2010 Projects on the Ports-to-Plains Alliance CorridorState      Corridor          Type           Description             ...
State      Corridor          Type           Description                                                   Total Funding   ...
Ports-to-Plains Alliance Report Card 2010
Ports-to-Plains Alliance Report Card 2010
Ports-to-Plains Alliance Report Card 2010
Ports-to-Plains Alliance Report Card 2010
Ports-to-Plains Alliance Report Card 2010
Ports-to-Plains Alliance Report Card 2010
Upcoming SlideShare
Loading in …5
×

Ports-to-Plains Alliance Report Card 2010

471 views

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
471
On SlideShare
0
From Embeds
0
Number of Embeds
23
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Ports-to-Plains Alliance Report Card 2010

  1. 1. 2010 Projects on the Ports-to-Plains Alliance CorridorState Corridor Type Description Total Funding CommentsColorado Heartland Construction I-76 over UPRR and State Highway 224 -- Replaces two $11,056,153 ARRA Funding Expressway bridges on I-76.Colorado Ports-to-Plains Construction Concrete Reconstruction Project -- The project will improve $12,499,486 ARRA Funding 8.7 miles of US Highway 40/287Colorado Ports-to-Plains Construction Concrete Reconstruction Project -- The project will reconstruct $15,677,776 ARRA Funding US Highway 287 in concrete and improve drainage and Complete shoulder embankments. Begins at the south end of Springfield, and continues south 7 miles.Colorado Ports-to-Plains Construction I-70 between Pena Boulevard and Tower Road installs $334,060 ARRA Funding -- median cable guardrail to prevent crossover accidents. Complete 2009Colorado Ports-to-Plains Construction I-70 between Havana St & Quebec St, New interchange $50,000,000 ARRA Funding construction Better Denver Bond ProgramMontana Theodore Construction U.S. Highway 2 Reconstruction and Realignment of Existing $20,000,000 Complete Roosevelt Two Lane with Expansion of Right-of-Way for Four Lane -- Expressway North Dakota State Line westNebraska Heartland Construction Kimball Reliever Route -- 5 miles $21,130,000 ExpresswayNebraska Heartland Construction U.S. Highway 26 -- New Overpass Spanning Highway and $9,466,000 Complete Expressway BNSF Railroad at Highway 26 and Highway 71 -- 1.2 milesNebraska Heartland Planning Heartland Expressway Corridor Development and $555,750 Funding Granted to Expressway Management Plan NDOR but awaiting the project startup.New Ports-to-Plains Construction Reconstruction of existing lanes on U.S. 64/87 and expansion $27,000,000 ARRA FundingMexico to a four-lane highway. The reconstruction of approximately 15 Complete miles near Des Moines, between Raton and ClaytonLimon Office Lubbock OfficeP.O. Box 9 5401 N MLK Blvd., Unit 395Limon, CO 80828 Lubbock, TX 79403P: 303.586.1787 P: 806.775.2338F: 719.775.9073 Fax: 806.775.3981 www.portstoplains.com
  2. 2. State Corridor Type Description Total Funding CommentsNorth Theodore Planning Corridor Development and Management Plan -- Phase I $337,870 $67,574 of OtherDakota Roosevelt Funding provided Expressway by TRE AssociationOklahoma Ports-to-Plains Construction U.S. Highway 287 North Reliever Route at Boise City, OK -- $7,612,875 Grade, Drain and Surface -- 2.979 milesOklahoma Ports-to-Plains Construction U.S. Highway 287 South Reliever Route at Boise City, OK -- $5,574,950 Complete Grade, Drain and Surface -- 1.752 milesOklahoma Ports-to-Plains Construction U.S. Highway 287 Curve Correction -- 7 miles south of Boise $2,316,228 ARRA Funding City, OK -- 0.83 milesSouth Heartland Construction U.S. Highway 385 -- Mill & AC Resurfacing of Existing Two $2,741,000Dakota Expressway Lanes South of Maverick JunctionSouth Heartland Construction U.S. Highway 385 -- Grading, Structures & Surfacing for Two $14,281,000Dakota Expressway Additional Lanes South of Maverick JunctionSouth Theodore Construction U.S. Highway 85-Expansion of Two Lane to Five Lane -- Belle $7,211,000Dakota Roosevelt Fourche -- Hay Creek to Belle Fourche River ExpresswayTexas Ports-to-Plains Construction U.S. Highway 287 Widening at Stratford, TX -- 0.909 miles $5,301,873 Enhancement Portion is ARRA FundingTexas Ports-to-Plains Construction State Loop 306 -- Bridge Construction -- San Angelo Relief $15,683,540 Texas Proposition Route 14Texas Ports-to-Plains Construction State Highway 349, Midland Reliever Route -- 1.867 miles $1,876,558 Texas Proposition 14Texas Ports-to-Plains Construction State Highway 349, Midland Reliever Route -- 2.052 miles $2,834,747 Texas Proposition 14Texas Ports-to-Plains Construction U.S. Highway 287 Bridge over BNSF at Dumas $9,581,339 Texas Proposition 14 TOTAL $243,072,205 PLANNING $889,810 CONSTRUCTION $242,182,395Limon Office Lubbock OfficeP.O. Box 9 5401 N MLK Blvd., Unit 395Limon, CO 80828 Lubbock, TX 79403P: 303.586.1787 P: 806.775.2338F: 719.775.9073 Fax: 806.775.3981 www.portstoplains.com

×