Vapor Intrusion Study Area – Moffett Field Area and MEW Area
Estimated Extent of Regional TCE Shallow GroundwaterPlume
Sampling Status of “Unsampled” Buildings -Moffett Field Area - North of Highway 101 12 Currently Occupied Buildings    12 ...
Implementation of Vapor Intrusion Remedy- Progress and Schedule• EPA Statement of Work – Remedial Design & Remedial Action...
For More Information - Websites NASA: environment.arc.nasa.gov/reports/vapor.html environment arc nasa gov/reports/vapor h...
EPA Update to the Moffett Restoration Advisory Board Regarding Vapor Intrusion
Upcoming SlideShare
Loading in …5
×

EPA Update to the Moffett Restoration Advisory Board Regarding Vapor Intrusion

1,591 views

Published on

Published in: Education, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,591
On SlideShare
0
From Embeds
0
Number of Embeds
75
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

EPA Update to the Moffett Restoration Advisory Board Regarding Vapor Intrusion

  1. 1. EPA Vapor Intrusion Update Former NAS Moffett FieldRestoration Advisory Board Meeting September 8, 2011 Alana Lee EPA R i 9 Region Lee.Alana@epa.gov
  2. 2. Vapor Intrusion Study Area – Moffett Field Area and MEW Area
  3. 3. Estimated Extent of Regional TCE Shallow GroundwaterPlume
  4. 4. Sampling Status of “Unsampled” Buildings -Moffett Field Area - North of Highway 101 12 Currently Occupied Buildings 12 Currently Occupied Sampled by MEW – July 2011 Buildings To Be Sampled by NASA – Sept/October 2011 23 569 N144 48 583C N212 146 583A N213 503 583B N240 543 596 N245 554 944 T20G Building –Specific Indoor Air Sampling Reports – Sept 13, 2011 5
  5. 5. Implementation of Vapor Intrusion Remedy- Progress and Schedule• EPA Statement of Work – Remedial Design & Remedial Action Work Requirements & Schedule - August 2011 includes Building-specific and Site-wide Work Plans, Sampling, Long-term Operations, Monitoring, and Maintenance, Maintenance Institutional Controls, Reporting Controls• Amended Consent Decree to DOJ – Sept 2011 p• Amended 106 Order - Sept 2011• Sit Site-wide Sampling Work Plan to Determine Response id S li W k Pl t D t i R Action Tier - Sept 29, 2011• Upcoming Sampling and reporting – Sept 2011 on 6
  6. 6. For More Information - Websites NASA: environment.arc.nasa.gov/reports/vapor.html environment arc nasa gov/reports/vapor html environment.arc.nasa.gov/maps/vapor.htmlEPA:www.epa.gov/region9/mewwww.epa.gov/region9/moffettfieldwww.epa.gov/oswer/vaporintrusion/ p g p

×