5. PROJ INITIATION
PROJECT START UP PROJECT CHARTER
YES IT IS
A PROJECT
PROJ MANAGER
OWNER
CUSTOMER
TEAM MEMBER
STAKE HOLDERS
PRODUCT ?
6. PROJ INITIATION
I AM PROJ MGR
&
FULLY
RESPONSIBLE
FOR THE
SUCCESS OR
FAILURE
OF THE PROJECT
PROJECT CHARTER
YES IT IS
A PROJECT A WRITTEN
APPROVAL BY THE
OWNER
7. PROJ CHARTER
PROJECT NAME : DREAM HOUSE
PROJECT SPONSOR: MR I M OWNER
PROJECT MANAGER: XYZ CUSTOMER: MRS I M OWNER
OTHER PROJ STAKE HOLDER:
STAKE HOLDERS RESPONSIBILITY
PROJECT OBJECTIVE: SPECIFIC, MEASURABLE, AGREED, REALISTIC, TIME LIMIT
DELIVERABLES:
PROJ COMPLETION DATE: BUDGET: 50 LACS
ASSUMPTIONS:
LINK TO OTHER PROJECT:
WE AGREE THAT THIS IS A VIABLE PROJ. WE AUTHORISE THE BEGINNING OF PLG
PROCESS
PROJECT SPONSOR PROJECT MANAGER
8. IMPORTANT DOCUMENTS
GOVERNING DOCUMENTS
CONTRACT AGREEMENT
ACCEPTANCE LETTER
GENERAL SPECIFICATION
PERTICULAR SPECIFICATIONS
BILL OF QTY
QUOTED RATES
DRGS
REFRENCES GIVEN IN THE CA
SUPPORTING DOCUMENTS
WORK ORDER
WORKS DIARY
SITE ORDER BOOK
LEVEL REGISTER
SAMPLE APPROVAL REGISTER
CEMENT
STEEL
BRICK
CONSTRUCTION MATERIAL
JOINARY
E/M STORE
QUALITY ASSURANCE MANUAL
HINDERANCE REGISTER
TEST RECORDS
WPI DATA
10. THE PROJ PLAN
PROJECT EXECUTIVE SUMMARY
PLANNING
WBS
RESOURSE ASSIGNMENT
PROJECT SCHEDULE
PROJECT BUDGET
RISK ASSESSMENT
COMMUNICATION PLAN
CHANGE CONTROL PROCESS
12. DREAM HOUSE
APPROVED
EXEC
DRGS
SITE WK STRUCTURE E/M WK FINISHES CLOSER
STR DRGS DDA APPROVAL TEMP WATER &
ELECT
CONNECTION
SOIL
INVESTIGATION
ARCH DRG
LINE PLAN
13. 13
THE NEXT LOWER LEVEL DECOMPOSITION
OF A WBS ELEMENT MUST
REPRESENT
100%
OF THE WORK APPLICABLE TO THE
NEXT HIGHER ELEMENT.
WBS: 100% RULE
14. DREAM HOUSE
APPROVED
EXEC
DRGS
SITE WK STRUCTURE E/M WK FINISHES CLOSER
STR DRGS DDA
APPROVAL
TEMP WATER &
ELECT
CONNECTION
SOIL
INVESTIGA
TION
ARCH DRGLINE PLAN
15. DREAM HOUSE
APPROVED
EXEC
DRGS
SITE WK STRUCTURE E/M WK FINISHES CLOSER
SITE
CLEARANCE
SURVEY &
LEVEL SHEET
TEMP SHED FOR
BLDG MTRL &
LABOUR
EXCAVATION
STORE ROOM LABOUR
ACCN
DUNNAGE
FOR STEEL
BASEMENT FDN UG WATER
TANK
BULK
EXCAVATION
HAND
EXCAVAIION
ROCK
EXCAVATION
16. DREAM HOUSE
APPROVED
EXEC
DRGS
SITE WK
FRAME FLOOR
&
SLABS
E/M WK FINISHES CLOSERSTRUCTURE
WALL
FDN BASEMENT
WALL
COL &
BEAMS
EXTERNAL
WALLS
PARTITION
WALLS
BASEMENT
FLOOR
OTHER
SLABS
STAIR
CASE
17. DREAM HOUSE
APPROVED
EXEC
DRGS
SITE WK STRUCTURE E/M WK FINISHES CLOSER
FINISH TRIMROUGH IN
PLUMBING A/C
PIPING
ELECTRICAL PLUMBING A/C
PIPING
ELECTRICAL
19. DREAM HOUSE
APPROVED
EXEC
DRGS
SITE WK STRUCTURE E/M WK FINISHES CLOSER
CLEANING TESTING OF
SERVICES
PREPARATION
OF INVENTRY
CLEARANCE
OF FINAL
BILLS
COMPLETION
REPORT
INTERNAL EXTERNAL WATER
PTS
ELECTRIC
PTS
B/R E/M
20. WBS TABLE
WBS/ WP DELIVERABLES
QTY
ESTIMATE RESOURSE
IN-
CHARGE
TIME IN
WEEK
1.1 APPROVED EXEC DRG
1.1.1 LINE PLAN LINE PLAN 1 SKETCH ARCH PM 1
1.1.2 ARCH DRG ARCH DRG 10 SHEETS ARCH ARCH 2
1.1.3 SOIL INVESTIGATION SOIL REPORT
4 BORE
HOLES
GEO
CONSULT JE 3
1.1.4 STRUCTURAL DRG STR DRG 10 SHEETS DESIGNER DESINER 2
1.1.5 DDA APPROVAL
DDA
APPROVAL
APPROVAL
LETTER ARCH ARCH 2
1.1.6
TEMP WATER & ELECT
CONNECTION
WATER
&ELECT
CONNECTION -DO- NDMC JE 1
1.2 SITE WORK
1.2.1
TEMP SHED FOR BLDG MTRL&
LABOUR
1.2.1.1 STORE ROOM 2 SHEDS
2M+
4HELPER JE 1
21. WORK PKG
1.1 .1
LINE PLAN CUSTOMER IS AVAILABLE
TILL ARCH DRGS ARE
FINALISED
1 WEEK ARCH FOR CONSULTATION
ON PHONE/
EMAIL/DISCUSSION IN
OFFICE @ 1 HR PER DAY
MAX 6 HRS
2500/- ARCH PAY FOR 1
DAY
CUSTOMER IS NOT CLEAR
AND CHANGES REQMT
EVERY DAY
INCHARGE: PM