  1. 1. VISION SEVEN HILLS CONFERENCE CENTER, SFSU - SEPTEMBER 14, 2022 2022 RESIDENT MEETING
  2. 2. TONIGHT’S TOPICS 1. Parkmerced Vision Overview 2. Mobility 3. Resident Protections 4. Phases 1A, 1B, 1C & 1D 5. Community Updates 6. Q&A
  3. 3. PARKMERCED VISION OVERVIEW
  4. 4. Parkmerced Today Constructed c. 1940-1952 152 Acres 3,221 Apartments
  5. 5. 10 Min. Walk 4 Min. Walk Neighborhood Retail / Amenities Grocery Store Daycare and K-5 Community Center Neighborhood Commons Community Amenities
  6. 6. St. Thomas More Social Heart 18 Acre Park Walking Paths SFSU Juan Bautista Circle Meadow Neighborhood Common (1 of 7 to be provided) 8900 310K 68 ac Parkmerced Vision Plan (Adopted 2011) Street Improvements School Community Center with Athletic Fields
  7. 7. MOBILITY TRANSPORTATION DEMAND MANAGEMENT
  8. 8. Muni Improvements Resident Shuttle Car Share Bike Share Transportation Coordinator Keeping You Moving
  9. 9. To Daly City BART & Westlake HIGUERA GARAGE 355 Serrano Garces at Grijalva JBC Leasing Center 125 CAMBON 100 FONT 55 CHUMASERO Monday-Friday 6:30AM-10PM Weekends 9AM-10PM Frequency every 10 Minutes Anticipated Launch with Construction Start of Phase 1A & 1B Gonzalez at Josepha Phase 1A/1B: Resident Shuttle and Bike Share
  10. 10. 1.5 to 1 0.5 to 1 Overall Parking Ratio up to 1 to 1 Off-Street Parking Strategy
  11. 11. RESIDENT PROTECTIONS
  12. 12. Replacement Units Parkmerced is providing a one-for-one replacement of any existing garden apartment to be demolished and prior to demolition: - In brand new construction with at least the same bedroom & bathroom count and of similar floor & storage areas, which based on average unit sizes - Upgrades - each Replacement Unit will have a dishwasher, washer and dryer - New homes will be a more efficient and comfortable, including improved accessibility - Same lease terms and rent, except for location/address changes - Same parking rights & parking rent - Moving expenses covered, including packing - No capital pass-throughs for new construction This one-time relocation will be done as a block—so neighbors can stay neighbors.
  13. 13. At Time of Relocation - All Townhome Residents Long-Term Existing Residents prior to July 9, 2001 OPTION A Brand New Replacement Apartment OPTION B Relocation Payment Benefits OPTION C Interim Replacement Apartment Relocation Options
  14. 14. Juan Bautista Circle Leasing SFSU Interim Replacement (E) 37E (E) 36 (E) 29 LAKE MERCED BLVD BROTHERHOOD WAY N I N E T E E N T H A V E N U E J U N I P E R O S E R R A B L V D FONT BLVD VIDAL DR ACEVEDO AVE HIGUERA AVE ARBALLO DR G O NZALEZ DR SERRANO DR PINTO AVE C H U M A S E R O D R C R E S P I D R GARCES DR 300 Arballo 199 Vidal V I D A L D R RIVAS DR B U C A R E L I D R Phases 1A and 1B Relocation Map 99 Higuera
  15. 15. Existing Tenant Notice Replacement Apartment Availability Notice Building Tour Selection of Replacement Apartment Relocation Notice Moving Services +/-6 Months Prior to Construction Completion Month 0-2 from Start of Construction REPLACEMENT BUILDING CONSTRUCTION START CONSTRUCTION END 2 Months Prior to Relocation Moving Process Selection Process 1-2 Months for Relocation
  16. 16. Q4 2022 Design Review Approvals for Phases 1C and 1D Buildings Q1 2023 Final Subdivision Map Approvals Phases 1C and 1D Q3/Q4 2023 Initial Resident/BART Shuttle and Bike Share Launch Q3/Q4 2023 Anticipated Construction Start for Street Improvements for Phases 1A and 1B Q4 2023 Existing Tenant Notices to First 56 To Be Replaced Apartments Q4 2023 Anticipated Construction Start for Blocks 1 (Replacement Buildings) and Block 6 Q4 2023 Anticipated Construction Start for Block 20 Q2 2024 Anticipated Construction Start for Block 22 Anticipated Look Ahead (dates subject to change) Look Ahead
  17. 17. L A K E M E R C E D B L V D BROTHERHOOD WY NINETEENTH AVE JUNIPERO SERRA BLVD SFSU FONT BLVD FONT BOULEVARD CHUMASERO DR V I D A L D R HIGUERA AVE ACEVEDO AVE A R B A L L O D R SERRANO DR GONZALEZ DR B1 B6 B2O B22 RESIDENT NEWSLETTER MARCH 2015 Pulse Resident Newsletter | Fall 2015 Pulse Resident Newsletter | Winter 2015/2016 Project Website e-mail Resident Newsletters Information Boards Job Site Entry 415.405.4666 info@parkmercedvision.com parkmercedvision.com Communication COMMUNICATION
  18. 18. PHASES 1A ,1B, 1C and 1D Building Designs, Community and Street Improvements
  19. 19. Phase 1A, 1B, 1C, and 1D Map
  20. 20. PHASE 1A 4 BUILDINGS - 401 HOMES: - 56 REPLACEMENT HOMES - 20 BELOW-MARKET HOMES - 325 NEW HOMES - AND OVER $13 MILLION COMMITTED TO THE CONSTRUCTION OF AFFORDABLE HOUSING IN SAN FRANCISCO OPEN SPACE – STREETS - INFRASTRUCTURE 300 Arballo 199 Vidal 455 Serrano/850 Gonzalez BROTHERHOOD WAY L A K E M E R C E D B L V D
  21. 21. Community Gardens Car & Bike Share Children’s Play Area Landmark Tree Reconfigured Driveway 199 VIDAL 300 ARBALLO Landscaping 3 1 0 A R B A L L O 3 5 0 A R B A L L O New Intersection VIDAL ACEVEDO ARBALLO Block 1 Community Open Space and Amenities Dedicated Drop Off Zone Parking LAKE MERCED BLVD
  22. 22. 199 Vidal 64 Homes (40 Replacement Homes)
  23. 23. Fitness Center Courtyard Resident Lounge 199 Vidal Building Amenities Fire Pit Outdoor Lounge
  24. 24. 300 Arballo 89 Homes (16 Replacement Homes) Resident Lounge and Terrace Play Structure Rooftop Deck Fitness Center
  25. 25. 455 Serrano/850 Gonzalez 248 Homes, 419 Parking Spaces
  26. 26. Community Garden Community Garden Walking Path Open Space Play Area Block 06 Community Open Space and Amenities 405 Serrano 455 SERRANO 810 Gonzalez 850 GONZALEZ
  27. 27. PHASE 1B 1208/1218 J. SERRA 95/99 CHUMASERO BROTHERHOOD WAY NINETEENTH AVE J. SERRA/SR-1 4 BUILDINGS - 612 HOMES: - 28 BELOW-MARKET HOMES - 584 NEW HOMES - AND OVER $24 MILLION COMMITTED TO THE CONSTRUCTION OF AFFORDABLE HOUSING IN SAN FRANCISCO OPEN SPACE – STREETS - INFRASTRUCTURE
  28. 28. 125 CAMBON 150 FO N T 100 FO N T Community Gardens Community Green Play Structure Tree Farm Chumasero/ J. Serra Car Share F O N T CAMBON J. SERRA Bike Share Block 20 Community Open Space and Amenities 1208 – 1218 J SERRA BLVD
  29. 29. 1208/1218 Junipero Serra 299 Homes, 353 Parking Spaces
  30. 30. 50 CHUMASERO 55 CHUMASERO Dog Park Open Space Neighborhood Commons Fire Pit Bike Share Car Share J. SERRA CHUMASERO B R O T H E R H O O D Block 22 Community Open Space and Amenities Fire Pit/BBQ 95 CHUMASERO 99 CHUMASERO
  31. 31. 95-99 Chumasero 313 Homes, 266 Parking Spaces
  32. 32. PHASE 1C 99 Higuera 600 Arballo BROTHERHOOD WAY L A K E M E R C E D B L V D 2 BUILDINGS - 425 HOMES: - 166 REPLACEMENT HOMES - 259 NEW HOMES - BMR – TBD in process OPEN SPACE – STREETS - INFRASTRUCTURE
  33. 33. Courtyard Courtyard Courtyard Paseo Paseo Car Share Alley Way Block 03W Community Open Space and Amenities 99 HIGUERA
  34. 34. 99 Higuera 274 Homes, 166 Replacement Homes, 489 Parking Spaces
  35. 35. Courtyard Block 04 Community Open Space Courtyard 600 ARBALLO
  36. 36. 600 Arballo 151 Homes
  37. 37. PHASE 1D 1 BUILDING - 471 NEW HOMES - BMR – TBD in process OPEN SPACE – STREETS - INFRASTRUCTURE 101 Font BROTHERHOOD WAY NINETEENTH AVE J. SERRA/SR-1
  38. 38. N Maximus PM Phase 1D Owner LLC One Maritime Plaza, Suite 1900 San Francisco, California 94111 TEL: 415.584.4832 Client Key Plan Project No. Scale Issue Date: Kohn Pedersen Fox Associates PC Architects & Planning Consultants 11 West 42nd Street New York, New York 10036 TEL: 212.977.6500 FAX: 212.956.2526 Architect Magnusson Klemencic Associates 1301 Fifth Avenue, Suite 3200 Seattle, Washington 98101 TEL: 206.292.1200 FAX: 206.292.1201 Structural Engineer Revision Drawing Title Seal & Signature Interface Engineering 135 Main Street, Suite 400 San Francisco, California 94105 TEL: 415.489.7240 Mechanical, Electrical, Plumbing Bionic 833 Market Street, Suite 601 San Francisco, California 94103 TEL: 415.206.0648 Landscape Architect PROGRESS SET NOT FOR CONSTRUCTION odesk Docs://2015 - Parkmerced/3066-A-KPF-Parkmerced-TOWER.rvt VER SHEET SAN FRANCISCO 08/31/22 3066 No. Description Date L.S-0.03 ILLUSTRATIVE 1 SCALE: 1"=20'-0" ILLUSTRATIVE SITE PLAN PLAN Neighborhood Common Courtyard Courtyard Bike Share Car Share Block 21S Community Open Space and Amenities 101 FONT
  39. 39. 101 Font 471 Homes, 153 Parking Spaces
  40. 40. COMMUNITY UPDATES
  41. 41. First Saturday of each month 11AM – 3PM in Juan Bautista Circle Parkmerced Block Party
  42. 42. Parkmerced Mural Project
  43. 43. Parkmerced Soccer Stars
  44. 44. Parkmerced Senior Programs • Qi Gong • Mahjong • Senior Social Hour • Dance and fitness classes
  45. 45. Resident Services residentservices@parkmerced.com 415.405.4690 ext. 3 Office Hours: Mon-Sat 9am-6pm Maintenance Department maintenance@parkmerced.com 415.405.4690 ext. 2 Office Hours: Mon-Fri 8am-7pm Sat-Sun 9am-5pm
  46. 46. www.parkmerced.com/residents
  47. 47. Q&A
  48. 48. Contact Us! 415.405.4666 info@parkmercedvision.com parkmercedvision.com THANK YOU!

×