FCI Works TM Knowledge-based Facility Condition Assessment  For Building Portfolio Owners in Education, Healthcare, Govern...
FCI Works <ul><ul><li>Accurately model FCI  (facility condition index) </li></ul></ul><ul><ul><ul><li>Intelligent system w...
FCI Works <ul><ul><li>Accurate </li></ul></ul><ul><ul><ul><li>Average 80% overall accuracy vs. detailed assessments </li><...
Reference Cost Databases Capital Planning & Budgeting Renovate vs. Replace Physical & Functional Needs Analyses/Metrics Bu...
Pinpoint Critical Needs Cost Effectively &  Prioritize Resource Allocation <ul><ul><li>Gain portfolio-wide visibility into...
$$$$ Cost $ Data Accuracy / Granularity  50%  80%  100% FCI Works On-site Assessments (overview) On-site Assessments (deta...
Building Systems Creation Default component breakdowns, Expected Useful Life, and Construction Year data Building Data Inp...
Pull-down list for standard  building templates
 
If available, the Last  Major Renovation Date can be entered, which  over-rides the “Original  Construction date”
Clicking “Reset All” populates “Cost”,  “ EUL” and “Age”  data fields.
Scroll right to view  and edit “EUL” data
Scroll right to view  and edit “EUL” data Pull-down list for standard  building templates If available, the Last  Major Re...
FCIworks Reports Various standard reports with filters.
“ Best-Practices” for HPBMS TM <ul><li>Economic volatility  </li></ul><ul><li>Sustainability mandates, </li></ul><ul><li>i...
HPBMS Frameworks
Calculate repair needs & measure overall conditions using FCIWORKS, for a fraction of the cost of sending highly-trained t...
Upcoming SlideShare
Loading in …5
×

Fc Iworks Overview 2010

700 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
700
On SlideShare
0
From Embeds
0
Number of Embeds
12
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Medical 2 billion “on the boards” and 236 projects Education 7 billion on the boards and 1200 projects Community 1 billion on the boards and 328 projects
  • Quantitative Decision Metrics Leverage “All the Best Data”
  • Fc Iworks Overview 2010

    1. 1. FCI Works TM Knowledge-based Facility Condition Assessment For Building Portfolio Owners in Education, Healthcare, Government, and Commercial Sectors.
    2. 2. FCI Works <ul><ul><li>Accurately model FCI (facility condition index) </li></ul></ul><ul><ul><ul><li>Intelligent system with 10,000 building database </li></ul></ul></ul><ul><ul><ul><li>Repair, renovations, & maintenance data </li></ul></ul></ul><ul><ul><ul><li>Integrate with reference cost data ( RS Means, DOD …) </li></ul></ul></ul><ul><ul><li>Significant Cost Savings vs. detailed condition assessments </li></ul></ul><ul><ul><li>Report FCI, DM*, and CRV* </li></ul></ul><ul><ul><li>*DM-deferred maintenance, CRV-current replacement value </li></ul></ul>
    3. 3. FCI Works <ul><ul><li>Accurate </li></ul></ul><ul><ul><ul><li>Average 80% overall accuracy vs. detailed assessments </li></ul></ul></ul><ul><ul><ul><li>Repair, Renovations, & Maintenance </li></ul></ul></ul><ul><ul><li>Cost Effective </li></ul></ul><ul><ul><ul><li>$0.005/sq.ft. vs. $0.08/sq.ft+ </li></ul></ul></ul><ul><ul><ul><li>No need for on-site 3-man assessment teams </li></ul></ul></ul><ul><ul><li>Standardized Reporting – UNIFORMAT II </li></ul></ul>
    4. 4. Reference Cost Databases Capital Planning & Budgeting Renovate vs. Replace Physical & Functional Needs Analyses/Metrics Budgetary Reporting Support Models Unit Prices Assemblies Assemblies Unit Prices Project Estimating Cost Validation Prioritization Time Estimation Assemblies Building Cost Models New Construction & Built Capital Renewal Preventive & Routine Maintenance Energy Janitorial System Cost Models* Unit Pricing** Uniformat II* Masterformat04**
    5. 5. Pinpoint Critical Needs Cost Effectively & Prioritize Resource Allocation <ul><ul><li>Gain portfolio-wide visibility into current and future requirements. </li></ul></ul><ul><ul><li>Validate internal and external condition and capital renewal data. </li></ul></ul><ul><ul><li>Focus detailed condition assessment where needed </li></ul></ul>
    6. 6. $$$$ Cost $ Data Accuracy / Granularity 50% 80% 100% FCI Works On-site Assessments (overview) On-site Assessments (detailed) FCI WORKS Model & RS Means Traditional Parametric Peer to Peer Benchmarking
    7. 7. Building Systems Creation Default component breakdowns, Expected Useful Life, and Construction Year data Building Data Input Demographics (Location), Building Sector, Building Type, Construction Data, Major Restoration Data, Replacement Value Capital Costing Repair needs and associated FCI calculated using established, calibrated deterioration curves Component Breakdown, Expected Useful Life and Construction/ Renovation dates can be individually adjusted following document review and interviews. No walkthroughs are required. Deterioration curve that has been calibrated against 10,500 buildings is used to calculate where each system is in it’s lifecycle and produces a high-level repair need cost.
    8. 8. Pull-down list for standard building templates
    9. 10. If available, the Last Major Renovation Date can be entered, which over-rides the “Original Construction date”
    10. 11. Clicking “Reset All” populates “Cost”, “ EUL” and “Age” data fields.
    11. 12. Scroll right to view and edit “EUL” data
    12. 13. Scroll right to view and edit “EUL” data Pull-down list for standard building templates If available, the Last Major Renovation Date can be entered, which over-rides the “Original Construction date” Clicking “Reset All” populates “Cost”, “ EUL” and “Age” data fields.
    13. 14. FCIworks Reports Various standard reports with filters.
    14. 15. “ Best-Practices” for HPBMS TM <ul><li>Economic volatility </li></ul><ul><li>Sustainability mandates, </li></ul><ul><li>imperatives </li></ul>Pressures Actions Capabilities Enablers <ul><li>Establish </li></ul><ul><li>organizational-wide </li></ul><ul><li>facilities capital </li></ul><ul><li>planning process </li></ul><ul><li>Centralize real </li></ul><ul><li>property / facilities </li></ul><ul><li>management </li></ul><ul><li>Strategic mission – </li></ul><ul><li>centric built </li></ul><ul><li>environment </li></ul><ul><li>planning group </li></ul><ul><li>Corporate </li></ul><ul><li>executive level </li></ul><ul><li>facilities / real </li></ul><ul><li>property group </li></ul><ul><li>Ability to maintain </li></ul><ul><li>an inventory of </li></ul><ul><li>facilities, conditions, </li></ul><ul><li>and track / monitor </li></ul><ul><li>/ forecast capital </li></ul><ul><li>needs </li></ul><ul><li>Internet tools to </li></ul><ul><li>monitor portfolio </li></ul><ul><li>Reference cost </li></ul><ul><li>databases / cost </li></ul><ul><li>validation </li></ul><ul><li>Internet tools to </li></ul><ul><li>rapidly establish and </li></ul><ul><li>monitor building </li></ul><ul><li>conditions </li></ul><ul><li>Internet tools for </li></ul><ul><li>project creation and </li></ul><ul><li>prioritization </li></ul>
    15. 16. HPBMS Frameworks
    16. 17. Calculate repair needs & measure overall conditions using FCIWORKS, for a fraction of the cost of sending highly-trained teams to visually-assess every facility of a large organization. techsupport@fciworks.com www.fciworks.com

    ×