My view of where design can and should be headed, given the enabling technology of BIM and the challenge of Living Buildings. This is a brief version of presentation given to Vancouver BC chapter of NAIOP.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
897
On SlideShare
0
From Embeds
0
Number of Embeds
114
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • jhcjhcjjh
  • Emo Phillips, comedian, actor
  • jhgcjhjh
  • jhgcjhjh
  • jhgcjhjh
  • A failure to innovate
  • BIM helps balanceInformation asymmetry is, by definition, a failure of intelligence
  • BIM helps balanceInformation asymmetry is, by definition, a failure of intelligence
  • BIM helps balanceInformation asymmetry is, by definition, a failure of intelligence
  • "Once you make a decision, the universe conspires to make it happen." Ralph Waldo Emerson
  • jhgcjhjh
  • Maharashtra, India
  • -Francis Baconessayist, philosopher, and statesman (1561-1626)
  • Intelligence To Innovation

    1. 1. Intelligence to Innovation<br />Sam Spata, AIA<br />Architect, LEED® AP samspata@serafinobuilders.com<br />
    2. 2. “I used to think that the brain was the most wonderful organ in my body. <br />Then I realized who was telling me this.”<br />- Emo Phillips<br />
    3. 3. BIM and… buildingSMART<br />Intelligence and… Innovation<br />Sustainable Design and… Form-Solving™<br />Contents<br />
    4. 4. BIM and… buildingSMART<br />Intelligence and… Innovation<br />Sustainable Design and… Form-Solving™<br />
    5. 5. BIM<br />Diagram – courtesy of HOK<br />
    6. 6. Drawing with Lines<br />
    7. 7. Building with Objects<br />I am a roof<br />I am a window<br />I am a SIP<br />I am a door<br />I am a slab on grade<br />
    8. 8. Building with Knowledge<br />3D… WxLxH<br />4D… Installation sequence<br />5D… Unit cost & quantities<br />6D… R value<br />
    9. 9. Building Information Modeling (BIM)<br />data & communication technology tool for object-oriented development using purpose-driven exchange to:<br />design & construct a project<br />maintain & operate a facility<br />
    10. 10. Virtual Design & Construction (VDC)<br />before we build in the field (in vivo), we build a prototype in BIM (in silico) and test that it works<br />the virtual building is analyzed with research applications & simulations to coordinate building systems and construction operations<br />...and to ensure sustainable performance<br />
    11. 11. Image – courtesy of HOK<br />
    12. 12. Image – courtesy of HOK<br />
    13. 13. Image – courtesy of HOK<br />
    14. 14. Image – courtesy of HOK<br />
    15. 15. Image – courtesy of HOK<br />
    16. 16. Early BIM<br />Owner<br />Architect<br />Construction Manager<br />Building Information Model<br />Building Department<br />Structural Engineer<br />Sub-Contractor<br />MEP+FP Consultant<br />Facilities Manager<br />
    17. 17. Author<br />3DS<br />Max<br />Rhino<br />Maya<br />ADT<br />Research<br />Gravity<br />Affinity<br />Ecotect<br />Sketch Up<br />Tekla<br />Create<br />BIM<br />Navisworks<br />Hold<br />Wind<br />CadDuct<br />5D<br />4D<br />Construction <br />Information <br />Model<br />TriRiga<br />(IWMS)<br />Mature BIM<br />Purpose – built models<br />Purpose – driven exchange<br />
    18. 18. Project Information Management<br />
    19. 19. 3DS<br />Max<br />Rhino<br />Maya<br />ADT<br />Gravity<br />Affinity<br />Ecotect<br />Sketch Up<br />collaborative<br />integrative<br />holistic<br />Tekla<br />BIM<br />Navisworks<br />Wind<br />CadDuct<br />5D<br />4D<br />Construction <br />Information <br />Model<br />TriRiga<br />(IWMS)<br />Workflow<br />
    20. 20. MacLeamy™ Curve<br />Effectiveness<br />Time<br />
    21. 21. Big BIM<br />Construction Administration<br />Implementation Documents<br />Conceptualization<br />Detailed Design<br />Agency Review<br />Criteria Design<br />Closeout<br />Buyout<br />Effectiveness<br />Time<br />
    22. 22. Effort moves forward…<br />Construction Administration<br />Implementation Documents<br />Conceptualization<br />Detailed Design<br />Agency Review<br />Criteria Design<br />Closeout<br />Buyout<br />Effort<br />Time<br />
    23. 23. Decisions move forward…<br />Construction Administration<br />Implementation Documents<br />Conceptualization<br />Detailed Design<br />Agency Review<br />Criteria Design<br />Closeout<br />Buyout<br />Decision-Making<br />Time<br />
    24. 24. Analysis moves forward...<br />Construction Administration<br />Implementation Documents<br />Conceptualization<br />Detailed Design<br />Agency Review<br />Criteria Design<br />Closeout<br />Buyout<br />Sense-Making<br />Time<br />
    25. 25. Certainty moves forward...<br />Wisdom Curve<br />Construction Administration<br />Implementation Documents<br />Conceptualization<br />Detailed Design<br />Agency Review<br />Criteria Design<br />Closeout<br />Buyout<br />Commitment<br />Time<br />
    26. 26. Form-Seeking<br />Generative<br />Components<br />Problem-Solving<br />Design<br />Affinity”<br />building<br />SMART<br />BIM<br />Technology<br />PIM<br />Process<br />Design <br />Interface<br />Matrix<br />Integrated Project Delivery™<br />
    27. 27. BIM and… buildingSMART<br />Intelligence and… Innovation<br />Sustainable Design and… Form-Solving™<br />
    28. 28.
    29. 29. Owner<br />Contractor<br />Architect<br />
    30. 30. Owner<br />Contractor<br />Architect<br />
    31. 31. Owner<br />Contractor<br />Architect<br />
    32. 32. Intelligence<br />Data<br />Information<br />Knowledge<br />Wisdom<br />
    33. 33. What should we do?<br />How do we solve this problem?<br />Where do we go now?<br />Who can help?<br />decision-making<br />recognizing patterns<br />fusing heart & soul<br />&quot;Once you make a decision, the universe conspires to make it happen.”<br />Wisdom asks & answers…<br />
    34. 34. Peter Drucker<br />
    35. 35. Innovation<br />Internal<br />process need<br />unexpected<br />incongruity<br />changes in market structure<br />External<br />new knowledge<br />demographics<br />changes in perception, mood, meaning<br />
    36. 36. BIM and… buildingSMART<br />Intelligence and… Innovation<br />Sustainable Design and… Form-Solving™<br />
    37. 37. 3DS<br />Max<br />Rhino<br />Maya<br />FormSolving™<br />ADT<br />Gravity<br />Affinity<br />Ecotect<br />Sketch Up<br />Tekla<br />BIM<br />Navisworks<br />Binder<br />Problem-Solving<br />Wind<br />CadDuct<br />5D<br />Blueprint<br />Form-Seeking<br />4D<br />Construction <br />Information <br />Model<br />IWMS<br />Building<br />Outcome<br />
    38. 38. FormSolving™<br />Past<br />Sustainable Design<br />‘form follows function’<br />Future<br />Living Design<br />‘form is function’<br />
    39. 39. Living Buildings<br />
    40. 40. BioPhilia<br />
    41. 41. BioMorphism<br />
    42. 42. BioMimicry<br />
    43. 43. Biomimicry Guild<br />
    44. 44. Image – courtesy of HOK<br />
    45. 45. Image – courtesy of HOK<br />
    46. 46. Final Thoughts<br />Building Information Modeling<br />collaborative<br />holistic<br />Purpose – Driven Exchange<br />innovative<br />predictive<br />buildingSMART is FormSolving™<br />function is form<br />wisdom emerges<br />
    47. 47. Thank You<br />

    ×