Mstr 9

593 views

Published on

MicroStrategy Basics

1 Comment
1 Like
Statistics
Notes
  • http://dbmanagement.info/Tutorials/Microstrategy.htm
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
No Downloads
Views
Total views
593
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
0
Comments
1
Likes
1
Embeds 0
No embeds

No notes for slide

Mstr 9

  1. 1. MSTR 9.0 – CLASS SESSION
  2. 2. CREATING “PROJECT SOURCE”
  3. 4. PROJECT SOURCE NAME POINTING TO LINUX SERVER BCZ MSTR SERVER PART AVAILABLE IN THIS MACHINE
  4. 6. USER CREATED IN SERVER BY ADMIN ENTER THE USERNAME
  5. 7. CREATING “NEW PROJECT” IN THE PROJECT SOURCE
  6. 9. ENTER THE PROJECT NAME
  7. 15. CREATING “ATTRIBUTE” SELECT THE Attributes IN THE Schema Objects THEN CLICK
  8. 16. SELECT TABLE IN THE LIST THEN IT SHOWS THE COLUMNS BASED ON THE TABLE, DOUBLE CLICK ON THE COLUMN
  9. 18. DASHBOARD CREATION
  10. 27. DRAG THE GRID HERE
  11. 28. DRAG THE REGION HERE
  12. 29. RIGHT CLICK AND SELECT THE PROPERTIES
  13. 31. AGAIN THE DRAG & DROP THE GRID FOR THE GAUGE AND THEN DRAG THE COST METRIC ON IT
  14. 33. RIGHT CLICK & THEN SELECT GRAPH VIEW
  15. 34. AFTER SELECTING THE GRAPH VIEW, IT SHOWS LIKE THIS
  16. 35. DOUBLE CLICK & THEN RIGHT CLICK , THEN SELECT EDIT CONTROL
  17. 36. SELECT GRIDGRAPH2 AND THEN PRESS > BUTTON
  18. 38. RIGHT CLICK ON THE 2 ND GRID AND SELECT PROPERTIES, THEN IN THE FLASH TAB, SELECT GAUGE
  19. 39. DOUBLE CLICK ON THE 2 ND GRID, AND THEN RIGHT CLICK AND SELECT GRAPH TYPE
  20. 40. SELECT THE ADVANCED, AND THEN SELECT THE GAUGE TAB
  21. 42. THEN SAVE THE REPORT AND SPECIFY NAME FOR THAT, THEN CLICK FLASH VIEW BUTTION

×