TESTING OF ISOLATORS AND
CIRCUIT BREAKERS
Contents
•Introduction
•Testing of isolators
•Testing of CB
•Synthetic test of CB and isolator
•Conclusion and Reference
Prepared by S.ARUN M.Tech Testing of isolators and CB
Introduction
• Isolator – mechanical switching device which
provides in the open position
• Capable of carrying current under normal circuit
conditions
• CB- routine switching and for protection of other
equipment
• Preventive maintenance
2Prepared by S.ARUN M.Tech Testing of isolators and CB
Testing of isolators
Dielectric tests
Overvoltage withstand test of power frequency, lightning
and switching impulse voltages.
The impulse test
Impulse test and switching surge tests with switching over
voltage are done.
Temperature and mechanical tests
These tests are done in CB. Which use to be conduct
withstand capability of isolators.
Prepared by S.ARUN M.Tech Testing of isolators and CB 3
Testing of CB
Short circuit tests
(a) Direct tests
(b) Using a short circuit generator as the source
Prepared by S.ARUN M.Tech Testing of isolators and CB 4
(a) Direct testing
This is done during period of limited energy
consumption or when the electrical energy is
diverted to other sections of the network which
are not connected to the circuit under the test.
( b) Using a short circuit generator as the source
A make switch initiates the short circuit and
the master C.B isolates the test device from the
source at the end of predetermine time set on a
test controller.
5Prepared by S.ARUN M.Tech Testing of isolators and CB
SYNTHETIC TESTS
ON CIRCUIT BREAKER AND ISOLATOR
(a) Synthetic Testing of Circuit Breakers
In the initial period of the short circuit test,a.c
current source supplies the heavy current at a
low voltage, and recovery voltage is simulated
by a source of high voltage of small current
capacity.
(b) Composite Testing
The C.B is tested first for its rated breaking
capacity at a reduced voltage and afterwards for
rated voltage at a low current.
6Prepared by S.ARUN M.Tech Testing of isolators and CB
( c ) Unit Testing
When large C.B of very high voltage rating
(220 kV and above) are to be tested and
where more than one break is provided per
pole, the breaker is tested for one break at its
rated current and the estimated voltage.
7Prepared by S.ARUN M.Tech Testing of isolators and CB
( d ) Testing Procedure
The C.B are tested for their breaking capacity B and making
capacity Mand it is tested for following duty cycle
(1) B-3-B-3-B at 10%of the rated symmetrical breaking
capacity
(2) B-3-B-3-B at 30%of the rated symmetrical breaking
capacity
(3) B-3-B-3-B at 60%of the rated symmetrical breaking
capacity
(4) B-3-MB-3MB-MB0 at 10%of breaking capacity with
the recovery voltage not less 95% of the rated service
voltage
8Prepared by S.ARUN M.Tech Testing of isolators and CB
(e) Asymmetrical Tests
One test cycle is repeated for the
asymmetrical breaking capacity in which the
d.c component at the instant of contact
separation is not less than 50% of the a.c
component
9Prepared by S.ARUN M.Tech Testing of isolators and CB
• Conclusion
From this we came to know about the
varies types of testing procedure incorporated
in circuit breaker and isolators.
• Reference
“High voltage engineering ” by M S Naidu and
V Kamaraju, Tata McGraw Hill Education, 5th
edition.
Prepared by S.ARUN M.Tech Testing of isolators and CB 10

More Related Content

What's hot (20)

Circuit breakers
Circuit breakersCircuit breakers
Circuit breakers
 
Mod5part1
Mod5part1Mod5part1
Mod5part1
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Contactors relays
Contactors  relaysContactors  relays
Contactors relays
 
Impulse voltage
Impulse voltageImpulse voltage
Impulse voltage
 
Circuit breakers
Circuit breakers Circuit breakers
Circuit breakers
 
Testing of cb
Testing of cbTesting of cb
Testing of cb
 
Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage lab
 
Psps ppt
Psps pptPsps ppt
Psps ppt
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
Module 6part1
Module 6part1Module 6part1
Module 6part1
 
circuit breaker
circuit breakercircuit breaker
circuit breaker
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
 
Low voltage circuit breakers
Low voltage circuit breakersLow voltage circuit breakers
Low voltage circuit breakers
 
Measurement of hvac (High Voltage Engineering )
Measurement  of  hvac (High Voltage Engineering )Measurement  of  hvac (High Voltage Engineering )
Measurement of hvac (High Voltage Engineering )
 
Circuit breaker
Circuit  breakerCircuit  breaker
Circuit breaker
 
Lightning arresters
Lightning arrestersLightning arresters
Lightning arresters
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in brief
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
1+1 venky
1+1 venky1+1 venky
1+1 venky
 

Similar to Circuit breaker

Testing of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTesting of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTafhim Bin Nasir
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalNihal Shiroya
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
Sona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing CentreSona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing CentreSona College of Technology
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
Transient Recovery Voltage (TRV) Studies.pdf
Transient Recovery Voltage (TRV) Studies.pdfTransient Recovery Voltage (TRV) Studies.pdf
Transient Recovery Voltage (TRV) Studies.pdfssuserfe5963
 
Circuit Breakers Interrupting Capacity and Short-Time Current Rating
Circuit Breakers Interrupting Capacity and Short-Time Current Rating Circuit Breakers Interrupting Capacity and Short-Time Current Rating
Circuit Breakers Interrupting Capacity and Short-Time Current Rating michaeljmack
 
Switchgear and protection 4
Switchgear and protection 4Switchgear and protection 4
Switchgear and protection 4Md Irshad Ahmad
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, IndiaRajuMondal18
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERRitesh Kumawat
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.pptThien Phan Bản
 
Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Rajeev Kumar Raj
 
Student_01_Ankit Kherodia_Nirma Univ_Ahmedabad
Student_01_Ankit Kherodia_Nirma Univ_AhmedabadStudent_01_Ankit Kherodia_Nirma Univ_Ahmedabad
Student_01_Ankit Kherodia_Nirma Univ_Ahmedabadankit kherodiya
 
Transformer: Open Circuit and Short Circuit Test
Transformer: Open Circuit and Short Circuit TestTransformer: Open Circuit and Short Circuit Test
Transformer: Open Circuit and Short Circuit TestRidwanul Hoque
 
Electrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxElectrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxPritishPachhapure1
 

Similar to Circuit breaker (20)

Testing of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTesting of Circuit Breakers.pptx
Testing of Circuit Breakers.pptx
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihal
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
16950
1695016950
16950
 
Sona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing CentreSona Electric Power Engineering and Testing Centre
Sona Electric Power Engineering and Testing Centre
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
Transient Recovery Voltage (TRV) Studies.pdf
Transient Recovery Voltage (TRV) Studies.pdfTransient Recovery Voltage (TRV) Studies.pdf
Transient Recovery Voltage (TRV) Studies.pdf
 
IEEE Blue Book
IEEE Blue BookIEEE Blue Book
IEEE Blue Book
 
Circuit Breakers Interrupting Capacity and Short-Time Current Rating
Circuit Breakers Interrupting Capacity and Short-Time Current Rating Circuit Breakers Interrupting Capacity and Short-Time Current Rating
Circuit Breakers Interrupting Capacity and Short-Time Current Rating
 
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptxMeduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
 
Switchgear and protection 4
Switchgear and protection 4Switchgear and protection 4
Switchgear and protection 4
 
Ratio Burden Admittance Testing
Ratio Burden Admittance TestingRatio Burden Admittance Testing
Ratio Burden Admittance Testing
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.
 
Student_01_Ankit Kherodia_Nirma Univ_Ahmedabad
Student_01_Ankit Kherodia_Nirma Univ_AhmedabadStudent_01_Ankit Kherodia_Nirma Univ_Ahmedabad
Student_01_Ankit Kherodia_Nirma Univ_Ahmedabad
 
Transformer: Open Circuit and Short Circuit Test
Transformer: Open Circuit and Short Circuit TestTransformer: Open Circuit and Short Circuit Test
Transformer: Open Circuit and Short Circuit Test
 
Electrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptxElectrical disturbances from conduction and coupling.pptx
Electrical disturbances from conduction and coupling.pptx
 

More from sarunkutti

More from sarunkutti (19)

Multi stage amp
Multi stage ampMulti stage amp
Multi stage amp
 
Differential amplifier
Differential amplifierDifferential amplifier
Differential amplifier
 
Oscillator
OscillatorOscillator
Oscillator
 
Fb amplifier (2)
Fb amplifier (2)Fb amplifier (2)
Fb amplifier (2)
 
Load line analysis
Load line analysisLoad line analysis
Load line analysis
 
Biasing
BiasingBiasing
Biasing
 
Mosfet
MosfetMosfet
Mosfet
 
Bjt
BjtBjt
Bjt
 
Lcd
LcdLcd
Lcd
 
Clipper and clamper
Clipper and clamperClipper and clamper
Clipper and clamper
 
Surge diverter
Surge diverterSurge diverter
Surge diverter
 
Insulator
InsulatorInsulator
Insulator
 
Insulation coordination
Insulation coordinationInsulation coordination
Insulation coordination
 
Impulse current
Impulse currentImpulse current
Impulse current
 
Dc voltage
Dc voltageDc voltage
Dc voltage
 
Ac voltage
Ac voltageAc voltage
Ac voltage
 
Ac voltage
Ac voltageAc voltage
Ac voltage
 
Triggatron gap
Triggatron gapTriggatron gap
Triggatron gap
 
Ac impulse voltage
Ac impulse voltageAc impulse voltage
Ac impulse voltage
 

Recently uploaded

Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 

Recently uploaded (20)

Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 

Circuit breaker

  • 1. TESTING OF ISOLATORS AND CIRCUIT BREAKERS Contents •Introduction •Testing of isolators •Testing of CB •Synthetic test of CB and isolator •Conclusion and Reference Prepared by S.ARUN M.Tech Testing of isolators and CB
  • 2. Introduction • Isolator – mechanical switching device which provides in the open position • Capable of carrying current under normal circuit conditions • CB- routine switching and for protection of other equipment • Preventive maintenance 2Prepared by S.ARUN M.Tech Testing of isolators and CB
  • 3. Testing of isolators Dielectric tests Overvoltage withstand test of power frequency, lightning and switching impulse voltages. The impulse test Impulse test and switching surge tests with switching over voltage are done. Temperature and mechanical tests These tests are done in CB. Which use to be conduct withstand capability of isolators. Prepared by S.ARUN M.Tech Testing of isolators and CB 3
  • 4. Testing of CB Short circuit tests (a) Direct tests (b) Using a short circuit generator as the source Prepared by S.ARUN M.Tech Testing of isolators and CB 4
  • 5. (a) Direct testing This is done during period of limited energy consumption or when the electrical energy is diverted to other sections of the network which are not connected to the circuit under the test. ( b) Using a short circuit generator as the source A make switch initiates the short circuit and the master C.B isolates the test device from the source at the end of predetermine time set on a test controller. 5Prepared by S.ARUN M.Tech Testing of isolators and CB
  • 6. SYNTHETIC TESTS ON CIRCUIT BREAKER AND ISOLATOR (a) Synthetic Testing of Circuit Breakers In the initial period of the short circuit test,a.c current source supplies the heavy current at a low voltage, and recovery voltage is simulated by a source of high voltage of small current capacity. (b) Composite Testing The C.B is tested first for its rated breaking capacity at a reduced voltage and afterwards for rated voltage at a low current. 6Prepared by S.ARUN M.Tech Testing of isolators and CB
  • 7. ( c ) Unit Testing When large C.B of very high voltage rating (220 kV and above) are to be tested and where more than one break is provided per pole, the breaker is tested for one break at its rated current and the estimated voltage. 7Prepared by S.ARUN M.Tech Testing of isolators and CB
  • 8. ( d ) Testing Procedure The C.B are tested for their breaking capacity B and making capacity Mand it is tested for following duty cycle (1) B-3-B-3-B at 10%of the rated symmetrical breaking capacity (2) B-3-B-3-B at 30%of the rated symmetrical breaking capacity (3) B-3-B-3-B at 60%of the rated symmetrical breaking capacity (4) B-3-MB-3MB-MB0 at 10%of breaking capacity with the recovery voltage not less 95% of the rated service voltage 8Prepared by S.ARUN M.Tech Testing of isolators and CB
  • 9. (e) Asymmetrical Tests One test cycle is repeated for the asymmetrical breaking capacity in which the d.c component at the instant of contact separation is not less than 50% of the a.c component 9Prepared by S.ARUN M.Tech Testing of isolators and CB
  • 10. • Conclusion From this we came to know about the varies types of testing procedure incorporated in circuit breaker and isolators. • Reference “High voltage engineering ” by M S Naidu and V Kamaraju, Tata McGraw Hill Education, 5th edition. Prepared by S.ARUN M.Tech Testing of isolators and CB 10