Process engineering of chemical plant

8,514 views

Published on

Published in: Education

Process engineering of chemical plant

  1. 1. Process Engineering of Chemical Plant Koncept Learning Center klcenter@gmail.com
  2. 2. Block Diagram Process Engineering ‘G’ ‘B’ ‘W’ Reaction Filtration Drying Wet ‘A’ Filtrate Cake Cooling Distillation ‘w’ Koncept Learning Center klcenter@gmail.com ‘P’
  3. 3. Flow Sheet Process Engineering Vent To Atmosphere Solvent From Storage M 05C001 03T001 CWR Reactant ‘B’ From Bulk Storage Reactant ‘A’ From Bulk Storage Waste To ETP CWS 03R001A/B/C/D Recovered ‘A’ From Recovery Slurry To Filter 01T001 01P001A/B 02T001 02P001A/B 04T001 Koncept Learning Center klcenter@gmail.com 04P001A/B
  4. 4. Equipment List Process Engineering Client Plant Capacity S. No. 1 2 3 4 5 Ton No. Equipment List Technical Specifications Equipment Name Doc.No. Project No. Qty. Op. Sb. M.O.C. Scope 1 - SS-304 K 0 4 - SS-304 K 0 SS-316 K 0 SS-304 C 0 SS-316 K 0 Type Capacity : Cyl./Vert., Flat Bottom/ TopTank : 40 m3 (Gross) Type Capacity : Cyl./Vert., Dished Bottom/Top Jacketed Vessel : 50 m3 (Gross) Agitator for Reactor Type Speed : Propeller, Top Mounted : 150 RPM 4 - 04T001 Product Slurry Storage Tank Type Capacity : Cyl./Vert., Flat Bottom, Conical Top Tank : 40 m3 (Gross) 1 - 04P001 A/B Product Slurry Pump Type Capacity : Horizontal/ Centrifugal Pump : 10 m3/hr 1 1 03T001 Reactant ‘A’ Overhead Tank 03R001 A/B/C/D Reactor 03R001 N01 A/B/C/D Koncept Learning Center klcenter@gmail.com Remarks Rev.
  5. 5. Process Water PID-8 PW Code No. Description 03T001 Reactant ‘A’ Overhead Tank 03R001A Reactor 03R001AN01 Agitator for Reactor 03R001A 40-PW-12-15-XP1 From 08P002A/B 50NB N8 N1 50NB N5 N4 Reactant ‘A’ 100-FA-03-09XA1 N6 PID-1 50NB LSH 0301 03T001 LAH 0301 LT 0301 LI 0301 80NB N7 N2 N3 25NB Drain 25NB Drain FAH 0301 FIC 0301 FAL 0301 CR50X40 FT 0301 I 03.2 80-FA-01-12XA1 XV 0302 XV 0301 EL + 6.300M Reactant ‘A’ PID-1 CR50X25 From 01P001A/B Reactant ‘B’ PID-2 CR50X25 FB 80-FA-03-01XA1 50-FB-02-21XB1 25NB Drain 25NB Drain 50-FB-03-06XB1 25NB Drain 50-FA-03-03XA1 PID-9 FG Cooling Water 50-CW-03-07XC1 PID-7 CW To 07U001 TSHH 0301 FA Notes: 1) 2) 3) Waste Gases 100-FG-03-10XG1 M N7 N1 N2 FCV 0301 FA To 05C001 FY 0301 I 03.3 PID-4 To 03R001B/C/D CR50X40 I 03.1 Reactant ‘A’ 50-FA-03-02XA1 25-PW-03-08-XP1 LAL 0301 50-FA-03-05-XA1 EL +19.300M 50-FA-03-04-XA1 I 03.1 FA To 01T001 25-FA-03-12XA1 P&ID Process Engineering N6 I 03.2 N4 N5 CR80X50 TE 0302 N9 TAH 0301 TI 0301 50NB15NB Vent CR80X50 TE 0301 LSH 0302 03R001A TAL 0301 N10 I 03.3 LAH 0302 TW1 80NB From 02P001A/B Cooling Water 50-CW-10-17-XC1 PID-7 CW TI 0302 03R001AN01 N3 From 07P001A/B N8 25NB Drain LT 0302 LI 0302 LAL 0302 100-FP-03-11-FP1 Product Slurry PID-4 FP 25NB R Description Drn Chkd Appd Dt. Client : M/s ABC Co. Plant : 30 TPD of Product ‘P’ Location : Pune (Maharashtra) P & I Drawing For Reaction System PROJECT Hose Koncept Learning Center klcenter@gmail.com DRAWING NUMBER Rev. No. 05001 PID – 05001 – 01 - 101 0 To 04T001
  6. 6. PN 16 11 10 Mumbai-Delhi NH-8 Plot Plan Process Engineering 9 4 7 6 3 5 12 Main Gate 13 X X X X X X X X X 14 8 15 X X X X 2 X X X X X 1 X X X X X X X X X X Scale- 1:100 Koncept Learning Center klcenter@gmail.com AN
  7. 7. 8m 8m 8m 14 6m 3m 03R001B 03R001A 03R001C 4m 15 6m Floor Plan Process Engineering 03R001D 16 G E F +6.3M Koncept Learning Center klcenter@gmail.com D
  8. 8. Elevation Process Engineering +19.3M +12.3M +6.3M 03T001 05C001 03R001A/B/C 03R001D 04T001 +0.3M 04P001A/B Koncept Learning Center klcenter@gmail.com
  9. 9. Process Data Sheet Process Engineering Koncept Learning Center klcenter@gmail.com
  10. 10. Process Engineering of Chemical Plant For Training Workshop Write us at : klcenter@gmail.com Koncept Learning Center klcenter@gmail.com

×