Effort Estimation - Chinmay VS - Scrum Bangalore 19th Meetup

Effort Estimation - Chinmay VS - Scrum Bangalore 19th Meetup - March 25, 2017 - at Prowareness

  • Login to see the comments

Effort Estimation - Chinmay VS - Scrum Bangalore 19th Meetup

  1. 1. EFFORT ESTIMATION Write down the number of “squares” in the above image…
  2. 2. 5 REASONS WHY ESTIMATES TEND TO BE WRONG 1. Ambiguous/Incomplete Requirements. No documented use-cases. 2. Using Assumptions/Gut-feeling. Instead of facts. 3. Large-Scale. No breakdown structure = Omitted activities. 4. Single-Point Estimates. Average ≠ Conditional. 5. Bad work processes Bad design, code  Bugs  Rework/Firefighting.
  3. 3. THE 6TH SECRET REASON WHY ESTIMATES ARE WRONG OFF THE CUFF ESTIMATES ! Q. Can you get this done by Friday? Answer: Looks do-able. I will try. What is the right question? What is the right way to answer it?
  4. 4. CONE OF UNCERTAINTY
  5. 5. ¯_(ツ )_/¯ NOT KNOWING THE ANSWER IS OKAY
  6. 6. 1. Ambiguous/Incomplete Requirements. No documented use-cases. 2. Using Assumptions/Gut-feeling. Instead of facts. 3. Large-Scale. No breakdown structure = Omitted activities. 4. Single-Point Estimates. Average ≠ Conditional. 5. Bad work processes Bad design, code  Bugs  Rework/Firefighting. 5 REASONS THE 6TH SECRET REASON WHY ESTIMATES ARE WRONGQ. Can you get this done by Friday? Answer: Looks do-able. I will try.
  7. 7. RIGHT QUESTION? / RIGHT WAY TO ANSWER IT? 1. Ambiguous/Incomplete Requirements. No documented use-cases. 2. Using Assumptions/Gut-feeling. Instead of facts. 3. Large-Scale. No breakdown structure = Omitted activities. 4. Single-Point Estimates. Average ≠ Conditional. 5. Bad work processes Bad design, code  Bugs  Rework/Firefighting. Q. Can you get this done by Friday? Answer: Looks do-able. I will try.
  8. 8. ESTIMATES THE USUAL SUSPECTS Reference: Software Estimation Demystifying the Black Art – Steve McConnell
  9. 9. PRECISION = UNINTENDED CONFIDENCE.It is10:30 am. You are on your way to meet a friend… You: “Will see you at the mall by 11 o’clock.” Sounds like will be there sometime before 11:05 VS. You: “Will meet you at the mall at 10:58am.” Sounds like will be there sometime before 10:59 The 2nd estimate was simply based on an ETA of 28mins shown by the navigation app at 10:30.
  10. 10. INTERESTING BITS FROM AROUND THE WORLD... Calculating Functions Points - A practical example…  stackoverflow.com/q/34473698/319204 “Function Points? Valuable, but too much effort to get right.” - Mike Cohn (Scrum Alliance)  stackoverflow.com/a/153458/319204 12 tips to better estimates  stackoverflow.com/a/35571856/319204 PMBOK – 5th Edition  A Guide to the Project Management Body of Knowledge – 5e

×