near and remote future. We are looking for prototypes of experimental living and working spaces with a critical reflection on the historical context, socio-economical background and climatic changes. The specific site of the island is exposed to the rising see-water level and is asking for appropriate mobility on the island and to the main land. Our design focus is an innovative interpretation of quality of space, with a high level of interactivity and connection between spaces, a new definition of intermediate spaces, a high social cohesion and mixed-used spaces to integrate students life into the context of the island. a b c d a b c
  20. 20. 07 STUDENT HOUSING - VENICE FRANCIS KERE WORKSHOP 120 a 122 a MODELLI c 123 o del edificio. li. c d c d CONCEPT & MODELS FROM THE LINEAR SHAPE OF THE ARCHITECTURE UNIVERSITY COMPLEX IUAV AS A TEAM WE ARRIVED TO A SNAKE LIKE CONCEPT FOR THE BUILDINGS
  21. 21. fe 2 c) Pianta piano terra. d) Pianta Primo piano. e) Pianta secondo piano. f) Pianta tipo. b c d 07STUDENT HOUSING - VENICE FRANCIS KERE WORKSHOPb 121 f c e d b c d 123
  22. 22. puma energy canopy 08 with acrd - retail project chalLenge Designing a concept for a growing energy company. graphic designer Collaboration. PROGRAMS Lumion revit
  23. 23. puma energy canopy 08with acrd - retail Rebranding & Canopy Concept for client presentation
  24. 24. puma energy canopy 08 with acrd - retail Detail elements Concept development for sig- nage, podium with storage and a Service box
  25. 25. Apartment renovation 09with acrd project chalLenge Renovating an apartment situated in brighton (vic) PROGRAMS Revit Lumion
  26. 26. apartment renovation 09 with acrd DDDDESKKKKKKKK CCCCCCCCCCCUUUUUPPPPPPBBBOOOOOOAAAAAAAARRRRRRDDDDDDDD CCCCCCEEEENNNNNNTTTTTTTRRRRRRAAAAAAAALLLL WWWWWWWWOOOOOOOOOOOOOORRRRRRKKKKKK BBBBBBBBBBBBEEEENNNNNNCCCCCCCCCCHHHHHH CUPBOARDCUPBOARD CUPBOARD 2202680220431022012544002201968220 220 3538 345 4350 1714 2865 120 3650 220 220 3699 220 1130 120 7643 220 220329212289512021281204566220 120 1690 120 2242 450120 1413 1725 1395 167845012060090159975900751416 2188168316481039751459801535781459220 671 857 120 900 120 1031 600 120 600 1222 2946 1925 1221 479 740878350 45012798001240600 235590075 9882000812 939 1000 1181 ROBE ROBE ROBE LLLLLLAAAAAAAAAAAAAUUUUUUUUUUDDDDDDDDDDRRRRRRRRRRYYYYYYYYYYY LLLLIVIING ROOOOMM DINIING OOOOOVVVVVVENNNNNN FR PPPPPPUUUUULLLLLLLL OOOOOOOUUUUUTTTTTT PPPPPPAAAAAAAAANNNNNNNTTTTTTRRRRRRRYYYYYYYY DW SEAT plan & renders extract from documentation
  27. 27. Apartment renovation 09with acrd bathroom renders research & documentation
  28. 28. THANK YOU

×