ENGINEERING DEPARTMENT ROYAL ORCHID CENTRAL      Resentation prepared by          Raghunath Patil          Chief Engineer
MAIN FEEDER        Make Megawin Switch gear Incomer – 111000 VI/C From Naiknaware   Incomer --211000 V I/C From MarigoldCO...
CT PTLocation : Meter RoomPurpose : To record daily electricity consumptionTechnical Data : Rating11000 V CT Rating 25/5 S...
LT.PANELLocation : Near MSEDC RoomPurpose :Feed the supply to LT panel     inMinus oneTechnical Data :ACB1600 AType: NT 16...
LT.PANELLocation : Minus OnePurpose : Receive the Supply fromMSEB and DG Set and distribute topanels and capacitor bank th...
LT.PANEL ( From Left First Section )Location : Minus One ( LT Panel )Technical Data1) 63 A Switches Make – MG – 3 Nos2) 32...
LT.PANEL ( From Left Second Section )                     MSEB BREAKERLocation : L.T. ROOM PANELPurpose : To feed MSEB sup...
LT.PANEL ( From Left Third Section )                  DG BREAKERLocation : L.T. ROOM PANELPurpose : To feed Genertor suppl...
LT.PANEL ( From Left Fourth Section )                4th FLOOR BREAKERLocation : L.T. ROOM PANELPurpose : To feed supply t...
LT.PANEL ( From Left Fifth Section )Location : L.T. ROOM PANELPurpose : Get supply from Busbar andfeed to1) (Spare)2) Serv...
CAPECIRER (BANK) A P F C     PANELLocation : L.T. ROOM PANELPurpose : To improve the power  factor of electrical supplyTec...
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Supply distribution and equip31.7.11
Upcoming SlideShare
Loading in …5
×

Supply distribution and equip31.7.11

966 views

Published on

Published in: Business
  • Be the first to comment

Supply distribution and equip31.7.11

  1. 1. ENGINEERING DEPARTMENT ROYAL ORCHID CENTRAL Resentation prepared by Raghunath Patil Chief Engineer
  2. 2. MAIN FEEDER Make Megawin Switch gear Incomer – 111000 VI/C From Naiknaware Incomer --211000 V I/C From MarigoldCOMMEN FEEDER Feeder No 1To Ventura & Life Style Feeder No 2Royal OrchidZALIO TRANSFOMER PROTECTION PANELTransformer
  3. 3. CT PTLocation : Meter RoomPurpose : To record daily electricity consumptionTechnical Data : Rating11000 V CT Rating 25/5 Stc Rating13/ KA For 1 SecPT11000 √3/110/√3 Make Huphen Electronic Meter No 07035421
  4. 4. LT.PANELLocation : Near MSEDC RoomPurpose :Feed the supply to LT panel inMinus oneTechnical Data :ACB1600 AType: NT 16 HIMake: Merline GerinDigital Voltmeter and Ammeter
  5. 5. LT.PANELLocation : Minus OnePurpose : Receive the Supply fromMSEB and DG Set and distribute topanels and capacitor bank throughbreakers.Technical Data :ACB1600 A 2 NosACB1000 A 1 NosType: NT—16 HIMake: Merline GerinDigital VoltmetersAmmetersKWH MetersCapacitor BankSwitchesMCBsIndicators
  6. 6. LT.PANEL ( From Left First Section )Location : Minus One ( LT Panel )Technical Data1) 63 A Switches Make – MG – 3 Nos2) 32 A Switches Make – MG – 1 Nos3) 63 A – 3 Pole MCB – 3 Nos4) 32 A – 3 Pole MCB – 2 Nos5) 32 A – 2 Pole MCB – 1 Nos6) 10 A – 2 Pole MCB – 1 NosPurpose : Receive the Supply from and distribute to Panels and equipmentsSwitches 1) Lobby Light 2) . 3) Pump 4) Pump 5) MainMCBs:- 1) Guest Elevator 2) UPS ROC 3) Guest Elevator 4) 5) Softner 6) UPS LT Room 7) Parking Lighting DB
  7. 7. LT.PANEL ( From Left Second Section ) MSEB BREAKERLocation : L.T. ROOM PANELPurpose : To feed MSEB supply to breakers in LTpanel roomTechnical Data :ACB1600 AType: NT16 HIMake: Merline GerinDigital Voltmeter -1 noAmmeter – 1 NoKWH Meter
  8. 8. LT.PANEL ( From Left Third Section ) DG BREAKERLocation : L.T. ROOM PANELPurpose : To feed Genertor supply to breakerswhen MSEB Supply goes OFFTechnical Data :ACB1600 A EDOType: NT16 HI MASTER PACTMake: Merline GerinDigital Voltmeter -1 noAmmeter – 1 NoKWH Meter
  9. 9. LT.PANEL ( From Left Fourth Section ) 4th FLOOR BREAKERLocation : L.T. ROOM PANELPurpose : To feed supply to 4TH Floor Panel roomTechnical Data :ACB1600 A EDOType: NT16 HIMake: Merline GerinDigital Voltmeter -1 noAmmeter – 1 NoKWH Meter
  10. 10. LT.PANEL ( From Left Fifth Section )Location : L.T. ROOM PANELPurpose : Get supply from Busbar andfeed to1) (Spare)2) Service Elevator3) Lobby Scanner4) (?????)5) ArealiaTechnical Data : Switch Merlin Gerin125 A TPN SF 4 -- 5 No KWH Meter – 1 Ammeter– 1
  11. 11. CAPECIRER (BANK) A P F C PANELLocation : L.T. ROOM PANELPurpose : To improve the power factor of electrical supplyTechnical Data :Breaker; 1000A ACB EDOMake ; Marlin Gerin50 KVAR 100A SFU – 11 NosPower Factor Controller HFI-6612PF Meter Make SyconVolt meter 1Ampere Meter 1

×