Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Newbldg2004 2014

608 views

Published on

New Building 2004-2014

Published in: Education
  • You can try to use this service ⇒ www.HelpWriting.net ⇐ I have used it several times in college and was absolutely satisfied with the result.
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Making a living taking surveys at home! I have been a stay at home mom for almost 5 years and I am so excited to be able to still stay home, take care of my children and make a living taking surveys on my own computer! It's so easy to get started and I plan to make enough money each week so that my husband can actuallly quit his second job!!! Thank you so much! ●●● https://bit.ly/2Ruzr8s
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

Newbldg2004 2014

  1. 1. 2004-2014 NEW ADMIN/ARCHIVE & DISPLAY BLDG
  2. 2. 2007  The pad was poured in July 2004 and in 2007 the lower section was raised by the local high school carpentry crew.
  3. 3. 2008  In 2008 museum visitors and local wildlife enjoyed the new structure at the rear of the site.
  4. 4. 2008  The roof was installed in the fall of 2008.
  5. 5. 2009  In 2009 we learned that the roof would need snow stops
  6. 6. 2010  By 2010 the windows and snow stops were installed
  7. 7. 2011  2011 saw much activity in behind the cedars. The new porch was added….
  8. 8. 2011  and water/electricity were roughed in.
  9. 9. 2012  The Services Upgrade (water, sewer, power, communications) was completed in May/June.
  10. 10. 2012  The Exterior siding was donated and installed in the summer of 2012
  11. 11. 2012  Landscaping work was completed and the site was extended to its legal survey line in the NE corner.
  12. 12. 2012  The site was graded and gravel was spread and the equipment was placed
  13. 13. 2013  The porch deck was laid and the work on the interior began over the winter
  14. 14. 2013  The insulation was completed over the winter.
  15. 15. 2013  The interior was dry-walled after the HVAC system was installed.
  16. 16. 2013  The exterior doors were painted and installed.
  17. 17. 2013  Painting, trim and carpet installation is underway and the fire system components.
  18. 18. 2013  The interior finishing upper level includes an  Office, Processing Rm, and Archive Rm
  19. 19. 2013  The lower level includes a  Display space, Washroom, and Utility closet
  20. 20. 2013  By the end of April – the building was ready to move into…after a little construction clean-up.
  21. 21. 2013  Robert Valcourt got us all set up with our new computer system and Fred Provost built a new desk for the office.
  22. 22. 2013  Michel Henry got the lights on and Fenner hooked up the lift station pump system.
  23. 23. 2014  All Moved in
  24. 24. 2014  All Moved in
  25. 25. 2014  This project was made possible with funding from Heritage Canada. Seed money was provided by local government and local businesses and members. Thanks to all who have supported this project since 2004.

×