Parking Lot Upgrade
Information Meeting
January 18, 2015
Agenda
• Introduction (Rob Gravelsins, Official Board)
• “Technical” Presentation (Ken Poulsen,
Property)
• Background
• O...
Satellite View
City of Mississauga Satellite View on Bing
Recommendations I
• removal of the entire asphalt surface.
• installation of the sub drain along the center
of the drive a...
Recommendations II
• install 2-100mm ducts below the granular base
for future sprinklers or lighting on the islands
• add ...
BEQUEST FUND PROJECT
• Current Balance (2014/12/31) $175,983.85
• Bequest Fund Guiding Principals ( OB
2013/04/09 )
• Non ...
Upcoming SlideShare
Loading in …5
×

Parking lot upgrade

49 views

Published on

Streetsville United Church parking lot upgrade 2015

Published in: Spiritual
  • Be the first to comment

  • Be the first to like this

Parking lot upgrade

  1. 1. Parking Lot Upgrade Information Meeting January 18, 2015
  2. 2. Agenda • Introduction (Rob Gravelsins, Official Board) • “Technical” Presentation (Ken Poulsen, Property) • Background • Options • Recommendations • Financial Aspects (Charlie Walsh, Finance) • Wrap-up Questions and Discussion are Encouraged!
  3. 3. Satellite View City of Mississauga Satellite View on Bing
  4. 4. Recommendations I • removal of the entire asphalt surface. • installation of the sub drain along the center of the drive aisle along the two easterly parking bays • excavation and removal of soil below the existing granular base in targeted areas of the parking lot • remove and replace concrete curbs in specific areas where badly damaged.
  5. 5. Recommendations II • install 2-100mm ducts below the granular base for future sprinklers or lighting on the islands • add a nominal amount of granular material to the existing surface, and proof roll the surface to provide compaction of the granular base. • pave the drive aisle (6.0m width) of the two easterly bays with two asphalt layers. • pave the remainder of the parking lot with one asphalt layer. • provide pavement markings
  6. 6. BEQUEST FUND PROJECT • Current Balance (2014/12/31) $175,983.85 • Bequest Fund Guiding Principals ( OB 2013/04/09 ) • Non operational greater than $30,000. ( 25%) • Est $80,000. Fund $60,000. Congregation raises $20,000. • Approvals Exec, Official Board, (2/3 Majority) Congregation (Majority) • So, after Congregational approval at our February Annual Meeting, we will start a Parking Lot Campaign to raise $20,000

×