Task

Very Small

Inbound Interfaces
(Typically using BDCs
and IDOCS)

File Structure Change : At the End of
structure.
Si...
List Reports

Change in Text Element, Field Label,
changing field length or position.
Addition of new Messages(Info, error...
Function Module

Changes to Function module used in single
program with 1 parameter changes
Time 6hrs

LSMW

OSS Notes (Li...
Small
File Structure Chage : In Middle of
structure..
Validating the Input file.
And / Or Configuration changes to
IDOCS.
...
Creating new reports using 2 tables,
with no calculations, and no
processing of data. Modification the
report output, like...
Changes to Function module with 2 -5
parameter changes, with simple logic.
Or
New Function module with 4
parameters and ex...
Very Complex

New Interface : BDC / IDCOS involving
multiple transactions.
(Time 56 hrs)

NA

NA

NA
NA

NA

NA

Creation of New module programs with
document posting.
Time 72 hrs
NA

New Report which includes creation of
new SAP Sets and Modifying SAP Sets OR
Applying changes for multiple rows in
Rep...
Upcoming SlideShare
Loading in …5
×

Size & complexity estimation template abap

1,896 views

Published on

Published in: Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,896
On SlideShare
0
From Embeds
0
Number of Embeds
10
Actions
Shares
0
Downloads
73
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Size & complexity estimation template abap

  1. 1. Task Very Small Inbound Interfaces (Typically using BDCs and IDOCS) File Structure Change : At the End of structure. Simple Validation upto 3 fields. And / Or Change in Parameter not involving Program changes. And no Configuraton changes to IDOCS (Time 8 hrs) Outbound Interfaces (Typically using SQL) Change in Parameter not involving Program changes. And No Configuraton changes to IDOCS Or File Naming convention change (Time 6 hrs) Interactive Reports Change in Text Element, Field Label, changing field length or position. Addition of new Messages(Info, error, Abend etc) Time 4hrs ALV Reports Format change, Or Addition of new fields with no logic change for ALV List. Or Change in Text Element, Field Label Or Addition of new Messages(Info, error, Abend etc) Time 6hrs
  2. 2. List Reports Change in Text Element, Field Label, changing field length or position. Addition of new Messages(Info, error, Abend etc) Time 4hrs BDC Programs Single field value updation. Or Change in BDC programs for Master data. Time 8hrs SAPScripts and Smart Forms Any Image Upload Or Simple Header Text Changes Time 8hrs User Exits Addition of conditional statement Time 10 hrs Dialog Programs Format Changes for the selection screen. Or Adding validation upto one field Or Adding search help for upto one field Or Adding Pop up messages Time 8 hrs
  3. 3. Function Module Changes to Function module used in single program with 1 parameter changes Time 6hrs LSMW OSS Notes (Limited to only Applying) Applying upto 1 note Or As per note taking acess key of Program and doing changes manually for upto 2 programs Time 8 hrs Applying changes upto two rows in Report Or applying changes to single SAP Set (Changes applied to one Report after Report Painter/Report Writer getting Mapping File from BA/Client)
  4. 4. Small File Structure Chage : In Middle of structure.. Validating the Input file. And / Or Configuration changes to IDOCS. Or Parameter changes (Upto 2) involving Program changes. New Interface with Single file updating Z tables (Time 20 hrs) Medium New Interface using simple BDC. Parameter changes (> 2) involving Program changes. (Time 36 hrs) Complex New Interface : With Error notification and complex BDC / IDOCS. (Time 48 hrs) Parameter changes (> 2) involving Program changes. Simple change in Logic for extracting Or data. Change in Logic for extracting Or data. Parameter changes (Upto 2) involving Or Program changes. Addition of New fields in output Or file. Addition of New fields in output file Or New Interface, involving complex involving simple logic Simple New Interface. IDOC creation logic. (Time 16 hrs) (Time 36 hrs) Time 48hrs New Reports upto one level of drilldown, using 4 tables, with no calculations, and no processing of data. OR Modification the report output, like change in selection screen upto 2 fields, addition of 1 or 2 internal tables, adding search help upto 2 fields. Modifying list output for multiline heading, and tabular output. Time 16 hrs New Reports for more than 1 level of drilldown, with calculations, and processing of data , hotspots for 2 columns Or New reports for Cross module Time 24hrs Format change, Or Addition of new fields with logic change and calculatios for ALV Grid. Or Format change, Or Event triggering upto 2 levels. Addition of new fields with no logic Change in Selection Screen 4 change and no calculatios for ALV 8 fields with change in logic Grid. Change in Selection Screen upto New development with simple 4 fields with change in Logic logic with simple calculations Time 16hrs Time 30 hrs New Reports for more than 1 level of drilldown with hotspots for multiple columns with calculations, and processing of data . Time 36 hrs. Change in Selection Screen more than 8 fields with change in logic and involving complex calculations. Or New development with complex logic and complex calculations Or Event triggering more than 2 levels Time 48 hrs
  5. 5. Creating new reports using 2 tables, with no calculations, and no processing of data. Modification the report output, like change in selection screen upto 2 fields, addition of 1 or 2 internal tables, adding search help upto 2 fields. Modifying list output for multiline heading, and tabular output.Or Event Triggering (New toolbar buttons) Time 12hrs Change in BDC programs for transactional data (Simple transaction like Delivery, Shipping ) Or New BDC program for change in Master data Time 20 hrs Creating new reports using 3 - 6 tables, with calculations, and processing of data Or New reports for Cross module using less than 4 tables. change in selection screen more than 2 fields with change in selection query Or Performance tunning Time 20hrs New BDC Programs for creating Master Data. Or New BDC programs for transactional Data, Simple transactions Time 36 hrs New SAP Script with less Small changes in Process Logic complexity like Debit Note, Or Credit Note, Delivery challan Addition of upto 3 extra fields on Or Script. Changes in Processing Logic Or Or Addition of Standard Text, and calling Addition of more than 3 extra in SAP script fields on Script Time 16 hrs Time 36 hrs New Exit with complex logic affecting single Transaction Or New exit with simple logic affecting New exit with simple logic only single transaction. affecting multiple transaction. Time 24 hrs Time 36 hrs Creation of New program with 2 screen, with no table controls and step loops Or Adding Search help for more than one Validation changes for more field. than 4 fields Or Or Adding new selection screen element Addition of new columns upto 2 upto 3 fields in Table controls. Or Or Validation chnages for 1 - 4 Addition of New List report. Time 16 hrs Time 30 hrs New Reports using 7 and above tables. Or New Reports for Cross Module using 5 and above tables. Time 32hrs New BDC Programs for transactional data. (E.g Purchase Order, FI transaction) Time 50 hrs New SApScripts with more complex logic for e.g. Purchase Order Sales Order, Bank Statement Time 50 hrs. New Exit with complex logic affecting multiple Transaction Time 54 hrs Creation of new program with table controls or step loop or tab strip . Or New module program with Dynamic calls to screen. Time 56 hrs
  6. 6. Changes to Function module with 2 -5 parameter changes, with simple logic. Or New Function module with 4 parameters and exception. Time 16 hrs New BAPI's with simple logic. Or New Function module with more than 4 parameters and exceptions, with table changes. Time 24 hrs Changes to Existing LSMW based data migration Time 40 hrs New BAPI's with complex logic. Time 36 hrs New LSMW for data migration Time 60 hrs Applying more than 1 note but upto 5 Or Applying note manually more than 2 and less than 5 programs Time 16 hrs Applying changes upto two rows in Report Or applying changes to single SAP Set (Changes applied for multiple Reports after getting Mapping File from BA/Client) Applying changes for multiple rows in Report Or changes upto 5 SAP Set (Changes applied for one Report after getting Mapping File from BA/Client) Applying changes for multiple rows in Report Or applying changes upto 5 SAP Set (Changes applied for multiple Reports after getting Mapping File from BA/Client)
  7. 7. Very Complex New Interface : BDC / IDCOS involving multiple transactions. (Time 56 hrs) NA NA NA
  8. 8. NA NA NA Creation of New module programs with document posting. Time 72 hrs
  9. 9. NA New Report which includes creation of new SAP Sets and Modifying SAP Sets OR Applying changes for multiple rows in Report and mofiying multiple SAP Sets for multiple Reports (Changes applied for multiple Reports after getting Mapping File from BA/Client)

×