  1. 1. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS REFURBISHMENT AND TILING OF AN EXISTING FIBREGLASS OUTDOOR POOL
  2. 2. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  REMOVAL OF EXISTING FIBRERGLASS LINER AND MOSIAC TILING OF POOL, PAINTING OF CONCRETE TILE SURROUND, ACID AND HOT WASH OF EXISTING FLAGS, FITTING NEW DOSING SYSTEM, REPAIR TO PIPEWORK, NEW POOL COVER, IMPROVEMENT TO CLEAN WATER DISTRIBUTION SYSTEM
  3. 3. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  THE FIBREGLASS LINED POOL  THE START OF THE PROJECT
  4. 4. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  ALL THE EXISTING FIBREGLASS LINING (510 SQUARE METRES) HAD TO BE REMOVED – THIS WAS A PAINSTAKING PROJECT
  5. 5. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  SHOWN IS ONE OF OUR OPERATIVES PAINSTAKINGLY REMOVING THE GLASS LINING AND SCABBLING THE NEWLY EXPOSED WALLS TO ENSURE CORRECT THOROUGH PREPARATION
  6. 6. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  COMMENCEMENT OF MOSAIC TILING TO SHALLOW END
  7. 7. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  PREPARED DEEP END FLOOR BEING THOROUGHLY CLEANED PRIOR TO BEING TILED
  8. 8. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  SHOWN IS THE POOL DEEP END IN THE PROCESS OF BEING MOSAIC TILED IN “POOL BLUE”
  9. 9. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  ONE OF OUR OPERATIVES QUALITY CHECKING AN AREA OF POOL WHICH HAS BEEN GROUTED
  10. 10. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  SHOWN IS ONE OF OUR FEMALE OPERATIVES GIVING THE FINISHED SHALLOW END THE “WOMANS TOUCH” PRIOR TO POOL FILLING
  11. 11. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  BEFORE AND AFTER PICTURES OF SURROUND TILES
  12. 12. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  ACID AND HOT JET WASHING OF SURROUNDING FLAGS BEFORE AND AFTER
  13. 13. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  THE POOL BEING SLOWLY FILLED
  14. 14. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS  THE FINISHED POOL DURATION APPROX 5 WEEKS FROM START TO FINISH
  15. 15.  BEFORE AND AFTER – WHAT A TRANSFORMATION  ON TIME AND IN BUDGET!! TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
  16. 16. TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS Comments made by Mr Mark Hart “Operations Manager” of the School “Thank you very much for all you have done for us to date an excellent job, I very much look forward to working with you all again”

×