Tissue Lane<br />
Tissue Lane<br />Proposed Site<br />
Tissue Lane<br />2<br />12<br />Legend<br />11<br />1. Maintenance Building<br />2. (Expansion) Greenhouse<br />10<br />3....
Tissue Lane<br />-(Expansion)<br /> Possible Future Projects<br />Site Sections<br />100’<br />25’<br />0’<br />50’<br />
Tissue Lane<br />A-A<br />2<br />1<br />B-B<br />UP<br />5<br />3<br />Ground Floor Plan<br />4<br />10’<br />0’<br />5’<b...
Tissue Lane<br />10’<br />0’<br />5’<br />25’<br />Section B-B<br />2’<br />0’<br />10’<br />0’<br />Section Detail<br />4...
Tissue Lane<br />East Elevation<br />10’<br />0’<br />South Elevation<br />25’<br />5’<br />
Tissue Lane<br />Concrete Wall<br />Wooden Post<br />Truss<br />Stud Wall<br />
Tissue Lane<br />Northwest Rendering<br />Southeast Rendering<br />
Upcoming SlideShare
Loading in …5
×

Baker Tissue Lane Final

237 views

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
237
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Baker Tissue Lane Final

  1. 1. Tissue Lane<br />
  2. 2. Tissue Lane<br />Proposed Site<br />
  3. 3. Tissue Lane<br />2<br />12<br />Legend<br />11<br />1. Maintenance Building<br />2. (Expansion) Greenhouse<br />10<br />3. Employee Parking<br />1<br />4. Fleet Parking<br />5. Filler Bays<br />6. Chemical Storage<br />4<br />9<br />8<br /> 7<br />7. Spray Booth<br />6<br />8. Compost Pile<br />5<br />9. Dumpster<br />3<br />10. Ext. Dining Area<br />11. Fuel Tank<br />12. Visitor Parking<br />-(Expansion)<br /> Possible Future Projects<br />Site Plan Weave<br />
  4. 4. Tissue Lane<br />-(Expansion)<br /> Possible Future Projects<br />Site Sections<br />100’<br />25’<br />0’<br />50’<br />
  5. 5. Tissue Lane<br />A-A<br />2<br />1<br />B-B<br />UP<br />5<br />3<br />Ground Floor Plan<br />4<br />10’<br />0’<br />5’<br />25’<br />Legend<br />1. Maintenance Area<br />2. Shop<br />A-A<br />3. Men&apos;s Mud & Restroom<br />4. Women&apos;s Mud & Restroom<br />7<br />5. Covered Parking Bays<br />Down<br />6. Conference Room<br />9<br />7. 15’x15’ Office<br />8. 100 S.F. Office<br />B-B<br />7<br />9. Storage<br />8<br />Down<br />6<br />10. Ext. Dining Area<br />10<br />Upper Floor Plan<br />10’<br />0’<br />5’<br />25’<br />N<br />
  6. 6. Tissue Lane<br />10’<br />0’<br />5’<br />25’<br />Section B-B<br />2’<br />0’<br />10’<br />0’<br />Section Detail<br />4’<br />1’<br />5’<br />25’<br />Section A-A<br />
  7. 7. Tissue Lane<br />East Elevation<br />10’<br />0’<br />South Elevation<br />25’<br />5’<br />
  8. 8. Tissue Lane<br />Concrete Wall<br />Wooden Post<br />Truss<br />Stud Wall<br />
  9. 9. Tissue Lane<br />Northwest Rendering<br />Southeast Rendering<br />

×