Project Begins 7 8 12

264 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
264
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Project Begins 7 8 12

  1. 1. Marblehead, MA – Beautiful Town
  2. 2. The school moves out of both buildings
  3. 3. Trailers arrive – Tight Squeeze but it fit
  4. 4. Home
  5. 5. AQE arrives and gets off to a great start!
  6. 6. Containments are built
  7. 7. Removal ofExt. WindowCaulking
  8. 8. So much plastic, IThought I sawJoan Rivers!
  9. 9. Rear building to be demolished
  10. 10. Out with the old buildings and in with the new – The countdown toDemolition has begun!
  11. 11. Say Goodbye!
  12. 12. Almost crunch time! (Photo used from internet as display only)

×