Kickoff PoC Project GAPW/BAG

604 views

Published on

18-2-2009
Dutch presentation of the kickoff of the project GAPW/BAG at client dS+V Gemeente Rotterdam. Starting with a Proof of Concept (PoC)

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
604
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Kickoff PoC Project GAPW/BAG

  1. 1. Testfase PoC Project GAPW/BAG 13-07-09
  2. 2. Planning  Mijlpalen  11/3 Ketentestomgeving gereed  13/3 Acceptatietestgevallen gereed  20/3 Bouw en systeemtest (PoC) afgerond  20/3 GUC (PoC) opgeleverd (incl. Koppeling LV BAG)  23/3 Start Acceptatietest (PoC)  27/3 Acceptatietest afgerond en advies vervolg PoC 2 13-07-09
  3. 3. Entry-Criteria (per 18/3) Woonplaatscodes bekend (evt. dummies) Woonplaatsgeometrie (XML) beschikbaar 3 13-07-09
  4. 4. Acceptatiecriteria PoC  Succesvolle levering en mutatie (HERNOEMEN) van ‘WOONPLAATS’ vanuit BRS via BAG Totaal aan de GUC en LV BAG, inclusief correcte foutafhandeling en correcte terugkoppeling in BAG Totaal.  Bij verstoring in de aansluitingen naar BAG-Totaal, LV BAG en Gegevensmagazijn en het herstarten ervan mag geen corrupte data ontstaan.  Het inlezen van woonplaatsgeometrie is mogelijk in de BRS.  BRS-performance mag voor de gebruikers niet tot verstorende achteruitgang leiden (‘WOONPLAATS’ < 2 sec). 4 13-07-09
  5. 5. Acceptatieprocedure PoC Verwerking en muteren ‘WOONPLAATS’ door keten  Inclusief terugkoppeling LV BAG in BAG Totaal! Advies vanuit testteam vervolg PoC incl. risico’s Advies vanuit leveranciers vervolg PoC 5 13-07-09
  6. 6. ‘WOONPLAATS’ 6 13-07-09
  7. 7. Wie en waar? EP II 12.x 7 13-07-09

×