Project Task Plan
           Telematics-Health Monitoring Application
TASK ID                          TASK               ...
lan
plication
    NO OF HOURS

        40

        16
        24

        96

        32
        16
        48

        11...
Upcoming SlideShare
Loading in …5
×

Sharmila Telematics

326 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
326
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Sharmila Telematics

  1. 1. Project Task Plan Telematics-Health Monitoring Application TASK ID TASK FROM DATE TO DATE 1 Project Planning 20-Jan-09 24-Jan-09 1.1 Application Goal 20-Jan-09 21-Jan-09 1.2 External References 22-Jan-09 24-Jan-09 2 Requirement Definition 27-Jan-09 9-Feb-09 2.1 Functional Requirement Analysis 27-Jan-09 30-Jan-09 2.2 Non-functional Requirement Analysis 2-Feb-09 3-Feb-09 2.3 Document Preparation 4-Feb-09 9-Feb-09 3 Designing 10-Feb-09 27-Feb-09 3.1 Data Flow Diagram 10-Feb-09 11-Feb-09 3.2 Architecture Design 12-Feb-09 13-Feb-09 3.3 System Design 16-Feb-09 17-Feb-09 3.4 User Interface Design 18-Feb-09 23-Feb-09 3.5 Database Design 24-Feb-09 27-Feb-09 4 Coding and Unit testing 2-Mar-09 3-Apr-09 4.1 Developing Source Code 2-Mar-09 30-Mar-09 4.2 Module Testing 31-Mar-09 3-Apr-09 5 Testing 6-Apr-09 18-Apr-09 5.1 Test Plan 6-Apr-09 7-Apr-09 5.2 Test Development 8-Apr-09 9-Apr-09 5.3 Test Execution 10-Apr-09 10-Apr-09 13-Apr-09 14-Apr-09 5.4 Test Reporting,Result Analysis 5.5 Retesting the Resolved Defects 15-Apr-09 16-Apr-09 5.6 Regression Testing 17-Apr-09 17-Apr-09 5.7 Test Closure 18-Apr-09 18-Apr-09 6 Installation and Acceptance 20-Apr-09 28-Apr-09 6.1 Acceptance Plan 20-Apr-09 21-Apr-09 6.2 Deployment 22-Apr-09 28-Apr-09
  2. 2. lan plication NO OF HOURS 40 16 24 96 32 16 48 112 16 16 16 32 32 208 176 32 88 16 16 8 16 16 8 8 56 16 40

×