Agile Enterprise Adoption and
   Enterprise Stage Gates
Agile Continuum
Agile Enterprise Adoption
Waterfall Software Gates &
                    Phases

Charter   Define   Design   Code   Accept   Integrate   Release
Current State – Waterfall
        1         2   3                    4     5     6

  Charter     Design Spec   Code   Acc...
State 1 – Agile Teams in "Flow"
         1          2   3                  4     5     6

  Charter    Design Spec    Code...
State 1/2 – Agile Teams in
              Iteration "Pull"
          1          2   3                            4     5   ...
State 2 – Agile Team in release
                    "Pull"
           1      2              5   6   7




           1    ...
State 3 – Agile Program in release
                   "Pull"
           1        2             5   6   7




           1 ...
State 5 – Lean Program in
                   "Innovate"
             1/                                       5    6
     ...
Upcoming SlideShare
Loading in …5
×

Agile Enterprise Adoption And Enterprise Agile Enterprise Adoption And Enterprise Stage Gates

2,233 views

Published on

These slides show the changes that happen in the enterprise stage gate model as your Agile adoption moves up and matures in the organization.

Published in: Technology, Business
0 Comments
3 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
2,233
On SlideShare
0
From Embeds
0
Number of Embeds
17
Actions
Shares
0
Downloads
58
Comments
0
Likes
3
Embeds 0
No embeds

No notes for slide

Agile Enterprise Adoption And Enterprise Agile Enterprise Adoption And Enterprise Stage Gates

  1. 1. Agile Enterprise Adoption and Enterprise Stage Gates
  2. 2. Agile Continuum
  3. 3. Agile Enterprise Adoption
  4. 4. Waterfall Software Gates & Phases Charter Define Design Code Accept Integrate Release
  5. 5. Current State – Waterfall 1 2 3 4 5 6 Charter Design Spec Code Accept-Test System-Test GA 1 6 5 2 Traditional Waterfall 3 4 Development Phases and Gates
  6. 6. State 1 – Agile Teams in "Flow" 1 2 3 4 5 6 Charter Design Spec Code Accept-Test System-Test GA 1 6 5 2 Agile Iterations 3 4 inside of Traditional Gates
  7. 7. State 1/2 – Agile Teams in Iteration "Pull" 1 2 3 4 5 6 Charter Design Spec Internal Release Accept-Test System-Test GA 1 6 5 2 Agile Internal releases inside of traditional gates 3 4
  8. 8. State 2 – Agile Team in release "Pull" 1 2 5 6 7 1 6 5 2 3. 3. Agile Team with 1 2 “n” Releases /4 /4 based on .1 .2 dependancy needs
  9. 9. State 3 – Agile Program in release "Pull" 1 2 5 6 7 1 6 5 2 3. 3. Agile Program 1 2 with “n” Releases /4 /4 based on .1 .2 governance needs
  10. 10. State 5 – Lean Program in "Innovate" 1/ 5 6 2 Charter Agile Releases System-Test GA 1/ 5 Lean 2 Program with reduced gates and 3. 3. 3. 3. n/ increased 1 2 3 4. governance /4 /4 /4 n /1 .2 .3

×