Total project costs<br />Original Estimated Cost: Rs 25 Cr.<br />Current Projected Cost: Rs 35 Cr.<br />
Increase in Temple Costs??<br />Increase in Built up area<br />Original Built up area: <br />    75000 sq ft.<br />Current...
Total Collection till May 2011: <br />                  Rs 20 Cr<br />
Plan for collecting required amt.<br />
Upcoming SlideShare
Loading in …5
×

Nvcc status

333 views

Published on

New Iskcon temple which is under construction at Pune.

Published in: Spiritual, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
333
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Nvcc status

  1. 1.
  2. 2.
  3. 3.
  4. 4.
  5. 5.
  6. 6. Current Status <br />
  7. 7. Total project costs<br />Original Estimated Cost: Rs 25 Cr.<br />Current Projected Cost: Rs 35 Cr.<br />
  8. 8. Increase in Temple Costs??<br />Increase in Built up area<br />Original Built up area: <br /> 75000 sq ft.<br />Current Built up area: 150000 sq ft.<br />Inflation – Increase in costs<br />New land acquisition<br /> (1.5 acres) <br />
  9. 9.
  10. 10. Total Collection till May 2011: <br /> Rs 20 Cr<br />
  11. 11. Plan for collecting required amt.<br />

×