Eng. Ahmed Altaif
Renewable Energy Director
2
 Sudan is one of the largest countries in Africa.
 In July 2011 south Sudan was separated and
became an independent co...
Area :
1.89 M Sq. Km
Population :
33 Million
Capital :
Khartoum
GDP (2011):
66 Billion Dollars
3
Republic of SUDAN - Minis...
 The supply of electric energy in
Sudan started in Khartoum the
capital of Sudan in the year
1908.
 From 2010 the Minist...
THE MINISTER
Public and Private Companies
Technical Organ for Electricity
Regulation and Control
Dams implementation unit
...
Hydro
56.8%
Steam
17.5%
Combined Cycle
16.1%
Diesel
7.2%
Gas Turbine
2.3%
Total Installed Capacity = 2,533 MW
6
Republic o...
7
Total Generated Electricity
2011: 8,455.17 GWh
Republic of SUDAN - Ministry of Water Resources & Electricity
8
 The Sudan electricity generation system
comprises approximately 8,560 km of high
voltage transmission lines.
 In addi...
Domestic
51%
Industrial
16%
Agriculture
5%
Commerce
15%
Governmental
13%
9
Republic of SUDAN - Ministry of Water Resources...
 Electrification Ratio: 40%
 Electricity consumption per capita:
256.2 kWh/ year
10
Republic of SUDAN - Ministry of Wate...
11
Republic of SUDAN - Ministry of Water Resources & Electricity
12
Republic of SUDAN - Ministry of Water Resources & Electricity
 Renewable energy resources studies.
 3 Wind Energy generation projects with a
total capacity of 320 MW
 4 Solar Energy...
 Resource studies are been carried out to
pin point future generation project.
 The available studies:
◦ Wind Atlas
◦ So...
 Average wind speed 4.2
– 8.1 meter/second at
80 meters above
ground level (agl)
 Areas with highest wind
speed:
◦ Red S...
 Average daily solar
irradiation: 5.8 – 7.2
kWh/m2
 The solar radiation
increases in northern
and west-northern
areas an...
17
Republic of SUDAN - Ministry of Water Resources & Electricity
 100MW Dongola wind farm .
 20MW Nyala wind farm .
 180MW Red Sea wind farm .
18
Republic of SUDAN - Ministry of Water ...
19
• Capacity: 100 MW
• Location: Dongola
• Wind speed: 7.2 m/s
(@60m agl) annual average.
• Feasibility study: available
...
20
• Capacity: 20 MW
• Location: Nyala
• Wind speed: 7.9 m/s
(@60m agl) annual average.
• Feasibility study: available
• L...
21
• Capacity: 180 MW
• Location: Portsudan
• Wind speed: 7.04 m/s
(@50m agl) annual average.
• Feasibility study: ongoing...
22
Republic of SUDAN - Ministry of Water Resources & Electricity
 10 MW Khartoum Photovoltaic Power Plant
 5 MW Nyala Photovoltaic Power Plant
 3 MW Al Fashir Photovoltaic Power Plant
...
 Capacity: 10 MW
 Location: Khartoum
 The average annual solar
irradiation: 2,398 kWh/m2
 Connected to the National
Gr...
 Capacity: 5 MW
 Location: Nyala
 The average annual solar
irradiation: 2,330 kWh/m2
 Connected to isolated grid
 Est...
 Capacity: 3 MW
 Location: Al Fashir
 The average annual solar
irradiation: 2,370 kWh/m2
 Connected to isolated grid
...
 Capacity: 2 MW
 Location: Al Geniena
 The average annual solar
irradiation: 2,370 kWh/m2
 Connected to isolated grid
...
28
Republic of SUDAN - Ministry of Water Resources & Electricity
 Target: 1.1million solar home system(SHS)
 Period: 2012-2031
 Beneficiaries: 5.5 million, 16% of population
 Budget: ...
30
Republic of SUDAN - Ministry of Water Resources & Electricity
 Khartoum 50 MW waste to energy project,
feasibility study completed.
 Feasibility Study To assess the production
and ut...
 Renewable energy Master Plan based on
resource studies.
 Geothermal Energy Geo-scientific Study in
Red Sea and North Da...
33
Eng. Ahmed Altaif
Renewable Energy Director
Ministry of Water Resources and Electricity – Sudan
Email: aaltaif@gmail.co...
Upcoming SlideShare
Loading in …5
×

RCREEE-enerMENA_sudan renewable energy projects-21.08.2013

1,614 views

Published on

Renewable Energy for Project Planners and Managers:enerMENA Professional Training Course for CSP
19-23 August,2013
Cairo, Egypt.

Published in: Technology, Business
0 Comments
6 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,614
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
6
Embeds 0
No embeds

No notes for slide

RCREEE-enerMENA_sudan renewable energy projects-21.08.2013

  1. 1. Eng. Ahmed Altaif Renewable Energy Director
  2. 2. 2  Sudan is one of the largest countries in Africa.  In July 2011 south Sudan was separated and became an independent country.  Sudan is bordered by seven countries which are Egypt, Libya, Chad, Central Africa, South of Sudan, Ethiopia, Eritrea in addition to the Red Sea in the east. Republic of SUDAN - Ministry of Water Resources & Electricity
  3. 3. Area : 1.89 M Sq. Km Population : 33 Million Capital : Khartoum GDP (2011): 66 Billion Dollars 3 Republic of SUDAN - Ministry of Water Resources & Electricity
  4. 4.  The supply of electric energy in Sudan started in Khartoum the capital of Sudan in the year 1908.  From 2010 the Ministry of Water Resources and Electricity became the responsible state body for the electric power sector in Sudan. 4 Republic of SUDAN - Ministry of Water Resources & Electricity
  5. 5. THE MINISTER Public and Private Companies Technical Organ for Electricity Regulation and Control Dams implementation unit Kinana &Rahad Implementation Corporation Ministerial Council Consultant Council Undersecretary General Directorate for Generating Electricity using Nuclear, Renewable, and Alterative Energy General Directorate for Policies, Planning and Projects General Directorate for Financial and Human Resources General Directorate for International Relations General Directorate for Investment, Finance and Contracts Electric Power Sector Structure in Sudan Sudanese Hydro Generation Company Sudanese Thermal Generation Company Sudanese Electricity Transmission Company Sudanese Electricity Distribution Company Marowe Dam Company 5 Republic of SUDAN - Ministry of Water Resources & Electricity
  6. 6. Hydro 56.8% Steam 17.5% Combined Cycle 16.1% Diesel 7.2% Gas Turbine 2.3% Total Installed Capacity = 2,533 MW 6 Republic of SUDAN - Ministry of Water Resources & Electricity
  7. 7. 7 Total Generated Electricity 2011: 8,455.17 GWh Republic of SUDAN - Ministry of Water Resources & Electricity
  8. 8. 8  The Sudan electricity generation system comprises approximately 8,560 km of high voltage transmission lines.  In addition, fourteen isolated centres are served by thermal generating plants and local distribution networks. Republic of SUDAN - Ministry of Water Resources & Electricity
  9. 9. Domestic 51% Industrial 16% Agriculture 5% Commerce 15% Governmental 13% 9 Republic of SUDAN - Ministry of Water Resources & Electricity
  10. 10.  Electrification Ratio: 40%  Electricity consumption per capita: 256.2 kWh/ year 10 Republic of SUDAN - Ministry of Water Resources & Electricity
  11. 11. 11 Republic of SUDAN - Ministry of Water Resources & Electricity
  12. 12. 12 Republic of SUDAN - Ministry of Water Resources & Electricity
  13. 13.  Renewable energy resources studies.  3 Wind Energy generation projects with a total capacity of 320 MW  4 Solar Energy generation projects with a total capacity of 20 MW 13 Republic of SUDAN - Ministry of Water Resources & Electricity
  14. 14.  Resource studies are been carried out to pin point future generation project.  The available studies: ◦ Wind Atlas ◦ Solar Atlas  The ongoing studies: ◦ Geothermal Energy Geo-scientific Study ◦ Biomass resources study 14 Republic of SUDAN - Ministry of Water Resources & Electricity
  15. 15.  Average wind speed 4.2 – 8.1 meter/second at 80 meters above ground level (agl)  Areas with highest wind speed: ◦ Red Sea ◦ Northern Sudan (Dongola) ◦ Jabel Marra Mountains in western Sudan 15 Republic of SUDAN - Ministry of Water Resources & Electricity
  16. 16.  Average daily solar irradiation: 5.8 – 7.2 kWh/m2  The solar radiation increases in northern and west-northern areas and decreases towards the south 16 Republic of SUDAN - Ministry of Water Resources & Electricity
  17. 17. 17 Republic of SUDAN - Ministry of Water Resources & Electricity
  18. 18.  100MW Dongola wind farm .  20MW Nyala wind farm .  180MW Red Sea wind farm . 18 Republic of SUDAN - Ministry of Water Resources & Electricity
  19. 19. 19 • Capacity: 100 MW • Location: Dongola • Wind speed: 7.2 m/s (@60m agl) annual average. • Feasibility study: available • Land: Secured • Estimated commission date:2015 • Status: Fund required. Republic of SUDAN - Ministry of Water Resources & Electricity
  20. 20. 20 • Capacity: 20 MW • Location: Nyala • Wind speed: 7.9 m/s (@60m agl) annual average. • Feasibility study: available • Land: Available • Estimated commission date: 2015 • Status: Fund required. Republic of SUDAN - Ministry of Water Resources & Electricity
  21. 21. 21 • Capacity: 180 MW • Location: Portsudan • Wind speed: 7.04 m/s (@50m agl) annual average. • Feasibility study: ongoing • Land: Available • Estimated commission date:2015 • Status: measurement process ongoing Republic of SUDAN - Ministry of Water Resources & Electricity
  22. 22. 22 Republic of SUDAN - Ministry of Water Resources & Electricity
  23. 23.  10 MW Khartoum Photovoltaic Power Plant  5 MW Nyala Photovoltaic Power Plant  3 MW Al Fashir Photovoltaic Power Plant  2 MW Al Geniena Photovoltaic Power Plant 23 Republic of SUDAN - Ministry of Water Resources & Electricity
  24. 24.  Capacity: 10 MW  Location: Khartoum  The average annual solar irradiation: 2,398 kWh/m2  Connected to the National Grid  Estimated commission date: 2014  Status: Tendering phase. 24 Republic of SUDAN - Ministry of Water Resources & Electricity
  25. 25.  Capacity: 5 MW  Location: Nyala  The average annual solar irradiation: 2,330 kWh/m2  Connected to isolated grid  Estimated commission date : 2014  Status: Tendering phase. 25 Republic of SUDAN - Ministry of Water Resources & Electricity
  26. 26.  Capacity: 3 MW  Location: Al Fashir  The average annual solar irradiation: 2,370 kWh/m2  Connected to isolated grid  Estimated commission date: 2014  Status: Tendering phase. 26 Republic of SUDAN - Ministry of Water Resources & Electricity
  27. 27.  Capacity: 2 MW  Location: Al Geniena  The average annual solar irradiation: 2,370 kWh/m2  Connected to isolated grid  Estimated commission date: 2014  Status: Tendering phase. 27 Republic of SUDAN - Ministry of Water Resources & Electricity
  28. 28. 28 Republic of SUDAN - Ministry of Water Resources & Electricity
  29. 29.  Target: 1.1million solar home system(SHS)  Period: 2012-2031  Beneficiaries: 5.5 million, 16% of population  Budget: 400 million US $  Share in rural electrification rate 26% in 20 years 29 Republic of SUDAN - Ministry of Water Resources & Electricity
  30. 30. 30 Republic of SUDAN - Ministry of Water Resources & Electricity
  31. 31.  Khartoum 50 MW waste to energy project, feasibility study completed.  Feasibility Study To assess the production and utilization of biogas for power generation, feasibility study ongoing. 31 Republic of SUDAN - Ministry of Water Resources & Electricity
  32. 32.  Renewable energy Master Plan based on resource studies.  Geothermal Energy Geo-scientific Study in Red Sea and North Darfur areas (Bayuda area study completed). Republic of SUDAN - Ministry of Water Resources & Electricity 32
  33. 33. 33 Eng. Ahmed Altaif Renewable Energy Director Ministry of Water Resources and Electricity – Sudan Email: aaltaif@gmail.com Thank you

×