moladi - Building System - Plastic Formwork #moladi #building #system

moladi plastic formwork building construction system
moladi plastic formwork building construction systemmoladi Plastic Formwork Building System - Est 1986 at moladi plastic formwork building construction system
Low cost housingFormwork
moladi
Established - 1986
WELCOME
moladi
Henry Ford of mass housing
Modular plastic formwork
Our age of anxiety is, in great
part, the result of trying to do
today’s jobs with yesterday’s
tools - Marshall McLuhan
YESTERDAY’S TOOL…
moladi
TRANSPORT
INNOVATION
moladi
Creative destruction
PROGRESS
Creative Destruction - Joseph Schumpeter
moladi
CONSTRUCTION
INNOVATION
moladi
THEBES 1458 B.C.
CONSTRUCTION
moladi
Old brick system
PROGRESS
3500 YEARS
moladi
Compressed soil cement blocks
Brick making machines
PROGRESS-PRODUCTION
moladi
Bricklayer
ARTISAN-BOTTLE NECK
SKILLS SHORTAGE
moladi
TIME
moladi
QUALITY
moladi
CASH FLOW
moladi
CONSTRUCTION CYCLE
 Erratic supplies = Erratic delivery
 Dependant on skilled labour
 Slow delivery
 Waste
 Rework
 Inconsistent quality
 Unpredictable cash flow
 Increased cost
moladi
AN EDUCATED GUESS?
 How many bricks or blocks are laid per day?
 Is the quantity of bricks laid per day the same for every day of the
week?
 How many bricks wasted or broken or stolen?
 Are walls straight plumb and square?
 How long to chase for electricity piping?
 How long to chase for water piping?
 Is plaster thickness consistent or does it vary?
 How long does it take to do beam filling?
 How long does it take to plaster window reveals?
 Any rework?
“If you can't measure it, you can't manage it.”
- Peter Drucker -
moladi
YESTERDAY’S TOOL…
moladi
TODAY’S PROBLEM…
moladi
 SOCIAL ACCEPTANCE
 AFFORDABILITY
HOME OWNER CRITERIA
 DURABILITY
moladi
SOLUTION THINKING
moladi
moladi
“PLANT”
Small is Beautiful - Ernst Friedrich Schumacher
moladi
DISRUPTIVE INNOVATION
A disruptive innovation is an innovation that helps create a new
market and value network, and eventually disrupts an existing
market and value network (over a few years or decades), displacing
an earlier technology
moladi
RAFT FOUNDATION FORMER
moladi
RAFT FOUNDATION - COMPACT
moladi
RAFT FOUNDATION-TRENCHING
moladi
RAFT FOUNDATION-TRENCHING
moladi
RAFT FOUNDATION-REINFORCING
moladi
RAFT FOUNDATION-CONCRETE
moladi
RAFT FOUNDATION-LEVEL
moladi
POWER FLOAT SLAB
moladi
ERECT FORMWORK
moladi
ERECT FORMWORK
moladi
REINFORCING
moladi
REINFORCING
moladi
PLUMBING
moladi
PLUMBING
moladi
ERECT FORMWORK
moladi
MOULD ERECTED
moladi
Modular plastic formwork
Plastic formwork
MOULD ERECTED
FOUR HOURS
moladi
12-15mPa
 1800kg or 0.720m³ of local
decomposed granite/ river sand.
 250kg of ordinary Portland
cement (OPC).
 2.5 litres of moladiCHEM
 200 litres of water
* This is a generic mix for example purposes only
MORTAR MIX
moladi
RIVER SAND+CEMENT+WATER+moladiCHEM
TWO HOURS
MOULD FILLED
moladi
MOULD FILLED
moladi
TWO HOURS
STRIP & RE-ERECT
moladi
STRIP & RE-ERECT
moladi
STRIP & RE-ERECT
moladi
STRIP & RE-ERECT
moladi
STRIP & RE-ERECT
moladi
ROOF TRUSS
moladi
ROOF TRUSS
moladi
ROOF TRUSS
moladi
NO BEAM FILLING
moladi
ROOF
moladi
CEILING
moladi
COMPLETED IN FIVE DAYS
“If you can measure it, you can manage it.”
moladi
MORTAR – NOT CONCRETE
moladi
40 M²
moladi
Mass housing
Affordable housing
House
Housing
40 M²
moladi
Building system Bank approved
Agrément
NHBRC
ERIC MOLOBI - 52 M²
moladi
2006 - 2015
9 YEARS LATER
moladi
PANAMA 60 M²
moladi
Cast in place structures
Superior building technology
Alternative building technology
TANZANIA - 68 M²
moladi
moladi 75m Unit
75 M²
moladi
Henry Ford
CAPE TOWN - 87 M²
Hennie Botes
moladi
BONDED BY STANDARD BANK SINCE 1993
110 M²
moladi
GHANA - 120 M²
moladi
120 M²
moladi
MEXICO
moladi
NIGERIA
moladi
WALK UP
moladi
BOTSWANA - DOUBLE STOREY
moladi
CLINIC
moladi
CLASSROOM
moladi
CLASSROOM
moladi
ABLUTION BLOCK
moladi
SECURITY WALLING
moladi
FIRST HOME -1987
moladi
1987 - 2015
28 YEARS LATER
moladi
FUTURE DEVELOPMENTS
moladi
 Speed without compromising quality
 No need to plaster
 No need to chase
 No beam filling
 Waterproof
 Reinforced
 No waste
 Logistics
 Green
 Alterations and additions
BENEFITS
“If you can measure it, you can manage it.”
moladi
Holistic
Construction
Technology
INNOVATION
moladi
RADICAL CHANGE
MONOLITHIC REINFORCED CAST IN PLACE STRUCTURES
SUPERIOR BUILDING TECHNOLOGY
moladi
SOCIAL ACCEPTANCE
CRITERIA
AFFORDABILITY
DURABILITY
EMPLOYMENT
moladi
DREAMS AND VISIONS
Hennie Botes – www.moladi.net
THANKYOU
Fight poverty, unemployment and crime
through housing
1 of 82

Recommended

MODERN CONSTRUCTION METHODS by
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSShourya Puri
41.1K views15 slides
moladi-Empower-people-to-help-themselves-cooperatives by
moladi-Empower-people-to-help-themselves-cooperativesmoladi-Empower-people-to-help-themselves-cooperatives
moladi-Empower-people-to-help-themselves-cooperativesmoladi plastic formwork building construction system
21 views68 slides
moladi - Plastic Formwork building affordable housing construction by
moladi - Plastic Formwork building affordable housing construction moladi - Plastic Formwork building affordable housing construction
moladi - Plastic Formwork building affordable housing construction moladi plastic formwork building construction system
524 views37 slides
moladi presentation - International Conference on Sustainable Development ICS... by
moladi presentation - International Conference on Sustainable Development ICS...moladi presentation - International Conference on Sustainable Development ICS...
moladi presentation - International Conference on Sustainable Development ICS...moladi plastic formwork building construction system
235 views38 slides

More Related Content

More from moladi plastic formwork building construction system

moladi Co-operative RSA Parliament presentation by
moladi Co-operative RSA Parliament presentationmoladi Co-operative RSA Parliament presentation
moladi Co-operative RSA Parliament presentationmoladi plastic formwork building construction system
1.1K views79 slides

More from moladi plastic formwork building construction system(20)

Recently uploaded

Here_Process book by
Here_Process bookHere_Process book
Here_Process booknykimstudio
15 views74 slides
TISFLEET WEB DESIGN PROJECT by
TISFLEET WEB DESIGN PROJECTTISFLEET WEB DESIGN PROJECT
TISFLEET WEB DESIGN PROJECTRabius Sany
38 views13 slides
StratPlanning Manual 220713.pdf by
StratPlanning Manual 220713.pdfStratPlanning Manual 220713.pdf
StratPlanning Manual 220713.pdfLakewalk Media
15 views43 slides
polaris by
polarispolaris
polarisscribddarkened352
237 views13 slides
217 Drive - All on upper.pptx by
217 Drive - All on upper.pptx217 Drive - All on upper.pptx
217 Drive - All on upper.pptxvidstor282
14 views7 slides
Presentation (1).pdf by
Presentation (1).pdfPresentation (1).pdf
Presentation (1).pdfhjksa
17 views5 slides

Recently uploaded(20)

TISFLEET WEB DESIGN PROJECT by Rabius Sany
TISFLEET WEB DESIGN PROJECTTISFLEET WEB DESIGN PROJECT
TISFLEET WEB DESIGN PROJECT
Rabius Sany38 views
StratPlanning Manual 220713.pdf by Lakewalk Media
StratPlanning Manual 220713.pdfStratPlanning Manual 220713.pdf
StratPlanning Manual 220713.pdf
Lakewalk Media15 views
217 Drive - All on upper.pptx by vidstor282
217 Drive - All on upper.pptx217 Drive - All on upper.pptx
217 Drive - All on upper.pptx
vidstor28214 views
Presentation (1).pdf by hjksa
Presentation (1).pdfPresentation (1).pdf
Presentation (1).pdf
hjksa17 views
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf by NirmalanGanapathy1
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdfIEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf
Big Deal Curmel Moton Shirt by brandshop1
Big Deal Curmel Moton ShirtBig Deal Curmel Moton Shirt
Big Deal Curmel Moton Shirt
brandshop18 views
commercial interior designers -Dortodesigns studio.pdf by Prasadgyb
commercial interior designers -Dortodesigns  studio.pdfcommercial interior designers -Dortodesigns  studio.pdf
commercial interior designers -Dortodesigns studio.pdf
Prasadgyb5 views
Design System in Figma A to Z.pdf by Atiqur Rahaman
Design System in Figma A to Z.pdfDesign System in Figma A to Z.pdf
Design System in Figma A to Z.pdf
Atiqur Rahaman18 views

moladi - Building System - Plastic Formwork #moladi #building #system