  • Tiwi Islands Construction
  • Setting out the Modular Floor Frames
  • Modular Floor Frame Installation 2 days-4 Men
  • Onsite Installation of the qbModCon Patented Structural Extrusions ,External walls and Windows
  • In a fenced lot a few doors down, the concrete footings and floor frame has been laid that will form the basis of local school principal Leah Kerinauia's new home, which will be the first house in Nguiu to be privately owned
  • qbModCon Leah Nguiu Tiwi Islands 2009

    1. 1. qbModCon<br />Tiwi Islands Construction Crew<br />Tiwi Islands 2009 qbModCon Modular House<br />
    2. 2. Tiwi Islands<br />Day One Site Preparation for footings<br />
    3. 3. Floor Frame Complete<br />Modular Floor Frame Set Out<br />The Concrete Footings<br />Day two Floor Frame Completed with Concrete Footings<br />
    4. 4. Installing The Flooring and Structural Extrusions<br />Day 3 Install Viva Board Flooring and qbModCon Structural Extrusions<br />
    5. 5. The Exterior Walls and Windows<br />Day 4 Set-out External Walls with qbModCon Structural Extrusions<br />
    6. 6. The Local Fella’s Working Hard<br />
    7. 7. Installing the Ring Beam & Trusses<br />Day 5 Complete External Walls and Tighten Down Ring Beam for Truss Installation<br />
    8. 8. Installing the Trusses , Ridge and Hip beams<br />Day 6 Continue Truss Installation -with Ridge and Hip Beam Extrusions<br />Hip Beam Installation<br />Installing Internal Walls prior to roof panels <br />
    9. 9. Up Go the Roof Panels <br />Day Seven-With the Truss Sections and qbModCon Ridge Beams in Place Install the Roof Panels<br />
    10. 10. Internal Walls<br />Day 8 Finishing of Internal Walls<br />
    11. 11. <ul><li>Trim-Deck Roof Sheets
    12. 12. Available in Various colours
    13. 13. Powder coated Aluminium rails
    14. 14. Composite Decking
    15. 15. Heat Insulated Walls
    16. 16. R-Value 3.78
    17. 17. Cool in Summer
    18. 18. Warm in Winter
    19. 19. Eco Friendly
    20. 20. Cyclone Proof
    21. 21. Virtually Maintenance free</li></ul>Day Nine Install the Roof Sheets and all Flashings.<br />Continue with the finishing touches on the exterior<br />
    22. 22. The Internal Fit Out<br />The Internal Fit Out<br /><ul><li>Acrylic rendered walls
    23. 23. Tiled Floors
    24. 24. Melamine Kitchen
    25. 25. Combination Upright stove
    26. 26. Double Stainless Sink
    27. 27. Cathedral Ceilings
    28. 28. Large Open plan
    29. 29. Kitchen Lounge and Dinning</li></li></ul><li> 110 sqm 3 Bedroom Modular House<br />
    30. 30. Sustainable Housing By qbModCon<br />Exposed Trusses<br />Cool and Spacious<br />
    31. 31. The Finished Product<br /> Tiled Bathroom<br /> Full Kitchen<br />
    32. 32. The Local Construction Crew<br />Tiwi Islands<br />Local Construction Crew<br /><ul><li>Guiseppe Tipiloura
    33. 33. Russell Yunupingu
    34. 34. Stephen O Keeffe
    35. 35. Ben Bokkerink
    36. 36. Zachary Bloor
    37. 37. Rodney Coleman
    38. 38. Malcolm Blair</li></ul>qbModCon3 Bedroom 110 sqm House with 18 sqm deck<br />Nguiu 2009<br />
    39. 39. Tiwi Islands 2009<br />We would like to personally thank Leah Kerinauia all of the Friendly local Indigenous workers from Nguiu and Melville Island the locals at Tiwi Barge ,Brian Clancy from Tiwi Island Land Council, Bernard & Lynette(TLO) ,The Tiwi Collage ,The Licensed Contractors from MiBT and all the people who made this project successful<br />Regards<br />David Holmes<br />

    ×