Q4 2013 presentation final

467 views

Published on

Published in: Investor Relations
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
467
On SlideShare
0
From Embeds
0
Number of Embeds
211
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Q4 2013 presentation final

  1. 1. o o o o o o o o o
  2. 2. 160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 - 2012 2013
  3. 3. Thousands 200 180 160 140 120 100 2012 2013
  4. 4. o o o o
  5. 5. 2012 2013 2014E 2015E 2016E 9
  6. 6. o   o      o    o
  7. 7. Builds on Mine San Dimas Established Presence in Mexico (AT DECEMBER 31, 2012, MINERAL RESOURCES INCLUDE MINERAL RESERVES) Black Fox Mine Au Reserves (Moz) 0.66 Au M&I Resources (Moz) 0.78 (AT DECEMBER 31, 2012, MINERAL RESOURCES INCLUDE MINERAL RESERVES) Au Inferred Resources (Moz) 0.76 Au Reserves (Moz) 0.77 Ag Reserves (Moz) 39.4 Au M&I Resources (Moz) 0.96 Ag M&I Resources (Moz) 46.9 Inferred Resources (Moz) 0.06 Ag Inferred Resources (Moz) 64.6 Ventanas Property Grey Fox (AT JANUARY 27 2009) Ind. Resources (koz AuEq.) 34.0 Inferred Resources (koz AuEq.) 70.0 (AT DECEMBER 31, 2012, MINERAL RESOURCES EXCLUDE MINERAL RESERVES) Au Reserves (Moz) 0.71 Au M&I Resources (Moz) 0.92 Ag Reserves (Moz) 15.3 Ag M&I Resources (Moz) 20.6 Cu Reserves (M lbs) 56.4 103.4 Au Indicated Resources (Moz) 0.51 Au Inferred Resources (Moz) Cerro del Gallo Cu M&I Resources (M lbs) (AT JULY 2, 2013) 0.23
  8. 8. o o o   o
  9. 9. Exploration and Development Upside o o o o
  10. 10. 20
  11. 11. o o o
  12. 12. Recent Tax Ruling Created Positive Leverage to Silver o o o o Silver Gold 25% 75%
  13. 13. West Block 2014 EXPLORATION San Antonio Sinaloa Graben Central Block Tayoltita Block Mined 1987-2002 Mined 2012-Current Mined 2002-Current Mined 1975-Current Arana Hanging Wall NE SW 3,000 m. 3,000 m. 2014 EXPLORATION PROGRAM 2,000 m. 2,000 m. DRILLING FOR EXTENSIONS OF KNOWN VEINS 1,000 m. 1,000 m. Source: San Dimas Geology Office Mineralization – Ore Bodies Favorable Horizon Extension of the Favorable Horizon Potential Faults Intrusive 0 1 K I L O M E T E R S 2
  14. 14. o o o o o o o o o o o o o
  15. 15. o o o o o o o o o o o o o o o o o o o |

×