 CLAUSE 51.0 : EVENTS AND CONSEQUENCES OF DEFAULT BY THE
CONTRACTOR
 CLAUSE 53.0 : TERMINATION ON CORRUPTION,UNLAWFUL OR ILLEGAL
ACTIVITIES
OBJECTIVE
• TO UNDERSTAND ABOUT THE SPECIFIC CLAUSES IN DETAIL.
• TO DETERMINE THE LEGAL SIGNIFICANCE OR THE EXTERNAL ACTS OF THE
PARTY.
• TO GET TO KNOW THE RESPONSIBILITY OF EACH PARTIES ACCORDING TO
THE CLAUSES.
• TO KNOW THE FLOW OF WORK ACCORDING TO THE CLAUSES.
PURPOSE OF CLAUSE 51.0
Events and the consequences of default by the contractor.
 1. So that the contractor involved can performed according to the procedures in the clause
specified in the contract.
 2. To avoid any incidents or disputes or disagreements in the contract.
 3. If there is any disagreements or disputes in the contract can be settled fairly and impartially.
 4. To make sure the contractor to understand the impact if the contractor fails to follow the
written procedures in clause.
 5. To make sure the contractor to understand the consequences if the project is terminated.
 6. To let know the contractor on his obligations if the contract is terminated.
PURPOSE OF CLAUSE 53.0
TERMINATION ON CORRUPTION,UNLAWFUL OR ILLEGAL ACTIVITIES
 Termination on corruption , unlawful or illegal activities.
 To let the contractor know the procedure and consequences of termination and
corruption, unlawful and illegal activities.
Contractor fails
to follow the
written contract.
Government
terminates the
contract by giving
written notice.
The contractor
clears the site
within given
time.
The government
finds a new
contractor to
finish the work.
The contract pays
for the any losses
and damages
during work.
CLAUSE 51.0 : EVENTS AND CONSEQUENCES OF DEFAULT
BY THE CONTRACTOR
Corruption
happens
between
contractor and
governments
employees.
Government
terminates the
contract by
giving written
notice.
The contractor
clears the site
within given
time.
The
government
finds a new
contractor to
finish the work.
The contract pays
for the any losses
and damages
during work.
CLAUSE 53.0 : TERMINATION ON CORRUPTION,UNLAWFUL
OR ILLEGAL ACTIVITIES
OBLIGATIONS OF PARTIES
CLAUSE 51.0 EVENTS AND CONSEQUENCES OF DEFAULT BY THE CONTRACTOR.
Once the contract is terminated,
CONTRACTOR
 Stop all construction works.
 Must make sure the safety of the site and equipment on site and cleanliness of site.
 Remove all his men from site.
 Vacate the site.
 Must hand over the Government all plans, designs and any other documents related to the work.
 Pay for any losses or damages.
GOVERNMENT
 Call upon the Performance Bond or forfeit the Performance Guarantee Sum.
 Visit the site.
 Take responsibility on his project to continue and complete the work.
 Claim any losses, costs, and damages from contractor.
CLAUSE 53.0 TERMINATION ON CORRUPTION, UNLAWFUL OR ILLEGAL ACTIVITIES.
GOVERNMENT
 Entitled to terminate the contract if the company, personal, servants, or employees is convicted by a court of law for corruption.
 Entitled to all losses, costs, damages and expenses arising from such termination.
 Call upon the Performance Bond or forfeit the Performance Guarantee Sum.
 Visit the site.
 Take responsibility on his project to continue and complete the work.
 Claim any losses, costs, and damages from contractor.
CONTRACTOR
 Stop all construction works.
 Must make sure the safety of the site and equipment on site and cleanliness of site.
 Remove all his men from site.
 Vacate the site.
 Must hand over the Government all plans, designs and any other documents related to the work.
 Pay for any losses or damages.
IMPACTS FROM CLAUSES
CLAUSE 51.0 EVENTS AND CONSEQUENCES OF DEFAULT BY THE CONTRACTOR.
 It gives clear view for contractor on his obligations towards the contract.
 The contractor understand the consequences that he will face if he failed to follow the
contract.
 The contractor understands the requirements of the government.
 There is mutual understanding between contractor and the government so that the flow of
work is efficient and relevant.
CLAUSE 53.0 TERMINATION ON CORRUPTION, UNLAWFUL OR ILLEGAL ACTIVITIES.
 It prevent corruption during tender and construction period.
 It make sure all the works are done according to law.
 New contractors stand chance to win contract.
 There is mutual understanding between contractor and the government so that the flow of
work is efficient and relevant.
GLOSSARY
1. Prejudice – Preconceived judgement or opinion about the client
2. Termination – The actions of bringing the contract or the construction to an end.
3. Obligations – A duty / commitment given to the contractor according to the
clauses.
4. Provisions – Amount of statements provided in the clause.
5. Comply – To act according to the clauses.
6. Breach – A failure to do what is required by a clause.
7. Personnel – Employee or workmen of the contractor.
8. Render – To provide.
THANK YOU

More Related Content

What's hot

pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanFiQahh AmiNn
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2Azizan Supardi
 
Ukur terabas teodolit
Ukur terabas teodolitUkur terabas teodolit
Ukur terabas teodolitNik M Farid
 
Report kayu
Report kayuReport kayu
Report kayusppj1415
 
Chapter 5 lantai
Chapter 5 lantaiChapter 5 lantai
Chapter 5 lantaiAmiRul AFiq
 
Unit 2 concrete material 2.7
Unit 2 concrete material 2.7Unit 2 concrete material 2.7
Unit 2 concrete material 2.7Mara
 
Report kerja kayu
Report kerja kayuReport kerja kayu
Report kerja kayusppj1415
 
SURVEY ALIP SETTING OUT (1).docx
SURVEY ALIP SETTING OUT (1).docxSURVEY ALIP SETTING OUT (1).docx
SURVEY ALIP SETTING OUT (1).docxAliffHaiqal32
 
Unit 6 Kaji Daya Bahan
Unit 6 Kaji Daya BahanUnit 6 Kaji Daya Bahan
Unit 6 Kaji Daya BahanMalaysia
 
Pengenalan industri binaan ok
Pengenalan industri binaan okPengenalan industri binaan ok
Pengenalan industri binaan okamoi amore
 
1.1.4 interpret project manager
1.1.4 interpret  project manager1.1.4 interpret  project manager
1.1.4 interpret project managerNatalie Ulza
 
J3009 Unit 6
J3009   Unit 6J3009   Unit 6
J3009 Unit 6mechestud
 
Unit 2 contract 2.1-2.3
Unit 2 contract 2.1-2.3Unit 2 contract 2.1-2.3
Unit 2 contract 2.1-2.3Mara
 
Chapter 2 soil investigation
Chapter 2 soil investigationChapter 2 soil investigation
Chapter 2 soil investigationAmiRul AFiq
 

What's hot (20)

pihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaanpihak yang terlibat dalam projek pembinaan
pihak yang terlibat dalam projek pembinaan
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 
Ukur terabas teodolit
Ukur terabas teodolitUkur terabas teodolit
Ukur terabas teodolit
 
Report kayu
Report kayuReport kayu
Report kayu
 
Chapter 5 lantai
Chapter 5 lantaiChapter 5 lantai
Chapter 5 lantai
 
Unit 2 concrete material 2.7
Unit 2 concrete material 2.7Unit 2 concrete material 2.7
Unit 2 concrete material 2.7
 
Bab 3
Bab 3Bab 3
Bab 3
 
Report kerja kayu
Report kerja kayuReport kerja kayu
Report kerja kayu
 
Report kayu
Report kayuReport kayu
Report kayu
 
SPK JKR Malaysia: Terminologi
SPK JKR Malaysia: TerminologiSPK JKR Malaysia: Terminologi
SPK JKR Malaysia: Terminologi
 
SURVEY ALIP SETTING OUT (1).docx
SURVEY ALIP SETTING OUT (1).docxSURVEY ALIP SETTING OUT (1).docx
SURVEY ALIP SETTING OUT (1).docx
 
Unit 6 Kaji Daya Bahan
Unit 6 Kaji Daya BahanUnit 6 Kaji Daya Bahan
Unit 6 Kaji Daya Bahan
 
Bab 6
Bab 6Bab 6
Bab 6
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 
Pengenalan industri binaan ok
Pengenalan industri binaan okPengenalan industri binaan ok
Pengenalan industri binaan ok
 
1.1.4 interpret project manager
1.1.4 interpret  project manager1.1.4 interpret  project manager
1.1.4 interpret project manager
 
J3009 Unit 6
J3009   Unit 6J3009   Unit 6
J3009 Unit 6
 
Unit 2 contract 2.1-2.3
Unit 2 contract 2.1-2.3Unit 2 contract 2.1-2.3
Unit 2 contract 2.1-2.3
 
Azlanmohdnorf
AzlanmohdnorfAzlanmohdnorf
Azlanmohdnorf
 
Chapter 2 soil investigation
Chapter 2 soil investigationChapter 2 soil investigation
Chapter 2 soil investigation
 

Viewers also liked

Pwd 203 a rev2007
Pwd 203 a rev2007Pwd 203 a rev2007
Pwd 203 a rev2007shimz2287
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
Secrets to Outperforming the Market When Selling Your Home
Secrets to Outperforming the Market When Selling Your HomeSecrets to Outperforming the Market When Selling Your Home
Secrets to Outperforming the Market When Selling Your HomePam Ahern
 
Construction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Cicerone
 
Legal issues associated with project management and consulting
Legal issues associated with project management and consultingLegal issues associated with project management and consulting
Legal issues associated with project management and consultingThis account is closed
 
RWY CIPAA 2012 - Scope and Applicability
RWY CIPAA 2012 - Scope and ApplicabilityRWY CIPAA 2012 - Scope and Applicability
RWY CIPAA 2012 - Scope and Applicabilityjyhling
 
(9) similar fact evidence
(9) similar fact evidence(9) similar fact evidence
(9) similar fact evidenceHafizul Mukhlis
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and paymentsHafizul Mukhlis
 
Contract management
Contract managementContract management
Contract managementNishant Rai
 
Provision for warranties
Provision for warrantiesProvision for warranties
Provision for warrantiesdeepthihm
 

Viewers also liked (17)

Construction claims
Construction claimsConstruction claims
Construction claims
 
Pwd 203 a rev2007
Pwd 203 a rev2007Pwd 203 a rev2007
Pwd 203 a rev2007
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Secrets to Outperforming the Market When Selling Your Home
Secrets to Outperforming the Market When Selling Your HomeSecrets to Outperforming the Market When Selling Your Home
Secrets to Outperforming the Market When Selling Your Home
 
London Conference - Kate Allan - Common contractual issues
London Conference - Kate Allan -  Common contractual issuesLondon Conference - Kate Allan -  Common contractual issues
London Conference - Kate Allan - Common contractual issues
 
Construction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of Residences
 
Legal issues associated with project management and consulting
Legal issues associated with project management and consultingLegal issues associated with project management and consulting
Legal issues associated with project management and consulting
 
Completion
CompletionCompletion
Completion
 
Construction claims
Construction claimsConstruction claims
Construction claims
 
Site Possession
Site PossessionSite Possession
Site Possession
 
RWY CIPAA 2012 - Scope and Applicability
RWY CIPAA 2012 - Scope and ApplicabilityRWY CIPAA 2012 - Scope and Applicability
RWY CIPAA 2012 - Scope and Applicability
 
(9) similar fact evidence
(9) similar fact evidence(9) similar fact evidence
(9) similar fact evidence
 
Contract management
Contract managementContract management
Contract management
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and payments
 
Contract management
Contract managementContract management
Contract management
 
Provision for warranties
Provision for warrantiesProvision for warranties
Provision for warranties
 

Similar to clause 51.0 and 53.0 - contract

Construction Contract Issues in Nebraska
Construction Contract Issues in NebraskaConstruction Contract Issues in Nebraska
Construction Contract Issues in NebraskaWoods & Aitken LLP
 
Issues In Dispute Resolution Procedures and Practice
Issues In Dispute Resolution Procedures and PracticeIssues In Dispute Resolution Procedures and Practice
Issues In Dispute Resolution Procedures and PracticePalecek & Palecek, PLLC
 
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationExtension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationAyush Joshi
 
How To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal InterestsHow To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal InterestsPalecek & Palecek, PLLC
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation Lin Hui
 
General Terms & Conditions Group Project Final Draft
General Terms & Conditions Group Project Final DraftGeneral Terms & Conditions Group Project Final Draft
General Terms & Conditions Group Project Final DraftThomas Smith
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
Forcemajeureclausesrevisited
ForcemajeureclausesrevisitedForcemajeureclausesrevisited
ForcemajeureclausesrevisitedLinhNguyen988
 
Substitute and vicarious_performance
Substitute and vicarious_performanceSubstitute and vicarious_performance
Substitute and vicarious_performanceHafizul Mukhlis
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTYee Len Wan
 
PP2 Seminar Presentation
PP2 Seminar PresentationPP2 Seminar Presentation
PP2 Seminar Presentationashleyyeap
 
Suspension and Termination by Contractor Presentation.pptx
Suspension and Termination by Contractor Presentation.pptxSuspension and Termination by Contractor Presentation.pptx
Suspension and Termination by Contractor Presentation.pptxNathannielGonzales1
 
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxCONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxGLC
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management ContractSAJJAD KHUDHUR ABBAS
 
Managing Contractors Effectively 2011
Managing Contractors Effectively 2011Managing Contractors Effectively 2011
Managing Contractors Effectively 2011Stephen Findlay
 

Similar to clause 51.0 and 53.0 - contract (20)

Construction Contract Issues in Nebraska
Construction Contract Issues in NebraskaConstruction Contract Issues in Nebraska
Construction Contract Issues in Nebraska
 
Issues In Dispute Resolution Procedures and Practice
Issues In Dispute Resolution Procedures and PracticeIssues In Dispute Resolution Procedures and Practice
Issues In Dispute Resolution Procedures and Practice
 
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationExtension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentation
 
How To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal InterestsHow To Protect Your Construction Business and Legal Interests
How To Protect Your Construction Business and Legal Interests
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation
 
General Terms & Conditions Group Project Final Draft
General Terms & Conditions Group Project Final DraftGeneral Terms & Conditions Group Project Final Draft
General Terms & Conditions Group Project Final Draft
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Forcemajeureclausesrevisited
ForcemajeureclausesrevisitedForcemajeureclausesrevisited
Forcemajeureclausesrevisited
 
Arizona Lien Law
Arizona Lien LawArizona Lien Law
Arizona Lien Law
 
Substitute and vicarious_performance
Substitute and vicarious_performanceSubstitute and vicarious_performance
Substitute and vicarious_performance
 
Professional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOTProfessional Practice II - Presentation - Construction Delays & EOT
Professional Practice II - Presentation - Construction Delays & EOT
 
PP2 Seminar Presentation
PP2 Seminar PresentationPP2 Seminar Presentation
PP2 Seminar Presentation
 
Chapter 3- Construction Law
Chapter 3- Construction Law Chapter 3- Construction Law
Chapter 3- Construction Law
 
Suspension and Termination by Contractor Presentation.pptx
Suspension and Termination by Contractor Presentation.pptxSuspension and Termination by Contractor Presentation.pptx
Suspension and Termination by Contractor Presentation.pptx
 
Seminar p8x
Seminar p8xSeminar p8x
Seminar p8x
 
Claims and insolvencies (1)
Claims and insolvencies (1)Claims and insolvencies (1)
Claims and insolvencies (1)
 
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxCONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management Contract
 
Hurricane Recovery Compilation for Community Association
Hurricane Recovery Compilation for Community AssociationHurricane Recovery Compilation for Community Association
Hurricane Recovery Compilation for Community Association
 
Managing Contractors Effectively 2011
Managing Contractors Effectively 2011Managing Contractors Effectively 2011
Managing Contractors Effectively 2011
 

Recently uploaded

Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studydhruvamdhruvil123
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackinghadarpinhas1
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...KrishnaveniKrishnara1
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...shreenathji26
 
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Amil baba
 
Indian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfIndian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfalokitpathak01
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...IJAEMSJORNAL
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHbirinder2
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 

Recently uploaded (20)

Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain study
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
ASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductosASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductos
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and tracking
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
 
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
 
Indian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfIndian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdf
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRH
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 

clause 51.0 and 53.0 - contract

  • 1. GROUP MEMBERS  PAVITRAH A/P SEGARAN 01DKA14F2025  PRASANNA SRI A/P RAVI 01DKA14F2002  JEYASARANIYA A/P PARSURAMAN 01DKA14F2007  UMESWARAN A/L LETCHUMANAN 01DKA142008
  • 2.  CLAUSE 51.0 : EVENTS AND CONSEQUENCES OF DEFAULT BY THE CONTRACTOR  CLAUSE 53.0 : TERMINATION ON CORRUPTION,UNLAWFUL OR ILLEGAL ACTIVITIES
  • 3. OBJECTIVE • TO UNDERSTAND ABOUT THE SPECIFIC CLAUSES IN DETAIL. • TO DETERMINE THE LEGAL SIGNIFICANCE OR THE EXTERNAL ACTS OF THE PARTY. • TO GET TO KNOW THE RESPONSIBILITY OF EACH PARTIES ACCORDING TO THE CLAUSES. • TO KNOW THE FLOW OF WORK ACCORDING TO THE CLAUSES.
  • 4. PURPOSE OF CLAUSE 51.0 Events and the consequences of default by the contractor.  1. So that the contractor involved can performed according to the procedures in the clause specified in the contract.  2. To avoid any incidents or disputes or disagreements in the contract.  3. If there is any disagreements or disputes in the contract can be settled fairly and impartially.  4. To make sure the contractor to understand the impact if the contractor fails to follow the written procedures in clause.  5. To make sure the contractor to understand the consequences if the project is terminated.  6. To let know the contractor on his obligations if the contract is terminated.
  • 5. PURPOSE OF CLAUSE 53.0 TERMINATION ON CORRUPTION,UNLAWFUL OR ILLEGAL ACTIVITIES  Termination on corruption , unlawful or illegal activities.  To let the contractor know the procedure and consequences of termination and corruption, unlawful and illegal activities.
  • 6. Contractor fails to follow the written contract. Government terminates the contract by giving written notice. The contractor clears the site within given time. The government finds a new contractor to finish the work. The contract pays for the any losses and damages during work. CLAUSE 51.0 : EVENTS AND CONSEQUENCES OF DEFAULT BY THE CONTRACTOR
  • 7. Corruption happens between contractor and governments employees. Government terminates the contract by giving written notice. The contractor clears the site within given time. The government finds a new contractor to finish the work. The contract pays for the any losses and damages during work. CLAUSE 53.0 : TERMINATION ON CORRUPTION,UNLAWFUL OR ILLEGAL ACTIVITIES
  • 8. OBLIGATIONS OF PARTIES CLAUSE 51.0 EVENTS AND CONSEQUENCES OF DEFAULT BY THE CONTRACTOR. Once the contract is terminated, CONTRACTOR  Stop all construction works.  Must make sure the safety of the site and equipment on site and cleanliness of site.  Remove all his men from site.  Vacate the site.  Must hand over the Government all plans, designs and any other documents related to the work.  Pay for any losses or damages. GOVERNMENT  Call upon the Performance Bond or forfeit the Performance Guarantee Sum.  Visit the site.  Take responsibility on his project to continue and complete the work.  Claim any losses, costs, and damages from contractor.
  • 9. CLAUSE 53.0 TERMINATION ON CORRUPTION, UNLAWFUL OR ILLEGAL ACTIVITIES. GOVERNMENT  Entitled to terminate the contract if the company, personal, servants, or employees is convicted by a court of law for corruption.  Entitled to all losses, costs, damages and expenses arising from such termination.  Call upon the Performance Bond or forfeit the Performance Guarantee Sum.  Visit the site.  Take responsibility on his project to continue and complete the work.  Claim any losses, costs, and damages from contractor. CONTRACTOR  Stop all construction works.  Must make sure the safety of the site and equipment on site and cleanliness of site.  Remove all his men from site.  Vacate the site.  Must hand over the Government all plans, designs and any other documents related to the work.  Pay for any losses or damages.
  • 10. IMPACTS FROM CLAUSES CLAUSE 51.0 EVENTS AND CONSEQUENCES OF DEFAULT BY THE CONTRACTOR.  It gives clear view for contractor on his obligations towards the contract.  The contractor understand the consequences that he will face if he failed to follow the contract.  The contractor understands the requirements of the government.  There is mutual understanding between contractor and the government so that the flow of work is efficient and relevant.
  • 11. CLAUSE 53.0 TERMINATION ON CORRUPTION, UNLAWFUL OR ILLEGAL ACTIVITIES.  It prevent corruption during tender and construction period.  It make sure all the works are done according to law.  New contractors stand chance to win contract.  There is mutual understanding between contractor and the government so that the flow of work is efficient and relevant.
  • 12. GLOSSARY 1. Prejudice – Preconceived judgement or opinion about the client 2. Termination – The actions of bringing the contract or the construction to an end. 3. Obligations – A duty / commitment given to the contractor according to the clauses. 4. Provisions – Amount of statements provided in the clause. 5. Comply – To act according to the clauses. 6. Breach – A failure to do what is required by a clause. 7. Personnel – Employee or workmen of the contractor. 8. Render – To provide.