What are PMO tools?
ResourceSchedule
Financial
Time
Risk /
Issue
Commu-
nication
Project
Priority
Support management of:
3 of 59
Enabler #1 –
the blueprint
Processes:
4 of 59
Enabler #2 –
the fuel
Data:
5 of 59
Enabler #3 –
the drivers
People:
6 of 59
Govern DrivePower
Processes Data People
Tools
7 of 59
Why are PMO tools (& their
enablers) so important?
Help get the job
done!
with efficiency & accuracy
9 of 59
3. Inform 4. Decide
1. Know 2. Predict
Support PMO to:
10 of 59
What happens
the right PMO tools?
without
11 of 59
How do we end up with the
“not-so-right” tools?
1. Not the right fit
2. Dysfunctional
for the organization
enablers
13 of 59
1. Not the right fit
for the organization
Choices & Situations
Tool
Challenges
14 of 59
• Complicated
• Requires coordination
• Time intensive
• Not standardized
• Not published
2. Dysfunctional
enablers
Processes
15 of 59
Data
• Doesn’t exist
• Inaccurate
• Can’t be populated in the tool
• Sporadically located
• Can’t be easily updated
2. Dysfunctional
enablers
16 of 59
People
• Not well-trained
• Don’t have relevant PMO maturity
• Consider tool to be a “burden”
• Lack of support & incentives
• Individual “IP” can get the job done faster
2. Dysfunctional
enablers
17 of 59
How do we discover the “right”
tools for our PMO?
[1]
Know what you need
19 of 59
Definition
 Ability to perform specific task or obtain information
 How the task will be done
Illustration
 The ability to fly between two cities
 Airplane
Relevant Example
 Ability to estimate the number of projects that can be managed
based on existing resource ability
 Database with resource information
What is a business-capability?
20 of 59
[2]
Know what success
looks like
21 of 59
[3]
Know who is behind you
(and if you don’t have anyone, then get someone)
22 of 59
Guidance Support Ready!Awareness
23 of 59
Approach
(4) Tool
Implementation
(2) Requirements
Validation
(1) Requirements
Identification
(3) Tool
Identification
ResultActionIntent
25 of 59
• Current state
• Future state
• Gap analysis
(1) Requirements Identification:: Intent
RAI
26 of 59
• Liaise with key stakeholders
• Conduct analysis
• Determine business capabilities
• Understand success factors
(1) Requirements Identification:: Action
RAI
27 of 59
• Finalized prioritized requirements
• Metrics that gauge success
(1) Requirements Identification:: Result
RAI
28 of 59
Business capability
>> Ability to estimate the number of projects that can be
managed based on existing resource ability
Relevant requirement
>> System shall capture the resource requirements by project
by month
>> System shall capture the availability of resources by month
What is a business-capability
oriented requirement?
29 of 59
• Proof of Concept (POC)
• Pilot
(2) Requirements Validation:: Intent
RAI
30 of 59
• POC & pilot management
• Pilot results
• Requirements verification
• Business case preparation
(2) Requirements Validation:: Action
RAI
31 of 59
• Business case
(2) Requirements Validation:: Result
RAI
32 of 59
poc/pilottoolguidingforces pmo capability
requirements suitability
budget & time
easy
special
requirements
tool decision
(build or try – free or
limited trial)
1
2
3
4
5
6
33 of 59
Did the enablers fare well?
34 of 59
• Tool and/or vendor selection
(3) Tool Identification:: Intent
RAI
35 of 59
• Tool – Procure or Build?
• Procure or Build support –
External or internal?
• Roll-out support – External or
internal?
(3) Tool Identification:: Action
RAI
36 of 59
• Finalized tool
• Finalized partner(s) for build
and/or support
(3) Tool Identification:: Result
RAI
37 of 59
• Tool roll-out
(4) Tool Implementation:: Intent
RAI
38 of 59
• “Projectize”
– POC & pilot
– PMLC, SDLC & governance
– Change management
(4) Tool Implementation:: Action
RAI
39 of 59
• Implemented tool
• Enablers in sync
• Benefits realized
(4) Tool Implementation:: Result
RAI
40 of 59
Who is this for?
• Brand new PMOs
42 of 59
• Growing PMOs
43 of 59
• Mature PMOs
44 of 59
5 tips for a rewarding discovery
5
Think
big
smallStart
46 of 59
Engaged & vocal
executive sponsorship
47 of 59
Realistic
adoption
expectations
48 of 59
M
E
A
S
U
R
E
49 of 59
Interim solution
is
interim
50 of 59
Case Study
overview problem
solution result
• Ineffective resource
staffing on
initiatives due to
limited visibility on
resource capacity &
demand
• Platform for
resource
management
strategy
• Business case to
customize PPM tool
across the
organization
• Fortune 100 client
• Resource capacity &
demand planning
• Using current PPM
tool for time
management
• Exercised
requirements based
approach with POC
& pilot to uncover
and validate
comprehensive
future state
requirements
quick glance
52 of 59
• Lack of single view of resource
assignments, availability and skills
• Unable to create project
schedules with relevant resource
availability
• Inability to gauge resource
utilization
• Ad hoc decision making by
resource managers
• Restricted view of SME shortages,
resource conflicts and future
hiring needs
• Workforce flexibility
• Speed & accuracy of resource
staffing
• Better resource forecasting
• Broad view of resource
constraints
• Improved ability to meet business
needs through quicker and
relevant staffing
resource management challenges benefits
detailed challenges & benefits
53 of 59
thank you!
hussain@parwaazcc.com
www.parwaazcc.com
@parwaaz03 | @parwaazcc
presentation link: http://bit.ly/1HFDVz0
survey link: http://bit.ly/1EY3LJz
Appendix
Selective Tool Comparison – PMO Features
Product
Collaborative
IssueTracking
Scheduling
ProjectPortfolioMgmt
ResourceMgmt
DocumentMgmt
Workflow
Reporting
BudgetMgmt
TimeTracking
Invoicing
Asana Y U U U U U U U N N N
AtTask (now Workfront) Y Y Y Y Y Y Y Y Y Y N
Basecamp Y N N N Y Y N N N N N
Clarity Y Y Y Y Y U U Y Y Y Y
Clarizen Y Y Y Y Y Y Y Y Y Y N
Daptiv Y Y Y Y Y Y Y Y Y Y U
HP Project & Portfolio Software Y Y Y Y Y Y Y Y N N N
Huddle Y N N N N Y N N N N N
Innotas Y Y Y Y Y U U Y Y Y U
JIRA Y Y Y N N N Y Y N Y N
Mavenlink Y N Y Y Y Y N N Y Y Y
Microsoft Office Project Server Y Y Y Y Y Y Y Y Y Y N
Pivotal Tracker Y Y Y N N Y Y Y N N N
Planview Y Y Y Y Y U Y Y U Y U
Trello Y Y U U U N N U N N N
Wrike Y Y Y Y Y Y Y Y N Y N
Zoho Y Y Y N Y Y Y Y N Y Y
Y = Yes, N = No, U = Unknown (based on research conducted)
All products are web-based
Asana, AtTask, BaseCamp, Clarizen, Mavenlink, Pivotal Tracker, Trello, and Zoho offer SaaS-only service
Rest offer both host- and SaaS-based service
56 of 59
Selective Tool Comparison – Pricing
Product Pricing Visit Source for Latest Pricing Information
Asana
Free - 3 project cards and unlimited guests
$21/mo starting price for paid versions
https://asana.com/pricing
AtTask (now
Workfront)
Free - trial available
$30/user/mo starting price for paid versions
http://www.workfront.com/pricing/
Basecamp
Free - 60-day unlimited use trial
$20/mo starting price for paid versions
https://basecamp.com/start#prices
Clarity Contact Clarity for more information http://www.ca.com/ca/en/intellicenter/ca-ppm.aspx
Clarizen
Free - 30-day unlimited use trial
$29.95/user/mo starting price for paid
versions
http://www.clarizen.com/pricing/pricing-comparison.html
Daptiv Contact Daptiv for more information http://www.daptiv.com/products.htm
HP Project & Portfolio
Software
Contact HP for more information
http://www8.hp.com/ca/en/software-solutions/project-portfolio-
management-it-portfolio-management/
Huddle
Free - trial available
$20/user/mo starting price for paid versions
http://www.huddle.com/huddle-prices/
Innotas Contact Innotas for more information https://www.innotas.com/
JIRA
Free - 7-day trial
$10/mo starting price for paid versions
(cloud-based)
$10 starting price for paid versions (host-
based)
https://www.atlassian.com/software/jira/pricing/?tab=cloud
Mavenlink
Free - 10-day trial
$4/mo/user starting price for paid versions
https://www.mavenlink.com/pricing/project-management-software-
comparison
Microsoft Office
Project Server
Contact Microsoft for more information https://products.office.com/en-us/project/enterprise-project-server
Pivotal Tracker
Free - 30-day unlimited use trial
$15/mo starting price for paid versions
http://www.pivotaltracker.com/why-tracker/pricing
Planview Contact Planview for more information https://www.planview.com
Trello
Free - version available
$5/mo starting price for paid versions
https://trello.com/gold
Wrike
Free - 5 users for basic task management
$49/mo starting price for paid versions
https://www.wrike.com/price/?utm_expid=75732941-36.VXdXq7-vQ-
esyVLgEUwGiQ.0&utm_referrer=https%3A%2F%2Fwww.wrike.com%2Ftour
%2F
Zoho
Free - 1 project at 10GB
$20/mo starting price for paid versions
https://www.zoho.com/projects/zohoprojects-pricing.html
Selective Tool Comparison – Sources
Wikipedia: http://en.wikipedia.org/wiki/Comparison_of_project_management_software#Monetary_features
Asana: https://asana.com/product
CA: http://www.ca.com/ca/en/intellicenter/ca-ppm/resources.aspx
Daptiv: http://www.daptiv.com/products.htm
Planview: https://www.planview.com/products/platform/
58 of 59
Tool Research - Gartner Magic Quadrants
Magic Quadrant for Cloud-
Based IT PPM Services
Magic Quadrant for Integrated IT
Portfolio Analysis Applications
59 of 59
1 of 59

More Related Content

What's hot(20)

PMO FrameworksPMO Frameworks
PMO Frameworks
Michael Kaplan21.6K views
Project Management PlaybookProject Management Playbook
Project Management Playbook
Demand Metric15K views
Project Management FrameworkProject Management Framework
Project Management Framework
Wadhwani Foundation9.5K views
Project risk managementProject risk management
Project risk management
Er Swati Nagal3K views
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
Business Beam4.2K views
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
Abdelrahman Elsheikh PMOC,PMP,CBAP,RMP,ACP,SP,MCITP,ITIL4.5K views
PMO-FrameworkPMO-Framework
PMO-Framework
Rahmat Hashim, PMP8.5K views
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
Slav Karaslavov7.6K views
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
Dilawar Abbas7.4K views
Having a PMO with agile flavorHaving a PMO with agile flavor
Having a PMO with agile flavor
Imad Alsadeq2.2K views
Pmp communication chapter 10Pmp communication chapter 10
Pmp communication chapter 10
Ahmed Elshaboury,PMP,LEED GA 2.8K views
PMO Setup with Microsoft Project OnlinePMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project Online
Gonzague PATINIER1.2K views
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
Hussain Bandukwala115.7K views
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
OxfordCambridge931 views
Project Management Professional (PMP) Project Management Professional (PMP)
Project Management Professional (PMP)
Ahmad Maharma, PMP,RMP13.2K views
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
Hisham Haridy MBA, PMP®, RMP®, SP®11.1K views

Similar to Discover the right tools for your Project Management Office (PMO)

PM Tool MeetupPM Tool Meetup
PM Tool MeetupPaul McCormack
81 views36 slides
Pm Tool MeetupPm Tool Meetup
Pm Tool MeetupAmbition Group
99 views36 slides
PM Tool MeetupPM Tool Meetup
PM Tool MeetupAmbition Group
386 views36 slides
PM Tool MeetupPM Tool Meetup
PM Tool MeetupPaul McCormack
278 views36 slides

Similar to Discover the right tools for your Project Management Office (PMO)(20)

Discover the right tools for your Project Management Office (PMO)

  • 1. Discover the right tools for your Project Management Office (PMO) Hussain Bandukwala Mar 2015
  • 2. What are PMO tools?
  • 4. Enabler #1 – the blueprint Processes: 4 of 59
  • 5. Enabler #2 – the fuel Data: 5 of 59
  • 6. Enabler #3 – the drivers People: 6 of 59
  • 7. Govern DrivePower Processes Data People Tools 7 of 59
  • 8. Why are PMO tools (& their enablers) so important?
  • 9. Help get the job done! with efficiency & accuracy 9 of 59
  • 10. 3. Inform 4. Decide 1. Know 2. Predict Support PMO to: 10 of 59
  • 11. What happens the right PMO tools? without 11 of 59
  • 12. How do we end up with the “not-so-right” tools?
  • 13. 1. Not the right fit 2. Dysfunctional for the organization enablers 13 of 59
  • 14. 1. Not the right fit for the organization Choices & Situations Tool Challenges 14 of 59
  • 15. • Complicated • Requires coordination • Time intensive • Not standardized • Not published 2. Dysfunctional enablers Processes 15 of 59
  • 16. Data • Doesn’t exist • Inaccurate • Can’t be populated in the tool • Sporadically located • Can’t be easily updated 2. Dysfunctional enablers 16 of 59
  • 17. People • Not well-trained • Don’t have relevant PMO maturity • Consider tool to be a “burden” • Lack of support & incentives • Individual “IP” can get the job done faster 2. Dysfunctional enablers 17 of 59
  • 18. How do we discover the “right” tools for our PMO?
  • 19. [1] Know what you need 19 of 59
  • 20. Definition  Ability to perform specific task or obtain information  How the task will be done Illustration  The ability to fly between two cities  Airplane Relevant Example  Ability to estimate the number of projects that can be managed based on existing resource ability  Database with resource information What is a business-capability? 20 of 59
  • 22. [3] Know who is behind you (and if you don’t have anyone, then get someone) 22 of 59
  • 25. (4) Tool Implementation (2) Requirements Validation (1) Requirements Identification (3) Tool Identification ResultActionIntent 25 of 59
  • 26. • Current state • Future state • Gap analysis (1) Requirements Identification:: Intent RAI 26 of 59
  • 27. • Liaise with key stakeholders • Conduct analysis • Determine business capabilities • Understand success factors (1) Requirements Identification:: Action RAI 27 of 59
  • 28. • Finalized prioritized requirements • Metrics that gauge success (1) Requirements Identification:: Result RAI 28 of 59
  • 29. Business capability >> Ability to estimate the number of projects that can be managed based on existing resource ability Relevant requirement >> System shall capture the resource requirements by project by month >> System shall capture the availability of resources by month What is a business-capability oriented requirement? 29 of 59
  • 30. • Proof of Concept (POC) • Pilot (2) Requirements Validation:: Intent RAI 30 of 59
  • 31. • POC & pilot management • Pilot results • Requirements verification • Business case preparation (2) Requirements Validation:: Action RAI 31 of 59
  • 32. • Business case (2) Requirements Validation:: Result RAI 32 of 59
  • 33. poc/pilottoolguidingforces pmo capability requirements suitability budget & time easy special requirements tool decision (build or try – free or limited trial) 1 2 3 4 5 6 33 of 59
  • 34. Did the enablers fare well? 34 of 59
  • 35. • Tool and/or vendor selection (3) Tool Identification:: Intent RAI 35 of 59
  • 36. • Tool – Procure or Build? • Procure or Build support – External or internal? • Roll-out support – External or internal? (3) Tool Identification:: Action RAI 36 of 59
  • 37. • Finalized tool • Finalized partner(s) for build and/or support (3) Tool Identification:: Result RAI 37 of 59
  • 38. • Tool roll-out (4) Tool Implementation:: Intent RAI 38 of 59
  • 39. • “Projectize” – POC & pilot – PMLC, SDLC & governance – Change management (4) Tool Implementation:: Action RAI 39 of 59
  • 40. • Implemented tool • Enablers in sync • Benefits realized (4) Tool Implementation:: Result RAI 40 of 59
  • 41. Who is this for?
  • 42. • Brand new PMOs 42 of 59
  • 45. 5 tips for a rewarding discovery 5
  • 47. Engaged & vocal executive sponsorship 47 of 59
  • 52. overview problem solution result • Ineffective resource staffing on initiatives due to limited visibility on resource capacity & demand • Platform for resource management strategy • Business case to customize PPM tool across the organization • Fortune 100 client • Resource capacity & demand planning • Using current PPM tool for time management • Exercised requirements based approach with POC & pilot to uncover and validate comprehensive future state requirements quick glance 52 of 59
  • 53. • Lack of single view of resource assignments, availability and skills • Unable to create project schedules with relevant resource availability • Inability to gauge resource utilization • Ad hoc decision making by resource managers • Restricted view of SME shortages, resource conflicts and future hiring needs • Workforce flexibility • Speed & accuracy of resource staffing • Better resource forecasting • Broad view of resource constraints • Improved ability to meet business needs through quicker and relevant staffing resource management challenges benefits detailed challenges & benefits 53 of 59
  • 54. thank you! hussain@parwaazcc.com www.parwaazcc.com @parwaaz03 | @parwaazcc presentation link: http://bit.ly/1HFDVz0 survey link: http://bit.ly/1EY3LJz
  • 56. Selective Tool Comparison – PMO Features Product Collaborative IssueTracking Scheduling ProjectPortfolioMgmt ResourceMgmt DocumentMgmt Workflow Reporting BudgetMgmt TimeTracking Invoicing Asana Y U U U U U U U N N N AtTask (now Workfront) Y Y Y Y Y Y Y Y Y Y N Basecamp Y N N N Y Y N N N N N Clarity Y Y Y Y Y U U Y Y Y Y Clarizen Y Y Y Y Y Y Y Y Y Y N Daptiv Y Y Y Y Y Y Y Y Y Y U HP Project & Portfolio Software Y Y Y Y Y Y Y Y N N N Huddle Y N N N N Y N N N N N Innotas Y Y Y Y Y U U Y Y Y U JIRA Y Y Y N N N Y Y N Y N Mavenlink Y N Y Y Y Y N N Y Y Y Microsoft Office Project Server Y Y Y Y Y Y Y Y Y Y N Pivotal Tracker Y Y Y N N Y Y Y N N N Planview Y Y Y Y Y U Y Y U Y U Trello Y Y U U U N N U N N N Wrike Y Y Y Y Y Y Y Y N Y N Zoho Y Y Y N Y Y Y Y N Y Y Y = Yes, N = No, U = Unknown (based on research conducted) All products are web-based Asana, AtTask, BaseCamp, Clarizen, Mavenlink, Pivotal Tracker, Trello, and Zoho offer SaaS-only service Rest offer both host- and SaaS-based service 56 of 59
  • 57. Selective Tool Comparison – Pricing Product Pricing Visit Source for Latest Pricing Information Asana Free - 3 project cards and unlimited guests $21/mo starting price for paid versions https://asana.com/pricing AtTask (now Workfront) Free - trial available $30/user/mo starting price for paid versions http://www.workfront.com/pricing/ Basecamp Free - 60-day unlimited use trial $20/mo starting price for paid versions https://basecamp.com/start#prices Clarity Contact Clarity for more information http://www.ca.com/ca/en/intellicenter/ca-ppm.aspx Clarizen Free - 30-day unlimited use trial $29.95/user/mo starting price for paid versions http://www.clarizen.com/pricing/pricing-comparison.html Daptiv Contact Daptiv for more information http://www.daptiv.com/products.htm HP Project & Portfolio Software Contact HP for more information http://www8.hp.com/ca/en/software-solutions/project-portfolio- management-it-portfolio-management/ Huddle Free - trial available $20/user/mo starting price for paid versions http://www.huddle.com/huddle-prices/ Innotas Contact Innotas for more information https://www.innotas.com/ JIRA Free - 7-day trial $10/mo starting price for paid versions (cloud-based) $10 starting price for paid versions (host- based) https://www.atlassian.com/software/jira/pricing/?tab=cloud Mavenlink Free - 10-day trial $4/mo/user starting price for paid versions https://www.mavenlink.com/pricing/project-management-software- comparison Microsoft Office Project Server Contact Microsoft for more information https://products.office.com/en-us/project/enterprise-project-server Pivotal Tracker Free - 30-day unlimited use trial $15/mo starting price for paid versions http://www.pivotaltracker.com/why-tracker/pricing Planview Contact Planview for more information https://www.planview.com Trello Free - version available $5/mo starting price for paid versions https://trello.com/gold Wrike Free - 5 users for basic task management $49/mo starting price for paid versions https://www.wrike.com/price/?utm_expid=75732941-36.VXdXq7-vQ- esyVLgEUwGiQ.0&utm_referrer=https%3A%2F%2Fwww.wrike.com%2Ftour %2F Zoho Free - 1 project at 10GB $20/mo starting price for paid versions https://www.zoho.com/projects/zohoprojects-pricing.html
  • 58. Selective Tool Comparison – Sources Wikipedia: http://en.wikipedia.org/wiki/Comparison_of_project_management_software#Monetary_features Asana: https://asana.com/product CA: http://www.ca.com/ca/en/intellicenter/ca-ppm/resources.aspx Daptiv: http://www.daptiv.com/products.htm Planview: https://www.planview.com/products/platform/ 58 of 59
  • 59. Tool Research - Gartner Magic Quadrants Magic Quadrant for Cloud- Based IT PPM Services Magic Quadrant for Integrated IT Portfolio Analysis Applications 59 of 59