improvement of Railway stations in Western Railway

5,099 views

Published on

this give various details of works done at railway stations in western railways

Published in: Travel
3 Comments
8 Likes
Statistics
Notes
  • sir can you mail me this presentation please ?
    email ID : ahmeddans@gmail.com
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • details given have to be updated as many more improvements have been done.
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • wonderful work...but public of our country should know how to use these amenities!!!!!!
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
No Downloads
Views
Total views
5,099
On SlideShare
0
From Embeds
0
Number of Embeds
9
Actions
Shares
0
Downloads
0
Comments
3
Likes
8
Embeds 0
No embeds

No notes for slide

improvement of Railway stations in Western Railway

  1. 1. Western Railway <ul><li>Improvements in Passenger Amenities </li></ul>
  2. 2. Addition Amenities provided <ul><li>Foot Over Bridges are provided </li></ul><ul><li>Addition PF shelters are provided </li></ul><ul><li>Low level platforms are raised to medium level </li></ul><ul><li>Medium level platforms are raised to high level </li></ul><ul><li>Platforms are extended to 24 coach systematically </li></ul><ul><li>Drinking water facilities </li></ul>
  3. 3. ITEMS IMPROVED <ul><li>Improvement of circulating area & façade of station </li></ul><ul><li>Improvement of Booking /Enquiry Offices </li></ul><ul><li>Improvement to the Platform Surface. </li></ul><ul><li>Better Lighting in circulating area ,Booking Office & Queuing Area and platforms. </li></ul>
  4. 4. ITEMS IMPROVED <ul><li>Renovated Water Booths </li></ul><ul><li>Renovated, Modern, Pay and Use Toilets. </li></ul><ul><li>Good Waiting and Retiring Rooms with Modern Furniture. </li></ul><ul><li>Good Passenger Guidance System including Signage and Coach Indication Boards. </li></ul>
  5. 5. EXPENDITURE ON PASSENGER AMENITY WORKS Year Budget Grant (Rs. in Cr) Actual Expenditure (Rs. In Cr) 06-07 26.12 28.76 07-08 41.76 43.44 08-09 61.25 75.63 09-10 65.75 38.29 (upto Sept 09)
  6. 6. FEW PHOTOGRAPHS <ul><li>IMPROVEMENTS </li></ul><ul><li>IN </li></ul><ul><li>PASSENGER AMENITIES </li></ul><ul><li>WESTERN RAILWAY </li></ul>
  7. 7. Mumbai Division <ul><li>Improvements to passenger Amenities </li></ul>
  8. 8. Booking office New booking offices at STC (North-East) & BYR (South – West )
  9. 9. Work of Improvement to Booking Office in the pattern of PRS at CCG, MM(E), BVI(W), KILE, KHAR, STC(W), VLP(W), VAPI, VYA & NWU, BIY, NDB & EPR
  10. 10. <ul><li>Extension of Platform cover shed at BVI (P/F 4&5, 7), UDN (P/F 1, 2/3), BIM(NG) </li></ul>Platform Cover Shed
  11. 11. Replacement of old AC sheets of P/F covering by Aluminum sheets at CCG (P/F 1, 2 &3), ST (P/F 1, 2/3)
  12. 12. <ul><li>Improvement to deck slab flooring of FOB at BCT(L), DDR , EPR, STC, ADH by heavy duty chequered tiles. </li></ul>
  13. 13. <ul><li>Extension of High Level platforms at ADH (P/F 7), UDN (P/F 1&2), ST (P/F No. 4), VYA, NWU, MID, BIY, VYA, DDE & DXG to accommodate 24 coach trains </li></ul>Extension of platform <ul><li>2 nd rail level platforms have been provided at NWU, AN, DXG, MID & NDN. </li></ul>
  14. 14. <ul><li>Chequered tiles on edges of P/F No. 1, 2 & 3 for physically handicapped at VPI & BL have been completed. </li></ul><ul><li>Platform surface have been improved at BA P/F no. 1, between VR – UBR, ST (P/F 1, 2/3 & 4), BL (P/F 1) and BIY, DXG, AN, NDN, VYA, NDB & DDE, CHM, BL(1), NWU, </li></ul><ul><li>Goods platform at DDE, BIY & AN have been concreted. </li></ul>Improvement to Platform Surface
  15. 15. Foot Over Bridges (FOB) <ul><li>FOB provided at south end of BDTS </li></ul><ul><li>Construction of new FOB at DIC south out to out (BMC) </li></ul>
  16. 16. <ul><li>Additional landing provided at FOBs at STC PF no.1&2, MM PF no.2, BA PF no.1, NSP (North-East) </li></ul>
  17. 17. Vadodara Division <ul><li>Improvements in Passenger Amenities </li></ul>
  18. 18. AC Visitors’ Room – Vadodara Station
  19. 19. AC Retiring Room – Vadodara Station
  20. 20. AC Dormitory – Vadodara Station
  21. 21. Booking Office – Bharuch Station
  22. 22. General Waiting Room – Bharuch Station
  23. 23. Visitors Room – Bharuch Station
  24. 24. Booking Office – Ankleshwar Station
  25. 25. Platform Surface– Anand Station
  26. 26. Circulating Area – Nadiad Station
  27. 27. Upper Class Waiting Room – Nadiad Station
  28. 28. Visitors’ Room – Nadiad Station
  29. 29. FOB- Godhra
  30. 30. Premium Sitting Arrangement- Godhra
  31. 31. Booking Office- Godhra
  32. 32. Ahmadabad Division <ul><li>Improvements in Passenger Amenities </li></ul>
  33. 33. Renovation of platform surface at Maninagar station has been done in September-09
  34. 34. <ul><li>As a part of Touch & Feel items, platform surfacing of BG platform No.2 & 3 at Kalol station have been done up and also provided with Kota stone flooring </li></ul>
  35. 35. <ul><li>As a part of touch and feel item the work of improvement to the circulating area of DHG, BCO & SIOB station were completed during Feb-09 </li></ul>
  36. 36. <ul><li>During the year 2008-09 a total of 228 number 3-seater Stainless steel benches (Seating capacity 684 Nos.) were provided at Platforms, Waiting Rooms, PRS's, etc. at Ahmedabad (40 nos.), Maninagar (84 Nos.), Sabarmati (74 Nos.), Bhuj (10 nos.), and Kalol (10 nos.) stations </li></ul>
  37. 37. Improved Façade of Sabarmati Station Improved Circulating Area of Dhrangadhra Station
  38. 38. Improved Circulating Area of Samakhiyali Station Improved Circulating Area of Bhachau Station
  39. 39. Renovation of the FOB at Godhra BRC divn FOB at Dwarka Station Rajkot Divn
  40. 40. <ul><li>As a part of Touch & Feel items, following improvemental works have been executed in Sabarmati (MG) Station: </li></ul><ul><ul><ul><li>Improvement to circulating Area, Parking area, and Approach Road. </li></ul></ul></ul><ul><ul><ul><li>Improvement the platform surface by providing Kota Stone Flooring. </li></ul></ul></ul><ul><ul><ul><li>Raising the floor level of the Waiting rooms, VIP rooms, etc. including renovation of Toilet to match with the platform level. </li></ul></ul></ul><ul><ul><ul><li>Improvement to façade of the Station building. </li></ul></ul></ul><ul><li>As the station is situated very near to Gandhi Ashram, Glass Mosaic Murals of Father of the Nation, depicting various themes have also been provided. </li></ul>
  41. 41. <ul><li>The North side FOB of Ahmadabad station has been provided with flame cut granite stone which is not only durable but also provides a good aesthetic appearance </li></ul>
  42. 42. <ul><li>During October-08, renovation of the waiting room at Bhuj station was completed. The floor and dado have been provided with granite tiles </li></ul>
  43. 43. <ul><li>The Circulating area at Mahesana station has been improved as a part of Touch and Feel item during 2007-08 </li></ul>
  44. 44. Bhavnagar Division <ul><li>Improvements in Passenger Amenities </li></ul>
  45. 45. BHAVNAGAR TERMINUS After Improvement
  46. 46. PORBANDAR Before improvement After improvement
  47. 47. VERAVAL Before improvement After improvement
  48. 48. JUNAGADH Before improvement After improvement
  49. 49. GANDHIGRAM Before improvement After improvement
  50. 50. VERAVAL STATION
  51. 51. BEFORE AFTER
  52. 52. Premium Sitting Lounge at Godhra
  53. 53. Ratlam Division <ul><li>Improvements in </li></ul><ul><li>Passenger Amenities </li></ul>
  54. 54. RATLAM
  55. 55. RATLAM Ratlam Station Main Entrance
  56. 56. RATLAM Circulating Area
  57. 57. RATLAM A View of Station Building
  58. 58. RATLAM Illumination with High mast Tower in Circulating Area
  59. 59. RATLAM VIP Room
  60. 60. RATLAM Renovated Retiring Room
  61. 61. RATLAM Waiting Room with improved Seating Arrangement
  62. 62. INDORE
  63. 63. INDORE Front view of AC lounge
  64. 64. INDORE In side View of AC lounge
  65. 65. INDORE Sit Out Area Developed Near Platform No. 5
  66. 66. INDORE Inside view of AC Dormitory
  67. 67. INDORE New Pay & Use Toilet Pedestrian Plaza in front of Indore Station
  68. 68. UJJAIN
  69. 69. UJJAIN Improved Facade of Ujjain Station BG Side
  70. 70. UJJAIN Highmast Tower in Circulating Area
  71. 71. UJJAIN A View of Redesigned Circulating Area
  72. 72. UJJAIN New Upper Class Waiting Room with Furniture
  73. 73. UJJAIN Inside View of New Booking Office VIP Room
  74. 74. NAGDA
  75. 75. NAGDA A view of Improve Facade A view of Old Facade
  76. 76. NAGDA Circulating Area
  77. 77. DAHOD
  78. 78. DAHOD Improved façade Old façade of Dahod station
  79. 79. DAHOD Improved Facade
  80. 80. DAHOD Passenger sitting lounge developed at platform no.1
  81. 81. DAHOD VIP Room
  82. 82. DAHOD Garden in circulating area DHD
  83. 83. CHITTOGARH
  84. 84. CHITTORGARH Improved Façade of Chittaurgarh Station with Provision of Highmast in Circulating Area
  85. 85. CHITTORGARH Redesigned Circulating Area of Chitaurgarh Station with Lane Dividers
  86. 86. CHITTORGARH New “Pay and Use “Toilet VIP Room
  87. 87. CHITTORGARH Renovated Retiring Room
  88. 88. A view of platform No. 4
  89. 89. Sitting space provided at platform no. 4
  90. 90. Sitting arrangement in Waiting Hall
  91. 91. A view of High Mast at RTM Station
  92. 92. Second entry side circulating area
  93. 93. ATM Facility at RTM Station
  94. 94. UJJAIN Station New Upper Class & Second Class waiting hall
  95. 95. INDORE Main Entry of IND Station (BG & MG Side)
  96. 96. INDORE
  97. 97. Rajkot Division <ul><li>Improvements in Passenger Amenities </li></ul>
  98. 98. Improvement at Morbi Station after Earth Quake
  99. 99. Model Station at Rajkot
  100. 100. Improvement at FOB RJT
  101. 101. New 2nd class waitin hall at RJT Station
  102. 102. Completed FOB at THAN Station
  103. 103. Improvement of Waiting Room at THAN station
  104. 104. Improvement of Platform at Wankaner Station
  105. 105. Improvement at WKR Booking Office
  106. 106. Improvement at Booking office Bhaktinagar
  107. 107. Thanks

×