ABSTRACT
Modeling Construction Competitive Bidding: An Agent-Based Approach
Sadegh Asgari
The construction industry is a c...
of market conditions (2) study the effect of contractors’ risk behavior, cost estimating and project
management skills, an...
Upcoming SlideShare
Loading in …5
×
Upcoming SlideShare
Studies on Iron Biofortified Maize
Next
Download to read offline and view in fullscreen.

0

Share

Download to read offline

Sadegh Asgari - Modeling Construction Competitive Bidding An Agent-Based Approach - Abstract

Download to read offline

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

Sadegh Asgari - Modeling Construction Competitive Bidding An Agent-Based Approach - Abstract

  1. 1. Modeling Construction Competitive Bidding: An Agent-Based Approach Sadegh Asgari Submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy in the Graduate School of Arts and Sciences COLUMBIA UNIVERSITY 2016
  2. 2. © 2016 Sadegh Asgari All rights reserved
  3. 3. ABSTRACT Modeling Construction Competitive Bidding: An Agent-Based Approach Sadegh Asgari The construction industry is a complex, multi-level system that includes a large collection of independent, heterogeneous organizations and institutions and is associated with several economic sectors and markets. Because of its unique characteristics, the construction industry as one of the major economic sectors and contributors to the economic development of the nation needs its own specific and dedicated economics. The shortcomings of the existing methodologies call for the use of more sophisticated modeling tools that can capture more important aspects of the real world and its complexity in particular the interconnections among elements of the system, their idiosyncrasies, and emergent behavior. As a pioneer attempt in the exploration of a new theory of construction economics, this study aims to found the first building blocks of the comprehensive economic model of the construction industry. In this dissertation, an agent-based approach is applied to model the low-bid lump-sum construction competitive bidding by which most construction works are allocated. This model has several advantages over the previous analytical and empirical models including the capability of observing the bidding process dynamics, the interaction between the heterogeneous and learning agents, and the emergent bidding patterns arising from multiple scenarios of market conditions and contractors’ attributes. Then the model is used as a virtual laboratory for conducting a variety of experiments to answer several important research questions in the field of construction economics. The main research objectives of this study are to: (1) analyze the effectiveness of major quantitative methods in the bidding environment under a variety
  4. 4. of market conditions (2) study the effect of contractors’ risk behavior, cost estimating and project management skills, and complexity of projects on contractors’ choice of optimal markup, long- term financial growth and market share (3) investigate the impact of risk behavior and need for work on contractors’ performance. The results presented in this dissertation offer new understandings and insights on the construction bidding environment and recommendations for both owners and contractors’ competitive success, which are not available using conventional approaches. In particular, results suggest that (1) using Friedman model can result in considerably higher market share whereas using Gates model can result in higher profit per project, (2) the optimal policy for contractors is moderation in both dimensions of risk attitude and need for work, (3) the comparative performance of slightly and extremely risk averse contractors are depending on level of cost estimating accuracy and project execution skills of contractors as well as the level of project complexities.

Views

Total views

313

On Slideshare

0

From embeds

0

Number of embeds

66

Actions

Downloads

2

Shares

0

Comments

0

Likes

0

×