Risk management in complex changeovers through cfmea
Maintenance Reliability
1. The Problem with Maintenance Today Managers and craftsmen.. reacting to an immediate need... end up running around planning the job just before its due to start, or the supervisor assigns a craftsman to accomplish it. This evolution almost always results in work delays, incompletejobs, inefficient work plans, job interruptions, and absolutely nohistoryof what transpired in the planning phase to build performance measures. All Work is planned! It is just a matter of .. Who… (you or the equipment) When… (you or the equipment) and How Well!
2. Basic Maintenance Philosophies Reactive Maintenance - Run to Failure Preventive Maintenance - Interval or Time Based Predictive Maintenance- Condition Based Proactive Maintenance - Root Cause Based
3. Potential to Hard Failure Curve Changes in Vibration P-F interval 1-9 months Point where failure starts to occur Wear Debris in oil P-F interval 1-6 months IR Thermography P-F interval 3-12 weeks Audible noise P-F interval 1-4 weeks P1 P2 P3 Heat by touch P-F interval 1-5 days P = Potential Failure P4 P5 F = Failure F
4. The P-F Incidents on Scrubber Failure Example: Circulation pump failed. Unknown failure at this point. Supplier scheduled and performed PM on scrubber system-identified problems. Material had a long lead time, ordered all necessary material/supplies to correct problems. Scheduling down time to perform repairs. Circulation tank filling up with sludge & circulation pump seal leaking. Build up of material on Plater is accumulating more than normal. P1 P3 P2 Scrubber ventilation decreased beyond functional levels-Shut Down Discovered the circulating pump quit working. Scrubber and plater continue to run. Ordered new pump-long lead time. P = Potential Failure P4 P5 F0 Increased smell emitting from plater material F = Failure F1
5. Events and Reason the Scrubber Failed Example: Scheduled and performed PM on scrubber. Identified problems and material. Material had a long lead time, ordered and received all necessary material/supplies to correct problems. Scheduling supplier to perform removal of material. Scrubber ventilation decreased beyond functional levels-We learned that the machine will run to failure but due to the working conditions, the machine had to be shut down and repaired. We must perform repairs between P5 and F0. P1 P2 P3 P4 Points where failure starts to occur P1 to P3 P5 Predictive Tools Used => Air Flow Meter F0 F1 W-1 W-2 W-4 W-5 W-6 W-? W-3 W+1 Timeline Towards Failure Future Work Execution
7. Asset Reliability Foundation Key elements for building a good foundation. Each company will need to build the foundation to their needs and requirements. 100% Reliability 90% OEE MTBF & MTTR 80% Restoration / Overhaul Predictive Maintenance 70% Autonomous Maintenance Maintenance Planning Maintenance Scheduling 60% Maintenance CMMS 40% Leadership Buy-IN Maintenance Training Establish Maintenance Team
9. Requirements for Success Good Planning Complete Parts Lists Good Scheduling High % of Scheduled Work High Schedule Compliance Integrated Processes Purchasing, Stores & Work Management Good Control System Manual or CMMS
10. How to get it done! Significantly Expand the PdM initiatives Re-institutionalized the use of the CMMS Focused on Planning/Scheduling the Right Work (PM, PdM, Results) Conducted RCM analysis on strategic systems Optimized and integrated their PM & PdMStrategies Integrated Master Scheduling