n                td           Ahorro Inversión inicial
    10               0.1          1243.3       2900
    10         ...
Upcoming SlideShare
Loading in …5
×

Prepa 1. trimetre 2

398 views

Published on

Prepa 1 Redes de Distribucion

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
398
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Prepa 1. trimetre 2

  1. 1. n td Ahorro Inversión inicial 10 0.1 1243.3 2900 10 0.1 2218.7 3630 10 0.1 2998.7 4550 10 0.1 3451.5 5000 10 0.2 24057 30000 10 0.2 58304 100000 10 0.2 23619 120000 TIR (solver) Función objetivo PBT(solver) Función objetivo 0.42 0 2.77 0 0.61 0 1.87 0 0.65 0 1.72 0 0.69 0 1.64 0 0.69 4850.07 1.57 0 0.58 0 2.3 0 0.15 0 2.3 -79489.91

×